PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
SUMMARY
ELEMENT DESCRIPTION UNIT BLOCK A BLOCK B BLOCK C BLOCK D BLOCK E BLOCK F 单位
- - - - - - A CIVIL & STRUCTURAL WORK - - - - - -
Piling - - - - - - Building work - - - - - -
M2 644 653 653 448 661 690 - - - - - - - - - - - -
B ARCHITECTURE WORK - - - - - - - - - - - -
1 ROOF & ROOF FINISHES - - - - - - M2 276 351 351 351 247 224 NO 6 8 8 8 6 6 NO 6 8 8 8 6 6
- - - - - - 2 M2 1,358 1,477 1,477 1,022 1,595 2,030
- - - - - - 3 M2 4,105 4,396 4,396 3,027 4,687 5,753
- - - - - - 4 M2 5,347 5,541 5,541 3,780 5,733 6,618
- - - - - - 5 M2 1,889 1,980 1,980 1,355 2,070 2,302
- - - - - - 6 M2 771 777 777 521 781 804
- - - - - - 7 NO 98 104 104 74 110 118
- - - - - - 8 NO 54 56 56 38 58 66
- - - - - - 9 NO 54 56 56 38 58 66
- - - - - - 10 M2 390 437 437 307 483 665
- - - - - - 11 MS RAILING - - - - - -
M 36 60 60 60 48 72
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES) 排屋
Waterproofing (防水)
Roof Covering (屋顶覆盖)Aluminium Sun Shade (Master Bedroom) (遮阳帘)Glass Cover (玻璃盖)
BRICKWALL (砖墙)
PLASTERING (抹灰)
PAINTING (油漆)
TILING (瓷砖)
PLASTER CEILING (天花板)
ALUMINIUM WINDOWS & DOORS (玻璃窗和门 )
TIMBER DOOR (木门)
IRONMONGERY (门锁)
TIMBER FLOORING (木地板)
Staircase railing (楼梯栏杆)
Page 2
M 51 81 81 81 64 90 - - - - - -
12 NO 96 110 110 78 124 180 - - - - - - - - - - - -
C - - - - - - - - - - - -
D - - - - - - - - - - - -
E EXTERNAL WORK - - - - - - Access Slab M2 74 75 75 51 74 74 Access Ramp - - - - - - Fencing & Gate M 166 166 166 128 166 166
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Balcony railing (阳台的栏杆)
SANITARY INSTALLATIONS (卫生级管件)
ELECTRICAL WORK (电气工作)
MECHANICAL WORK (水暖工作)
Page 3
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
SUMMARY
ELEMENT DESCRIPTION UNIT
单位
A CIVIL & STRUCTURAL WORKPilingBuilding work
M2
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES M2NONO
2 M2
3 M2
4 M2
5 M2
6 M2
7 NO
8 NO
9 NO
10 M2
11 MS RAILINGM
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES) 排屋
Waterproofing (防水)
Roof Covering (屋顶覆盖)Aluminium Sun Shade (Master Bedroom) (遮阳帘)Glass Cover (玻璃盖)
BRICKWALL (砖墙)
PLASTERING (抹灰)
PAINTING (油漆)
TILING (瓷砖)
PLASTER CEILING (天花板)
ALUMINIUM WINDOWS & DOORS (玻璃窗和门 )
TIMBER DOOR (木门)
IRONMONGERY (门锁)
TIMBER FLOORING (木地板)
Staircase railing (楼梯栏杆)
BLOCK G BLOCK H BLOCK I BLOCK J BLOCK K
- - - - - - - - - - - - - - - - - - - - 800 448 550 448 448 - - - - - - - - - - - - - - - - - - - - - - - - - 224 179 179 179 179 6 4 4 4 4 6 4 4 4 4 - - - - - 2,366 1,022 1,250 1,022 1,022 - - - - - 6,704 3,027 3,711 3,027 3,027 - - - - - 7,719 3,780 4,661 3,780 3,780 - - - - - 2,673 1,355 1,668 1,355 1,355 - - - - - 938 521 649 521 521 - - - - - 135 74 89 74 74 - - - - - 77 38 47 38 38 - - - - - 77 38 47 38 38 - - - - - 776 307 372 307 307 - - - - - - - - - - 72 36 36 36 36
Page 4
M
12 NO
C
D
E EXTERNAL WORKAccess Slab M2Access RampFencing & Gate M
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Balcony railing (阳台的栏杆)
SANITARY INSTALLATIONS (卫生级管件)
ELECTRICAL WORK (电气工作)
MECHANICAL WORK (水暖工作)
90 47 47 47 47 - - - - - 210 78 94 78 78 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 86 51 63 51 51 - - - - - 185 128 147 128 128 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Page 5
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
SUMMARY
ELEMENT DESCRIPTION UNIT
单位
A CIVIL & STRUCTURAL WORKPilingBuilding work
M2
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES M2NONO
2 M2
3 M2
4 M2
5 M2
6 M2
7 NO
8 NO
9 NO
10 M2
11 MS RAILINGM
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES) 排屋
Waterproofing (防水)
Roof Covering (屋顶覆盖)Aluminium Sun Shade (Master Bedroom) (遮阳帘)Glass Cover (玻璃盖)
BRICKWALL (砖墙)
PLASTERING (抹灰)
PAINTING (油漆)
TILING (瓷砖)
PLASTER CEILING (天花板)
ALUMINIUM WINDOWS & DOORS (玻璃窗和门 )
TIMBER DOOR (木门)
IRONMONGERY (门锁)
TIMBER FLOORING (木地板)
Staircase railing (楼梯栏杆)
BLOCK L
- - - - 661 - - - - - 247 6 6 - 1,595 - 4,687 - 5,733 - 2,070 - 781 - 110 - 58 - 58 - 483 - - 48
Page 6
M
12 NO
C
D
E EXTERNAL WORKAccess Slab M2Access RampFencing & Gate M
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Balcony railing (阳台的栏杆)
SANITARY INSTALLATIONS (卫生级管件)
ELECTRICAL WORK (电气工作)
MECHANICAL WORK (水暖工作)
64 - 124 - - - - - - - 74 - 166 - - - - - - - - -
Page 7
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
SUMMARY
ELEMENT DESCRIPTION UNIT
单位
A CIVIL & STRUCTURAL WORKPilingBuilding work
M2
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES M2NONO
2 M2
3 M2
4 M2
5 M2
6 M2
7 NO
8 NO
9 NO
10 M2
11 MS RAILINGM
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES) 排屋
Waterproofing (防水)
Roof Covering (屋顶覆盖)Aluminium Sun Shade (Master Bedroom) (遮阳帘)Glass Cover (玻璃盖)
BRICKWALL (砖墙)
PLASTERING (抹灰)
PAINTING (油漆)
TILING (瓷砖)
PLASTER CEILING (天花板)
ALUMINIUM WINDOWS & DOORS (玻璃窗和门 )
TIMBER DOOR (木门)
IRONMONGERY (门锁)
TIMBER FLOORING (木地板)
Staircase railing (楼梯栏杆)
BLOCK M BLOCK N BLOCK O BLOCK P BLOCK Q BLOCK R
- - - - - - - - - - - - - - - - - - - - - - - - 470 470 866 448 644 448 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 224 224 247 179 104 179 6 6 6 4 2 4 6 6 6 4 2 4 - - - - - - 1,358 1,358 2,050 1,022 1,358 1,022 - - - - - - 3,851 3,851 6,056 3,027 4,105 3,027 - - - - - - 4,415 4,415 7,494 3,780 5,347 3,780 - - - - - - 1,561 1,561 2,695 1,355 1,889 1,355 - - - - - - 537 537 1,037 521 771 521 - - - - - - 84 84 140 74 98 74 - - - - - - 44 44 76 38 54 38 - - - - - - 44 44 76 38 54 38 - - - - - - 444 444 612 307 390 307 - - - - - - - - - - - - 72 72 48 36 12 36
Page 8
M
12 NO
C
D
E EXTERNAL WORKAccess Slab M2Access RampFencing & Gate M
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Balcony railing (阳台的栏杆)
SANITARY INSTALLATIONS (卫生级管件)
ELECTRICAL WORK (电气工作)
MECHANICAL WORK (水暖工作)
90 90 64 47 17 47 - - - - - - 120 120 156 78 96 78 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 50 50 99 51 74 51 - - - - - - 128 128 204 128 166 128 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Page 9
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
SUMMARY
ELEMENT DESCRIPTION UNIT
单位
A CIVIL & STRUCTURAL WORKPilingBuilding work
M2
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES M2NONO
2 M2
3 M2
4 M2
5 M2
6 M2
7 NO
8 NO
9 NO
10 M2
11 MS RAILINGM
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES) 排屋
Waterproofing (防水)
Roof Covering (屋顶覆盖)Aluminium Sun Shade (Master Bedroom) (遮阳帘)Glass Cover (玻璃盖)
BRICKWALL (砖墙)
PLASTERING (抹灰)
PAINTING (油漆)
TILING (瓷砖)
PLASTER CEILING (天花板)
ALUMINIUM WINDOWS & DOORS (玻璃窗和门 )
TIMBER DOOR (木门)
IRONMONGERY (门锁)
TIMBER FLOORING (木地板)
Staircase railing (楼梯栏杆)
TOTAL COMPLETED REMAINING
BLOCK S 总量 完成的工作 WORK 剩余工作量
- - - - - - - - - - - - 439 10,889 9,516 1,373 - - - - - - - - - - - - - - 104 4,248 3,676.50 572 2 100 85 15 2 100 85 15 - - - - 903 26,307 22,566 3,741 - - - - 2,736 77,200 66,470.00 10,730 - - - - 3,586 94,830 82,253 12,577 - - - - 1,264 33,732 29,263 4,470 - - - - 515 12,801 11,209 1,593 - - - - 68 1,786 1,548 238 - - - - 36 954 828 126 - - - - 36 954 828 126 - - - - 260 8,035 6,841 1,194 - - - - - - - - 12 888 720 168
Page 10
M
12 NO
C
D
E EXTERNAL WORKAccess Slab M2Access RampFencing & Gate M
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Balcony railing (阳台的栏杆)
SANITARY INSTALLATIONS (卫生级管件)
ELECTRICAL WORK (电气工作)
MECHANICAL WORK (水暖工作)
17 1,162 950 212 - - - - 64 2,072 1,754 318 - - - - - - - - - - - - - - - - - - - - 50 1,224 1,075 150 - - - 128 2,850 2,492 358 - - - - - - - - - - - - - - - - - - - - - - - - - - -
Page 11
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 2 4 Building work 2 4 Waterproofing M2 2 4 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES Roof Covering M2 2 4 37.1 Aluminium Sun Shade (Master Bedroom) NO 2 4 1 Glass Cover NO 2 4 1
2 BRICKWALL M2 2 4 342.2
3 PLASTERING M2 2 4 973.9
4 PAINTING M2 2 4 1105.5 Wall 737.2 Ceiling 342.5 Door 25,2Staircase 25.8
5 TILING M2 2 4 409.8 Wall 110.1 Floor 299.7
6 PLASTER CEILING M2 2 4 134.3
7 ALUMINIUM WINDOWS & DOORS NO 2 4 25
8 TIMBER DOOR NO 2 4 11
Page 12
9 IRONMONGERY NO 2 4 11
10 TIMBER FLOORING M2 2 4 111.5
11 MS RAILINGStaircase railing M 2 4 11.8 Balcony railing M 2 4 14.9
12 SANITARY INSTALLATIONS NO 2 4 30
Page 13
C ELECTRICAL 2 4
D MECHANICAL 2 4
E EXTERNAL WORKAccess Slab M2 2 4 12.2 Access RampFencing & Gate M 2 4 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 14
BLOCK A : Lot 1-6
3STOREY 2STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT
(QTY) (QTY)
109.9 116.1 102.6 233 411
37.1 52 43 104 172 1 1 1 2 4 1 1 1 2 4
336.1 223.6 227.5 448 910
951.1 683 684.6 1,366 2,739
1101.6 912.2 880.5 1,825 3,522 708.1 604.4 606.1 342.5 274.9 241.5 25.2 18.2 18.2 25.8 14.7 14.7
370.5 319.1 312.4 639 1,250 81.8 68.9 65.8 288.7 250.2 246.6
133.7 129.5 128 259 512
17 19 15 38 60
11 9 9 18 36
Page 15
11 9 9 18 36
110.5 64.8 64.8 130 260
11.8 6 6 12 24 14.9 8.4 8.4 17 34
30 16 16 32 64
Page 16
- - - -
12.2 12.2 12.2 25 49 - -
18.9 44.7 18.9 90 76 - -
5,258 10,163
7/SUM
Page 17
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2 - STOREY TERRACE HOUSES)
SUMMARY
2 - STOREY ELEMENT DESCRIPTION PAGE NO. corner Int CORNER LOT
(qty)
A WORK BELOW LOWEST FLOOR FINISH LEVEL 7/A/9
B FRAME 7/B/10
C UPPER FLOORS 7/C/6
D ROOF & ROOF FINISHES 7/D/3Roof Covering 52 43 104.00 Aluminium Sun Shade (Master Bedroom) 1 1 2.00
E EXTERNAL WALLS 7/E/3 98.8 71.4 197.60
F INTERNAL WALL & PARTITIONS 7/F/1 124.8 156.1 249.60
G WINDOW & EXTERNAL DOORS 7/G/7Aluminium Window & Door 7 3 14.00 Door 3 3
H INTERNAL WINDOWS & DOORS 7/H/4Aluminium Window & Door - Door 6 6
I STAIRCASE & STAIRCASE FINISHES 7/I/6
J WALL FINISHES 7/J/7Plastering 245 227 Painting 245 229 Wall tiles
K FLOOR FINISHES 7/K/6 302.9
Page 18
L CEILING FINISHES 7/L/6
M PLUMBING & SANITARY INSTALLATIONS * 7/M/5 5 5 10.00
N BUILDER'S WORKS & SUNDRIES 7/N/1
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY) 577.20
7/SUM
Page 19
BLOCK A : Lot 1-6
2 - STOREY INTERMEDIATE LOT
(RM/CTS)
172.00 4.00
285.60
624.40
12.00
-
Page 20
20.00
1,118.00
7/SUM
Page 21
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 1 1 4 Building work 1 1 4 Waterproofing M2 1 1 4 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 1 1 4 342.2
3 PLASTERING M2 1 1 4 973.9
4 PAINTING M2 1 1 4 1105.5
5 TILING M2 1 1 4 409.8 Wall 110.1 Floor 299.7
6 PLASTER CEILING M2 1 1 4 134.3
7 ALUMINIUM WINDOWS & DOORS NO 1 1 4 25
8 TIMBER DOOR NO 1 1 4 11
9 IRONMONGERY NO 1 1 4 11
10 TIMBER FLOORING M2 1 1 4 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 1 1 4 30
Page 22
C ELECTRICAL 1 1 4
D MECHANICAL 1 1 4
E EXTERNAL WORKAccess Slab M2 1 1 4 12.2 Access RampFencing & Gate M 1 1 4 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 23
BLOCK B : Lot 7-12
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 125 - 117 411
336.1 223.6 227.5 343 - 224 910
951.1 683 684.6 974 - 683 2,739
1101.6 912.2 880.5 1,106 - 913 3,522
370.5 319.1 312.4 410 - 320 1,250 81.8 68.9 65.8 288.7 250.2 246.6
133.7 129.5 128 135 - 130 512
17 19 15 25 - 19 60
11 9 9 11 - 9 36
11 9 9 11 - 9 36
110.5 64.8 64.8 112 - 65 260
30 16 16 30 - 16 64
Page 24
12.2 12.2 12.2 13 - 13 49
18.9 44.7 18.9 45 - 45 76
3,473 - 2,700 10,163
7/SUM
Page 25
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 1 1 4 Building work 1 1 4 Waterproofing M2 1 1 4 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 1 1 4 342.2
3 PLASTERING M2 1 1 4 973.9
4 PAINTING M2 1 1 4 1105.5
5 TILING M2 1 1 4 409.8
6 PLASTER CEILING M2 1 1 4 134.3
7 ALUMINIUM WINDOWS & DOORS NO 1 1 4 25
8 TIMBER DOOR NO 1 1 4 11
9 IRONMONGERY NO 1 1 4 11
10 TIMBER FLOORING M2 1 1 4 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 1 1 4 30
Page 26
C ELECTRICAL 1 1 4
D MECHANICAL 1 1 4
E EXTERNAL WORKAccess Slab M2 1 1 4 12.2 Access RampFencing & Gate M 1 1 4 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 27
BLOCK C : Lot 13-18
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 125 - 117 411
336.1 223.6 227.5 343 - 224 910
951.1 683 684.6 974 - 683 2,739
1101.6 912.2 880.5 1,106 - 913 3,522
370.5 319.1 312.4 410 - 320 1,250
133.7 129.5 128 135 - 130 512
17 19 15 25 - 19 60
11 9 9 11 - 9 36
11 9 9 11 - 9 36
110.5 64.8 64.8 112 - 65 260
30 16 16 30 - 16 64
Page 28
12.2 12.2 12.2 13 - 13 49
18.9 44.7 18.9 45 - 45 76
3,473 - 2,700 10,163
7/SUM
Page 29
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 1 1 2 Building work 1 1 2 Waterproofing M2 1 1 2 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 1 1 2 342.2
3 PLASTERING M2 1 1 2 973.9
4 PAINTING M2 1 1 2 1105.5
5 TILING M2 1 1 2 409.8
6 PLASTER CEILING M2 1 1 2 134.3
7 ALUMINIUM WINDOWS & DOORS NO 1 1 2 25
8 TIMBER DOOR NO 1 1 2 11
9 IRONMONGERY NO 1 1 2 11
10 TIMBER FLOORING M2 1 1 2 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 1 1 2 30
Page 30
C ELECTRICAL 1 1 2
D MECHANICAL 1 1 2
E EXTERNAL WORKAccess Slab M2 1 1 2 12.2 Access RampFencing & Gate M 1 1 2 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 31
BLOCK D : Lot 19-22
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 125 - 117 206
336.1 223.6 227.5 343 - 224 455
951.1 683 684.6 974 - 683 1,370
1101.6 912.2 880.5 1,106 - 913 1,761
370.5 319.1 312.4 410 - 320 625
133.7 129.5 128 135 - 130 256
17 19 15 25 - 19 30
11 9 9 11 - 9 18
11 9 9 11 - 9 18
110.5 64.8 64.8 112 - 65 130
30 16 16 30 - 16 32
Page 32
12.2 12.2 12.2 13 - 13 25
18.9 44.7 18.9 45 - 45 38
3,473 - 2,700 5,202
7/SUM
Page 33
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 2 4 Building work 2 4 Waterproofing M2 2 4 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 2 4 342.2
3 PLASTERING M2 2 4 973.9
4 PAINTING M2 2 4 1105.5
5 TILING M2 2 4 409.8
6 PLASTER CEILING M2 2 4 134.3
7 ALUMINIUM WINDOWS & DOORS NO 2 4 25
8 TIMBER DOOR NO 2 4 11
9 IRONMONGERY NO 2 4 11
10 TIMBER FLOORING M2 2 4 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 2 4 30
Page 34
C ELECTRICAL 2 4
D MECHANICAL 2 4
E EXTERNAL WORKAccess Slab M2 2 4 12.2 Access RampFencing & Gate M 2 4 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 35
BLOCK E : Lot 23-28
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 250 - - 411
336.1 223.6 227.5 685 - - 910
951.1 683 684.6 1,948 - - 2,739
1101.6 912.2 880.5 2,211 - - 3,522
370.5 319.1 312.4 820 - - 1,250
133.7 129.5 128 269 - - 512
17 19 15 50 - - 60
11 9 9 22 - - 36
11 9 9 22 - - 36
110.5 64.8 64.8 223 - - 260
30 16 16 60 - - 64
Page 36
12.2 12.2 12.2 25 - - 49
18.9 44.7 18.9 90 - - 76
6,808 - - 10,163
7/SUM
Page 37
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 2 4 Building work 2 4 Waterproofing M2 2 4 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 2 4 342.2
3 PLASTERING M2 2 4 973.9
4 PAINTING M2 2 4 1105.5
5 TILING M2 2 4 409.8
6 PLASTER CEILING M2 2 4 134.3
7 ALUMINIUM WINDOWS & DOORS NO 2 4 25
8 TIMBER DOOR NO 2 4 11
9 IRONMONGERY NO 2 4 11
10 TIMBER FLOORING M2 2 4 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 2 4 30
Page 38
C ELECTRICAL 2 4
D MECHANICAL 2 4
E EXTERNAL WORKAccess Slab M2 2 4 12.2 Access RampFencing & Gate M 2 4 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 39
BLOCK F : Lot 29-33a
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 250 440 - -
336.1 223.6 227.5 685 1,345 - -
951.1 683 684.6 1,948 3,805 - -
1101.6 912.2 880.5 2,211 4,407 - -
370.5 319.1 312.4 820 1,482 - -
133.7 129.5 128 269 535 - -
17 19 15 50 68 - -
11 9 9 22 44 - -
11 9 9 22 44 - -
110.5 64.8 64.8 223 442 - -
30 16 16 60 120 - -
Page 40
12.2 12.2 12.2 25 49 - -
18.9 44.7 18.9 90 76 - -
6,808 13,122 - -
7/SUM
Page 41
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 2 5 Building work 2 5 Waterproofing M2 2 5 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 2 5 342.2
3 PLASTERING M2 2 5 973.9
4 PAINTING M2 2 5 1105.5
5 TILING M2 2 5 409.8
6 PLASTER CEILING M2 2 5 134.3
7 ALUMINIUM WINDOWS & DOORS NO 2 5 25
8 TIMBER DOOR NO 2 5 11
9 IRONMONGERY NO 2 5 11
10 TIMBER FLOORING M2 2 5 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 2 5 30
Page 42
C ELECTRICAL 2 5
D MECHANICAL 2 5
E EXTERNAL WORKAccess Slab M2 2 5 12.2 Access RampFencing & Gate M 2 5 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 43
BLOCK G : Lot 35-41
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 250 550 - -
336.1 223.6 227.5 685 1,681 - -
951.1 683 684.6 1,948 4,756 - -
1101.6 912.2 880.5 2,211 5,508 - -
370.5 319.1 312.4 820 1,853 - -
133.7 129.5 128 269 669 - -
17 19 15 50 85 - -
11 9 9 22 55 - -
11 9 9 22 55 - -
110.5 64.8 64.8 223 553 - -
30 16 16 60 150 - -
Page 44
12.2 12.2 12.2 25 61 - -
18.9 44.7 18.9 90 95 - -
6,808 16,336 - -
7/SUM
Page 45
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 1 1 2 Building work 1 1 2 Waterproofing M2 1 1 2 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 1 1 2 342.2
3 PLASTERING M2 1 1 2 973.9
4 PAINTING M2 1 1 2 1105.5
5 TILING M2 1 1 2 409.8
6 PLASTER CEILING M2 1 1 2 134.3
7 ALUMINIUM WINDOWS & DOORS NO 1 1 2 25
8 TIMBER DOOR NO 1 1 2 11
9 IRONMONGERY NO 1 1 2 11
10 TIMBER FLOORING M2 1 1 2 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 1 1 2 30
Page 46
C ELECTRICAL 1 1 2
D MECHANICAL 1 1 2
E EXTERNAL WORKAccess Slab M2 1 1 2 12.2 Access RampFencing & Gate M 1 1 2 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 47
BLOCK H : Lot 42-45
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 125 - 117 206
336.1 223.6 227.5 343 - 224 455
951.1 683 684.6 974 - 683 1,370
1101.6 912.2 880.5 1,106 - 913 1,761
370.5 319.1 312.4 410 - 320 625
133.7 129.5 128 135 - 130 256
17 19 15 25 - 19 30
11 9 9 11 - 9 18
11 9 9 11 - 9 18
110.5 64.8 64.8 112 - 65 130
30 16 16 30 - 16 32
Page 48
12.2 12.2 12.2 13 - 13 25
18.9 44.7 18.9 45 - 45 38
3,473 - 2,700 4,964
7/SUM
Page 49
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 1 1 3 Building work 1 1 3 Waterproofing M2 1 1 3 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 1 1 3 342.2
3 PLASTERING M2 1 1 3 973.9
4 PAINTING M2 1 1 3 1105.5
5 TILING M2 1 1 3 409.8
6 PLASTER CEILING M2 1 1 3 134.3
7 ALUMINIUM WINDOWS & DOORS NO 1 1 3 25
8 TIMBER DOOR NO 1 1 3 11
9 IRONMONGERY NO 1 1 3 11
10 TIMBER FLOORING M2 1 1 3 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 1 1 3 30
Page 50
C ELECTRICAL 1 1 3
D MECHANICAL 1 1 3
E EXTERNAL WORKAccess Slab M2 1 1 3 12.2 Access RampFencing & Gate M 1 1 3 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 51
BLOCK I : Lot 46-50
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 125 - 117 308
336.1 223.6 227.5 343 - 224 683
951.1 683 684.6 974 - 683 2,054
1101.6 912.2 880.5 1,106 - 913 2,642
370.5 319.1 312.4 410 - 320 938
133.7 129.5 128 135 - 130 384
17 19 15 25 - 19 45
11 9 9 11 - 9 27
11 9 9 11 - 9 27
110.5 64.8 64.8 112 - 65 195
30 16 16 30 - 16 48
Page 52
12.2 12.2 12.2 13 - 13 37
18.9 44.7 18.9 45 - 45 57
3,473 - 2,700 7,445
7/SUM
Page 53
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 1 1 2 Building work 1 1 2 Waterproofing M2 1 1 2 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 1 1 2 342.2
3 PLASTERING M2 1 1 2 973.9
4 PAINTING M2 1 1 2 1105.5
5 TILING M2 1 1 2 409.8
6 PLASTER CEILING M2 1 1 2 134.3
7 ALUMINIUM WINDOWS & DOORS NO 1 1 2 25
8 TIMBER DOOR NO 1 1 2 11
9 IRONMONGERY NO 1 1 2 11
10 TIMBER FLOORING M2 1 1 2 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 1 1 2 30
Page 54
C ELECTRICAL 1 1 2
D MECHANICAL 1 1 2
E EXTERNAL WORKAccess Slab M2 1 1 2 12.2 Access RampFencing & Gate M 1 1 2 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 55
BLOCK J : Lot 51-53a
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 125 - 117 206
336.1 223.6 227.5 343 - 224 455
951.1 683 684.6 974 - 683 1,370
1101.6 912.2 880.5 1,106 - 913 1,761
370.5 319.1 312.4 410 - 320 625
133.7 129.5 128 135 - 130 256
17 19 15 25 - 19 30
11 9 9 11 - 9 18
11 9 9 11 - 9 18
110.5 64.8 64.8 112 - 65 130
30 16 16 30 - 16 32
Page 56
12.2 12.2 12.2 13 - 13 25
18.9 44.7 18.9 45 - 45 38
3,473 - 2,700 4,964
7/SUM
Page 57
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 1 1 2 Building work 1 1 2 Waterproofing M2 1 1 2 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 1 1 2 342.2
3 PLASTERING M2 1 1 2 973.9
4 PAINTING M2 1 1 2 1105.5
5 TILING M2 1 1 2 409.8
6 PLASTER CEILING M2 1 1 2 134.3
7 ALUMINIUM WINDOWS & DOORS NO 1 1 2 25
8 TIMBER DOOR NO 1 1 2 11
9 IRONMONGERY NO 1 1 2 11
10 TIMBER FLOORING M2 1 1 2 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 1 1 2 30
Page 58
C ELECTRICAL 1 1 2
D MECHANICAL 1 1 2
E EXTERNAL WORKAccess Slab M2 1 1 2 12.2 Access RampFencing & Gate M 1 1 2 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 59
BLOCK K : Lot 55-57a
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 125 - 117 206
336.1 223.6 227.5 343 - 224 455
951.1 683 684.6 974 - 683 1,370
1101.6 912.2 880.5 1,106 - 913 1,761
370.5 319.1 312.4 410 - 320 625
133.7 129.5 128 135 - 130 256
17 19 15 25 - 19 30
11 9 9 11 - 9 18
11 9 9 11 - 9 18
110.5 64.8 64.8 112 - 65 130
30 16 16 30 - 16 32
Page 60
12.2 12.2 12.2 13 - 13 25
18.9 44.7 18.9 45 - 45 38
3,473 - 2,700 4,964
7/SUM
Page 61
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 2 4 Building work 2 4 Waterproofing M2 2 4 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 2 4 342.2
3 PLASTERING M2 2 4 973.9
4 PAINTING M2 2 4 1105.5
5 TILING M2 2 4 409.8
6 PLASTER CEILING M2 2 4 134.3
7 ALUMINIUM WINDOWS & DOORS NO 2 4 25
8 TIMBER DOOR NO 2 4 11
9 IRONMONGERY NO 2 4 11
10 TIMBER FLOORING M2 2 4 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 2 4 30
Page 62
C ELECTRICAL 2 4
D MECHANICAL 2 4
E EXTERNAL WORKAccess Slab M2 2 4 12.2 Access RampFencing & Gate M 2 4 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 63
BLOCK L : Lot 59-63a
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 250 - - 411
336.1 223.6 227.5 685 - - 910
951.1 683 684.6 1,948 - - 2,739
1101.6 912.2 880.5 2,211 - - 3,522
370.5 319.1 312.4 820 - - 1,250
133.7 129.5 128 269 - - 512
17 19 15 50 - - 60
11 9 9 22 - - 36
11 9 9 22 - - 36
110.5 64.8 64.8 223 - - 260
30 16 16 60 - - 64
Page 64
12.2 12.2 12.2 25 - - 49
18.9 44.7 18.9 90 - - 76
6,808 - - 10,163
7/SUM
Page 65
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 2 2 Building work 2 2 Waterproofing M2 2 2 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 2 2 342.2
3 PLASTERING M2 2 2 973.9
4 PAINTING M2 2 2 1105.5
5 TILING M2 2 2 409.8
6 PLASTER CEILING M2 2 2 134.3
7 ALUMINIUM WINDOWS & DOORS NO 2 2 25
8 TIMBER DOOR NO 2 2 11
9 IRONMONGERY NO 2 2 11
10 TIMBER FLOORING M2 2 2 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 2 2 30
Page 66
C ELECTRICAL 2 2
D MECHANICAL 2 2
E EXTERNAL WORKAccess Slab M2 2 2 12.2 Access RampFencing & Gate M 2 2 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 67
BLOCK M : Lot 65-68
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 250 220 - -
336.1 223.6 227.5 685 673 - -
951.1 683 684.6 1,948 1,903 - -
1101.6 912.2 880.5 2,211 2,204 - -
370.5 319.1 312.4 820 741 - -
133.7 129.5 128 269 268 - -
17 19 15 50 34 - -
11 9 9 22 22 - -
11 9 9 22 22 - -
110.5 64.8 64.8 223 221 - -
30 16 16 60 60 - -
Page 68
12.2 12.2 12.2 25 25 - -
18.9 44.7 18.9 90 38 - -
6,808 6,696 - -
7/SUM
Page 69
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 2 2 Building work 2 2 Waterproofing M2 2 2 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 2 2 342.2
3 PLASTERING M2 2 2 973.9
4 PAINTING M2 2 2 1105.5
5 TILING M2 2 2 409.8
6 PLASTER CEILING M2 2 2 134.3
7 ALUMINIUM WINDOWS & DOORS NO 2 2 25
8 TIMBER DOOR NO 2 2 11
9 IRONMONGERY NO 2 2 11
10 TIMBER FLOORING M2 2 2 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 2 2 30
Page 70
C ELECTRICAL 2 2
D MECHANICAL 2 2
E EXTERNAL WORKAccess Slab M2 2 2 12.2 Access RampFencing & Gate M 2 2 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 71
BLOCK N : Lot 69-72
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 250 220 - -
336.1 223.6 227.5 685 673 - -
951.1 683 684.6 1,948 1,903 - -
1101.6 912.2 880.5 2,211 2,204 - -
370.5 319.1 312.4 820 741 - -
133.7 129.5 128 269 268 - -
17 19 15 50 34 - -
11 9 9 22 22 - -
11 9 9 22 22 - -
110.5 64.8 64.8 223 221 - -
30 16 16 60 60 - -
Page 72
12.2 12.2 12.2 25 25 - -
18.9 44.7 18.9 90 38 - -
6,808 6,696 - -
7/SUM
Page 73
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 2 6 Building work 2 6 Waterproofing M2 2 6 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 2 6 342.2
3 PLASTERING M2 2 6 973.9
4 PAINTING M2 2 6 1105.5
5 TILING M2 2 6 409.8
6 PLASTER CEILING M2 2 6 134.3
7 ALUMINIUM WINDOWS & DOORS NO 2 6 25
8 TIMBER DOOR NO 2 6 11
9 IRONMONGERY NO 2 6 11
10 TIMBER FLOORING M2 2 6 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 2 6 30
Page 74
C ELECTRICAL 2 6
D MECHANICAL 2 6
E EXTERNAL WORKAccess Slab M2 2 6 12.2 Access RampFencing & Gate M 2 6 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 75
BLOCK O : Lot 73 - 80
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 250 - - 616
336.1 223.6 227.5 685 - - 1,365
951.1 683 684.6 1,948 - - 4,108
1101.6 912.2 880.5 2,211 - - 5,283
370.5 319.1 312.4 820 - - 1,875
133.7 129.5 128 269 - - 768
17 19 15 50 - - 90
11 9 9 22 - - 54
11 9 9 22 - - 54
110.5 64.8 64.8 223 - - 389
30 16 16 60 - - 96
Page 76
12.2 12.2 12.2 25 - - 74
18.9 44.7 18.9 90 - - 114
6,808 - - 15,124
7/SUM
Page 77
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 1 1 2 Building work 1 1 2 Waterproofing M2 1 1 2 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 1 1 2 342.2
3 PLASTERING M2 1 1 2 973.9
4 PAINTING M2 1 1 2 1105.5
5 TILING M2 1 1 2 409.8
6 PLASTER CEILING M2 1 1 2 134.3
7 ALUMINIUM WINDOWS & DOORS NO 1 1 2 25
8 TIMBER DOOR NO 1 1 2 11
9 IRONMONGERY NO 1 1 2 11
10 TIMBER FLOORING M2 1 1 2 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 1 1 2 30
Page 78
C ELECTRICAL 1 1 2
D MECHANICAL 1 1 2
E EXTERNAL WORKAccess Slab M2 1 1 2 12.2 Access RampFencing & Gate M 1 1 2 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 79
BLOCK P : Lot 81-83a
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 125 - 117 206
336.1 223.6 227.5 343 - 224 455
951.1 683 684.6 974 - 683 1,370
1101.6 912.2 880.5 1,106 - 913 1,761
370.5 319.1 312.4 410 - 320 625
133.7 129.5 128 135 - 130 256
17 19 15 25 - 19 30
11 9 9 11 - 9 18
11 9 9 11 - 9 18
110.5 64.8 64.8 112 - 65 130
30 16 16 30 - 16 32
Page 80
12.2 12.2 12.2 13 - 13 25
18.9 44.7 18.9 45 - 45 38
3,473 - 2,700 4,964
7/SUM
Page 81
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 2 4 Building work 2 4 Waterproofing M2 2 4 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 2 4 342.2
3 PLASTERING M2 2 4 973.9
4 PAINTING M2 2 4 1105.5
5 TILING M2 2 4 409.8
6 PLASTER CEILING M2 2 4 134.3
7 ALUMINIUM WINDOWS & DOORS NO 2 4 25
8 TIMBER DOOR NO 2 4 11
9 IRONMONGERY NO 2 4 11
10 TIMBER FLOORING M2 2 4 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 2 4 30
Page 82
C ELECTRICAL 2 4
D MECHANICAL 2 4
E EXTERNAL WORKAccess Slab M2 2 4 12.2 Access RampFencing & Gate M 2 4 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 83
BLOCK Q : Lot 85-90
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 - - 233 411
336.1 223.6 227.5 - - 448 910
951.1 683 684.6 - - 1,366 2,739
1101.6 912.2 880.5 - - 1,825 3,522
370.5 319.1 312.4 - - 639 1,250
133.7 129.5 128 - - 259 512
17 19 15 - - 38 60
11 9 9 - - 18 36
11 9 9 - - 18 36
110.5 64.8 64.8 - - 130 260
30 16 16 - - 32 64
Page 84
12.2 12.2 12.2 - - 25 49
18.9 44.7 18.9 - - 90 76
- - 5,258 9,925
7/SUM
Page 85
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2&3 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 1 1 2 Building work 1 1 2 Waterproofing M2 1 1 2 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 1 1 2 342.2
3 PLASTERING M2 1 1 2 973.9
4 PAINTING M2 1 1 2 1105.5
5 TILING M2 1 1 2 409.8
6 PLASTER CEILING M2 1 1 2 134.3
7 ALUMINIUM WINDOWS & DOORS NO 1 1 2 25
8 TIMBER DOOR NO 1 1 2 11
9 IRONMONGERY NO 1 1 2 11
10 TIMBER FLOORING M2 1 1 2 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 1 1 2 30
Page 86
C ELECTRICAL 1 1 2
D MECHANICAL 1 1 2
E EXTERNAL WORKAccess Slab M2 1 1 2 12.2 Access RampFencing & Gate M 1 1 2 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 87
BLOCK R : Lot 91-93a
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 125 - 117 206
336.1 223.6 227.5 343 - 224 455
951.1 683 684.6 974 - 683 1,370
1101.6 912.2 880.5 1,106 - 913 1,761
370.5 319.1 312.4 410 - 320 625
133.7 129.5 128 135 - 130 256
17 19 15 25 - 19 30
11 9 9 11 - 9 18
11 9 9 11 - 9 18
110.5 64.8 64.8 112 - 65 130
30 16 16 30 - 16 32
Page 88
12.2 12.2 12.2 13 - 13 25
18.9 44.7 18.9 45 - 45 38
3,473 - 2,700 4,964
7/SUM
Page 89
PROJECT : PROPOSED HOUSING DEVELOPMENT, ON N.T. 213 182 444, N.T. 213 090 245, N.T. 213 090 236, N.T. 213 090 227, N.T. 213 090 254, N.T. 213 090 272, N.T. 213 082 298, N.T. 213 088 512 & N.T. 213 086 376 AT KG. KIBABAIG, DISTRICT OF PENAMPANG
BILL NO. 7 - BUILDING WORKS (2 - STOREY TERRACE HOUSES)
SUMMARY
3STOREYELEMENT DESCRIPTION UNIT 3 STOREY 3STOREY 2 STOREY 2 STOREY corner
(CORNER) (INT) (CORNER) (INT)
A CIVIL & STRUCTURAL WORKPiling 2 2 Building work 2 2 Waterproofing M2 2 2 124.8
B ARCHITECTURE WORK
1 ROOF & ROOF FINISHES
2 BRICKWALL M2 2 2 342.2
3 PLASTERING M2 2 2 973.9
4 PAINTING M2 2 2 1105.5
5 TILING M2 2 2 409.8
6 PLASTER CEILING M2 2 2 134.3
7 ALUMINIUM WINDOWS & DOORS NO 2 2 25
8 TIMBER DOOR NO 2 2 11
9 IRONMONGERY NO 2 2 11
10 TIMBER FLOORING M2 2 2 111.5
11 MS RAILING
12 SANITARY INSTALLATIONS NO 2 2 30
Page 90
C ELECTRICAL 2 2
D MECHANICAL 2 2
E EXTERNAL WORKAccess Slab M2 2 2 12.2 Access RampFencing & Gate M 2 2 44.7
TOTAL FOR 1 UNIT CORNER LOT & 1 UNIT INTERMEDIATE LOT (CARRIED TO FINAL SUMMARY)
7/SUM
Page 91
BLOCK S : Lot 95 - 98
3STOREY 2STOREY 3 - STOREY 2 - STOREY Int corner Int CORNER LOT INTERMEDIATE LOT CORNER LOT INTERMEDIATE LOT
(QTY) (QTY) (QTY) (QTY)
109.9 116.1 102.6 - - 233 206
336.1 223.6 227.5 - - 448 455
951.1 683 684.6 - - 1,366 1,370
1101.6 912.2 880.5 - - 1,825 1,761
370.5 319.1 312.4 - - 639 625
133.7 129.5 128 - - 259 256
17 19 15 - - 38 30
11 9 9 - - 18 18
11 9 9 - - 18 18
110.5 64.8 64.8 - - 130 130
30 16 16 - - 32 32
Page 92
12.2 12.2 12.2 - - 25 25
18.9 44.7 18.9 - - 90 38
- - 5,258 4,964
7/SUM