Top Banner
Terra Dominguez May 5, 2014 NC-SIS PowerSchool EOY Expectations
22

Terra Dominguez May 5, 2014

Feb 25, 2016

Download

Documents

fordon

NC-SIS PowerSchool EOY Expectations. Terra Dominguez May 5, 2014. Audience. LEA / Charter NC-SIS PowerSchool coordinators Tech Directors. Purpose. Describe End of Year (EOY) Define LEA, DPI and Pearson responsibilities Discuss resources and support Identify next steps - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Terra Dominguez May 5, 2014

Terra Dominguez

May 5, 2014

NC-SIS PowerSchoolEOY Expectations

Page 2: Terra Dominguez May 5, 2014

Audience

• LEA / Charter NC-SIS PowerSchool coordinators

• Tech Directors

Page 3: Terra Dominguez May 5, 2014

Purpose• Describe End of Year (EOY)

• Define LEA, DPI and Pearson responsibilities

• Discuss resources and support

• Identify next steps

• Answer questions

Page 4: Terra Dominguez May 5, 2014

What is End of Year (EOY)?• Function similar to NC WISE that promotes

students to the next year school and next year grade at the end of a school year

• Run at each LEA for all schools

• Shut-down window similar to NC WISE YET

– All PowerSchool instances will be shut-down prior to running EOY in late June and remain unavailable through first week in July

Page 5: Terra Dominguez May 5, 2014

More About EOY• Three processes that occur at the LEA level

– Validation: most reports and clean up can be executed by school staff

– EOY: performed on all schools in the LEA at the same time

– Post-EOY: most tasks may be completed by school staff

• Current year (SY 13/14) data must be corrected prior to EOY– EOY will not complete if validation fails

• If using PowerScheduler, SY 14/15 schedules must be committed prior to EOY (HS, MS)

• EOY must be run during shut-down window

Page 6: Terra Dominguez May 5, 2014

Who Does What? - Responsibility1. LEA – Validate data

2. LEA – Communicate completion

3. DPI – Verify validation is complete for all LEAs

4. DPI / Pearson – Shut-down (Pearson back-up systems in place)

5. LEA or DPI – Run EOY (this part’s easy) during shut-down

6. DPI / Pearson – Re-connect and initiate PowerSchool Instances (ODS)

7. DPI – Complete year end processes for state’s integrated/dependent systems

8. DPI – Communicate systems up

9. LEA – Begin Post-EOY (SIS review, updates and local system integration)

Page 7: Terra Dominguez May 5, 2014

LEA - Validate• Begin now• Use PowerTools reports (School level, can run for SY 13/14)

– Section Enrollment Audit

– School Enrollment Audit

Also located: Start > Reports (System)

• Run validations on End-of-Year Process screen – LEA User: DO NOT RUN EOY process until DPI shut-down has been communicated

• Correct at LEA and school level

Page 8: Terra Dominguez May 5, 2014

Read Everything First – End-of-year process Screen Path

Page 9: Terra Dominguez May 5, 2014

Validate Only • DPI will provide the appropriate entry

and exit codes

Page 10: Terra Dominguez May 5, 2014

Lather, Rinse, Repeat• Begin validation and correction now

• Continue to run validation and correct data until DPI shut-down window

• EOY validation tools can be used all year long

Page 11: Terra Dominguez May 5, 2014

Validation Support• Weekly technical webinars

https://www1.gotomeeting.com/register/340351513

• Home Base Support Center (HBSC) available to answer validation questions– Does your technical staff need more help? Log that too

• Documentation on NC-SIS sitehttp://www.nc-sis.org/EOY.html

• Articles on PowerSource– Some articles only accessible to LEA Technical contact

Page 12: Terra Dominguez May 5, 2014

LEA - Communicate• Respond to DPI survey by Friday, May 9th

• Provide contact in survey

– EOY requires 24/7 LEA contact

• Be prepared to run EOY by XXXX

Page 13: Terra Dominguez May 5, 2014

Integration and Dependency• Integrated systems* are dependent on the

completion of EOY for all LEAs, however; no LEA may begin EOY function before DPI shut-down communication– ODS (Repository)

– CFNC

– CECAS

– SchoolNet

– Open Class

– Test Nav

– TNL – NCEES*Examples

Page 14: Terra Dominguez May 5, 2014

DPI – Verify Validation• Check-points will be established to

assist LEAs/Charters

• EOY will not be run until all LEAs/Charters have completed validations

• LEAs/Charters are encouraged to run EOY – a.k.a. ‘Push the button’

Page 15: Terra Dominguez May 5, 2014

LEA / DPI – Run EOYWait…You want me to ‘Push the Button’?• EOY is run after DPI shut-down is communicated

• LEA encouraged to run EOY– ‘Pushing the button’ starts with a drop-down and ends with Submit

– In some cases, this may provide LEAs more time for data clean-up

• If data is correct EOY function will run

• If process does halt, DPI 24/7 resource available

• Complete the survey by Friday, May 9th

Page 16: Terra Dominguez May 5, 2014

DPI - Shut-down Window• Back-ups taken by Pearson Hosting

• 24/7 support for DPI from Pearson

• 24/7 support for LEAs/Charters from DPI

• More detail pending on when to ‘push the button’ – Large LEAs will begin EOY first

Page 17: Terra Dominguez May 5, 2014

Isn’t There More?• Yes but we are learning with you so we

will update the EOY webpages

• Tips and Tricks document specific to NC

• Tuesday Tech webinars https://www1.gotomeeting.com/register/340351513

• DPI can establish meetings for technical staff for in-depth questions

Page 18: Terra Dominguez May 5, 2014

DPI – Connect, Complete, Communicate• Pearson to re-connect ODS

• DPI / vendors complete end of year processes for integrated systems

• Post-EOY validation tasks– Individual contact with LEAs/Charters as

needed

• Communicate completion to state

Page 19: Terra Dominguez May 5, 2014

LEA – Begin Post-EOY• Post EOY- tasks

– System and data review

– Integrate local systems if needed

• First day of SY 14/15 is 6/27/2014

Page 20: Terra Dominguez May 5, 2014

Next Steps1. Review NC-SIS EOY pages for validation procedures

and support documents http://www.nc-sis.org/EOY.html

2. Determine participation – will you ‘push the button’

3. Begin validation

4. Respond to survey by Friday May 9, 2014

5. Register for weekly Tuesday state-wide Tech Webinars https://www1.gotomeeting.com/register/340351513

Page 21: Terra Dominguez May 5, 2014

Burning Questions• EOY required activities

– Optional, Recommended and Required tasks are defined in the support documents

• Next grade, next school– Students transferring out

– Charter Schools

– Program Schools

• Scheduling

Page 22: Terra Dominguez May 5, 2014

Thank youHome Base Support CenterAvailable: Monday - Friday

7:30 AM to 5:00 PM

Phone: 919-807-4357Email:

[email protected]

(Please do not send an email to this address unless you are a designated school official

authorized to submit service desk tickets to Home Base Support Center)