US Green Infrastructure Solutions, LLC. 3700 34th. St. Suite 302, Orlando, FL 32805 Email: [email protected] | Ph: +01 (866) 576-4410 | Fax: +01 (866) 689-2204 1 TERMS SHEET For 360 Metric Ton-Per-Day | Solid Waste Solution CREATING 10 MEGA WATTS OF ELECTRICITY PER HOUR US Green Infrastructure Solutions, LLC. is pleased to provide the following configuration, cost, and projected revenue data for our Total Waste Processing System to assist in effectively managing solid waste to energy system plant. The data provided herein addresses the equipment required to process 100% of the material received into a marketable state. Recommended System Components Provided below is our recommended 360 Metric Ton-Per-Day (TPD) system configuration (Installation and Freight Included) which also includes the Generation System:
12
Embed
TERMS SHEET For 360 Metric Ton-Per-Day | Solid Waste ...€¦ · 360 Metric Ton-Per-Day | Solid Waste Solution CREATING 10 MEGA WATTS OF ELECTRICITY PER HOUR US Green Infrastructure
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
US Green Infrastructure Solutions, LLC. 3700 34th. St. Suite 302, Orlando, FL 32805 Email:
360 Metric Ton-Per-Day | Solid Waste Solution CREATING 10 MEGA WATTS OF ELECTRICITY PER HOUR
US Green Infrastructure Solutions, LLC. is pleased to provide the following configuration, cost, and projected revenue data for our Total Waste Processing System to assist in effectively managing solid waste to energy system plant. The data provided herein addresses the equipment required to process 100% of the material received into a marketable state.
Recommended System Components Provided below is our recommended 360 Metric Ton-Per-Day (TPD) system configuration (Installation and Freight Included) which also includes the Generation System:
US Green Infrastructure Solutions, LLC. 3700 34th. St. Suite 302, Orlando, FL 32805 Email:
Dewatering Press US GREEN INFRASTRUCTURE SOLUTIONS, LLC. has designed a very special, heavy-duty unit that can be controlled to produce any desired moisture content going to the cooker. 15% to 25% is the desired range of humidity at the end of the process. Tank size is customer option, though we do suggest the water treatment system that removes and returns solids to the cooker/dryer unit, allowing safe release of the liquids. This is typically something where we like to see a site plan and know the surrounding area before we make any recommendations, for both liability and efficiency reasons. This liquid byproduct can be easily used for irrigation. In one 24 hour period you will generate approximately 6500 Liters of bacteria free liquid. Optional if you chlorinate the liquid you will create 6500 liters of drinking water. This configuration provides needed redundancy of operations as MSW material is processed simultaneously through separate groupings of equipment in a planned 24-hour day and 7-day per-week operation. In typical solid waste facility operations, the majority of MSW is delivered to a facility within a 6 to 8-hour time window, thus the tipping floor needs to have staging /storage capacity. We also recommend using one or two bucket-loader vehicles (see examples below) to stage delivered material and move finished product.
Ideally a 10,000 square-foot of staging area, utilizing two or three push-walls in a configuration (shown above-left) is ideal. An additional 10,000 square feet is recommended for the actual tipping area, ingress/egress, and safety/buffer zones. The waste processing equipment requires an additional 10,000 square feet,
US Green Infrastructure Solutions, LLC. 3700 34th. St. Suite 302, Orlando, FL 32805 Email:
Operational Costs: Labor and the fuel required to run one or two bucket loaders are the other operating costs included. For labor, we project 24 full-time equivalent laborers (6+ per shift) will be needed to sort and process material through the operation. We are projecting that Loader Operators are more skilled, thus a 50% increase in their rate of pay. Monthly costs for supervisors, managers, and the plant manager are all based on multiples of the basic labor rate. To be conservative we use a 24-hour operating day to project costs. All waste may be processed in 16 to 18 hours, which would provide a reduction in the labor expense.
US Green Infrastructure Solutions, LLC. 3700 34th. St. Suite 302, Orlando, FL 32805 Email:
Proven Track Record Yes With Toxic Fumes Oil Change No Yes
Air Filter Change No Yes Ratio per Tons to Energy
per 1600Tons 800 Megawatts Incineration 41 Megawatts
Steamed 200 Megawatts MEGAWATTS CONSUMED TO OPERATE IN 24HOURS
1.8 MW 8 MW
THE TURBINE
CAI’s Spirit 15 MW Turbine Power Generation System is a smart choice for value, reliability and performance. It is an innovative package created by integrating the best technology. Spirit 15 MW package is fully tested and ready to generate 15 MW of power on a 24/7 basis. Spirit 15 MW components are shipped skid-mounted anywhere in the world. The turbine assembly is shipped as one unit, complete from the bell-mouth on the air intake end to the power turbine on the drive end. The coupling, gear box and generator is shipped as a skid-mounted assembly. The control system cabinet and
US Green Infrastructure Solutions, LLC. 3700 34th. St. Suite 302, Orlando, FL 32805 Email:
lubrication/starter skid are shipped as loose components to be integrated at site. A weather resistant sound attenuated enclosure is provided for the complete turbine-generator skid with intake air filter/silencer assembly and exhaust/silencer assembly. An off-engine lube oil system skid is supplied, complete with local starter, instrumentation that can be wired into the control system package, oil cooler, etc. The skid is designed to be modular and can hook up to the starter skid. The starter skid consists of a reservoir and electric pumps that connect to the retractable starter. Continuous Duty Package includes:
COMPARISON CHART BETWEEN ROTARY TURBINE ENGINES FUELED BY SYNGAS AND PISTON DRIVEN ENGINES
FUELED BY SYNGAS
DESCRIPTION TURBINE (OURS) PISTON Maintenance due 8000 2000 hours
Oil Tanks 2 1 Air Filters 2 1
No. Controls Computerized 42 4 Down time for Maintenance 0 24
Max Capacity for $Value 6 Megawatts 6 Megawatt Space needed for 10MW 400 sq. feet (10MW) 2000 sq. feet (10MW)
Offsite Monitoring Yes No Life Expectancy 30 Years 10 Years
Time Non Stop Operation 10 Years 1 Year Country of Origin United States China
Response Time Immediate Up to operator Warranty Program Yes No
Proven Track Record Yes unknown Engine on for Oil Change Yes No Engine on for Air Filter
Change Yes No
INSTALLATION AND TESTING
Installation: US Green Infrastructure Solutions, LLC. shall install the Equipment at the Installation Site in accordance with the installation schedule set forth in and incorporated herein (the "Installation Schedule") and connect the same to the safety switches or electrical outlets to be provided and installed by US Green Infrastructure Solutions, LLC. or End User. US Green Infrastructure Solutions, LLC. shall be responsible for all costs associated with the installation of the Equipment. US Green Infrastructure Solutions, LLC. shall have a qualified installer install all utility connections including but not limited to electrical, water, gas, etc. to the equipment.
Testing and Certification. Upon completion of installation of the Equipment, US Green Infrastructure Solutions, LLC. shall perform prescribed tests to determine that the Equipment is operating in conformance with the manufacture’s published performance specifications for the Equipment and any other requirements agreed to by the parties (hereinafter "Specifications"), a copy of which are attached hereto and incorporated herein as verification data (hereinafter "Equipment Turnover").
US Green Infrastructure Solutions, LLC. 3700 34th. St. Suite 302, Orlando, FL 32805 Email:
In the event the Equipment or any feature or option thereof requires certification under any local laws, US Green Infrastructure Solutions, LLC. will complete and file all necessary reports regarding Company's manufacture, assembly, installation or other activity relating to the Equipment.
Warranty. US Green Infrastructure Solutions, LLC. warrants to the End User of the equipment, for a Warranty Period of (5) Five Years on parts, and (5) five year on labor placed on the Equipment to be free from material defects in materials and workmanship.
Acceptance. “Acceptance" of the Equipment shall be deemed to occur on the date when, in the reasonable opinion of US Green Infrastructure Solutions, LLC. the equipment conforms to the Specifications, and has continuously operated in compliance with the Specifications for thirty (30) days after Equipment Turnover. US Green Infrastructure Solutions, LLC. shall present End User with a Final Certificate of Acceptance immediately prior to the expiration of the 30th day.
Compliance with Laws. US GREEN INFRASTRUCTURE SOLUTIONS, LLC. shall perform this Agreement in compliance with all applicable Federal, State, and local laws, rules, regulations, and ordinances, and represents that it shall have obtained all licenses and permits required by law to engage in the activities necessary to perform its obligations under this Agreement. US GREEN INFRASTRUCTURE SOLUTIONS, LLC. and its subsidiaries hereby represent and warrants that all Equipment to be provided to US GREEN INFRASTRUCTURE SOLUTIONS, LLC. hereunder has received approval, and that copies of the clearance/approval documentation issued will be provided to US GREEN INFRASTRUCTURE SOLUTIONS, LLC. Upon US GREEN INFRASTRUCTURE SOLUTIONS, LLC.'s request.
Please feel free to consult us should there be any questions,