Top Banner
TERCERO PHASE II NEW CONSTRUCTION, LEED GOLD David Mogavero Patrice Coffman
26

Tercero phase II new Construction, LEED GOLD

Jan 11, 2016

Download

Documents

alodie

Tercero phase II new Construction, LEED GOLD. David Mogavero Patrice Coffman. Project Profile. Tercero Student Housing, Phase II 155,000 square feet $35 million 592 beds Sep. 2010 completion Architect: Mogavero Notestine Associates Contractor: Brown Construction. Energy. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tercero phase II new Construction, LEED GOLD

TERCERO PHASE IINEW CONSTRUCTION, LEED GOLD

David Mogavero

Patrice Coffman

Page 2: Tercero phase II new Construction, LEED GOLD

Project Profile

Tercero Student Housing, Phase II 155,000 square feet $35 million 592 beds Sep. 2010 completion Architect: Mogavero

Notestine Associates Contractor: Brown

Construction

Page 3: Tercero phase II new Construction, LEED GOLD
Page 4: Tercero phase II new Construction, LEED GOLD
Page 5: Tercero phase II new Construction, LEED GOLD

Energy

exceeded Title 24 by 32% savings of 572,145

kWh + 3,576 therms = $52,744

high-performance windows

solar thermal

Page 6: Tercero phase II new Construction, LEED GOLD
Page 7: Tercero phase II new Construction, LEED GOLD

Water

project reduction of water use by 41% 30% from fixtures 11% from process

water

Page 8: Tercero phase II new Construction, LEED GOLD

Indoor Environment

increased ventilation by 30% rapidly renewable material recycled content material low or no VOC lighting controls

Page 9: Tercero phase II new Construction, LEED GOLD

Innovation

Green Cleaning Policy & Program education program (CIR 9/24/2001) “green” furniture building metering

Page 10: Tercero phase II new Construction, LEED GOLD

Occupant Satisfaction

93.3% of occupants are satisfied reliance on natural light

Page 11: Tercero phase II new Construction, LEED GOLD

CUARTO DINING COMMONSCOMMERCIAL INTERIORS, LEED GOLD

David Mogavero

Patrice Coffman

Page 12: Tercero phase II new Construction, LEED GOLD

Project Profile

Cuarto Dining Commons 18,430 square feet $7.9 million Sep. 2010 completion design/build Design Architect:

Stafford King Wiese Architect of Record:

Mogavero Notestine Associates

Contractor: Valley Construction

Page 13: Tercero phase II new Construction, LEED GOLD

Existing Interior

cafeteria style low ceilings dark small rooms multiple renovations

Page 14: Tercero phase II new Construction, LEED GOLD

Design – First Floor

Page 15: Tercero phase II new Construction, LEED GOLD

Design – Second Floor

Page 16: Tercero phase II new Construction, LEED GOLD

Energy

25% more efficient than Title 24-2001 40% reduction in lighting density solar thermal Melink system

Page 17: Tercero phase II new Construction, LEED GOLD

Interior

Page 18: Tercero phase II new Construction, LEED GOLD

Interior

Page 19: Tercero phase II new Construction, LEED GOLD

Outcome

a destination showcase dining facility support UC sustainable food goals education program (CIR 9/24/2001)

Page 20: Tercero phase II new Construction, LEED GOLD
Page 21: Tercero phase II new Construction, LEED GOLD
Page 22: Tercero phase II new Construction, LEED GOLD
Page 23: Tercero phase II new Construction, LEED GOLD
Page 24: Tercero phase II new Construction, LEED GOLD
Page 25: Tercero phase II new Construction, LEED GOLD

David [email protected]

Patrice [email protected]

images from Frank Domin, Christopher Fallon, Julianne Nola, UC Davis, and Mogavero Notestine Associates

Contact and Credit Information

Page 26: Tercero phase II new Construction, LEED GOLD

Thank you for your time!

QUESTIONS?

This concludes The American Institute of Architects Continuing Education Systems

Program