Jul 01, 2015
Important factors
FarmerEntities
deploying the project
Agriculture in Egypt
Core solution
Phase 1: collecting suggestions and data
An illustration more than a
map
1- location of the pipe
2- location of the hydrant
1- when to implement the project2- financial details3- other suggestions : i.e. diameter of pipes
Farmer Registration form
• Farmer Name
• First Contact No:
• Second Contact No
Registration Complete for farmer:Ayman Ramadan
Identification Number: 92078
Core solutionPhase 2: compiling data, make the best use of it
Processed data
World bank
Ministry of Irrigation Ministry of
Agriculture Construction contractors
others
Core solutionPhase 3: interaction between project admin & farmer Via SMS
Web App. ?? Mobile App. ??
SMS ??
Farmer complaints
Land code: #34C5Problem category: number
Marwaproblem
Common codeBy the supervisor or engineer
System notification
Notify farmer about important timings
#54c342
#54c342
Advanced developments
Same mechanism and costs
landwater plant Irrigation
scheduling
Why Us ??!!!
• Suitable for the end users (farmers)
• Low cost
• Practical
• A base for expansion