No: D E S C R I P T I O N QTY UNIT RATE AMOUNT A CIVIL WORK 1 Si ll & Jambs: Mai n door fr ame : Removing existing plastering and prov iding a coat of new pl aster and Providing & fixing door opening sills & Jambs ( 12" wide Telephone Black Granite). Granite edges shall l be chambered mirror polished complete finished. 30 Rft 2 Removin g f looring: Removing existing flooring and skirting and certifying debris ou t site the premises at dumping groun d. ( Debris wi ll not be allowed to stack on the site branch premises.) Rates are inclusive of labour and c arting loading/unloading, etc. for complete job. 1420 Sft 3 Le ve li ng floor ing: Removing existing mosaic tiles and carting away debris out side the premises at dumping ground. Flooring shall be leveled with 1: 6 cement mortar leveling finished to required slope. 130 Sft 4 Providi ng & Laying Vi trified ti les:(Branch Area:) Providing and fixing 8/9mm thk vitrified tiles Marbonite of HR Johnson 600mmx600mm laid over existing tiles after chiseling/ chipping / roughening with electric cutter and cleaning the sur face thoroughly and making ready to receive vitrified tiles. Periphery of the premises shall be provided with 24" wide black tiles (24'x24 '). Tiles shall be a laid over existing flooring with topped with cement slurry after properly lay ing in level flush finished joints filled w ith matching colour cement finished co mplete as directed by the Architect. (Granada Beige or Antika of MarbleSeries). Rate.upto Rs. 60/- Sft. 1068 Sft 5 Cera mi c t il es Fl oori ng :( Storage / Passages/ Storage/ toilet area ): Chipping/ chiseling and or roughen ing with e lectric cutter and clea ning the surface thorough ly. Providing and fixing Ceramic tiles in the p assage & storage / toilet area, Tiles having size 1 8"x18" or 16"x16 shall be matching to the flooring provided in the banking hall as laid over with cement + Ruff as per specification of the manufacturer, over existing tile flooring, joints flushed in matching colour cement as per the shade approved by the architect with cleaning / curing, complete as directed by the Architect Make: HR Johnson/Vitco or as approved by the architect. (Rate Rs. 55 Sft) 370 Sft 6 Dismantling existing tiles dado and flooring from both toilets and carting away debris from the site. 300 Sft 7 Ti le Dado( Wa ll Tiles) : Prov. Fixing glazed tiles on the wall (12"x6") as per the pattern and design finished complete. ( Rate Rs.55/ Sft) 300 Sft 8 PLUMBING WORK : For all toilet blocks, Sink, etc. laying GI Pipes assorted sized with all required accessories, like bend, couplings, etc. and concealin g into the wall after providing black Japan overjute cloth finished complete. including prov. and fixing Providing an taps, bib cocks, stop cocks, pvc connecters, etc JOB JOB 9 Flushin g Tanks : Prov. & fixing flushing tank Perry Ware Hindware complete with drain lines, fittings like PVC connection, Angle cock ( Jaguar/Plumber /ESSO) complete. 2 Nos. BHAGAT&ASSOCIATES Architects & Interior Designers Email:associatesbhagat@y ahoo.co.in Tel/ F ax :022- 2877 9171 Cell No : 9820733197 MUMBAI :4, Siddhivinayak Apartment, Bangur Nagar, Goregaon - (W), Mumbai-400 104 GOA : LF31, GHB Colony, Opp. Ekta Nagar, Porvorim, Goa. PUNE : Siddhart Height, Flat No-3, Manas Rd., Dhayari Phata, Singhgad Road, Pune-411041 Tender for Civil work for BANK OF INDI A , BICHOLIM Branch Bank Of India Bicholim Br. 1 8/3/2012
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
1 Gypsum Board False Ceiling : (At the Periphery): Providing & Fixing ½” thk. India
Gypsum board false ceiling( 15") with galvanized 22/24 GI frame complete, with
necessary offset, cutouts, etc. for light fixtures, finished complete as per the
manufacturer’s specification. The false ceiling shall be provided as per the profile
edge moulding complete.
200 Sft.
2 False Ceiling (Armstrong) : Providing and fixing in position false ceiling in
Armstrong 600x600 mm 15/16 mm Dune Supreme RH 99 Prima tile with Regular
edge frame work as specified by Armstrong with suspenders wherever required
complete as per the standard specifications
900 Sft.
A Total of A False Ceiling Rs.
B FURNITURE WORK
1 ENTRANCE DOOR: Main Door. Prov. and fixing Entrance door (Glazed ) as per the drawing No. 11. in silver anodized( 16 Micron) aluminium door section over
existing surface (Jindal make) in top and bottom, glazed with 12mm thick glass of
approved make with frosting. Item to include floor springs, lock, all necessary
hardware of stainless steel finish handle as approved by the Project
Consultant/bank in all respects.
21 Sft.
2 Fixed Glass partition : Prov. And fixing glass partition as specified above with
aluminium extrudes finished complete as per the drawing.
35 Sft
3 Encasing of Rolling shutter Boxing: ( Below weather shade )
Making and fixing ms.bracket ms Frame (50mmxm50mmx6mm) made out and
CPW frame for fixing 19mm ply, members shall be placed at 24" c/c apart ( 19mm
thk. play Marine IS -710). Boxing shall be provided with hatch for operation of
rolling shutter complete with locking arrangement. The exterior surface shall be
finished with oil paint as approved by the architect.
28 Rft
SOLID FULL HEIGHT PARTITION: (GENERAL SPECIFICATION )
4 Making and fixing solid full height wooden partition in frame work including
door in 2'x2' grid both ways /vertically and horizontally comprising 2"x 1 1/2" TW
section with 6mm apart and finished with ply 6mm thk. finished with 1mm thk.
laminates of approved make and colour Item to include 2"x2" TW member for door
frame. All exposed TW surface to be finished in melamine polish of matching
laminate colour as directed including all necessary stainless steel finish fittings/hard
wares, and wood preservative paint, etc. as per list of approved material and as
approved complete.
320 Sft
5 Partly Glazed Full Height Partition (UPS:) Providing and fixing in position partly
glazed Full Height Partition work as shown in the drawing nos (3) & (4) including
door as shown in the drawing no (13) in frame work at 2' X 2' grid (horizontally and
vertically) comprising of 2" X 1½” T.W. Section and /or as per frame work shown in
the drawings with 6mm plywood on both sides finished with 1mm thick laminates of
approved shade and colour as shown in drawings. Item to include 8mm thick glass
with etching and frosting as per design and 2"X2" T.W. door frame to take 8mm
thick glass with etching and frosting. All exposed T.W. surfaces to be finished in
melamine polish of matching laminate colour as directed including all necessary
Stainless Steel finish fittings/Hardware, door closures, Godrej locks and wood
preservative paint etc. as per list of approved material and as approved by the
6 Partly Glazed Full Ht. Partition: (Manager's Cabin in Branch) :
Making & Fixing fully glazed partition shall be provided 12mm thk. sheet clear glass
with etching design as per the pattern/design. The glass door shutter shall held in
top an top bottom with ½” thk. glass. polished complete with decorative SS
NEKI/Magnum make door handle arrangement at top/bottom rail including fittings,
locking arrangement complete as directed by the Architect.
115 Sft.
7 Low Ht Partition : (Relation Mgr/Acctt):
Providing and fixing in position partly glazed low height partition 2 1/2" thk in frame
work wooden partition with TW vertical members at 2 c/c and e horizontal members
at equal distance comprising of 2x 1/2"TW section with 6 mm plywood on both
sides finished with 1 mm thk laminates of approved made and shade as shown in
drawing No.( 14 ) or (3). Item to include 12 mm thick glass clear/frosted to be fixed
as specified above with height 3''-0" approx. with 12mm thick Clear/frosted to be
fixed as shown in drawing The exposed edges of the glass to be fin finished in
mirror polish. TW runner should be melamine polished in matching colour of
laminate etc. complete in all respects.
100 Sft.
8 Wicket Gate With Side Partition:
Same as item (Solid Partition) but the same shall be as wicket gate provided with
brass hinges, tower bolts, CP etc. complete as directed.
14 Sft.
9 Wooden Door Shutter ( for Partitions):
Providing & Fixing Door Shutter made out of with 35 mm thk Block board
0 Nos
COUNTERS
11 FRONT OFFICE COUNTER: Providing and fixing in position Front Office Counter
2'-6" Wide as per the bank's standard drawings No.(1-A, 1-B, 1-C. 1D & 15)
comprising of the following complete in all respects comprising of the followingcomplete in all respects.
15 Rft
Working Desk : Working top made with 25mm thick plywood finished with 1mm
thick laminate. Outside edges of the working top shall be provided with 1 1/4" x1"
Teak Wood moulding finished with melamine polish. Inside edge will be provided
with 1/2" x 1" T.W. beading patti with melamine finish.
Vertical fascia (Apron): made with 18mm thick plywood finished 1mm thick laminate
with 1mm thick groove at the joint of laminates of two different shades.
Vertical drop (horizontal band) shall be provided on the fascia below the working
top made with 18mm thick plywood finished with 1mm thick laminate with provision
Glazed partition: above working top to be provided with 12mm thick clear glass cut
to the standard shape fixed to partition as per fixing details and to boxing with
concealed S.S. finished 'D' brackets as shown in the drawing. The exposed edges
of the glass shall be finished in mirror polish.
Boxing : P & F 3'10" high Boxing (10"x10") made with 18mm thick plywood finished
with 1 mm thick laminate including providing and fixing 6 mm thick square frosted
glass at a height 3'-2" above finished floor level.
Boxing : P & F 1'-9" high Boxing (5"x5") made with 12mm thick plywood finished
with 1 mm thick laminate.
Vertical support made with 18mm thk plywood finished with white enamel paint.
Telescopic CPU Stand/ ready made Keyboard tray shall be provided of approved
model and make.
Footrest : made with T.W. member of size 4" x 1 1/2" finished with French polish.
Drawer units as per drawing shall be provided with multipurpose Godrej locks in
Each drawer. Fascia of drawer unit shall be finished with 1mm thick laminate and all
other sides shall be finished with white enamel paint. The drawers will be providedwith handles (SS finish) and channels as per approval of the Architect/ Bank.
Boxing as per drawing made with 12mm thick plywood finished with Synthetic
enamel paint shall be provided below the table top for electrical conducting and at
the bottom for the LAN cabling/Telephone wire conducting.
The item to include all necessary hardware and fittings in Stainless Steel finish,
lapping to all edges and making provision only for electrical fitting behind the front.
Vertical drop and also in the 10" x10" boxing as shown in the drawing. Necessary
beadings with melamine polish for fixing the glass are to be provided fixing the glass
12 Providing and fixing in position Cash Counter 2'-9" wide as per the bank's standard
drawing comprising of the following.
8.5 Rft
i) Working top made with 25mm thick plywood finished with 1mm thick laminate.
Outside edge of the working top shall be provided with 1 1/4" x 1" Teak Wood
moulding finished with melamine polish. Inside edge will be provided with 1/2" x 1"
T.W. beading patti with melamine polish.
ii) Vertical Fascia ( Apron) made with 18mm thick plywood finished with 1 mm thick
laminate with 1mm thick groove at the joint of laminates of two different shades.
iii) Vertical drop (horizontal band) shall be provided on the fascia below the workingtop made with 18mm thick plywood finished with 1mm thick laminate with provision
for concealed light, 1mm thick groove shall be provided at the joint of two different
shades of laminates.
iv) Glazed partition of 1'-4" height above working top provided with 12mm thick clear
class cut out to the standard shape fixed to partition as per fixing details and to
boxing with concealed S.S. finished 'D' brackets as shown in the drawing .The
exposed edges of the glass shall be finished in mirror polish.
v) Transaction top shall be provided with 12mm thick toughened glass ( Partly glazed
partly frosted) fixed horizontally with concealed SS 'D' bracket. Both exposed edges
(inside and outside shall be molded and finished in mirror polish.
vi) Glazed partition ( on Cash Counter)having height 4'-3" above the transaction top
( in fascia) shall be provided with 12 mm thick glass (clear) with cut out of 8" x 4" as
per drawing. The edges of cut out and the top edge of glass are to be mirror
polished and to boxing with concealed S.S. finished 'D' brackets as shown in glass
(clear) above the slit to be fixed to partition as per fixing details and to boxing with
concealed S.S. finished 'D' brackets as shown in the drawing. The exposed edges
shall be finished in mirror polish.
vii) Boxing 7'-7" high(10"x10") made with 18mm thick plywood as per drawing with 1'-
6" horizontal extension at the top including providing and fixing 6mm thick square
frosted glass at a height of 5" -11" above Finished Floor level.
viii) 1'-9" high boxing (5"x5") made with 12mm thick plywood finished with 1mm thick
laminate are to be provided.
ix) Telescopic CPU Stand/ready made keyboard tray shall be provided of approved
model and make.
v) Transaction top shall be provided with 12mm thick toughened glass ( Partly glazed
partly frosted) fixed horizontally with concealed Stainless Steel 'D' bracket. Bothexposed edges (inside and outside shall be molded and finished in mirror polish.)
vi) Glazed partition having height 1'-0" above the transaction top ( in fascia) shall be
provided with 12 mm thick glass (clear) with cut out of 8" x 4" as per drawing. The
edges of cut out and the top edge of glass are to be mirror polished and to boxing
with concealed S.S. finished 'D' brackets as shown in glass (clear) above the slit to
vii) Boxing (10"x10")7'-7" high made with 18mm thick plywood as per drawing with 1'-
6" horizontal extension at the top including providing and fixing 6mm thick square
frosted glass at a height of 5" -11" above Finished Floor level.
viii) Boxing (5"x5") 1'-9" high made with 12mm thick plywood finished with 1mm thick
laminate are to be provided.
ix) Telescopic CPU Stand/ready made keyboard tray shall be provided of approved
model and make.
x) Footrest : made with T.W. member of size 4"x1 1/2" finished with French polish.
xi) Drawer Units : as per drawing shall be provided and each drawer should have a
vertical partitions for keeping the currency notes and multipurpose Godrej locks.
Fascia of drawer unit shall be finished with 1mm thick laminate and all other sides
shall be finished with white enamel paint. The drawers will be provided with handles
( Stainless Steel Finish) and channels as per approval of the Project consultant/
Bank.xii) Boxing : as per drawing made with 12mm thick plywood finished with Synthetic
enamel paint shall be provided below the table top for electrical conducting and at
the bottom for the LAN cabling/Telephone wire conducting.
The item to include all necessary hardware and fittings in Stainless steel finish,
lapping to all edges and making provision only for electrical fitting behind the Vertical
drop and also in the 10" x10" boxing as shown in the drawing. Necessary beadings
13 Partly Glazed Partition for Cash Cabin: P&F wooden partitions in position 7'-7"
high partly glazed partition for cash cabins as per drawing No. (2-A, 2-B, 2-C, 2-D &
2E) including door drawing No. (12) in frame work at 2'x2' grid( horizontally and
vertically)and comprising of 2" x 1 1/2" section and / or as per frame work shown in
the drawings with 6 mm plywood on both sides finished with 1 mm thick laminates of
approved shade and colour as shown in drawings. Item to include 8mm thk clear
glass with etching and frosting as per design and 2"x2" TW member for door sides
and glass sides and TW door frame to take 8mm thick glass with etching and
frosting. The door shutter will be provided with TW louvers finished in melamine
polish of matching laminate shade. The doors are also to be provided with Godrej
190 Sft
All exposed two surfaces to be finished in melamine polish of matching laminate
colour as directed including all necessary Stainless Steel finish fittings /hardwares
door closures, Godrej Locks and wood preservative paint, etc. as per list of
approved material and as approved by the Project Consultant/Bank complete in all
respects.
14 Partly Glazed Low Height Partition:: Prov. And fixing in position partly glazed low
height partition (2 x 1 1/2") p 2 X 1 1/2" thick in frame work with TW. vertical
members at 2' c/c and 3 horizontal members at equal distance comprising of 2"x 1
1/2" TW section with 6 mm thk plywood on both sides finished with 1 mm thick
laminates of approved make and shade as shown in drawing No,( 14) or (3) Item
No. include 12" mm thick glass clear/ froaster to be fixed as shown in drawing. The
exposed edges of the glass to be finished in mirror polish TW runner should bemelamine polished in matching colour of laminate etc complete in all respects.(Near
Acctt's desk)
12 Sft
B Total of B Furniture work "B" Rs.
C WORK STATIONS :
Making and supplying wooden working desk and fixing in position Manager's
Table of size 5'-6" x 2'-6" as per drawing No. (6) Officer's Table of 4'-6" x2'-6" as
per drawing No. (5) including side storage (Credenza) by using 25mm thick
plywood for top and 18mm thick plywood for all other horizontal and vertical
members> Telescopic CPU stand/ready made Key board tray shall be provided of
approved model and make forest made with TW members of size 4"x1 1/2"
finished with French polish. Side storage (Credenza) as per drawing shall be
provided. Fascia of side storage credenza shall be finished with 1mm thk laminatesas approved as shown in the drawing and all other side shall be finished with white
enamel paint. The side Storage shall be provided with handles (stainless steel)
finished and channels as per approval of the project consultant /Bank. All exposed
plywood surface to finished with 1 mm thk laminate of approved make and shade
and all exposed edges of table top and ply vertical s to have 1"x1/4" two lapping
finished complete.
All exposed TW sections to be Melamine and internal surfaces to have white
enamel paint as directed. Item to include plywood boxing, all necessary hardwares
and fittings and stainless steel finish, lapping to all edges etc. complete in all
respects.
Officer's Table with Side Runner) :Size 4'-3" X 2'-3" X 3'-0" L or as per site
condition Making & S Officer’s table made out of Ply as per the profile and design
as specified above. Refer. Drawing No.5.)
3 Nos
Side Runner: (16"wide X 2'-3"ht : Making and supplying wooden side runner (16”
wide) as per the plan and profile made out ¾” ply with openable/ sliding shutter,
lamination finish to all exposed surface with including shelves and fittings / fixtures,
press lock shall be provided to sliding shutters, etc. complete. Edges of the runner
shall be provided with boroteak moulded lapping. complete with polishing.
Sr. Manager's Table: Including side runner :Size 5'-6" X 2'-9" X 2'-6"H Making &
supplying Manager’s table made out of ply as per the specification and top as
design given by the architects. All exposed surface shall be laminated. The table
shall be provided with beach wood .Moulding to all edges of the furniture complete
with fittings and fixtures like handles shall be lacquer finished as approved by the
architect. Table top shall be frosted glass 8mm finished with lamination to all
exposed surface and internally French polish finished complete.
1 No.
Side Runner: (16"wide X 2'-2"ht) ( manager cabin ) Making and supplying wooden
side runner (16” wide) as per the plan and profile made out ¾” ply with openable/
sliding shutter, lamination finish to all exposed surface with including shelves and
fittings / fixtures, press lock shall be provided to sliding shutters, etc. complete.Edges of the runner shall be provided with boroteak moulded lapping. complete with
polishing as specified..
5 Relation Manager - Work station with side runner: As specified in above but
item No. 5 size shall be 4'-6"x 2"-6" finished complete.
1 No
C TOTAL AMOUNT OF 'C ' WORK STATIONS RS.
D WOODEN STORAGE :
Making and supplying/fixing wooden cabinet for storage of files/records, etc. The
cabinet shall be made out of 19mm thk ply for skeleton including shutters. The
shutter shall be openable /sliding as per the drawing complete with fittings and
type for sliding shutters, 3" handle lacquered finished as directed by the architect .
All exposed surface shall be finished with lamination and internally finished withFrench polish. All exposed edges of the play shall be finished with two lapping
including shelves (19mm thk) complete. Back ply of the cabinet shall be provided
with (IS- 701) marine ply treated with anti termite chemical " termiseal" finished as
complete.
1 Low Ht./ Full ht. Storage Cabinet As specified above. 60 Sft.
2 ELECTRIC CABINET: (With fire retardant paint) :Making and fixing wooden cabinet
15" deep wooden frame work for electric /switches, etc. Sides front and Shutters
shall be made out of 19mm thk FRMP (Fire retardant Marine Ply) with inter fire
retardant paint inside and laminated finished externally & with collapsible
openable hinges, aluminium ac grill 45degree louvers (EPC), fire retardant paint
from inside complete as specified.
32 Sft.
3 Column Paneling : ( Concealing down take elect/ data cables / Switch boards,
etc.) Providing and fixing wooden Hardwood /salwood frame (2"x1") with using 6mm& 12mm ply with combination of laminate as per bank's approved shade/ metal (4"
strip) Two 15mm thick 18 mm thk ply finished complete as directed.
150 Sft.
D TOTAL AMOUNT OF "D" RS.
E MISCELLANOUS WORK :
1 Soft Board (Display): Making and fixing soft board for displaying information, etc.
The soft board shall be ½” thk with approved felt cloth placed over 6mm thk ply with
two moulding (30mm) and decorative metal as per the design complete.
32 Sft.
2 Notice Board : Making & Fixing Notice board made out of 12 mm thk. ply & 3” deep
boxing with 6 mm back. soft board finished with fabric as approved by the Architect.
The edges shall be finished with lamination.
2 Nos.
3 Writing Desk/Complaint Box/ Cheque drop box: 30" long Wall mountedMaking and fixing Cheque writing desk with 8mm thk. glass on top and sides with
box 5"x5" with glass selves (4) with lamination to internal wooden ply surface sides,
writing desk shall be rested on the Box 12" deep with shutter and glass window
including locking arrangement as per the profile finished with lamination to exposed
and internally with zinc polish finished complete.
1 No.
6 ACP Work : Providing & fixing Aluminium cladding with 25 Al. foil 4mm thk PUD
finish (Exterior finish ) with LDP sheet including MS+ aluminium frame work and
covering / fixing the same as per the colour shade approved.
vii Supplying Patch Chords (RJ45 to RJ 45 factory crimped patch cord. 2 meter long)
TOTAL SECTION OF "H" Rs.
SECTION "I"
I) TELEPHONE WIRING
a) Supplying/Installation/Commissioning of Telephone DB consisting of tag blocks in
groups of 20 pair Krone and module with termination and crimping, etc. complete
with metal enclosure spray painted krone tag block mounting arrangement,
telephone distribution chart & locking arrangement.(Delton/ Finolex).
1 No
b) P & F 10 pair telephone cables 0.5 mm dia electrolytic tinned copper conductorsPVC insulated and twisted pair with rip cord as follows through already laid PVC
conduits.
25 Mtr
c) Supplying & laying 0.5mm Dia.electrolytic tinned Cu conductors PVC insulated &
twisted pair with rib cord(1 no. of 2 pair cables) through already laid conduits
complete including RJ 11 telephone outlet plate with box .
11 Nos
d) P & F chrome plated box suitable for mounting AT&T I/O socket. The box shall be
fixed in partitions recessed mounted. Including RJ 45 I/O plate.
11 Nos
TOTAL SECTION OF "I" Rs.
SECTION "J"
J EARTHING PIT
a)Excavating earth for earth pit with 600 x 600mm as per IS Code:3063 with 3mm
thick Cu electrode and with a chamber and funnel, watering arrangement including,
charcoal, salt etc.The electrode shall be connected with Cu strip (25mmx4mm thick)
& terminated into the chamber nut bolt arrangement.The rate for earthing strip up to
ATM/ Server is included. (Note: Photographs of Pit showing depth shall be
submitted and Cu plates shall be placed in the presence of the architect
/Bank)
2 Nos
b) Supply and laying of 1Core 16 sqmm insulated Cu wire from earthing chamber
to the UPS panel and terminating the same. The portion of the wire under ground
shall be laid to a depth of at least 30 cm. through GI pipe and on the wall with
saddles clamped.
6 mtr
c ) As above but copper strip 25 x 5 mm from Earth pit to main Panel with clamping
complete as directed.
6 mtr
TOTAL SECTION OF "J" Rs.
SECTION "K"
K INVERTER SECTION: (Optional Work)
i Change Over : P/F manually operated change over (KEW 63 A) including inter
connecting with necessary wiring complete as directed
1 No
ii Light Points : Providing light points as specified above for light and Wall/ ceiling
fan points.
10 Nos
TOTAL SECTION OF "K" Rs.
Rates are inclusive all taxes,VAT, Transport, Labour charges, etc.