SPAG Project 1 Tender Document For Fabrication, Supply & Erection of Structural Swing Doors for SPAG facilities (Package – A) Satish Dhawan Space Centre SHAR Indian Space Research Organization Sriharikota
23

Tender Document For Fabrication, Supply & Erection of ...

May 06, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

       

Tender Document  For 

Fabrication, Supply & Erection of Structural Swing Doors for SPAG facilities (Package – A)  

         

   

  

        

       

Satish Dhawan Space Centre SHAR Indian Space Research Organization 

Sriharikota 

Page 2: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

Table of Contents & List of Annexures 

S.No  Annexure  Page No.  

A  Bid Qualification Criteria  3 

1  Scope of work  5 

2  Technical specifications  6 

3  General Terms and conditions  12 

4  Annexure – 1 : Compliance Statement   18 

5  Annexure – 2 : Price Bid Format  19 

6  Annexure – 3 : QAP.  21 

7 Annexure  –  4  :  Drawings  for  doors  at  different  facilities  of  SPAG (Package – A) in SPP, SDSC‐SHAR. 

List as per table mentioned in clause 

1.9 of this specifications. 

  

Page 3: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

BID QUALIFICATION CRITERIA FOR SUPPLY & ERECTION OF STRUCTURAL STEEL SWING DOORS Bidders who are qualifying/meeting following Technical and Financial capabilities are eligible 

to  participate  in  the  bid  for  supply  of  structural  steel  raw materials,  site  fabrication,  finishing, levelling, Erection & Commissioning of structures. Bidder shall furnish all the requirements asked in this criterion with documentary proof and submit along with quotation. Bids of the parties which are not meeting the following criteria will not be considered for evaluation and will be rejected without seeking any further clarifications. 

Bidder shall print, sign and stamp each page of proposal as token of acceptance & submit scan copy of the same along with the offer.  

S.No  Description of Requirements  Bidders confirmation 

Technical Qualification  Requirements: The  bidder  should  meet  the  following  technical  qualifying requirements  a nd shall submit relevant certificates to establish his credentials. 

 

1.1 

The Bidder  should be  an  organization with  experience  in having executed  contracts  for  procurement  of  structural  steel  raw materials,  fabrication, supply and erection of structures for  last 5 Years  in  India.  Necessary  firm  establishment  certificate  shall  be provided. 

1.2 

The  firm  should  have  successfully  completed  supply/fabrication, finishing,  levelling and erection of structures using mobile cranes, erection and  commissioning of  structures/doors of  size ~4m and above during last 05 years.  Bidder  shall   provide  PO  copies,  relevant  completion  certificates  from  the owners  (end users with  addresses,  contact person with phone numbers) along with the submission of bid for consideration  of bid document. 

 

1.3 The  firm  should  have  facility  to  fabrication  of  structures  at  his factory  if  required  and  same  shall  be  sent  to  us  as  and  when required. 

1.4 Bidder  shall  furnish  the  details  of  their  factory  like manpower, machinery,  quality  system  etc,  for  department  to  access  their capability.  

 

2 Financial Qualification  Requirements: The bidder  should also meet  the following  financial qualification requirements: 

 

2.1 

The Bidder should have an annual turnover of not less than a value of Rs.60lakhs per year on average for the last three financial years 

ending                 31‐03‐2020. Copy of audited Balance Sheets for  last 

three years have to be submitted.

 

2.2 

Firm  should  have  undertaken  and  successfully  completed following value of works related fabrication of structures/doors at least in last 05 (Five) years: Single work order not less than: Rs.80lakh 

(or) Two works order not less than: Rs.50 lakh (each) 

(or) Three works order not less than: Rs.25lakh (each) Copies of PO`s shall be attached. 

 

2.3 Bidder  should  possess  a  current  Solvency  Certificate  from Nationalized Bank for an amount of not less than Rs.25lakh. 

 

Page 4: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

S.No  Description of Requirements  Bidders confirmation 

2.4 IT/ TDS  certificate  shall be  submitted with  Loss & Profit  for  last 

three  years ending 31‐03‐2020. Copy of audited Balance  Sheets 

for last three years shall be provided.

 

2.5 Bidder shall submit audited statement of  financial status  for  last 03 years ending 31‐03‐2020. 

II. The following documents shall be submitted along with the application for prequalification of 

Bid: 

1. List of documents of proof submitted along with BQC for S.No. 1 & 2.  

2. Any other relevant information which add value to above. 

IMPORTANT NOTES :  

1. Bidder shall furnish all the above details fully and explicitly.  

2. Please  note  that  the  “BID”  without  above  mentioned  the  documents/information  in support of the eligibility criteria will be summarily rejected.  

3. No further clarifications will be seeking in this regard. 

III. Bid Selection Procedure and Process of BID Qualification Step ‐ 1  :  Short listing based on documents submitted, satisfying the all eligibility criteria 

given above by the firm or individual along with their Bid / application. (Non‐

submission of any document as given in above list within stipulated time leads 

to rejection of Bid). 

Step ‐ 2  :   Subsequently Bidder’s competency, their technical achievements and  financial status will be evaluated suitable for his project. Feedbacks from Bidder`s clients will be verified. 

Step – 3  :  Visit  to  sites  by  technical  team  (ISRO  or  Third  party)  where  Bidder  has established above mentioned structures. 

Step ‐ 4  :  If required, visit will be made to their factory/ firm by technical team (ISRO or third party) for accessing the capability of manufacturer. 

Step ‐ 5  :  Meanwhile  technical  Bids  will  be  opened  and  scrutinized  for  meeting  all technical specification and supply conditions. 

ISRO  ‐  SHAR  reserves  right  to verify  the  information  / data  furnished by Bidder.  If  the  same  is 

found as fault or with any deviation the bid will be rejected. 

Only  those  Bidders  who  are  found  suitable  &  meeting  all  the  above  qualification 

Criteria/requirements will be finally qualify for opening the Price Bids for evaluation. 

 

Page 5: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

 

1. SCOPE OF THE WORK 

The  scope of  this work  is  fabrication,  supply, erection, painting and  inspection of  structural steel swing doors as per technical specifications, drawings and terms & conditions given below: 

1.1 Procurement of raw materials. 

1.2 Preparation of fabrication plan. 

1.3 For the wheel movement of the door, metal strip plate shall be grouted  in the concrete floor. Wheel shall transfer the  load to metal plate embedded  in the  floor throughout  its movement of door. 

1.4 Inspection of the fabricated door at supplier's work site. The bidder shall give a call for the inspection of fabricated doors before dispatch. 

1.5 Transportation of the doors to Sriharikota and unloading. 

1.6 Assembly of doors with hinges & accessories based on the embedment plates available in building at SHAR site. 

1.7 Erection of doors  in SHAR site as per  the drawing, checking  the alignments,  functioning and finishing the door as per dimensions considering to accomplish the minor variation in size as mentioned above.  

1.8 The  supplier  shall bring necessary welding  sets, gas cutting  sets,  consumables, erection tools/equipments like mobile crane/ Hydra etc., skilled man power for erection of doors. 

1.9 Painting of the doors as per terms & conditions given in this specification. 

S. No 

Facility 

Door Dimension (W X H)      (in 

meters) 

No. of Doors 

(Qty) 

Drawing Number 

Total approximate weight of doors 

including weight of  sub‐components        

(in kg) 

1  HIL‐3  4 x 3  1 10‐03‐SPAG‐03‐004‐A1  (Sheet 1)  

1 x ~1171 = ~1171 

2  HIL‐3  2.5 x 3  1 10‐03‐SPAG‐03‐005‐A1 

(Sheet 1) 1 x ~485 = ~485 

3 Bowl Cleaning facility 

6.77 x 6  2 10‐03‐SPAG‐06‐001/A1/R1 

(Sheet 1 & 2) 2 x ~4270 = ~8540 

4 Bowl Cleaning facility 

5.5 x 4  1 10‐03‐SPAG‐06‐002/A1/R1 (Sheet 1) 

1 x ~2113 = ~2113 

5 Bowl Cleaning facility 

3 x 2.5  7 10‐03‐SPAG‐06‐003/A1/R1 

(Sheet 1 & 2) 7 x ~926 = ~6482 

6 Vertical  Mixer facility (1 & 2) 

5.6 x 7  4 10‐03‐SPAG‐10‐001/A1/R1 

(Sheet 1 & 2 ) 4 x ~4384 = ~17536 

7 Vertical  Mixer facility (1 & 2) 

6.5 x 4.5  2 10‐03‐SPAG‐10‐002/A1 

(Sheet 1 & 2) 2 x ~2962 = ~5924 

Page 6: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

S. No 

Facility 

Door Dimension (W X H)      (in 

meters) 

No. of Doors 

(Qty) 

Drawing Number 

Total approximate weight of doors 

including weight of  sub‐components        

(in kg) 

8 Vertical  Mixer facility (1 & 2) 

7.6 x 7.5  4 10‐03‐SPAG‐10‐003/A1/R1 

(Sheet 1& 2) 4 x ~5680 = ~22720 

9 Vertical  Mixer facility (1 & 2) 

2 x 3  4 10‐03‐SPAG‐10‐004/A1 

(Sheet 1) 4 x ~442 = ~1768 

10 Vertical  Mixer facility (1 & 2) 

2.5 x 3  4 10‐03‐SPAG‐10‐005/A1 

(Sheet 1) 4 x ~485 = ~1940 

11 Premix  Storage facility 

6.77 x 6  2 10‐03‐SPAG‐04‐001/A1/R1 

(Sheet 1 & 2) 2 x ~4270 = ~8540 

12  MAHAN  8 x 4.4 2  10‐03‐SPAG‐08‐001/A1 

(Sheet 1 & 2) 2 x ~2709 = ~5918 

Note : The dimensions may vary within +300mm and the same shall be accommodated based on the 

actual dimensions available in revised drawings (if any)/site condition without any additional 

cost.  

2.  TECHNICAL SPECIFICATIONS 

2.1 Specifications for Raw materials (Structural Steel) for structural fabrication works : 

This  specification  covers  the  general  requirements  for  supply  of materials  required  for 

fabrication  of  structural  steel  swing  doors  as  per  the  relevant  standards  for  various  facilities 

coming  under  SPAG  Project,  SDSC  SHAR.  Following  requirements  need  to  be  ensured  by  the 

bidder regarding the procurement of materials: 

i) All steel raw materials used for structural steel swing doors shall be of good standard quality 

without any defects/inclusions/corrosion. 

ii) All the materials mentioned in the drawings shall be as per relevant IS standard. 

iii) Structural steel shall be as per IS: 2062 Gr. B and as per the drawings. 

iv) Shafts and Pins for hinges shall be of wrought steel as per the drawing. 

v) Steel should be of make M/s SAIL/ JINDAL/ RINL/ VIZAG /ESSAR / TISCO only. 

vi) Bearings  should be of good quality and genuine make of SKF/FAG‐INA/TIMKEN. Genuinity 

certificate of bearings shall be submitted. 

vii) All  structural  steel materials  shall  have  test  certificates  with  heat  no.  and  lot  no.  from 

original manufacturer/Material  test  certificate  from  government  approved  lab/authorised 

steel supplier shall be provided by the bidder. 

viii) Fasteners of reputed make like M/s TVS/UNBRAKO/LPS only shall be used. 

2.2 Inspection & Testing : 

For the scope of work mentioned above, arrangements shall be made by the bidder for 

the  inspection  during  various  stages  of  its manufacture  at  his  works  starting  from  the  raw 

materials stage to till the completion of works, as declared by SDSC SHAR. 

i) Door shall be inspected for dimensions, alignment, verticality etc. as per the drawing. 

ii) The bidder shall offer the  fabricated doors  for  inspection by department personnel before 

dispatch. 

Page 7: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

iii) For  any major modification/repair  work,  bidder  shall  seek  permission  from  department 

before doing so. 

iv) All  the material  test  certificate  has  to  be  submitted  to  the  department  at  the  time  of 

inspection. 

2.3 Equipment & Services to be provided by the bidder : 

i) Inspection & qualification tests shall be as per standard manufacturing procedures.  

ii) Supervision of fabrication/erection works. 

iii) DP test for critical welds i.e. load bearing members shall be conducted by the bidder. 

iv) DP test certificate shall be provided by the bidder. 

v) Erection and handing over at site. 

vi) Provisions for fixing anchor fasteners and erection of anchor fasteners to be carried out by 

the  bidder  wherever  embedded  plates  are  not  available.  All  hardware  like  fasteners, 

washers, clamps etc. is in the scope of bidder’s only. No separate claim shall be entertained, 

in this respect. 

vii) At least 10% extra hardware (like wheel/roller assembly, bearing type hinge assemblies etc) 

shall be provided for any installation/fixing work to ensure ready availability of hardware in 

case of damage of some hardware during installation. 

viii) Holes drilling/enlarging if any shall be carried out using drilling machine only. No gas cutting 

is permitted. 

ix) Grinding of sharp edges to smooth finish shall be carried out. 

x) Doors after erection should be perfectly vertical in both open and closed condition. 

xi) The gap between two  leafs of the door  in closed condition should be uniform  from top to 

bottom as mentioned in drawing. 

xii) Bidder shall bring all machinery and man power required to carry out erection works, minor 

fabrication work  at  site  if  any,  including  cutting  sets, welding machine,  grinding,  cutting 

machines and drilling machines.  

xiii) The  bidder  shall  bring  the  consumables  such  as  electrodes,  filler  rods,  grinding  wheels, 

industrial  gases  (oxygen/acetylene),  Argon  for  TIG,  DP  test  kit,  face  shields,  gloves, wire 

brush, paints, U‐clamps, emery paper, cotton waste, safety PPE and any other hand / power 

tools etc required for completion of the work. 

xiv) The  supplier  shall  bring  necessary  welding  sets,  gas  cutting  sets,  consumables,  erection 

tools/equipments like crane/forklift etc., skilled man power for erection of doors. However, 

material  handling  support  if  any  like  mobile  crane/forklifts  etc.,  will  be  provided  by 

department “if available” on chargeable basis. 

xv) Shop inspection and tests as per specifications in QAP and as mentioned in this tender shall 

be  arranged  by  the  bidder  to  enable  department  personnel  to  inspect.  Wherever  not 

specified, the shop inspection tests shall be as per latest IS codes applicable. 

xvi) Necessary height raising platforms/scaffoldings shall be arranged by supplier for carrying out 

erection works at site. 

2.4 Specifications for Fabrication & Erection: 

2.4.1 General : 

i) Fabrication  of  structural  steel  swing  doors  shall  be  done  as  per  drawing  issued  by Department. 

ii) Any defective material used in the work shall be replaced by the bidder at his own expense. 

Page 8: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

Necessary  care  and  precautions  shall  be  taken  so  as  not  to  cause  any  damage  to  the structure during any such removal and replacement.  

iii) All the structural steel swing doors shall be fabricated as per the approved drawings issued by the department.  

iv) After placement of PO  

a) The  bidder  shall  thoroughly  study  the  drawings  and  shall  prepare  fabrication  plan/ procedure with detailed  steps and  the  same  shall be  submitted  to  the department  for review  if  asked/required.  Any  clarification  required  shall  be  asked  by  bidder  before commencing fabrication work. 

b) Bidder shall prepare detailed shop drawings/fabrication drawings on the basis of design drawings  supplied  by  the  department.  After  approval  from  department,  the  bidder should start the fabrication work. 

v) Schematic  drawing  showing  the  sizes  of  structural  steel  swing  doors  is  furnished  in  the drawings  enclosed  with  this  tender  specification.  Any  minor  change  in  the  size (increase/decrease) of the doors at  later stage +300mm shall be done by the bidder as per revised drawing issued by the department without any extra cost. 

vi) The structural steel swing doors shall be fabricated in bidder’s workshop. This shall be open for inspection by department or any other agency nominated by Department. 

vii) Before dispatch of the fabricated structural steel swing doors from workshop, the same will be inspected by department engineer or agency nominated by department. 

viii) Tolerances for fabrication of steel structures shall be as per IS: 7215. 

ix) Bidder  shall depute his team for carrying out works on need basis. Bidder  shall also arrange material in smaller lots as and when required for site works. 

x) The bidder  shall use only ESAB/ L&T Eutectic/ ADOR/ D&H make electrodes for carrying out the structural fabrication works. 

xi) The  bidder  has  to  depute  one  experienced  supervisor  for  co‐ordination  of  site  activities, discussion  and  finalization  of  site  erections with  department  engineers  and  for  ensuring safety precautions. He shall be present at site during the entire period of work. 

xii) Bidder  is  responsible  for  safe  storage  of  raw  materials  and  shall  make  necessary arrangements if required at site. 

xiii) Water and Power supply shall be provided by the department at free of cost at one nearest point. Further distribution is in the scope of bidder. 

xiv) Bidder  shall  deploy  adequate  number  of  workforce  required  to  carry‐out  the  work  as discussed and approved after placement of purchase order. 

2.4.2 Fabrication Procedure 

i) All materials  shall be  straight and  if necessary, before being worked  shall be  straightened and/or flattened and shall be free from twists. 

ii) Plan of  fabrication/manufacturing  shall be prepared and  submitted  to department before starting of fabrication. 

iii) The  manufacture  includes  cutting  of  rolled  sections  &  plates  in  required  lengths,  edge preparation,  finishing,  welding,  inspection  of  welds,  stage  inspection,  removal  of  burrs, finishing. 

iv) The  entire  fabrication  activity  shall  be  performed  in  a  planned/  sequential  manner  to achieve desired dimensional/geometrical tolerances specified in the drawing. 

Page 9: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

v) In  assembling  and  joining parts of  a  structure or of build‐up member  the procedure  and approved  sequence of welding  shall be  followed such as  to avoid distortion and minimize shrinkage stress. 

vi) Bending of rolled sections and plates shall be done by cold process to shapes as shown on drawings. 

vii) Welder qualification, WPS, PQR as per IS shall be submitted. Qualified welders shall be used for this scope of work. 

viii) Edge preparation for welding to be carried out for all joints as per standard practice.  

ix) Preheat and  inter‐pass temperature shall be maintained as required on either side of point of welding as per the welding standards.  

x) All fillet welds shall be of minimum 6mm size unless otherwise specified in the drawing. The effective throat thickness of a fillet weld shall be shortest distance from the root to face of the diagrammatic weld.  

xi) All joints shall be welded unless noted otherwise on the drawings. 

xii) Welding shall be done in accordance with AWS/IS standards. 

xiii) Wherever welded  attachments  are  used  to  facilitate  fabrication,  same  shall  be  removed carefully by cutting or chipping and surface of material shall be finished smooth by grinding. 

xiv) Sub‐components  such  as  hinge  assembly,  wheel  assembly  etc.  shall  be  assembled  as     mentioned  in  the  drawing  to  check  for  the  dimensions,  alignment  and  functional requirement. Once the assembly of sub‐components  is done, unique  identification number    should  be marked  on  the  sub‐components  and  on  the  doors  also  so  that  at  the  time  of erection  the  sub‐components  can  be  fitted  at  the  correct  location  of  the  corresponding doors. 

xv) After  checking  the  alignment,  functional  requirement  and  marking  of  the  unique identification  number,  the  sub‐components  should  be  disassembled  and  door  along with sub‐components shall be painted as per the specification before dispatch. 

xvi) The  sub‐components  such  as  hinge  assembly,  wheel  assembly  etc.,  should  be  supplied separately and kept at safe location.  

2.4.3 Assembly 

i) The component parts shall be assembled and aligned in such a manner that they are neither twisted nor otherwise damaged, and shall be so prepared that the required camber, if any, is provided. Proper clamps, clips, jigs and other fasteners (bolts and welds) shall be placed in a  balanced  pattern  to  avoid  any  distortion  in  the members  and  to  ensure  their  correct positioning (i.e. angles, axes, nodes etc.). Any force fitting, pulling/stretching of members to join them shall be avoided.  

ii) Proper care  shall be  taken  for welding  to avoid  shrinkage & distortion  so as  to attain  the finished dimensions and shape of the structure shown on the drawings. 

iii) After assembling the  frame and before doing  the  full welding,  the  frame shall be properly inspected as per the dimensions shown in the drawing. 

2.4.4  Welding 

i) All joints shall be welded unless noted otherwise on the drawings. 

ii) Welding shall be in accordance with IS: 816, IS: 819, IS: 1024, IS: 1261, IS: 1323 and IS: 9595, AWS D1.1, AWS D1.2, & AWS D1.6 etc. (latest edition) as applicable. 

iii) The  Contractor  shall  have  sufficient  number  of welding  sets  of  the  required  capacity,  all 

Page 10: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

10 

consumables,  cutting  and  grinding  equipment  with  requisite  accessories/  auxiliaries, equipment & materials required for carrying out various tests such as dye penetration test. 

iv) Adequate  protection  against  rain,  dust,  snow  &  strong  winds  shall  be  provided  to  the welding  personnel  and  the  structural  members  during  off‐site  fabrication/welding operation. In the absence of such a protection no welding shall be carried out. It shall be the responsibility of the Contractor to ensure that all welding  is carried out  in accordance with the terms of  this specification and  relevant BIS codes. The Contractor shall provide all  the supervision to fulfil this requirement. 

2.4.5 Welding Approval & Testing of Welding Procedures  

i) The Contractor shall carry out procedure tests  in accordance with  IS: 7307 to demonstrate by means of a specimen weld of adequate length on steel representative of that to be used, that he can make welds with the welding procedure to be used for the work to the complete satisfaction of the Engineer‐in‐Charge/Quality Inspector. 

ii) The test weld shall include weld details from the actual construction and it shall be welded in a manner simulating the most unfavourable  instances of fit‐up, electrode condition etc., which  are  anticipated  to  occur  on  the  particular  fabrication. Where material  analysis  is available,  the welding procedure  shall be carried out on material with  the highest carbon equivalent values. 

iii) After welding, but before the relevant tests given  in  IS: 7307 are carried out, the test weld shall be held  as  long  as possible  at  room  temperature, but  in  any  case, not  less  than  72 hours,  and  shall  then  be  examined  for  cracking.  The  examination  procedure  shall  be sufficiently rigorous to be capable of revealing significant defects  in both parent metal and weld metal. 

iv) After establishing the welding method, the Contractor shall finally submit to the Engineer‐in‐Charge/Quality  Inspector  for his approval  the welding procedure  specification  in  standard format given in IS: 9595 before starting the fabrication. 

2.4.6 Sequence of Welding 

i) As far as practicable, all welds shall be made in a sequence that will balance the applied heat of welding while the welding progresses. 

ii) The direction of the general progression in welding on a member shall be from points where the parts are  relatively  fixed  in position with  respect  to each other  towards points where they have a greater relative freedom of movement. 

iii) Welding shall be carried continuously to completion with correct number of runs. 

iv) The Contractor shall choose the welding sequence after carefully studying each case such as to minimize distortion and shrinkage & submit the same to the Engineer  In‐Charge/Quality Inspector for comments and approval. 

v) The welding seams shall be  left to cool slowly. The contractor shall not be allowed to cool the welds quickly by any other method. 

vi) For multi‐pass welding, before welding the following layer the formerly welded layer shall be cleaned metal bright by light and wire brushing. 

2.4.7 Dye Penetration 

The  tests  shall  be  carried  out  by  employing  approved  testing  procedure  in accordance with IS: 822. 

i) All the critical welds/load bearing members shall be tested/qualified with 100% DP test. 

ii) For all  the other  fillet welds,  random  checking of 10% of  the welds  shall be done by  the 

Page 11: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

11 

Engineer‐in Charge/Quality Inspector. 

2.4.8 Site Operations 

i) Experienced and qualified Engineer/Supervisor/Manpower i.e. rigger, fitter, welder etc. shall be in full time charge of the job. 

ii) Bidder shall furnish at his own expense, the necessary non‐inflammable staging and hoisting materials  or  equipment  required  for  the  erection  work  like  mobile  cranes,  handling equipments, chain pulley blocks, winches, rigging tools etc. and shall remove and take them away after completion of the job.  

iii) Bidder  shall  also provide necessary passageways,  fences,  safety belts, helmets,  lights  and other fittings to the satisfaction of Owner/Engineer and to meet the rules of local authorities and for protection to his men and materials. A  licensed electrician shall be kept on the  job for  the  entire  duration  of  the  work  to  maintain  bidders  electrical  equipment  and connections. 

iv) Bidder shall protect all existing plant, structures, piping, conduits, equipment and  facilities against damage during erection. Any damage caused by bidder shall be rectified entirely at bidder’s cost, to the satisfaction of Owner/Engineer. If work has to be carried out adjacent to existing switch yards or electrical installations which are live, bidder must ensure suitable safety precautions in consultation with Engineer. 

v) If  a  portion  of  the work  of  the  project  area  cannot  be made  available  to  bidder  for  his activities due to operations being carried out by other agencies, he shall suitably modify his sequence  of  operations  to  continue  work  without  interruption.  Bidder  shall  work  in coordination with other agencies working on the project site and plan his work suitably so as not to hinder the progress of construction at site. 

2.4.9 Painting and corrosion protection 

i) The doors are exposed to dusty, highly humid and saline environment. Hence utmost care shall be taken while carrying out the painting work. 

ii) Spray  painting  shall  be  carried  out.  Bidder  should  have  necessary  tools  like  spray  gun, pneumatic hose, consumables etc. in order to do the painting work. 

iii) Before doing painting work, proper surface preparation shall be done confirming to SA 2 1/2 i.e. near to white metal finish. 

iv) Before closing the door frame, two coats of high build epoxy primer with a minimum DFT of ~80  microns  should  be  applied  all  over  the  surface.  Before  closing  the  door  frame  an inspection call be offered to department.  

v) No gap in the door frame shall be allowed so that no water should enter inside the frame i.e. the door frame should be completely sealed.  

vi) Painting operation shall generally in line with IS 1477. 

vii) Painting shall be done with high build epoxy/epoxy zinc rich primer and with epoxy paint. 

viii) Painting  of MS  Structural work which  are  exposed  to  atmosphere  i.e.  the  visible  portion includes surface preparation, mixing and application of two coats of high build epoxy primer and two coats of high build epoxy paint with a minimum total DFT of 300 microns. 

ix) Painting of MS  Structural work which  are not exposed  to  atmosphere  i.e.  the non‐visible portion  includes  surface preparation  and mixing &  application of  two  coats of high build epoxy primer only with a minimum DFT of 80 microns. 

x) Steps involved in Painting work:   

a) Painting of frame with two coats of high build primer. 

Page 12: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

12 

b) Before closing of sheets/frame, two coats of high build epoxy primer on inside surface of sheet shall be applied. 

c) Closing  the  other  face  of  the  frame with  cover  sheet  having  two  coats  of  high  build epoxy primer on inside surface, two coats of primer and one coat of paint on the outer surface. 

d) Applying final coat of paint on the entire structure which is exposed to atmosphere. i.e. the entire visible portion. 

e) Color  scheme:  It will be  provided by purchaser  and  in  general  as per  relevant  Indian standards and which will be applicable for final coat. 

f) Supply of paints shall be  in  the scope of bidder. Make of paints shall be M/s Berger / Asian Paints / Nerolac / J&N / Nippon / German Polymers / Grand Polycoats. Final paint code applied shall recorded and submitted to department. 

xi) The following inspections will be carried out by Department engineer. 

a) Pre‐surface preparation inspection. 

b) Determination of surface preparation. 

c) Inspection of coating surface & coating application. 

d) Evaluating cleaning between coats. 

e) DFT measurement through paint thickness measurement gauge. 

 

2.4.10 Erection of Doors 

i) The door shall be transported to Sriharkota after pre‐delivery inspection and approval from Department. 

ii) The doors should be properly unloaded at pre‐defined area given by Department and kept in a levelled surface so that no bending of structures should occur. 

iii) The doors should be erected in such a way that the door dimension should match with cut‐out size in the building and there should not be any gap between the door structure and the building  interfaces.  If any clearances/interferences are noticed, the same shall be  rectified by  the bidder without  any  additional  cost  and  final  finishing  and painting  shall be  as per standard procedure mentioned in this specifications. 

iv) In closed condition there should not any gap between the two leafs of the doors apart from the clearance provided in the drawing. 

v) The doors should open and close easily after erection. 

vi) Grease nipples should be provided in the hinge assemblies for greasing of bearings. 

vii) All the bearings shall be provided with lubricant i.e. grease of sufficient quantity. 

viii) For  the wheel movement of  the door, metal  strip plate  shall be  grouted  in  the  concrete floor. Wheel shall transfer the load to metal strip throughout the movement of door. 

3 GENERAL TERMS AND CONDITIONS 

3.1 Bidder  shall  sign and  stamp each page of proposal as a  token of his acceptance &  submit along with his offer. Document shall be scanned and uploaded in e‐procurement portal. 

3.2 Cost quoted shall be firm and fixed till completion of order. Price shall be quoted  in  Indian National Rupee only. 

Page 13: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

13 

3.3 Quote shall be based on F.O.R. Delivery at place, SPP, SDSC‐SHAR, Sriharikota. 

3.4 All Taxes and duties applicable shall be indicated clearly in quotation. 

3.5 Successful  Bidder  shall  submit  the  project  execution  plan  with  delivery  bar  chart  within 15days from the date of issue of purchase order. 

3.6 Bidder should award any part of the work under the scope of this tender to any sub vendor only  after  obtaining  necessary  approval  from  the  department.  If  bidder  is  planning  to subcontract any part of this tender document, then the bidder shall indicate clearly such of those works planned to offload to his sub‐vendor in their offer. 

3.7 The erection works at  facility  requires  that,  the bidder    (successful bidder)  shall adhere  to good  daily  housekeeping  practices.  During  erection,  the  bidder    shall  keep  all work  and storage  areas  used  by  them  free  from  accumulation  of  waste  materials.  Scrap  shall  be removed from the site to the satisfaction of the Department. 

3.8 Satish Dhawan Space Centre – SHAR (SDSC‐SHAR), Sriharikota is declared as prohibited place under  official  secrets  act  1923.  Hence  during  execution  of  site works  necessary  security requirements enforced by the department from time to time shall be followed strictly. 

3.9 During  the  erection  of  doors  at  site  in  Sriharikota,  the  bidder  has  to  make  his  own arrangements for boarding,  lodging and transportation of his men and materials. However, subject  to  availability,  hostel  accommodation may  be  provided  by  the  department  (SDSC SHAR) on chargeable basis. 

3.10 Free electricity and water shall be provided by the department at one location close to the site (SDSC SHAR) for any minor site fabrications, erection and testing works.  

3.11 Before  starting  the  site work  (at  SDSC  SHAR),  the  bidder    shall  provide  insurance  as  per workman  compensation  act  to  all  his  personnel  working  at  site  in  Sriharikota  against accidents. Insurance for the same shall be borne by the bidder . 

3.12 Till erection of doors, the safe storing and handling of all equipment is in the scope of bidder.  

3.13 Transportation & Transit Insurance (if any) are fully in the scope of bidder and the same shall be borne by the bidder. 

3.14 Bid shall be submitted in two parts  

        Part ‐1 : Techno‐Commercial Part of the Bid. 

        Part‐2 : Price Part of the Bid. 

3.15 The bidder has  to  submit  the offer  for  structural  steel  swing doors  fabrication and erection work  for different  facilities  in  SPP,  SDSC‐SHAR  as per Annexure‐2 of  this  tender document. Items mentioned  in  this  tender  document  cannot  be  split.  Combined  lowest  offer will  be considered for placing the purchase order. 

3.16 Necessary care shall be taken during erection and commissioning of equipment at our site. Any damage to the property of Department shall be adequately compensated by the bidder. 

3.17 Bidders may visit and examine the site and  its surrounding to familiarize themselves of the existing facilities and environment. 

3.18 Bidder shall confirm to all the tender terms and conditions and quote  for all entire scope of supply,  fabrication  and  site  erection.  If  bidder  is  not  quoting  for  either  of  the  item  in  the tender, department has the right to reject the offer. 

3.19 Quantity variation: Quantity may vary  in the range of ±5% of the Purchase Order quantity as per drawing. Rates quoted shall remain firm for ±5% of the Purchase Order quantity.  

3.20 Fabrication of  swing doors  shall as per  the drawings. The  size of  the doors may be vary within +300mm based on actual site conditions and the same shall be fabricated without 

Page 14: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

14 

any additional cost. Final door dimensions as per actual site conditions will be considered for quantifying/clearing the door for acceptance. 

The drawings are tentative and the final drawings will be issued along with purchase order as per actual door sizes. The payment will be made based on actual dimensions, drawings & weight on final drawings on pro rata basis.  

3.21 Validity of Offer : 

Bid  shall  remain  valid  for  acceptance  for  a  period  of  Six  months  from  the  due  date  of submission of the Bid.  

3.22 GST AND OTHER COSTS, IF ANY: Percentage of applicable GST for the quoted items along with HSN Code, shall be provided. As per the Notifications No.47/2017‐Integrated tax(Rate) dated 14.11.2017 issued by Ministry of Finance(Department of Revenue), SDSC SHAR is eligible for a reduced rate of 5% IGST for Inter‐state transactions. Similarly, as per Notification No.45/2017‐ Central Tax (Rate) dated 14.11.217 and Government of Andhra Pradesh Goods and Service Tax Act, 2017 (Act No.16 of 2017), G.O.MS.No.599, Dtd:12.12.2017, GST @5% is applicable for our Intra‐state transactions. Accordingly Concession Certificate will also be provided. 

3.23 LIQUIDATED DAMAGES (LD): Since delivery  is the essence of this order, for delayed delivery, LD @ 1/2% per week or part thereof subject to a maximum of 10% of the order value will be levied. 

3.24 SECURITY DEPOSIT:  If Order  value  exceeds  Rs.  5  Lakhs,  A  Bank Guarantee  for  the  faithful execution of the contract / PO for 3% of the order value shall be provided  immediately after receipt of the order towards the performance of the contract. The Bank Guarantee should be from  a  Nationalized  /  Scheduled  Bank  in  Rs.100  non‐judicial  stamp  paper  valid  till  the completion of the total scope of work / supply as per the order plus 60 days. This will not carry any  interest and  shall be  returned  to  you after  successful  completion of  full  scope of work against your request. In case of non‐performance/poor performance the Bank Guarantee shall be forfeited. If you are not submitted the BG within the specified period, this order is liable to be cancelled.   

3.25 COMBINED BANK GUARANTEE:    In case,  if You are unable to provide two separate BGs,  i.e., one for SD and one for PBG, You can submit a combined BG for SD & PBG for 3% of the Order value valid  till  the  completion of  total  contractual obligation  (i.e. Supply period + Warranty period + 60 days). Please confirm. 

3.26 Performance Bank Guarantee   :  A  Bank  Guarantee  for  3%  of  the  order  value  shall  be provided  along with  supply  towards  the  performance  of  the  system.  The  Bank  Guarantee should be from a Nationalized / Scheduled Bank in Rs.100/‐ non‐judicial stamp paper valid till the successful completion of warranty period plus 60 days. This will not carry any interest and shall be returned to you after successful completion of warranty period against your request.  In case of non‐performance/poor performance the Bank Guarantee shall be forfeited. 

3.27 Indemnity Bond  : However, Central PSEs/Autonomous Bodies/MSEs shall be exempted  from the payment of Security Deposit, and instead, an Indemnity Bond shall be secured from them in  lieu  of  the  Security  Deposit.  However,  Central  PSUs/PSEs/Autonomous  Bodies  shall  be exempt  from  the production of Performance Bank Guarantee.    Instead, an  Indemnity Bond shall be secured from them in lieu of PBG. 

3.28 MSME clause  :  Purchase / Price preference to MSEs :  

Purchase/Price  preference will  be  applicable  in  addition  to  product  reservation admissible to the Micro and Small Enterprises. Purchase/Price Preference shall be extended to  the MSEs  under  the  Public  Procurement  Policy  for MSEs  formulated  under  the Micro, Small and Medium Enterprises Development Act, 2006. The participating MSEs  in a tender, 

Page 15: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

15 

quoting price within the band of L‐1 + 15% may also be allowed to supply a portion of the requirement by bringing down  their price to the L‐1 price,  in a situation where L‐1 price  is from someone other  than an MSE. Such MSEs may be allowed  to supply up  to 20% of  the total tendered value. In case of more than one such eligible MSE, the supply will be shared equally. 

Micro & Small Enterprises which have  technical capability  to deliver the goods & Services as per prescribed technical & quality specifications and may not be able to meet the qualification  criterion  relating  to  prior  experience‐prior  turnover  may  be  relaxed  as  per guidelines issued by Ministry of MSMEs & as amended from time to time.  

3.29 Penal Interest Clause: If you fail to execute the order after drawal of advance payment, you have to refund the advance amount along with penal interest at bank lending rate plus 2%.   

3.30 Payment Terms :    The payment shall be made on number of doors supplied as per the drawing and number 

of doors erected on pro‐rata basis. It should be noted here that one number of door (set if any as  per  drawing)  shall  be  considered  as  completely  supplied/erected  if  it  confirms  all  the components as per drawing i.e. one number of door shall include 2 number of leafs (wherever applicable) and all other  components as per drawing. The  following are  the payment  terms based on the completion of different milestones: 

 

1  Advance  10% of the order supply value along against the submission of Advance Bank Guarantee. 

Payment  after  supply  of fabricated  structural  steel  swing doors along with  the heavy duty bearing  type  hinges,  wheel assembly  and other  components as per drawing. 

60% of the supply value on pro‐rata basis based on  the number of  swing  doors  supplied  as per the  concern  drawing  including  transportation, taxes & duties. 

3 Payment  after  erection  & commissioning. 

20%  of  the  supply  value  on  pro‐rata  basis against  the  successful  erection,  levelling, commissioning  and  acceptance  of  structural swing doors. 

4  Balance payment. 10% of  the order value can be  released against the submission of Performance Bank Guarantee. 

3.31 Warranty :  

The structure and related accessories shall be guaranteed against any manufacturing defects for a period of 12 months from the date of erection. For defects noticed during the warranty period,  replacement  rectification  should  be  arranged  at  free  of  cost within  a  reasonable period of such notification. 

3.32 Delivery :  

i) Delivery schedule is essence for this contract. Bidder   shall adhere to the delivery date mentioned  in  this  tender  for  individual  and  same  shall  be  confirmed  along with  the offer.  In  case  bidder    is  unable  to meet  the  delivery  schedule,  the  offer  is  liable  for rejection. 

ii) The total work shall be completed within 10 months from the date of PO release. 

iii) Rates quoted by the bidder shall be firm and fixed throughout the contract period up to completion of total work. 

iv) Delivery schedule shall be as given below: ‐ 

Page 16: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

16 

Sl. No. 

Item Description Delivery date from the date of award of Purchase Order 

1 Fabrication  and  supply  of  structural swing doors as per drawing. 

8 Months from the date of issue of PO. 

2  Erection of Structural swing doors. 2  months  from  the  date  of  site clearance. 

 

3.33 ARBITRATION 

   In the event of any question, dispute of difference arising under these conditions or any conditions contained  in the Purchase Order or  in connection with this contract,  (except as to any matters the decision of which is specially provided for by these conditions) the same shall be  referred  to  the  sole arbitration of  the head of  the Purchase Office or  some other person appointed by him,  it will be no objection that the arbitrator  is a Government Servant that he had  to deal with matter  to which  the  contract  relates or  that  in  the  course of his duties  as Government  Servant  he  had  expressed  views  on  all  or  any  of  the matters  in  disputes  or difference. The award of the arbitrator shall be final and binding on the parties of this contract. It is Term of this contract:  

a. If the arbitrator be the head of the purchase Office.   In the event of his being transferred or vacating his office by resignation or otherwise,  it shall be  lawful  for his  successor‐in office either  to proceed with  the  reference himself, or  to appoint another person as arbitrator, or. 

   In the event of his being unwilling or unable to act for any reason, it shall be lawful for the Head of the Purchase Office to appoint another person as arbitrator, or 

 b. If the arbitrator be a person appointed by the Head of the Purchase Office. 

   In the event of his dying, neglecting or refusing to act, or resigning or being unable to act, for any reason, it shall be lawful for the Head of the Purchase Office either to proceed with the reference himself or to appoint another person as arbitrator in place of the outgoing arbitrator. Subject as aforesaid, the Indian Arbitration and Conciliation Act, 1996and the rules there under and any statutory modifications thereof for the time being in force shall be deemed to apply to the arbitration proceedings under this Clause.  The arbitrator shall have  the power  to  the extent with  the consent of  the Purchaser and  the Contractor the time making and publishing the award. The venue of arbitration shall be place as  the purchaser  in his absolute discretion may determine. Work under  the Contract shall,  if reasonably possible, continue during arbitration Proceedings.  

c. In case order is concluded on the public Sector Undertakings, the following Arbitration Clause will be applicable.  

‐   In the event of any dispute or differences relating to the interpretation and application of the provisions of contracts, such dispute or difference shall be referred by either party to the Arbitration of one of the Arbitrator in the Department of Public Enterprises to be nominated by the Secretary  to  the Government of  India  in‐charge of  the Bureau of Public Enterprises. The Indian Arbitration and Conciliation Act, 1996  shall not be applicable  to  the Arbitration under this  clause.  The  award  of  the  arbitrator  shall  be  binding  upon  the  parties  to  the  dispute provided,  however,  any  party  aggrieved  by  such  award may make  a  further  reference  for setting  aside  or  revision  of  the  award  to  the  Law  Secretary,  Department  of  Legal  Affairs, Ministry  of  Law  &  Justice,  Government  of  India.  Upon  such  Additional  Secretary  when  so authorized by the Law Secretary whose decision shall bind the parties finally and conclusively. The  parties  to  the  dispute  will  share  equally  the  cost  of  arbitration  as  intimated  by  the arbitrator. 

Page 17: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

17 

 3.34 APPLICABLE LAW AND JURISDICTION 

The  laws of  India  shall govern  this purchase order  for  the  time being  in  force. The Courts of Andhra Pradesh,  India only shall have  jurisdiction  to be with and decide any  legal matters or disputes what so ever arising out of the purchase order.  

3.35 FORCE MAJEURE Should a part or whole work covered under this purchase order be delayed due to reasons of Force Majeure which shall  include  legal  lockouts, strikes, riots, civil commotion,  fire accident, quarantines,  epidemic,  natural  calamities  and  embargoes  the  completion  period  for  work, equipment  referred  to  in  this agreement  shall be extended by a period not  in excess of  the duration of such Force Majeure. The occurrence shall be notified within reasonable time. 

 

Date:      Signature & Office Seal of the bidder  Name of the contact person   : Designation of contact person   : Phone /Mobile number    : Email address of bidder   :       

Page 18: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

18 

Annexure‐1 Compliance Statement Form 

S.No.  Description Bidder’s compliance

Yes/No 

General Terms 

1.  

Confirm  that  the  entire  scope  of  work  as  given  in  the  tender specification, terms and conditions are considered for quoting the price.  All  deviations  shall  be  brought  out  separately.  In  the absence  of  deviations  list,  it  will  be  presumed  that  all  the specification, terms and conditions given are adhered to. 

 

2.   General  structural  fabrication  works  as  given  in  the  tender document is considered. 

 

3.   Performance Bank Guarantee  shall be provided  as per purchase terms and conditions. 

 

4.   Security  deposit  shall  be  provided  as  per  purchase  terms  and conditions. 

 

5.   Liquidated damage term shall be confirmed as per purchase terms and conditions. 

 

6.   Offer  shall  be  valid  for  Six  months  from  the  due  date  for submission of the Bid. 

 

7.  

In case Bid does not fully comply with the requirement of Proposal document and  the bidder  stipulates deviations  to  the  clauses of the proposal, which are unacceptable to the Department, the Bid will be rejected. 

 

8.  Confirm  that  the  fabrication  and  supply  of  materials  as  per technical  specification works  at  SHAR  shall be  completed within Ten months from the date of site clearance. 

 

9.  Bidder  shall adhere  to  the major milestones  listed  in  the  tender document.  Deviations  if  any  shall  be  brought  out  giving  valid reasons. 

 

 

Technical Compliance – Overall   

    13.  Quality assurance plan for General structural works w.r.t to all the items shall be submitted 

 

14.  DP test for root and final weld as per QAP.  

15.  Erection  and  commissioning  of  structures  at  our  site  shall  be carried out. 

 

16. Bidder shall  indicate clearly  list of works planned to offload to his sub‐vendor.  In such cases, details of works and sub‐vendors shall be provided. 

 

17.  Minor  changes  as  required  based  on  the  site  condition  shall  be incorporated at no extra cost. 

 

Date:               Signature & Office Seal of the bidder  Name of the contact person   : Designation of contact person   : Phone /Mobile number    : Email address of bidder   : 

Page 19: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

19  

Annexure‐2 

Price Bid Format for General structural fabrication Works 

Tender No. & Date:   Bidder’s Quotation No. & Date:   

Note:  

1. Bidder  shall  submit  the  Priced  Format  by mentioning  prices  against  each  item.  The  same  shall  be uploaded along with Price bid.  

2. The price bid should be submitted only as per  the given below  format. No  row shall be  left blank. Indicate "NA" in case the item is “not applicable”.  

3. Price shall be submitted in‐line covering all the below components. Any un‐filled price bid is likely to get rejected.  

4. Bidder shall submit following Breakup of Price Bid Format : 

 

S. No 

Facility 

Door Dimension (W X H)     (in 

meters) 

No. of Doors 

(Qty) 

Drawing Number 

Total approximate weight of doors 

including weight of  

sub‐components   

(in kg) 

Fabrication cost including raw material 

cost 

(Rs) 

Erection Cost (Rs) 

1  HIL‐3  4 x 3  1 10‐03‐SPAG‐03‐004‐A1  (Sheet 1)  

1 x ~1171 = ~1171 

 

2  HIL‐3  2.5 x 3  1 10‐03‐SPAG‐03‐005‐A1 

(Sheet 1) 

1 x ~485 = ~485 

   

3 Bowl Cleaning facility 

6.77 x 6  2 

10‐03‐SPAG‐06‐001/A1/R1 

(Sheet 1 & 2) 

2 x ~4270 = ~8540 

   

4 Bowl Cleaning facility 

5.5 x 4  1 10‐03‐SPAG‐06‐002/A1/R1 

(Sheet 1) 

1 x ~2113 = ~2113 

 

5 Bowl Cleaning facility 

3 x 2.5  7 

10‐03‐SPAG‐06‐003/A1/R1 

(Sheet 1 & 2) 

7 x ~926 = ~6482 

   

Vertical Mixer facility (1 & 2) 

5.6 x 7  4 

10‐03‐SPAG‐10‐001/A1/R1 

(Sheet 1 & 2 ) 

4 x ~4384 = ~17536 

   

Page 20: Tender Document For Fabrication, Supply & Erection of ...

SPAG Project 

20  

S. No 

Facility 

Door Dimension (W X 

H)         (in 

meters) 

No. of Doors 

(Qty) 

Drawing Number 

Total approximate weight of doors 

including weight of  

sub‐components   

(in kg) 

   

Vertical Mixer facility (1 & 2) 

6.5 x 4.5  2 10‐03‐SPAG‐10‐002/A1 

(Sheet 1 & 2) 

2 x ~2962 = ~5924 

   

Vertical Mixer facility (1 & 2) 

7.6 x 7.5  4 

10‐03‐SPAG‐10‐003/A1/R1 

(Sheet 1& 2) 

4 x ~5680 = ~22720 

   

Vertical Mixer facility (1 & 2) 

2 x 3  4 10‐03‐SPAG‐10‐004/A1 

(Sheet 1) 

4 x ~442 = ~1768 

   

10 

Vertical Mixer facility (1 & 2) 

2.5 x 3  4 10‐03‐SPAG‐10‐005/A1 

(Sheet 1) 

4 x ~485 = ~1940 

   

11 Premix Storage facility 

6.77 x 6  2 

10‐03‐SPAG‐04‐001/A1/R1 

(Sheet 1 & 2) 

2 x ~4270 = ~8540 

   

12  MAHAN  8 x 4.4 2  10‐03‐SPAG‐08‐001/A1 

(Sheet 1 & 2) 

2 x ~2709 = ~5918 

   

 

Note : 1) The tender  is on two part bid basis.  In this regard,  in the technical bid the above format shall be 

filled and uploaded with mentioning “QUOTED”. 2) If prices are disclosed in the technical bid, their bids will not be considered for evaluation. 3) In the price bid only, the prices shall be mentioned and uploaded. 

  Date:      Signature & Office Seal of the bidder  

                     

Page 21: Tender Document For Fabrication, Supply & Erection of ...

21  

Annexure‐3 

Quality Assurance Plan for General Structural fabrication works 

Sl No Characteristics/ type of checks 

Quantum of check 

Reference document 

Acceptance norms 

Formats of 

record Bidder  SHAR  Remarks 

1  2  3  4  5  6  7  8  9 

Raw Material Identification 

1.  Visual & dimensional  100%  Drawing  Drawing 

Material inspection report 

  R   

2.  Manufacturers TC verification with material specification/ drawings. 

100% 

ASME sec II part A/ IS 2062 

ASME sec II part A/ IS 2062 

    R   

3.  Chemical properties Mechanical properties 

  Drawing  Drawing  MTC       

4.  UT for plate thickness 20mm and above 

100% ASTM A 435 

ASTM A 435 

UT report 

  R   

5.  Identification mark verification and transfer of identification 

          R   

  Welding procedure qualification 

             

7.  Verification of WPS and WPQR 

100% WPS & WPQR 

ASME SEC IX 

WPS & WPQR 

  R   

8.  Marking  and  cutting Dimensions  and  bevel preparation 

100%  DRAWING  DRAWING  ‐‐‐    R   

   

Page 22: Tender Document For Fabrication, Supply & Erection of ...

22  

Sl No 

Characteristics/ type of checks 

Quantum of check 

Reference document 

Acceptance norms 

Formats of 

record Bidder  SHAR  Remarks 

1  2  3 4 5 6 7 8 9

9.  Fit‐up   inspection ‐Dimensions  bevel details mismatch 

100%  DRAWING  DRAWING  Fit up    R   

10.  DPT  on  root  and final pass 

100% ASME Sec ‐5, 

Art – 6 ASME SEC VIII, App 8 

DPT report    R   

11.  PT on back grinding 100% 

ASME Sec ‐5, Art – 6 

ASME SEC VIII, App 8 

DPT report    R   

Surface Perpetration & Painting 

14.  Visual Paint  thickness measurement 

  Drawing Specification 

Drawing Specification 

Painting report 

 R 

 

Final Certification 

15.  Hard Stamping Document Verification,  final inspection 

100%  Drawing Specification 

Drawing Specification 

Inspection release note W 

 

Manufacturer Quality Records 

1. Manufacturer certificate 

2. Material traceability summary sheet 

3. Material test certificate 

4. NDT Examination Report. 

5. Final Dimensional Reports 

6. Hard stamp rub‐off details  

Note: 

1. Bidder  shall confirm the broad guidelines mentioned in QAP. However, this is only indicative. Detailed QAP shall be submitted by the bidder  after placement of order based on the finalized fabrication process plan. 

2. All NDT procedure shall be submitted for approval 

Page 23: Tender Document For Fabrication, Supply & Erection of ...

23  

3. Material of construction as per approved drawings 

4. All requirements specified/approved drawings/specifications and applicable codes shall be fully complied. 

5. Job specific heat treatment, thermal stress reliving procedures shall be submitted for review and approval. Legends 

  

     

 Note : Bidder  shall sign in all pages of the tender specification document and submit the same along with the quotation.    

NAME & ADDRESS OF  The Bidder : 

      

Contact Person : 

Designation  

Ph/Mobile No : 

FAX No  : 

Email   :  

   Date :                                                                      Signature & Office Seal of the bidder 

H – Hold R ‐ Review W ‐ Witness MTC ‐ Material test certificate TC ‐ Test certificate UT ‐ Ultrasonic Test RT ‐ Radiography test MPI ‐ Magnetic particle test DPT ‐ Dye penetrant test