Top Banner
OPERATIONS I Temporary Production Facilities at West River Field with Dynamically Positioned FPSO, Munin South China Sea Hielke Brugts Bluewater Energy Services Return to Session Directory
81

Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

May 03, 2018

Download

Documents

lybao
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

OPERATIONS ITemporary Production Facilities at West River Field with Dynamically

Positioned FPSO, Munin

South China Sea

Hielke BrugtsBluewater Energy Services

Return to Session Directory

Page 2: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

1

Temporary Production Facilities at West River Field

with Dynamically Positioned (DP)FPSO Munin,

South China Sea

by Hielke Brugts,

Bluewater Energy Services

Page 3: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

2

Topics

Concept General Overview Dynamic Positioning (DP) TechnicalMaximize Availability– Dynamic Positioning (DP) Operations– DP Operation & Offloading– Solitons and Typhoons/Hurricanes

Experience Summary, Future & Conclusion

Page 4: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

3

Topics

Concept General OverviewDynamic Positioning (DP) TechnicalMaximize Availability– Dynamic Positioning (DP) Operations– DP Operation & Offloading– Solitons and Typhoons

Experience Summary, Future & Conclusion

Page 5: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

4

Dynamically Positioned FPSOConcept General Overview

Page 6: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

5

West River Field Layout

Existing submerged BTM Buoy with moorings and risers

Concept General Overview

Page 7: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

6

West River + Munin on DPConcept General Overview

Page 8: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

7

Concept General Overview

Existing submerged BTM Buoy with moorings and risers

New FPSO External Loading Structure and buoyancy tank

New Risers

New BTM outrigger + buoyancy tank

Concept General Overview

Page 9: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

8

External Loading StructureNew FPSO External Loading Structure

New FPSO Buoyancy Tank;to be lifted up out of the water by the outrigger of the ELS

New flexible risers coming from BTMportside

Concept General Overview

Page 10: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

9

Concept General Overview

Existing submerged BTM Buoy with moorings and risers

New FPSO outrigger and buoyancy tank

New Risers

New BTM outrigger + buoyancy tank

New back chain

Concept General Overview

Page 11: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

10

Newrisers

Existing BTM plus AdaptationsExisting submerged BTM30 metres below sea surface

Newbuoyancy tank

New outrigger

Concept General Overview

Page 12: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

11

New BTM OutriggerConcept General Overview

Page 13: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

12

Excursion LimitsConcept General Overview

Page 14: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

13

Excursion LimitsConcept General Overview

Page 15: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

14

Rotation around DP SetpointConcept General Overview

Page 16: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

15

Offloading to Conventional Tankers

Offloading Frequency : 1x 5-6 days

Offtake tanker size: 35,000 – 150,000 DWT (200K bbls.-1M bbls.)

Concept General Overview

Page 17: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

16

DP FPSO + Tanker + TugConcept General Overview

Page 18: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

17

Some Key Figures

FPSO Munin replaced temporarily (half a year) the field’s permanent FPSO

FPSO Munin has 600,000 bbls. storage cap. = 100.000 DWT

Production rate 70,000 bbls/day = 11,000 m3/day

Water depth 100 m.

Concept General Overview

Page 19: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

18

Topics

Concept General Overview Dynamic Positioning (DP) TechnicalMaximize Availability– Dynamic Positioning (DP) Operations– DP Operation & Offloading– Solitons and Typhoons

Experience Summary, Future & Conclusion

Page 20: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

19

Dynamic Positioning (DP) Technical

DP Class 2 Notation DNV-AUTR3 Independent Position Reference Systems :

Dynamic Positioning Technical

Page 21: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

20

Reference Systems

HPR

Artemis

Base station on land

2 x DGPS

Dynamic Positioning Technical

Page 22: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

21

DP Technical

DP Class 2 Notation DNV-AUTR3 Independent Position Reference Systems : - 2 x DGPS- HPR- Artemis

4 Main Engines, 2 Engine Rooms, 2 Bow Thrusters, 2 Azimuth Thrusters, 1 Main Propeller driven by 2 Electro Motors

Dynamic Positioning Technical

Page 23: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

22

One Line Diagram Power Supply System

DG DG DG DG HG

Main Diesel GeneratorsHFO

Main Diesel GeneratorsHFO or Crude Oil Harbour Generator

No 1 No 2 No 3 No 4

PM1

PM2

No 1 Bow Thruster

No 2 Bow Thruster

No 2 Azimuth Thruster

Propeller

No 1 Azimuth Thruster

Dynamic Positioning Technical

Page 24: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

23

Topics

Concept General Overview Dynamic Positioning (DP) TechnicalMaximize Availability– Dynamic Positioning (DP) Operations– DP Operation & Offloading– Solitons and Typhoons

Experience Summary, Future & Conclusion

Page 25: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

24

Subsea Installation Assistance

in marginal weather FPSO “Munin” on DP providing lee to the “Fu Lai” installation vessel on DP, to deploy ROV

DP Operations

Page 26: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

25

FPSO as PSV

FPSO delivering clump weight to the installation vessel

DP Operations

Page 27: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

26

FPSO as Crane Barge

FPSO moving in on DP to the installation vessel on DP to pick up and deploy a clump weight

DP Operations

Page 28: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

27

Buoyancy Tank and Riser Pull-inDP Operations

Page 29: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

28

Dynamic Positioning (DP) Operations

Capability/Limitations

Set at Hs 5.5-6.5 m. based on:

– DP Capability Plot diagrams, typical mono hull: limited athwart ship propulsion bow into the environment

– Experience of personnel on similar sized DP vessels

No downtime due to weather

DP Operations

Page 30: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

29

Wave Distribution Oct-March

wave distribution versus direction october-march (coming from)

0

5

10

15

20

25

30

35

40

45

50

n nne ne ene e ese se sse s ssw sw wsw w wnw nw nnw

direction [-]

dist

ribu

tion

[%]

80%

DP Operations

Page 31: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

30

FPSO Heading 0500Primary

DP Setpoint

30 m YellowWatch Circle

40 m Red WatchCircle

50 m Extreme

3 m

6 m

FPSO Heading 050º

Outrigger

Hull

30m

40m

50m

Primary DP Setpoint

DP Operations

Page 32: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

31

Wave Distribution Oct.-Mar.

wave distribution versus direction october-march (coming from)

0

5

10

15

20

25

30

35

40

45

50

n nne ne ene e ese se sse s ssw sw wsw w wnw nw nnw

direction [-]

dist

ribu

tion

[%]

5.6%

5.6%=10 days

DP Operations on NW’ly headings

Page 33: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

32

NW’ly HeadingsDP Operations on NW’ly headings

Page 34: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

33

Optimized DP set point.2 extra watch circles.Procedures:– Wind and Waves always on the port bow (on headings

between W-N-NE-E-SE) during DP position keeping.Resulting in:Vessel “loses” heading to starboard → hull moving away from risers.

PrecautionsDP Operations on NW’ly headings

Page 35: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

34

FPSO Heading 0500

Buoyancy TankNeutral Position

Operator EnteredPrimary DP Setpoint

3 m

3 m

6 m

20 m x 0600

30 m YellowWatch Circle

40 m RedWatch Circle

50 m Extreme

FPSO Heading 050º

30m

40m

50m

Primary DP Setpoint

Buoyancy Tank Neutral Position

20m

DP Operations on NW’ly headings

Page 36: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

35

Advantages DP set point to the NE:

Largest clearance for risers in all circumstances during NE monsoon.

No need to change DP set point for the various headings during the NE monsoon →reduced risk of operator error.

Optimized DP SetpointDP Operations on NW’ly headings

Page 37: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

36

Optimized DP set point.2 extra watch circles.Procedures:– Wind and Waves always on the port bow (on headings

between W-N-NE-E-SE) during DP position keeping.Resulting in:Vessel “loses” heading to starboard → hull moving away from risers.

PrecautionsDP Operations on NW’ly headings

Page 38: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

37

DP Control DisplayDP Operations on NW’ly headings

Page 39: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

38

Optimized DP set point.2 extra watch circles.Procedures:– Wind and Waves always on the port bow (on headings

between W-N-NE-E-SE) during DP position keeping.Resulting in:Vessel “loses” heading to starboard → hull moving away from risers.

PrecautionsDP Operations on NW’ly headings

Page 40: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

39

Additional MeasuresBilge keel removed in the risers/chain area of the hull.

Protection around risers and around chain, so risers may on an occasional basis touch.

EMERGENCY DISCONNECT FEATURE.

DP Operations on NW’ly Headings

Page 41: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

40

(Emergency) Disconnect

Emergency response -40 metres : quick disconnect!

Manually activated with pushbutton at DP desk.

DP Operations

Page 42: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

41

Main Prop Protection

Extra feature in DP to select “loading mode”(main propeller cannot run astern)

Outriggers on SB side to hang of offloading hose (Bft 4 and less)

DP Operations

Page 43: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

42

Main Prop Protection

Two Outriggers on SB side

DP Operations

Page 44: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

43

Main Prop Protection

Extra buoyancy in first couple of hose sections

DP Operations

Page 45: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

44

Topics

Concept General Overview Dynamic Positioning (DP) TechnicalMaximize Availability– Dynamic Positioning (DP) Operations– DP Operation & Offloading– Solitons and Typhoons

Experience Summary, Future & Conclusion

Page 46: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

45

DP Operation & OffloadingGeneral ProcedureOffloading/Hawser Load TestsFull Mission Bridge SimulationsEmergency Response– Offloading ESD – Quick disconnect risers

Maximize Availability

Page 47: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

46

DP Operation & Offloading

General ProcedureOffloading/Hawser Load Tests Full Mission Bridge SimulationsEmergency Response– Offloading ESD – Quick disconnect risers

Page 48: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

47

General ProcedureDP Operation & Offloading

Page 49: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

48

General ProcedureDP Operation & Offloading

Page 50: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

49

General ProcedureDP Operation & Offloading

Page 51: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

50

Hose Transfer

Weather limits : 2.5-3.5 mHs (irrespective whether DP or non-DP FPSO)

DP Operation & Offloading

Page 52: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

51

General ProcedureDP Operation & Offloading

Page 53: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

52

Offloading

Limits (irrespective whether DP or non-DP FPSO)Weather : 3.5-4.5 mHsHawser load : 3 x >150 t in 60 min.

DP Operation & Offloading

Page 54: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

53

DP Operation & Offloading

General ProcedureOffloading/Hawser Load TestsFull Mission Bridge SimulationsEmergency Response– Offloading ESD– Quick disconnect risers

Maximize Availability

Page 55: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

54

Offloading/Hawser Load Tests

Tug @ stern of FPSOChange load in force & direction

Purpose :

Response of DP system’s new software (hawser loadfeed forward interface)

Validation of computer simulations

DP Operation & Offloading

Page 56: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

55

DP Operation & Offloading

General ProcedureOffloading/Hawser Load TestsFull Mission Bridge SimulationsEmergency Response– Offloading ESD– Quick disconnect risers

Maximize Availability

Page 57: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

56

Bridge Simulations

Multi body simulations:– FPSO on DP– Offloading Tanker– Tug

Familiarize & Training of:– FPSO OIM & DPO– Mooring Master– Tug Masters

Response to emergency scenario’s

DP Operation & Offloading

Page 58: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

57

DP Operation & Offloading

General ProcedureFull Mission Bridge SimulationsOffloading/Hawser Load TestsEmergency Response– Offloading ESD– Quick disconnect risers

Maximize Availability

Page 59: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

58

Offloading Emergency ResponseDP Operation & Offloading

Page 60: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

59

Offloading Emergency ResponseDP Operation & Offloading

Page 61: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

60

Offloading Emergency Response

Offloading ESD

– ESD 1=Shutdown of offloading pumps +Closing offloading valve

– ESD 2=ESD 1 +Quick disconnect of hose +Quick disconnect of hawser

DP Operation & Offloading

Page 62: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

61

FPSO Emergency Response

Quick Disconnect of Risers & Offloading ESD– Excursion > 40 m of FPSO– Blackout of FPSO

Tug pulls away offtake tankerBlackout procedures for various scenarios & recovery situations

DP Operation & Offloading

Page 63: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

62

Topics

Concept General Overview Dynamic Positioning (DP) TechnicalMaximize Availability– Dynamic Positioning (DP) Operations– DP Operation & Offloading– Solitons and Typhoons

Experience Summary, Future & Conclusion

Page 64: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

63

SolitonsSolitons and Typhoons

Page 65: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

64

SolitonsSolitons and Typhoons

Page 66: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

65

SolitonsSolitons and Typhoons

Page 67: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

66

Soliton ResponseSolitons and Typhoons

≈≈≈≈≈≈≈≈≈≈

Page 68: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

67

Soliton ResponseSolitons and Typhoons

≈≈≈≈≈≈≈≈

≈≈≈

Page 69: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

68

Soliton ResponseSolitons and Typhoons

≈≈≈≈≈≈≈≈

≈≈≈

Page 70: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

69

Typhoons/HurricanesUsual typhoon alert system in placeExperienced one typhoon in Dec 2004; did not have to disconnect (experienced Hs 4.5 m)

FPSO Munin

China

Solitons and Typhoons

Page 71: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

70

Topics

Concept General Overview Dynamic Positioning (DP) TechnicalMaximize Availability– Dynamic Positioning (DP) Operations– DP Operation & Offloading– Solitons and Typhoons

Experience Summary, Future & Conclusion

Page 72: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

71

Experience Summary

Results after 150 days of operation on full DP:

– Cumulative Production = 11,000,000 bbls of oil

– Average production 73-74,000 bbls/day

– Number of offloadings = 27

– Uptime = 99%

Page 73: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

72

Experience Summary

Actual DP performance is better than earlier expected.

Experienced weather during the operations:15 - 40 knots wind, 1.5 – 4.5 m sign. wave height.

Position Deviation– Normally within 1 m from wanted setpoint.– Up to 2 m during regular operation.– Max. up to 5 m during rapid heading changes.

Page 74: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

73

Experience Summary, Offloading

Offloading every 5-6 days

Position deviation:

– Normally within 1 m from wanted set point (hawser load feed forward into DP working as intended)

– Up to 5 m with large offtake tankers of 150,000 DWT (1 Mbbls).

Page 75: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

74

Experience Summary, Offloading

Interaction between the FPSO and the offtake tanker have turned out to be less than expected.

Page 76: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

75

Experience Summary, Offloading

Normal hawser pull 20 tons – maximum values up to 50

tons (on one occasion 150t).

Heading deviation: with a tanker connected on the stern, the heading stability is even better than in regular operation

Page 77: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

76

Future

In deep water further pro’s

– No cost ‘sunk’ in mooring system

– Less tight station keeping requirements (prod. risers are more compliant than drilling risers)

– Less impairment of seafloor

Page 78: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

77

Future

More marginal fieldsMore deepwater fields

Higher (relative) cost for mooring systems

DP is a viable option

Page 79: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

78

Conclusions

This project proved flexibility of the DP FPSO concept in general

DP FPSO concept is reliable and safe

DP position keeping of the FPSO while offloading to conventional tankers is working very well

Page 80: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

79

Conclusions cont.

DP FPSO can be used as a “platform” to execute sub sea installation work

Ability to escape from hurricanes and reconnect.

Production operations on DP are an evolution from existing technology

DP FPSOs are especially interesting as temporary and/ or early field production facilities and/or deep water developments

Page 81: Temporary production facilities at West River Field … Production Facilities at West River Field with ... Temporary Production Facilities at West River ... Dynamically Positioned

80

QUESTIONS ?

For more info contact: Hielke BrugtsBluewater Energy Services, Marsstraat 33, 2132 HR Hoofddorp

Email: [email protected]: +31 235682864

Website: www.bluewater.com