Page 1: Temporary Pedestrian Accessible Routes (TPAR)

Temporary Pedestrian Accessible Routes(TPAR)

LAPCJustin King, State Work Zone Engineer

Page 2: Temporary Pedestrian Accessible Routes (TPAR)

TPAR

Page 3: Temporary Pedestrian Accessible Routes (TPAR)

3

Section 504 Rehab. Act

ADAAG / PROWAG

MUTCD ODOTStandards

ODOT Settlement

1991 19931973 2002? 2016

TPAR HistoryUS and Oregon, Pedestrian Accommodation Requirements

Page 4: Temporary Pedestrian Accessible Routes (TPAR)

TPARCritical Definitions

4

• “PEDESTRIAN” – Includes pedestrians with accessibility needs

• “ACCESSIBILITY” – Continued access to facilities during work

• “TEMPORARY PEDESTRIAN ACCESSIBLE ROUTE” (TPAR)• Area used by pedestrians to navigate through or around work area

• “TEMPORARY PEDESTRIAN ACCESSIBLE ROUTE PLAN”• Written and/or drawn plan for the project• Identifies required responsibilities and components within TPARs

Page 5: Temporary Pedestrian Accessible Routes (TPAR)

5

TPAR - StandardsODOT Traffic Control Plans Design Manual – 13th Ed.Accommodation Principles – During Design and Construction

• MUTCD (Chapter 6), ADA; and…• Provide “EQUAL TO” or “BETTER” Level of Accessibility

(ODOT)Not necessarily “ADA-compliant”, but no new accessibility

barriers

Page 6: Temporary Pedestrian Accessible Routes (TPAR)

6

TPAR – Full Standards• 60” width, ADA compliant ramps• Temporary Path/Sidewalk with ADA compliant ramps• Separation between path/sidewalk and work/traffic• Continuous

Page 7: Temporary Pedestrian Accessible Routes (TPAR)

7

TPAR – “EQUAL TO” or “BETTER”Why not always meet full ADA Standards?

Page 8: Temporary Pedestrian Accessible Routes (TPAR)

8

TPAR – “EQUAL TO” or “BETTER”• Match Existing Level of Accessibility• Provide an alternate method to accommodate peds Detour Flaggers Shuttle Full Closure, all traffic

Page 9: Temporary Pedestrian Accessible Routes (TPAR)

9

TPAR – ApplicationsProject specific solutions for each project

Page 10: Temporary Pedestrian Accessible Routes (TPAR)

10

TPAR – Document Existing ConditionDocument existing condition• Survey• Photos/Video• TMP

Page 11: Temporary Pedestrian Accessible Routes (TPAR)

11

TPAR – Document ExceptionsDocument any TPAR exceptions versus existing condition• TMP

Page 12: Temporary Pedestrian Accessible Routes (TPAR)

12

TPAR – Design Considerations• Existing Facility Inventory – What are we starting with?• Anticipated Pedestrian Volumes – Generators? Destinations?• Scope of Work• Impact Duration and Severity• TPAR Opportunities• Staging• Closures

Page 13: Temporary Pedestrian Accessible Routes (TPAR)

13

TPAR – Design ConsiderationsPUBLIC NOTIFICATION & OUTREACH

• During Project Development AND through Construction• Outreach to Media, Citizen Groups (AOCIL), Stakeholders• Postings on the Project Site• Notifications Updated over Life of the Project

• As Project Design changes• 10-Day Advance Notification signing (ODOT Specifications)• Pedestrian-Specific signing (ODOT Sign Policy)

Page 14: Temporary Pedestrian Accessible Routes (TPAR)

14

TPAR – Design Considerations

SHORT DURATIONS

LONG-TERM IMPACTS

• Brief, intermittent stoppages (1-5 mins).• Workers may escort pedestrians around hazard.

• Longer-duration closures with detours.• PCD, Curb ramps, and other devices used to

maintain pedestrian mobility.

Page 15: Temporary Pedestrian Accessible Routes (TPAR)

15

TPAR – Construction Considerations• It IS Required!

Page 16: Temporary Pedestrian Accessible Routes (TPAR)

16

TPAR – Construction Considerations• It HAS to work!

Page 17: Temporary Pedestrian Accessible Routes (TPAR)

17

TPAR – Construction Considerations• It HAS to work, AT ALL TIMES

Page 18: Temporary Pedestrian Accessible Routes (TPAR)

18

TPAR – Construction Considerations• It HAS to be maintained

Page 19: Temporary Pedestrian Accessible Routes (TPAR)

19

TPAR – Construction Considerations• It HAS to be Continuous

Page 20: Temporary Pedestrian Accessible Routes (TPAR)

20

TPAR – Construction Considerations• Caution Tape is not a approved device for TPAR

Page 21: Temporary Pedestrian Accessible Routes (TPAR)

TPAR3 E’s to Success!

21

Page 22: Temporary Pedestrian Accessible Routes (TPAR)

22

TPAR – Accommodation Challenges

Page 23: Temporary Pedestrian Accessible Routes (TPAR)

23

TPAR – Accommodation ChallengesCHALLENGES: BRIDGES

Page 24: Temporary Pedestrian Accessible Routes (TPAR)

24

TPAR – Accommodation ChallengesCHALLENGES: URBAN AREAS

Page 25: Temporary Pedestrian Accessible Routes (TPAR)

25

TPAR – Accommodation ChallengesCHALLENGES: URBAN AREAS

Page 26: Temporary Pedestrian Accessible Routes (TPAR)

26

TPAR – Accommodation ChallengesCHALLENGES: SUBURBAN AREAS

Page 27: Temporary Pedestrian Accessible Routes (TPAR)

27

TPAR – Accommodation ChallengesCHALLENGES: RURAL AREAS

Page 28: Temporary Pedestrian Accessible Routes (TPAR)

28

TPAR – Accommodation Developments

Page 29: Temporary Pedestrian Accessible Routes (TPAR)

29

TPAR – Accommodation Developments• “EQUAL TO” or “BETTER” Level of Accessibility

• TPAR Detail added to TM850

Page 30: Temporary Pedestrian Accessible Routes (TPAR)

30

TPAR – Accommodation DevelopmentsSCALABLE SOLUTIONS

• Proportionate to Duration, Impacts and Existing Facilities• Larger Impacts ≈ Greater TPAR Detail, Complexity, Pay Item list

…Simple TPAR

Page 31: Temporary Pedestrian Accessible Routes (TPAR)

31

TPAR – Accommodation DevelopmentsSCALABLE SOLUTIONS

• Proportionate to Duration, Impacts and Existing Facilities

…Complex TPAR

Page 32: Temporary Pedestrian Accessible Routes (TPAR)

32

TPAR – Accommodation DevelopmentsSCALABLE SOLUTIONS

Page 33: Temporary Pedestrian Accessible Routes (TPAR)

33

PCD RampsExisting Signs Vehicle

TPARDevices

SurfaceFlaggerTransit DomesMarkings

Page 34: Temporary Pedestrian Accessible Routes (TPAR)

AccessRec, LLC

34

Edging PPMPCD Surface

TPARDevices - Development

Page 35: Temporary Pedestrian Accessible Routes (TPAR)

TPAR Fundamentals

- Equal to or Better than existing- No new obstacles

- Settlement Agreement Outreach, Design, Inspection, Cons/Cont3 E’s, Engineering, Education, Enforcement

- Lessons LearnedLack of comprehensive, consistent guidanceLack of maintenanceCaution Tape

35

Page 36: Temporary Pedestrian Accessible Routes (TPAR)

36

TPARAdditional Information

https://www.oregon.gov/ODOT/Engineering/Pages/Accessibility.aspxhttps://www.oregon.gov/ODOT/Engineering/Pages/[email protected] TPAR Meeting, 3rd Tuesday of month, 1 PM, ODOT TLC

Page 37: Temporary Pedestrian Accessible Routes (TPAR)

37

Access ParkSurface Path Lot

TPARThe Good

DetourSignalAccess

Page 38: Temporary Pedestrian Accessible Routes (TPAR)

38

Tape RoutesClosure Signs Ramps

TPARThe Bad

SurfaceRoutesMaintain ContinuousPCD

Page 39: Temporary Pedestrian Accessible Routes (TPAR)

Thank you.39