Top Banner
TEMPORARY MODULAR BUILDING SOLUTIONS FOR EMERGENCY RESPONSE SITUATIONS
8

TEMPORARY MODULAR BUILDING SOLUTIONS

Dec 18, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TEMPORARY MODULAR BUILDING SOLUTIONS

TEMPORARY MODULAR BUILDING

SOLUTIONSFOR EMERGENCY RESPONSE SITUATIONS

Page 2: TEMPORARY MODULAR BUILDING SOLUTIONS

Building structures for emergency response situations

Hospitals

Intake Rooms

Screening Rooms

Exam Rooms

Waiting Rooms

Triage Areas

Negative Pressure/Quarantine Rooms

Test Chambers

Mortuary Coolers

Available to ship 125 units in 48-hours

Assembles in under 24-hours

ENGINEER INSTALL

TEMPORARY MODULAR SOLUTIONS

DESIGN

Page 3: TEMPORARY MODULAR BUILDING SOLUTIONS

Set up easily in parking lots, convention centers, stadiums, or any open space.

ASSEMBLY LOCATIONS

parking lots stadiums

convention centers open fields

Page 4: TEMPORARY MODULAR BUILDING SOLUTIONS

Pre-designed units offer flexible applications & configurations.

FLEXIBLE CONFIGURATIONS

Option A: 10’ x 12’ x 9’

Option B: 25’ x 12’ x 9’

Option C: 37’ x 12’ x 9’

Units are intended for indoor or outdoor use with a floor, lighting and access doors. HVAC is sized to fit units.

Page 5: TEMPORARY MODULAR BUILDING SOLUTIONS

EXAMPLE 10’ x 12’ x 9’ UNITEXTERIOR VIEWS INTERIOR VIEWS

Page 6: TEMPORARY MODULAR BUILDING SOLUTIONS

PANEL CONSTRUCTIONKPS Global® panels are modular for ease of assembly with

interlocking tongue-and-groove perimeter panels.

• Metal clad surfaces with tongue and groove

frames, are joined with a cam-lock that allows for

easy and fast on-site modular assembly and

ensure a tight seal.

• KPS Global uses a poured-in-place, HFC-free

urethane where temperature, humidity and

environmental conditions can be easily

controlled.

• Panels are delivered in 3 ½” thickness with 5” tops

to meet most structural load requirements.

Page 7: TEMPORARY MODULAR BUILDING SOLUTIONS

725,000 SQUARE FEET of Manufacturing Space

The largest manufacturer of cam-lock insulated panels in North America.

Offering production redundancy, reduced shipping costs and short lead times.

Page 8: TEMPORARY MODULAR BUILDING SOLUTIONS

KPS Global stands ready to help.