7/23/2019 Teknologi Produksi Lahan Pasir Pantai
1/32
TANAM DIMANA??????
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
2/32
TANAM DIMANA??????
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
3/32
1 2 3 4 5 6 7 8 910 11 12 1314 15 16 17 18 1920 21 22 23 24 25 26 27 28 29 303132 33 34 35 36
TEKNOLOGI PRODUKSI TANAMAN DI
LAHAN PASIR PANTAI SEBAGAI SENTRA
HORTIKULTURA MASA DEPAN
Dr. Ir. SAPARSO, M.P.
http://localhost/var/www/apps/conversion/tmp/scratch_3/VISITASI%20REVIEWER3JUNI09.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/VISITASI%20REVIEWER3JUNI09.ppthttp://c/My%20Documents/KOMPRE-PENDAHULUAN.ppthttp://c/My%20Documents/KOMPRE-PENDAHULUAN.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/VISITASI%20REVIEWER3JUNI09.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/VISITASI%20REVIEWER3JUNI09.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/VISITASI%20REVIEWER3JUNI09.ppt7/23/2019 Teknologi Produksi Lahan Pasir Pantai
4/32
KETAHANAN PANGAN
KONSUMSI 1995-2010
MENINGKAT 3,9 %/TH
jumlah penduduk,
Pendidikan, hemat devisa
SAYURAN 4,1%/TH
PENINGKATAN PRODUKSI
HORTIKULTURA
EKONOMISTANAMAN HORTIKULTURASumber vitamin, Sumber pendapat
Sumber devisa
Dominasi dataran tinggi
ambang kemiringan lahantadah hujan, akar gada
KONVERSI LAHAN
(50 ribu ha/th)
LAHAN MARGINAL
luas panen tidak tetap
irigasi sumur renteng
EFISIEN(LAHAN , TANAMAN)
PRODUKTIVITAS
GLOBALISASI
EKSTENSIFIKASI
INTENSIFIKASI
SEMANGKA
(KONVENSIONAL)
BAWANG MERAH
KUBIS
(KOMPONEN BARU
USAHATANI)
TEKNOLOGI SPESIFIKLAHAN PASIR PANTAI
PERKOLASI
DAYA IKAT AIRMUSIM
CAHAYA TINGGI
SUHU TANAH
2
PENGEMBANGAN
WILAYAH PESISIR
(EKOWISATA BAHARI)
1 2 3 4 5 6 7 8 910 11 12 1314 15 16 17 18 1920 21 22 23 24 25 26 27 28 29 303132 33 34 35 36
MASYARAKAT PETANI BELUM MENGUASAI
http://localhost/var/www/apps/conversion/tmp/scratch_3/PRESENTASI%2020%20JUNI.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/PRESENTASI%2020%20JUNI.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/PRESENTASI%2020%20JUNI.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/PRESENTASI%20KOMPRE-PENDAHULUAN.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/PRESENTASI%2020%20JUNI.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/PRESENTASI%20KOMPRE-PENDAHULUAN.ppt7/23/2019 Teknologi Produksi Lahan Pasir Pantai
5/32
3
m
1 2 3 4 5 6 7 8 910 11 12 1314 15 16 17 18 1920 21 22 23 24 25 26 27 28 29 303132 33 34 35 36
http://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/VISITASI%20KOMPRE-PENDAHULUAN.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/VISITASI%20REVIEWER3JUNI09.ppt7/23/2019 Teknologi Produksi Lahan Pasir Pantai
6/32
Pasir 95,59 %
Debu 1,85 %
Liat 2,56 %
UKURAN BUTIR PASIR
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
7/32
7
Kecepatan angin dan suhu udara musim kemarau dan
penghujan
0
20
40
60
80
100
HujJan-Mar01 K-Sept02 K-Okt02
Kec.angin0,1km/jam
t ud rata
Intens itas cahaya (lux) lahan pasir
pantai Samas musim penghujan
dan kemarau
109,960
82,700
69,610
0
20,000
40,000
60,000
80,000
100,000
120,000
Penghujan Kemarau Sept 02 Kemarau Okt 02
CAHAYAKECEPATAN ANGIN
SUHU UDARA
39.9331,0 32,030,2
25,82
90,08
1 2 3 4 5 6 7 8 910 1112 1314 15 16 17 18 1920 21
http://localhost/var/www/apps/conversion/tmp/scratch_3/hasil%20disertasi%20JAN08.ppt7/23/2019 Teknologi Produksi Lahan Pasir Pantai
8/32
8
0
100
200
300
400
500
600
700
800
Jan Peb Maret Apr Mei Juni Jul i Agust Sept Okt Nop Des
bulan
curahh
ujan(mm)
1999 1998
1997 1996
1995 Rata2
CURAH HUJAN
2061,94 mm/th
IH 0,1-47,3 mm/jam
Curah hujan siang hari di pantai Samas
-2
3
8
13
18
23
28
33
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
tanggal
curahhujan(mm)
Januari 01
Pebruari 01
Maret 01
0
5
10
15
20
25
Jan Peb Mare t Apr Me i Juni Ju li Agus t Sept Okt Nop Des
bulan
jumlahharihujan
1999 19981997 19961995 Rata2
HARI HUJAN 7,32
0
50
100
150
200
250
1 3 5 7 911
13
15
17
19
21
23
25
27
29
31
tanggal
cura
hhu
jan
(mm
)
Januari 01
Pebruari 01
Maret 01SIANG HARI
HUJAN 200127,8
1 2 3 4 5 6 7 8 910 1112 1314 15 16 17 18 1920 21
http://localhost/var/www/apps/conversion/tmp/scratch_3/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/KOMPRE-PENDAHULUAN.ppt7/23/2019 Teknologi Produksi Lahan Pasir Pantai
9/32
0
200
400
600
800
1000
1200
2 4 6 8 10
Umur Tanaman (m)
IntensitasCaha
ya(mol.m-2.s
-1)
hujan
kemarau
24
26
28
30
32
34
2 4 6 8 10
Umur Tanaman (m)
SuhuUdara(oC)
hujan kemarau
24
26
28
30
32
2 4 6 8 10
umur tanaman (m)
suhutanah(oC
hujan kemarau
0
20
40
60
80
100
2 4 6 8 10
umur tanaman (m)
kelembabanuda
ra(%)
hujan kemarau
INTENSITAS CAHAYA
SUHU UDARA KELEMBABAN UDARA
KECEPATAN ANGIN
KELEMBABAN UDARA LUAR
SUHU UDARA LUAR
SUHU TANAH
AGROKLMAT PERTUMBUHAN TANAMAN
0
2
4
6
8
Jan Peb Maret April Mei Juni Juli
Periode pertumbuhan tanaman (bulan)
ETo(mm.hari-
1)
Hujan Kemarau
EVAPOTRANS POTENSIAL
0.0
0.5
1.0
1.5
2.0
2.5
3.0
Jan Peb
Mare
tAp
rilMe
iJuni Ju
li
Periode pertumbuhan tanaman (bulan)
Kecepatanangin(km.jam
-1)
Hujan
Kemarau
0
10
20
30
40
50
11 21 31 41 51 61 71 81
Periode pe rtumbuhan tanaman (hari)
Suhu
udara
(oC)
Tertinggi Terendah
0
10
20
30
40
50
11 21 31 41 51 61 71
Periode pertumbuhan tanaman (hari)
Su
huudara(oC)
Tertinggi Terendahhujan kemarau
0
20
40
60
80
100
120
11 21 31 41 51 61 71 81
Periode pertumbuhan tanaman (hari)
Kele
mbabanudara(%)
Tertinggi Terendah Rata-rata
hujan
0
20
40
60
80
100
120
11 21 31 41 51 61 71 81
Periode p ertumbuhan tanaman (hari)
Ke
lembabanudara(%)
Tertinggi Terendah Rata-rata
kemarau
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
10/32
1 2 3 4 5 6 7 8 910 11 12 1314 15 16 17 18 1920 21 22 23 24 25 26 27 28 29 303132 33 34 35 36
http://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/VISITASI%20REVIEWER3JUNI09.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/KOMPRE-PENDAHULUAN.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/KOMPRE-PENDAHULUAN.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/PRESENTASI%20KOMPRE-PENDAHULUAN.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/KOMPRE-PENDAHULUAN.ppthttp://c/My%20Documents/KOMPRE-PENDAHULUAN.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/VISITASI%20REVIEWER3JUNI09.ppt7/23/2019 Teknologi Produksi Lahan Pasir Pantai
11/32
11
TEKNOLOGI SPESIFIK
PENYIRAMAN INTENSIF ( 3 kali sehari)
BAHAN ORGANIK 60 T/HA
INTERVAL 1 MINGGU DAN CARA KOCOR
MULSA JERAMI 5 T/HA
0
5
10
1520
25
30
35
40
2 4 6 8 10
minggu
suhu
tanah
Jerami 5 t/ha (J)
J+MPB
J+MPH
J+MPHP
Pertumbuhan dan serapan N pada berbagai cara pemupukan N
Benam Kocor Semprot
Berat kering (g) 61,36 79,54 62,26
LPT 6-8 mg (mg/cm2/hari) 6,095 10,804 8,70
Umur pembent krop (hari)47,00 43,00 47,00
Hasil (t/ha) 14,165 24,823 19,318
Serapan N (kg/ha) 72,56 116,261 104,752
Efisiensi pemupukan N (%)24,52 39,283 35,395
TANAMAN KUBISEFISIENSI PEMUPUKAN N 39,3 %
MULTYSTORY SYSTEM
1 2 3 4 5 6 7 8 910 1112 1314 15 16 17 18 1920 21
http://localhost/var/www/apps/conversion/tmp/scratch_3/KOMPRE-PENDAHULUAN.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/KOMPRE-PENDAHULUAN.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/KOMPRE-PENDAHULUAN.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/KOMPRE-PENDAHULUAN.ppthttp://localhost/var/www/apps/conversion/tmp/scratch_3/KOMPRE-PENDAHULUAN.ppt7/23/2019 Teknologi Produksi Lahan Pasir Pantai
12/32
28
TANPA BENTONIT
TANPA BENTONIT
BENTONIT
BENTONIT
TANPA BENTONIT
BENTONIT
INTERAKSI LAPISAN KEDAP BENTONIT DAN INTENSITAS CAHAYA
29
1 2 3 4 5 6 7 8 910 11 12 1314 15 16 17 18 1920 21 22 23 24 25 26 27 28 29 303132 33 34 35 36
http://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppt7/23/2019 Teknologi Produksi Lahan Pasir Pantai
13/32
HASIL TANAMAN KUBIS INTERAKSI LAPISAN KEDAP DAN NAUNGAN
33
0
10
20
30
40
50
192.14 359.06 535.99
Intensitas cahaya (mol.m-2.det-1)
Hasilkrop
(t.ha-1)
tb-aktual
b-aktual
tb-regresi
b-regresiYbsh.tb=4,15+0,141Xismh-1,65.10-4Xismh,R2=0,786**;(20,5%34,3 t.ha-1)
Ybsh.db=13,08+0,057Xismh,R2=0,819** ; ( 44,4 t.ha-1)
1 2 3 4 5 6 7 8 910 11 12 1314 15 16 17 18 1920 21 22 23 24 25 26 27 28 29 303132 33 34 35 36
44,4 t/ha
40%32,6 t/ha
http://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppthttp://localhost/var/www/apps/conversion/DISERTASI/UJIAN%20DISERTASI/hasil%20disertasi%20JAN08.ppt7/23/2019 Teknologi Produksi Lahan Pasir Pantai
14/32
Rekayasa irigasi & bahan pembenah di lahan pasir
15,8-17,3 ton/ha (50-70 % > TANPA PEMBENAH)
INTENSIF
RISTEK 2007
BENTONIT
http://localhost/var/www/apps/conversion/tmp/scratch_3/VISITASI%20REVIEWER3JUNI09.ppt7/23/2019 Teknologi Produksi Lahan Pasir Pantai
15/32
BENTONIT ???????
VERTISOL
1.800.000 HA (2 JUTA t/ha)
(0,9 % Indonesia)DAERAH PESISIR PANTAI
SUMBER DAYA LOKAL
MENINGKATKAN HASIL 36-40% (KUBIS), 70% (BAWANG MERAH)
LENGAS TANAH
LAPISAN KEDAP AIR BENTONIT
Kapasitas deposit
380 juta ton
33 tempat
Na dan Ca
1 2 3 4 5 6 7 8 910 1112 1314 15 16 17 18 1920 21
http://localhost/var/www/apps/conversion/tmp/scratch_3/VISITASI%20REVIEWER3JUNI09.ppt7/23/2019 Teknologi Produksi Lahan Pasir Pantai
16/32
BAWANG MERAH 3 MST PANTAI JETIS CILACAP
LAPISAN VERTISOL 3 HARI
SEKALI
TANPA LAPISAN TIAP
HARI
LAHAN GALIAN PASIR BANGUNAN
HIBAH KOMPETISI
STRANAS 2009
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
17/32
45 HST
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
18/32
A. Shallot Growth in Different Composition of Resistant Layer,
Technique and Irrigation Interval1. Onion Plant Growth in Different Intervals and Technique
Wtaering in the Land Without Vertisol Layer of 28 DAP
No. Growth Variabel Watering Interval
1 day 2 day 3 day
1 Plat Height (cm) 31,29 a 31,73 a 29,17 a
2. Number of Leaves (leaf) 28,33 a 28,33 a 23,33 a
3. Number of Tiller (plant) 7,00 a 6,47 a 6,07 a
4. Root Volume (ml) 1,33 a 1,53 a 1,00 a
5. Bulb Volume (ml) 7,67 a 6,00 a 4,33 a
6. Number of Root (strand) 47,33 a 51,67 a 39,67 a7. Root Length (cm) 13,40 a 13,17 a 13,05 a
8. Plant Fresh Weight (g) 23,12 a 20,92 a 15,57 a
0
1
2
3
4
5
6
1 day 2 day 3 day
Interval
PlantD
ryWeight(g
Aktual Y=5,99-1,262X (R2=0,523*)
No. Watering Technique Watering Interval
1 day 2 day 3 day
1 Without Vertisol,
overhead irrigation,
conventional (To)
5.07 a 2,90 b 2,50 b
2. Vertisol Layer 50%
Overhead (To) 4,42 a 2,81 b 2,24 b
Point Distance 50 cm(T1)
3,87 a 2,96 b 2,18 b
Point Distance 100 cm
(T2)
3,46 a 3,62 a 2,59 b
Point Distance 150 cm
(T3))
2,82 b 1,02 b 2,35 b
3. Lapisan Vertisol 100%
Overhead (To) 2,59 b 3,47 a 2,18 b
Point Distance 50 cm(T1)
3,48 a 4,25 a 2,16 b
Point Distance 100 cm
(T2)
4.08 a 3,40 a 3,01 b
Point Distance 150 cm
(T3))
3,14 a 4,39 a 2,31 b
Tabel 3. Plant Dry Weight of 28 DAP
T bl 5 Yi ld C f Sh ll
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
19/32
No. Watering Technique Watering Interval
1 day 2 day 3 day
1 Without Vertisol, overhead
irrigation, conventional (To)
8.61 b-e 7,50 cde 7,43 cde
2. 50% Vertisol Layer
Overhead (To) 11,46 a 8,264 b-e 10,07 a-d
Point Distance 50 cm (T1) 9,17 a-e 8,75 a-e 7,78 cde
Point Distance 100 cm (T2) 10,35 abc 10,83 ab 7,01 e
Point Distance 150 cm (T3)) 8,89 a-e 7,29 de 9,10 a-e
3. Lapisan Vertisol 100%
Overhead (To) 8,68 a-e 8,40 b-e 9,72 a-e
Point Distance 50 cm (T1) 10,90 ab 8,61 b-e 10,35 abc
Point Distance 100 cm (T2) 8,68 a-e 8,40 b-e 9,23 a-e
Point Distance 150 cm (T3)) 10,28 a-d 8,26 b-e 7,50 cde
Note: The number in the yield component colums are followed by the same
alphabet mark showed the significantly difference at 5% level
according to orthogonal contrast or DMRT
No
.
Yield
Compone
nt
Vertisol Layer Watering Interval
1 hari 2 hari 3 hari
1 Bulb
Volume
(ml)
Without Layer, T0 48,33 a-d 31,50 d 38,00 d
Vertisol 50%, T0 52,00 a-d 48,00 a-d 40,00 a-
Vertisol 100%, T1 59,17 abc 41,17 a-d 61,00 ab
2. Number
of Bulb
(bulb)
Without Layer, T0 12,50 a-d 9,83 bcd 13,00 a-
Vertisol 50%, T0 11,17 a-d 11,33 a-d 11,00 a-
Vertisol 100%, T1 15,00 abc 9,83 bcd 13,50 a-
3. Weight of
Bulb
(g)
Without Layer, T0 3,97 abc 3,15 bc 2,82 c
Vertisol 50%, T0 4,58 a 3,82 abc 3,72 ab
Vertisol 100%, T1 4,02 abc 3,88 abc 4,36 ab
4. HarvestIndex
(%)
Without Layer, T0 90,44 a 84,48 a 85,06 aVertisol 50%, T0 83,13 a 73,94 c 85,56 a
Vertisol 100%, T1 83,64 a 84,36 a 85,81 a
Note: The number in the yield component colums are follow
by the same alphabet mark showed the significant
difference at 5% level according to orthogonal contrast
DMRT
Tabel 6. The Fresh Bulb Yield (t.ha-1)
Table 5. Yield Component of Shallo
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
20/32
Interval penyiraman lebih dari 1 hari menurunkan
pertumbuhan tanaman bawang merah di lahan tanpa
lapisan kedap
Tanaman bawang merah di lahan dengan lapisan
Vertisol dapat tumbuh baik dengan intervalpenyiraman 2 hari pada semua teknik penyiraman
jarak titik 50 cm, 100 cm maupun 150 cm.
Tanaman di lahan dengan lapisan Vertisol 50% dapat
tumbuh baik sampai interval 2 hari pada jarak titiksiram 100 cm.
SIMPULAN
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
21/32
PENERAPAN TEKNOLOGI SPESIFIK LOKASI
LAHAN PASIR BUNTON, CILACAP
SUMUR RENTENG
PEMBENAH TANAH
PROGRAM IbM 2009
DP2M DITJEN DIKTI
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
22/32
PUPUK KANDANG, MULSA, UREA KOCOR
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
23/32
PENANAMAN DAN PEMULSAAN
PEMOTONGAN UJUNG UMBI
JARAK TANAM
Ditanam kemudian disiramMulsa jerami 5 t/ha
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
24/32
PEMELIHARAAN TANAMAN
Penyiangan gulma 10 hst
Tanaman 20 hst
Pembentukan anakan dan
laju pertumbuhan meningkat
Pertumbuhan dan perkembangan umbi
40 hst
PETANI MASIH RAGU AKAN
HASIL TANAMAN
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
25/32
PANEN PERDANA
PENJEMURAN DI LAHAN
PENGUMPULAN UMBI
PENGANGKUTAN KE PENJEMURAN
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
26/32
JENIS DAN DOSIS PUPUK NITROGEN
32.93
37.33
33.44
30
31
32
33
34
35
36
37
38
urea ZA KNO3
Jenis pupuk N
Jumlahdaun
JUMLAH DAUN
52.35155.458
56.829
0
10
20
30
40
50
60
Urea ZA KNO3
Jenis pupuk N
Kadarklorofil
KADAR KLOROFIL
39.928
49.44
39.542
0
10
20
30
40
50
60
Urea ZA KNO3
Jenis pupuk N
Luasdaun
LUAS DAUN
Pemberian pupuk ZA memberikan nilai rata-rata tertinggi pada
volume umbi per rumpun (50,880 ml), bobot umbi segar per
petak efektif (12,34 ton/ha) dan bobot umbi kering simpan perpetak efektif (484,4 g).
JENIS PUPUK NITROGEN
DOSIS PUPUK NITROGEN
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
27/32
JUMLAH DAUN
titik optimum (185,40
; 38,11)
Y = 11.48 + 0.030 3 X
R2=32.32 %
0
5
10
15
20
50 100 150 200 250
Dosis pupuk (kg N/ha)
Jum
lahumbiperrumpun
JUMLAH UMBI/TAN
bobot umbi segar per petak efektif
Optimum (169,56 ; 13,54)
optimum ( 171,67 ; 542,56)
bobot umbi kering per petak efektif
VOLUME UMBI
DOSIS PUPUK NITROGEN
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
28/32
Y = 0,4585 + 0,0039 X
R2=24,11 %
0,45
0,46
0,47
0,48
0,49
0,50
0,51
0,52
0 7,5 15
Tinggi Guludan (cm)
DiameterDaun
TINGGI GULUDAN
DIAMETER DAUN
15 cm hasil TERTINGGI
jumlah umbi 178,1/12 TAN;
bobot umbi segar 3,360 g/TAN,
bobot umbi kering 1,640 g/TAN,
dan hasil umbi segar 12,34 ton/ha
0 CM
7,5 CM
15 CM
PERLU AERASI YANG BAIK
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
29/32
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
30/32
50 HST
PAK KARJO (KETUA GAPOKTAN) PANEN
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
31/32
SIMPULAN
1. LAHAN PASIR PANTAI DAPAT DIKEMBANGKAN SEBAGAISENTRA HORTIKULTURA DENGAN APLIKASI TEKNOLOGI
SPESIFIK LOKASI UNTUK MENCAPAI EFISIENSI
PEMANFAATAN SUMBERDAYA PERTANIAN
2. MASYARAKAT MENYAMBUT POSITIF DAN MEMILIKIMOTIVASI TINGGI DALAM PEMANFAATAN LAHAN PASIR
PANTAI DENGAN USAHATANI TANAMAN HORTIKULTURA
PROSPEKTIF
3. PENDAMPINGAN BERKELANJUTAN DAPAT MENINGKATKANAPLIKASI TEKNOLOGI PERTANIAN LAHAN PASIR PANTAI
7/23/2019 Teknologi Produksi Lahan Pasir Pantai
32/32