SORBONNE UNIVERSITY UNITED ARAB EMIRATES TEKLA SOFTWARE IN PRACTICE:
8

Tekla reference: Sorbonne university

Mar 10, 2016

Download

Documents

_tekla_

An international agreement brought one of the most prestigious universities in the world, Paris-Sorbonne, to Abu Dhabi. The construction of the new campus necessitated integration of complex elements but was managed successfully to meet the key dates. Tekla Structures software was taken into use by Al Habtoor Murray and Roberts Joint Venture to fit everything together in time.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tekla reference: Sorbonne university

sorbonne universityunited arab emirates

tekla software in practice:

Page 2: Tekla reference: Sorbonne university

a an international agreement brought one of the most prestigious universities in the world, paris-sorbonne, to abu dhabi. the construction of the new campus necessitated integration of complex elements but was managed successfully to meet the key dates. tekla structures software was taken into use by al Habtoor murray and roberts Joint venture to fit everything together in time.

managed by

modeling

Page 3: Tekla reference: Sorbonne university

s university paris-sorbonne and the government of abu dhabi signed an international agreement in 2006 to bring french-speaking higher education to the capital city of the united arab emirates. the university opened its doors for the first phase in august 2009. the second and final phase was scheduled for completion in august 2010 and was completed ahead of time.

Page 4: Tekla reference: Sorbonne university

as-built validations “coordination between us, the main contractor, and the steel and façade subcontractors was a challenge that we overcame with the help of tekla software. changes to the as-built models from the design were communicated to the subcontractors to accommodate them into the steel and grc fabrication process. by doing this we avoided further conflicts and potential delays on site and sped up the installation process.”

“we used trimble surveying devices to get the as-built coordinates, which were superimposed on the tekla model to validate them against the theoretical exact locations of the components as per the design,” brinkman explains.

matcHing steel & concrete on sites when the first structural elements were delivered on site the new university campus, it was a concern that the precast concrete elements did not line up with the steel components. tekla structures bim (building information modeling) software was taken into use by al Habtoor murray and roberts Joint venture (Hmr) to enable as-built validation of the structures. “we have been working with tekla

since 2008,” says Ron Brinkman, technical manager at murray and roberts contractors. “in the sorbonne project we implemented bim to coordinate with the subcontractors between the construction of the main structure and the process of steel and façade (grc) fabrication and installation. in addition, we used bim technology to validate the as-built status of the structure.”

Page 5: Tekla reference: Sorbonne university

sorbonne field coordination process at a glance

Page 6: Tekla reference: Sorbonne university

dramatic increase in productivityC “productivity, efficiency and accuracy dramatically increased since bim was introduced in a later stage of the project;” says brinkman. “the amount of rework in the design, fabrication and erection of steel frames and façade elements was massively decreased due to the as-built design validation of the main structural elements: columns, beams and so on; which had already been constructed.”

by implementing bim, i would say to have saved almost 50% of the time, and even more, when taking into account that had we not used building information modeling, each steel frame would have been installed, its variance to concrete measured, and then it would have been sent back to the fabrication yard to be modified before returning on site to be finally re-installed.”

bim is a many splendid tHingC Hmr is considered a pioneer in applying the bim approach to tenders, pre-construction, construction, and as-built validation. the joint venture currently uses dedicated, knowledgeable, and well-trained bim teams to function as the design-construction ‘hub’ in a project. since adopting building information modeling, it has been used in a number of important projects, such as the st. regis resort and the trump tower, as well as in multiple tenders.

bim is being applied to a magnitude of work phases at Hmr, including quantity surveying and 5d estimating, 4d schedule simulation, model design coordination, reinforced concrete drawing production, equipment and construction planning, linking to surveying equipment, logistics and supply chain management, progress monitoring and reporting, as well as to as-built validation of structural elements.

“productivity, efficiency and accuracy dramatically increased since bim was introduced in a later stage of the project.”

Page 7: Tekla reference: Sorbonne university

M murray & roberts operates in southern africa, middle east, southeast asia, australasia and north and south america from its home-base in Johannesburg south africa, where it has a public listing on the Jse limited. murray & roberts is primarily focused on resources-driven construction markets in industry and mining; oil and gas; and power and energy, and offers civil, mechanical, electrical, mining and process engineering; general building and construction; materials supply and services to the construction industry; and management of concession operations.

F founded in 1970, al Habtoor engineering is one of the oldest construction companies in the middle east region. beginning with less than 100 employees and just two projects, the company has grown to more than 35,000 employees with the capacity to execute multi-billion dollar projects. their portfolio of projects spans both the private and public sectors to include retail, office, industrial, residential, government and public works not only in the uae, but further afield in locations such as Qatar, Jordan, lebanon, egypt and bahrain.

www.murrob.com www.habtoorengg.ae

Page 8: Tekla reference: Sorbonne university

Tekla is either a registered trademark or a trademark of Tekla Corporation in the United States and other countries.

our ambition is to multiply your potential to tHink and acHieve big

W with an ambition to multiply its customers’ potential to think and achieve big, tekla provides a bim (building information modeling) software environment that can be shared by contractors, structural engineers, steel detailers and fabricators, as well as concrete detailers and manufacturers.

the highly detailed as-built 3d models created, combined and distributed with tekla software enable the highest level of constructability and production control.

centralizing building information into the model allows for more collaborative and integrated project management and delivery. this translates into increased productivity and elimination of waste, thus making construction and buildings more sustainable.

T with its software, tekla corporation drives the evolution of digital information models and provides more and more competitive advantage to the construction and infrastructure industries. tekla was established in 1966, and today it has customers in 100 countries, offices in 15 countries, and a global partner network.