Strategic Plan Overview
Vision: We will become the nation’s model for delivery of technology, media and contact center
services for local government.
Attract and retain a skilled and
motivated IT workforce
Through Peak Performance,
develop a plan to staff TS in a
sustainable manner
Execute a plan to address
deficiencies and opportunities as
they are identified
Invest in Lean Six Sigma to equip
all levels of TS with the process
tools needed to improve our
business
Invest in employee technical
training in support of our
strategy, and consistent with
industry best practices
Document and execute
repeatable operational
processes, consistent with
industry best practices
Develop or procure tools to
effectively manage operational
systems and processes
Adopt a “cloud-first” strategy for
services or infrastructure where
hosted services are a higher
value
Modernize datacenters and
infrastructure, where doing so
improves service or reduces risk
Realize the full value of our
enterprise architecture and
enterprise applications
Develop a sustainable funding
model for TS, consistent with our
goals and strategy
Develop an effective system to
understand agency business and
business needs
Develop portfolio and project
management processes
consistent with industry
standards
Develop a plan for “light”
technologies and policies for
agency empowered solutions
Facilitate work anytime, anywhere
by integrating mobility and
collaboration technologies
Improve access, usability and
visibility of City information
Transform Denver 8 to a “media
services” model
Prepare and equip 311 to engage
citizens proactively and through
multiple online channels
Improve access to government
information
Improve citizen outreach activities
Create a comprehensive strategy
and further leverage social media
Invest in delivery of information
and services to mobile devices
2
Strategic Plan Overview
Citizens
Internal Customers
Employees
Values Goals
No one of these core values is more
important than another; they are all
equal. Failing to value any one of
these will be to the detriment of the
other two.
It is important to note that employee
engagement is the key driver to our
ability to achieve the other three goals.
Engaged employees are the key to our
success.
3
Tactical Plan Overview
2015 Initiatives Initiatives – Goals Maps
Office 365 ● ● ●
Hosted Video ● ● ●
WiFi Redesign ● ● ● ●
Web CMS /
Adobe ● ● ● ●
CRM /
Salesforce ● ● ●
PeopleSoft HR
Replacement ● ●
SharePoint
Collaboration ● ● ●
Accela Phases
2 & 3 ● ● ●
Property Tax
Replacement ● ● ●
Pocketgov ● ● ● ●
Mentorship
Programs ● ●
Project Month
1 2 3 4 5 6 7 8 9 10 11 12
SharePoint Special Events Site
Records Management/Alfresco
Justware E-Discovery
Case Logistics
Budget System Replacement
New Muni Ops Justware
WiFi Redesign
Web CMS/Adobe
PBX Replacement at 911
Server 2003 Remediation
CRM/Salesforce
Accela Phase 2
PCI 3.0
SharePoint Collaboration
Property Tax Replacement
DR Planning and Testing
Pocketgov
PMIS
ECS Rollout
Audit Remediation
Employee Training
Mentorship Programs
Denver Loft Sessions
Alfresco Implementation
BI Enhancements
SNOW - Incident and SR
Hot Docs
Integrated Trafic Ticketing (ITT)
Legislative Info System
eForeclosure System
Office 365
PeopleSoft HR Replacement
Hosted Video
Accela Phase 34
Mission-Level Outcome Metrics
Technology Services
Measure 2013 Actual 2014 Actual 2015 Goal Status Progress
Employee Engagement 7.2 27.05 27.05
IT Process Maturity 1.85 2.5 3.0
Agency Satisfaction 3.22 3.50 4.0
Citizen Satisfaction Courtesy 85%
Knowledge 77%
Responsiveness 76%
Courtesy 85%
Knowledge 80%
Responsiveness 78%
Courtesy 87%
Knowledge 83%
Responsiveness 80%
Employee Engagement
• This score is an average of responses received from a survey issued by OHR.
Operational Efficiency
• This measurement is based on industry best-practices to assess process maturity in an organization. The score ranges from 1
(ad-hoc) to 5 (innovating).
Agency Satisfaction
• This score is an average of responses to a survey issued by TS and to which more than 540 responses were received.
Citizen Satisfaction
• This score is an assessment of Denver 311 and is based on the 2014 national Citizen Survey. It is a composite score of the
following areas: courtesy, knowledge and responsiveness. 311 ratings were higher than overall City ratings in every category
(Knowledge 78%; Courtesy 70%; Responsiveness 69%)
5
Employee Engagement Index
6
Vital Signs
7
2011 2012 2013 2014
Vacation 32,434.8 30,622.8 28,759.5 28,263.3
Sick 20,109.0 16,497.8 15,073.3 12,020.0
PTO 4,857.0 6,292.3 10,990.3 13,574.8
Comp Time 421.1 439.2 570.5 538.2
Vacancy 2,946.7 3,596.7 4,405.6 3,322.2
Worker's Comp 7.0 69.3 240.0 56.0
010,00020,00030,00040,000
Ho
urs
Hours Not Worked
2011 2012 2013 2014
Overtime 4,792.8 4,340.0 4,447.0 3,593.2
Comp Time 631.7 658.8 855.8 807.3
0
1,000
2,000
3,000
4,000
5,000
6,000
Ho
urs
Backfill
2011 2012 2013 2014
Total Hours Not
Worked60,775.5 57,517.9 60,039.1 57,774.4
Total Backfill 5,424.5 4,998.8 5,302.7 4,400.5
Surplus / (Deficit)
Hours55,351.0 52,519.1 54,736.3 53,373.9
010,00020,00030,00040,00050,00060,00070,000
Ho
urs
Surplus / (Deficit) Hours
Agency Satisfaction Survey
8
328
548
0
100
200
300
400
500
600
2013 2014
Responses
3.6 3.71
0
1
2
3
4
5
2013 2014
Do you know how to obtain help from TS?
3.06 3.31
0
1
2
3
4
5
2013 2014
How easy is it to work with TS?
3.163.49
0
1
2
3
4
5
2013 2014
How would you rate your most recent experience with
the TS Service Desk?
2.763.15
0
1
2
3
4
5
2013 2014
Does TS resolve your issue in a timely manner?
3.51 3.82
0
1
2
3
4
5
2013 2014
Do you find TS employees to be courteous and accommodating?
Employee Engagement
9
Employee Engagement
10
27.0
5
2014
Index Score
DPS Workforce Development
Program
• Lincoln and West H.S.
• Over 100 Students
Participated
• Over 40 TS Employees
Participated
Mentoring Partnership with
Denver Public Schools
• 29 TS Employee Mentors
• 24 Student Participants
Employee Engagement
11
Continuing Drivers for Employee
Engagement
• Moved 17 staff from 10G to Webb to
foster additional collaboration
• Culture of empowerment, teamwork
and innovation
Performance Awards – 2014/2015
Exemplary Performance Award 6
High Performer Award 5
“Caught Ya” Awards 18
0
5
10
15
20
25
30
35
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Open TS Positions by Year
2014
2013
Multiple performance award programs
Reductions in Number of Open Positions and Turnover Rate
Additional training dollars for employees
Change Management
12
Change Management
13
Change Management
14
911 Team
15
911 Team
16
911 Team
17
911 Team
18
Field Support – DHS Dashboard
19
Field Support – Main Dashboard
20
Field Services
21
Severity
% of overall
tickets
Days to
complete:
January 14
Days to
complete:
December 14
3 15% 23 days 2 days
4 83% 32 days 3 days
Service Desk
22
0
5
10
15
20
25
Jan-14 Jan-15
Hold Times in Minutes
Headcount went from 19 to 13
• First call resolution % continues to increase
$810k cost savings in customer productivity
• Saved avg of 15 min / 90,000 tickets / employees at $36 = $810k
Service Desk
23
Security & Compliance
24
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
91
1
31
1 C
all C
ente
r
Ad
min
istr
atio
n
Arc
hit
ect
ure
Bu
sin
ess
Ap
p. A
dm
in.
Bu
sin
ess
Ap
p. A
nal
ysis
Bu
sin
ess
Ap
p. D
evel
op
men
t
Bu
sin
ess
Ap
p. S
up
po
rt
Dat
a C
en
ter
Team
De
nve
r M
edia
Ser
vice
s
EEB
End
Use
r Ex
per
ien
ce
Ente
rpri
se A
nal
ysis
Ente
rpri
se D
ata
Man
age
me
nt
Ente
rpri
se D
evel
op
men
t
ESD
M
Fin
ance
Info
Se
c
ITSM
IT A
sse
t M
gt -
Lic
en
sin
g
Lin
ux
Mo
bile
De
vice
Mgt
.…
NO
C
PM
O
Serv
ice
De
sk
TS D
eskt
op
Su
pp
ort
Vir
tual
izat
ion
Vo
ice
Dat
a O
ps
Win
do
ws
1
14
43
4952 52 53 53 53
0
13
25
38
50
63
Q1 2013 Q2 2013 Q3 2013 Q4 2013 Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015
Total Remediated Items
TS Playbooks Completion Stats Audit Remediation Stats
1 110
10
20
30
40
50
60
70
2014 2015
Complete Incomplete
BIA – Critical Apps CompletionCurrent Unremediated Items:
29
Ops Project Portfolio
25
Project Intake
26
Year Month TS
Arts &
Venue GSA DHS
DOF
CR&CF
DOF
Office of
Controller
DOF
BMO
DOF
C&R Safety 911
Denver
Library E&L
Parks &
Rec
Public
Works
DOHS
Office of
Childrens
Affairs
Civil Service
Commission
Denver
Election OHR Assessor
Planning &
Development Purchasing
Environment
Health
Dept. of
Law Unknown Total
2014 January 3 1 1 2 2 9
2014 February 1 1 1 2 2 1 1 1 10
2014 March 5 1 1 1 8
2014 April 1 1
2014 May 2 1 1 4
2014 June 2 2 4
2014 July 1 1 1 1 1 1 6
2014 August 1 3 1 1 1 1 1 1 10
2014 September 6 1 1 1 1 10
2014 October 1 1 3 1 1 7
2014 November 2 2
2014 December 1 1 1 2 1 1 1 8
6 5 1 1 1 6 1 1 22 2 2 2 2 3 1 1 2 4 1 1 1 6 3 4 79Agency Total:
0
1
2
3
4
5
6
7
8
9
10 9
10
8
1
4 4
6
10 10
7
2
8
PMO Intake Counts (Includes Grants)
Business Intelligence
27
Contract Automation BMO Dashboard
DSD Jail Capacity DPD Officer Productivity
Application Release Lifecycle
28
0 10 20 30 40 50 60
Old Model
New Model
Effort in Days
Software Development Cycle
Development Styling Test Automation Build Automation
Summary
• Election Results, Officer Lookup,
Inmate Search, Liquor & Marijuana
Hearings, and Pocketgov have
gone through the new process
• The displayed chart represents the
reduction in days for a single
application
• Build Automation – 24x
Improvement (2 Hrs to 5 Min)
• Development – 2x Improvement
(40 Days to 20 Days)
• Styling – 2x Improvement
(10 Days to 5 Days)
• Testing – 60x Improvement
(1 Hr to 1 Min per Component)
• Change Management – Unlimited
Releases Versus Bi-Monthly
(Automated Builds are Routine
Changes)
311 Statistics
29
0:00
1:12
2:24
3:36
4:48
6:00
January April July October
Tim
e
ASA 2013
ASA 2014
0:00
0:28
0:57
1:26
1:55
2:24
2:52
3:21
3:50
4:19
January April July October
Tim
e
AHT 2013
AHT 2014
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
1 2 3 4 5 6 7 8 9 10 11 12
Vo
lum
e
ONLINE 2013
ONLINE 2014
Average Speed of Answer Average Handling Time
Online Inquiries
Denver Loft Sessions
30
SRA Update
31
Description Cost Description Cost
PM Professional Services Infra $100,000.00 Denver 8 Downtown $81,200.00 Adobe WCMS $200,000.00 Wifi upgrade $100,000.00 Paperless Meetings $35,000.00 Windows 7 Upgrade $920,167.24 Ent Apps Program Manager $110,000.00 Firewall Security $150,000.00 Office 365 $1,550,000.00 Wi-Fi expansion $200,000.00 Cloud Hosting for Video $180,000.00 Security Assessment $20,000.00 DMV Queuing System $39,998.12 Strategic Resource Personnel $1,458,812.64 Asset Management Tool $162,500.00 Infrastructure $93,250.00 Prof Services Infrastructure $500,000.00 SharePoint Enterprise $400,000.00 QA Automation Tools $250,000.00 Audit Remediation $150,000.00 Business Intelligence $250,000.00 Aging PBX Replacement $400,000.00 Admin Access Control $50,000.00 Disaster Recovery/Business Con $122.677.50 Prof Services Radio Systems $89,000.00 Police Car High Speed $710,561.49 Disaster Recovery $750,000.00 Tenable Security Center Licenses $80,000.00 PM Tools/Audit $65,212.07 Technology Services Training $150,000.00 Anti Spam Device $15,250.00 Programming Enhancements $35,000.00 Internet Edge $1,001,623.98 Oracle Toad DBA Suite $41,542.00 Engage Contact Center Suite $22,035.00 Milestone Software $175,000.00 Computer Replacement $180,000.00 Media Services Footprint Exp $50,000.00 Application Modernization $1,340,000.00 Kids Community Planning $200,000.00 SharePoint - Pilot $175,000.00 311 Workstation Upgrade $19,999.90 Security Data Rooms $100,000.00 BusinessObjects CPU $97,200.00 Prof Services Security $250,000.00 311 Contact Ctr Wrfrce Mgmt Ap $37,832.61 Denver 8 Citywatch $53,000.00 Total = > $13,161,862.55
Sustainability
Comments:
• Four year phased approach for replacing all UPS units in the city with green mode.
.32
Resource
Investment
Projected Contribution to
Meeting 2020 Goals Key Assumptions
Upcoming Benchmarks
and Status
• $80,000 capital
expenditure budget
• Desk of the future
Budget TBD
• $30,000 operating
budget
• Waste Water
Datacenter Shutdown
(FTE Operational
Expense Only)
• $7,000 operating
budget
• Energy: Reduce energy
consumption of our Cooling
Units at our WMB Datacenter by
35% through a EC fan retrofit of
our current DC fan setup
• Energy: Desktop of the future
project. Reduce overall energy
consumption by City employees
at desktop work stations.
• Energy: Work to reduce building
energy consumption based on
UPS devices. A 4% increase in
efficiency per UPS
• Energy: Close the Waste Water
Datacenter . Moving storage
and virtualizing all servers will
save 20-30KW.
• Ducting the CRACs (Datacenter
Cooling Units) into the ceiling at
10 Galapago Datacenter. This
will provide efficiency and
decrease power usage by
• 35% reduction based on
motor kw2 = motor kw1 x
(speed2/speed1)3. A 20 %
reduction in fan speed
results in 49 % energy
savings
• Desk top of the future will
save as much as 150 to
300 watts over todays PC
• UPS sizes vary from
1500VA to 8,000VA
• Waste Water KW savings
includes shutdown of both
physical servers and
Storage equipment.
• Air flow study has been conducted
and is complete. A pilot will be take
place for 1 of the units and is
expected to be completed Aug 2015.
The other 3 Units will follow with a
target date of Dec 2015
• Meeting with vendors in 2015 to
explore new technologies available,
then put together a Decision Package
to push for implementation in 2016
• 15 UPS’s already deployed at 303 W.
Colfax. Planning under way for the roll-
out of an additional 25 UPS’s to
complete Phase 1.
• Virtualization of servers is underway
and will be completed in June
• Vendor has been chosen to do work
for Ducting. Planning to start and
complete work in October 2015
State of the City
33
0
200
400
600
800
1000
1200
1400
1600
1800
2000
Running Count of User Profiles
808
475404 372
180110 108
41 24 23 21 15 14 10 8 7 7 7 4 30
100
200
300
400
500
600
700
800
900
Counts by Case Type
Total Case
Count:
2641
Total User
Profiles:
1726