- 1. technical specifications POrt of oostende- priority to
offshore wind vessels -- outstanding geographical location --
excellent & immediate access to open sea -- NO LOCKS for
offshore installation terminals -- crew transfer vessels can berth
overnight behind locks -
2. technical specifications Port of OostendeCONTACTSPort of
OostendeSlijkensesteenweg 2 - 8400 OostendeT: +32 59 34 07 11F: +32
59 34 07 10www.portofoostende.beHarbour Master: Mario
[email protected] Director: Jan
[email protected] Director: Luc
[email protected] - A10document
date: 2014/10/17 2 3. technical specifications Port of
OostendeCONTENTSdocument name document nR document date revision1.
maritime accesspilotage 1.01 2014leading lights 1.02 2014acces from
open sea to port 1.03 2014harbour wall heads 1.04 2014widening
eastern shore 1.05 2014bathymetry 1.06 2014-10tide tables 1.07
20142. map of the port 2.01 2014-063. quaystechnical details 3.01
2014-104. pontoonslocation of the pontoons 4.01 2014-10pontoons
detail 4.02 2014-105. stevedore 5.01 2014-106. services towards
vessels 6.01 2014-107. usefull contacts 7.01 2014-10document date:
2014/10/17 3 4. technical specifications Port of Oostende1.
maritime accessPILOTAGEPilote has to be ordered via ship agency
(contacts p 17).DAB Loodswezen: www.loodswezen.bepilotage from
Wandelaar:- for vessels with a LOA of 80 M or +- 24 hrs from
Wandelaar pilot- tugs available+/- 1 hour sailingdoc.nr: 1.01date:
2014document date: 2014/10/17 4 5. technical specifications Port of
Oostende1. maritime access doc.nr: 1.02date: 2014VHF 65Q.RTraffic
centreWandelaarRQ.ROH2Fl.G.5s8mOH1(VHF 09PortControl)leading
lightsFl(3)G.10sOH70143Q.G1GO53F.G.14m10MBell4s25255'05114'5056'5114,62'NVuurtorendok3,7mFl(3)10s65m27MVisserijdokWkRadar
Tr Surveillance StationVisserijsluis(VHF 20)Port
ControlVismijnTijdokZeewezen-Iso.4s38m4MVoorhaven9,9m2,1mMRCCdok5,4m6,2mDemey-sluis(VHF
10)4,2m3,7mIso.4s48m4M25,1m9,9mVlotdok56'5114'2,6m1,1m5,1m20SS
(Traffic)Q.Y3,1m5,1mQ.YTide gaugeGebaggerde diepten (zie
nota)Q.YDredged depths (see
note)8mF.RF.G5,5m8mRO6Fl.G.5sOHGG256,52'E8mObscdRMercatorOOSTENDE250
m1:15000 (5120')0F7,4m22GG254,72'E255'm2
505113,37'N6,5m8mQ.ROH85,1mQ.ROH6R3,1mMontgomerydok2,6m5,7mdokken(VHF
14)Mercatorsluis4alignment 143 indicated by leading lightsnew
construction of 2 moles> access of vessels up to 200 m
length> entrance = 130 m wide at -8.4 m LAT> broadens out 5
cables inside the entrance> to a turning basin with a diameter
of 300m1 - 23.4.document date: 2014/10/17 5 6. technical
specifications Port of Oostende1. maritime access270 m150 m300
mAccess from open sea to portdoc.nr: 1.03date: 2014document date:
2014/10/17 6 7. technical specifications Port of Oostende1.
maritime access doc.nr: 1.04date: 2014Harbour wall headsdocument
date: 2014/10/17 7 8. technical specifications Port of Oostende1.
maritime access doc.nr: 1.05date: 2014Widening eastern shore>
works planned in 2015 (project approved)> the last phase of the
new harbour entrance project> removing the current slope and
dolphins on the eastern side of the approachto the turning
basin> result: widening the channel by 50 mremoval of
thedolphins50 m clearanceto new shoredocument date: 2014/10/17 8 9.
technical specifications Port of Oostende1. maritime
accessbathymetryN: 5675600 N: 5675600N: 5675800 N: 5675800N:
5676200 N: 5676200N: 5676400 N: 5676400N: 5675400 N: 5675400N:
5675000 N: 5675000N: 5675200 N: 567520056768005676600N: N: 5676800
N: 5676600 N: N: 5676000 N: 5676000N: 5677000 N: 5677000E: 494800
E: 494800E: 495000 E: 495000E: 496200 E: 496200495800 496000 E: E:
496000E: 495800E: E: 495200 E: 495200E: 495400 E: 495400E: 496400
E: 496400E: 495600 E: 495600N: 5677200 N: 5677200E: 494600 E:
494600494400 E: 0494400E: E: 494200 E: 494200494000 E: 50494000E:
15202580 dm B2.221 dm405 404 403B2.131 dmAB101 451025674800N: C465
dm5674600609N: 608607 6065674400N: 5674800 5674600 5674400 N: N: N:
605603602501Baggerkuil70 dm601406503502402401103A554 dm104
105C3.151 dm201 202Schip203204 205 206A731 dmA651 dmA457 dmC2.262
dmC3.380 dmC3.290 dmC2.180 dmC180 dmB355 dmB151 dmA374
dm604g1OPNAMEFREQUENTIE 33 kHzmb1OH8OH2OH6OH1OHA1+A280 dmdoc.nr:
1.06date: 2014-100SITUERINGSPLAN | schaal 1:14 0000515202545
SchipE: 494200 E: 494200N: 5675600 N: 5675600ZONE PEILINGNOOSTENDE
HAVEN 30/09/2014E: 495600 E: 495600LEGENDEStreefdieptekaartDiepte
< Streefdiepte -2.0 mDiepte < Streefdiepte -1.0 mDiepte <
StreefdiepteDiepte < Streefdiepte +0.5 mDiepte < Streefdiepte
+1.0 mDiepte < Streefdiepte +1.5 mDiepte > Streefdiepte +1.5
mDieptelijnen om de meterBoeipositie volgens BAZWaargenomen
boeipositie tijdens peilingBaggergrenzen01/10/2014UITVOEREN VAN
HYDROGRAFISCHE METINGEN IN DE VLAAMSE ZEE- EN
JACHTHAVENSOOSTENDEHAVEN33 kHz (LAT)Info meting Info vorige
metingVorig plan:Meetvaartuig:Echolood:Geosurveyor IIKongsberg
EA400GPS-RTK FLEPOS30/09 & 01-10/2014Jeroen Van
GerwenPlaatsbepaling: Vorige opnamedatum:Info revisie:Nagezien
door:140731_305_HA_OST_HAV_AB_SB_3331/07/2014 & 01/08/2014Fien
Van HauteGuido JansseuneGoedgekeurd door Kust:Datum:Info
kaartMinimale dieptes in dm t.o.v.
LATBestek16EH/12/43Dossiernummer:
212.305VerwerkingTekenaar:Datum:ID-nummer:Plannr:SCHAAL:1/2500Plan
opgemaakt door:GEOXYZKUSTgeoxyZ bvbaharelbeekstraat 104 d8550
ZwevegemBelgiumtel +32 (0)56 70 68 48fax +32 (0)56 75 46
[email protected]:Surveyor:UTM ruitennet -
WGS84 - zone 31Samuel DeleuAanvaard door AMT:Datum:Ing. Virginie
DebuckPieter Sedeyn02/10/2014403140930_403_HA_OST_HAV_AB_SB_33E:
493800 E: 493800E: 493600 E: 493600N: 5674200 N: 5674200document
date: 2014/10/17 9 10. technical specifications Port of Oostende1.
MARITIME ACES doc.nr: 1.07date: 2014-10TIDE TABLESdownload list for
tide
tables:http://www.vlaamsehydrografie.be/level2.asp?TAAL_ID=1&ITEM_L1_ID=13&ITEM_L2_ID=28document
date: 2014/10/17 10 11. technical specifications Port of Oostende2.
MAP OF THE PORT & LOCKS doc.nr: 2.01date: 2014-06BEFORE
ENTERING THE PORTalways contact PORT CONTROLVHF Ch 09LOCK
:Visserijsluis (L 91 x W 15.3 m)open 7/7 - 24/24always accessible
with a ship draught of 3.5 mtime in lock: +/- 30 min depending on
the tidecontact via VHF Ch 20LOCK: Demeysluis (L 124 x W 17.5
m)open 7-7 / 6 AM > 10 PMship draught < 3.5 m : always
accessible3.5 m < ship draught < 6 m : depending on tidetime
in lock: +/- 30 min depending on the tidecontact via VHF Ch
84document date: 2014/10/17 11 12. technical specifications Port of
Oostende3. QUAYSfor OFFSHOREINSTALLATION VESSELSdoc.nr: 3.01date:
2014-10for OFFSHORESERVICES VESSELSTECHNICAL DETAILSBERTH 501 502
503 603 - 604 605 606depth * 8 m 8 m 7 m 5 m 5 m 5 mlength of berth
200 m 180 m 110 m 200 mmax. length of vessel 200 m 180 m 100 m 200
mstrengthened seabed in frontno no yes noof quayquay height 7.30
LAT /6.80 TAW7.30 LAT /6.80 TAW7.30 LAT /6.80 TAW7.30 LAT /6.80
TAW7.30 LAT /6.80 TAW7.30 LAT /6.80 TAWforROROBERTH 105 501 &
502 404 202depth * 7 m 8 m 8 m 8 mlength of berth 170 m 180 m 200 m
180 mlinkspan double deck 2 1 double deckloading capacity 240 ton
240 ton 240 ton 140 tonwidht of linkspan 6.5 m 7.05 m 9 m 7.05 m#
pontoons 1 2 1 1side-loader 1max. length of vessel 170 m 180 m 200
m 190 m* LATdocument date: 2014/10/17 12 13. technical
specifications Port of Oostende4. PONTOONS doc.nr: 4.01date:
2014-10location of the PONTOONSdocument date: 2014/10/17 13 14.
technical specifications Port of Oostende4. PONTOONSpontoonS
detaildoc.nr: 4.02document date: 2014/10/17 14 15. technical
specifications Port of Oostende5. STEVEDOREdoc.nr: 5.01date:
2014-10Stevedore activities in the port of Oostende for the
offshore industryStevedoring = To load or unload the cargo of (a
ship) or to engage in the process of loading orunloading such a
vessel.As the offshore industry is working with very heavy and
sensitive components, it is allowed inthe port of Oostende that the
company working with these components on the offshore terminalcan
use its own workers and equipment for the handling of these
components.However, for every loading on or unloading of a vessel,
pontoon, installation vessel, of com-ponentsat least two (2) dock
workers have to be employed.These dockers belong to a pool and can
be employed by the companies that belong to thispool. In Oostende
the dockers used for the offshore industry have to be commanded via
thecompany Verhelst Port Operators.document date: 2014/10/17 15 16.
technical specifications Port of Oostende6. SERVICES TOWARDS
VESELSdoc.nr: 6.01date: 2014-10drinking water: provided by port at
any quay at costelectricity: different electricity posts at
terminal (to be discussed with port)bunkering: free choice (not
organised by port)waste: organising of waste management needs to be
provided to port by companydocument date: 2014/10/17 16 17.
technical specifications Port of Oostende7. USEFUL contactsShip
agenciesVerhelst Port OperatorsT: +32 59 33 11 33F: + 32 59 33 14
33M: +32 496 588
[email protected], Botra &
PartnersT: +32 478 67 49
[email protected]: +32 50 82 73 43M: +32
474 263 [email protected]: +32 50 54
42 66M: +32 475 58 42 [email protected]
CONTROLMaritiemplein 3 - 8400 OostendeT: +32 59 25 54 88 (24/24 -
7/7)[email protected] via VHF Ch
84Visserijsluiscontact via VHF Ch 20MRC - maritime rescue &
cordination centreMaritiemplein 3 - 8400 OostendeT: +32 59 34 10 20
(24/24 - 7/7)[email protected]: 7.01date: 2014-10document date: