PDF generated on 04 Jul 2017 DISCLAIMER : UNCONTROLLED WHEN PRINTED – PLEASE CHECK THE STATUS OF THE DOCUMENT IN IDM Technical Specification Technical Specification for Mechanical Engineering Support The contract is needed for the specialist mechanical engineering support which is required as part of the ICH antenna project.The work comprises of evaluation, verification and compliance of the mechanical designs of the ICH antenna produced by the ICH antenna design team as well as the writing of technical specifications. Approval Process Name Action Affiliation Author Graham M. 26 Jun 2017:signed IO/DG/COO/TED/HCD Co-Authors Beaumont B. 26 Jun 2017:signed IO/DG/COO/TED/HCD/ICLH Reviewers Calarco F. 03 Jul 2017:recommended IO/DG/COO/TED/HCD/ICLH Approver Boilson D. 04 Jul 2017:approved IO/DG/COO/TED/HCD Document Security: Internal Use RO: Graham Margaret Read Access LG: heatings, LG: IC Antenna team, GG: IO DDGs (and Senior Advisors), AD: ITER, AD: External Collaborators, AD: IO_Director-General, AD: EMAB, AD: Auditors, AD: ITER Management Assessor, project administrator, RO IDM UID UXVV4K VERSION CREATED ON / VERSION / STATUS 26 Jun 2017 / 1.2 / Approved EXTERNAL REFERENCE / VERSION
12
Embed
Technical Specification Support Technical Specification .... Tech … · Technical Specification for Mechanical Engineering Support The contract is needed for the specialist mechanical
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PDF generated on 04 Jul 2017DISCLAIMER : UNCONTROLLED WHEN PRINTED – PLEASE CHECK THE STATUS OF THE DOCUMENT IN IDM
Technical Specification
Technical Specification for Mechanical Engineering Support
The contract is needed for the specialist mechanical engineering support which is required as part of the ICH antenna project.The work comprises of evaluation, verification and compliance of the mechanical designs of the ICH antenna produced by the ICH antenna design team as well as the writing of technical specifications.
Approval Process Name Action AffiliationAuthor Graham M. 26 Jun 2017:signed IO/DG/COO/TED/HCDCo-Authors Beaumont B. 26 Jun 2017:signed IO/DG/COO/TED/HCD/ICLHReviewers Calarco F. 03 Jul 2017:recommended IO/DG/COO/TED/HCD/ICLHApprover Boilson D. 04 Jul 2017:approved IO/DG/COO/TED/HCD
Document Security: Internal UseRO: Graham Margaret
8 LIST OF DELIVERABLES AND DUE DATES .............................................................69 ACCEPTANCE CRITERIA..............................................................................................610 SPECIFIC REQUIREMENTS AND CONDITIONS......................................................711 WORK MONITORING / MEETING SCHEDULE .......................................................712 ASSURANCE (QA) REQUIREMENTS...........................................................................813 CAD DESIGN REQUIREMENTS....................................................................................914 SAFETY REQUIREMENTS.............................................................................................9
ITER_D_ XXXXXX
Page 2 of 11
1 Purpose
This document describes the technical needs for the specialist work relating to the mechanical
engineering, design and evaluation and the writing of technical specifications for the design
and evaluation work required for the ICH Antenna project.
2 Scope
The work comprises of the evaluation, verification and compliance of the mechanical designs
of the ICH antenna produced by the ICH Antenna design team as well as the writing of
technical specifications. The Ion Cyclotron Heating (ICH) antenna uses radio frequency (RF)
in the range of 40 to 55MHz to provide the heating and current drive to the ITER plasmas in
order to assist in accessing the H-mode and achieving Q=10 as well as other plasma control
functions.
The design of the antenna is being outsourced and work is required at ITER to verify and
check that the design conforms to all the necessary ITER requirements.
The work will support the ITER ICH antenna project manager in moving the antenna design
from PDR through to FDR and providing all the necessary detailed technical specifications
and
drawings for the procurement.
3 Definitions
CYCLE (TO 02): CYCLE is a consortium of European laboratories (CCFE, CEA, ERM, IPP & POLITO) who, through a contract called a task order (TO 02), are completing some of the antenna design work.DA: Domestic AgencyICH: Ion Cyclotron HeatingIO: ITER OrganizationIO-TRO: ITER Organization Technical Responsible OfficerTL: Transmission LinePDR: Preliminary Design ReviewFDR: Final Design ReviewFor a complete list of ITER abbreviations see: ITER Abbreviations (ITER_D_2MU6W5).