Technical Projects Update YRBWEP Workgroup Meeting March 11, 2015
59

Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Mar 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Technical Projects Update YRBWEP Workgroup Meeting March 11, 2015

Page 2: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

• Keechelus-to-Kachess Conveyance

• Kachess Drought Relief Pumping Plant • Bull Trout Enhancement • Cle Elum Pool Raise • Wymer Dam and Reservoir • Reservoir Fish Passage • Bumping Enlargement Geological Investigation • Hydrologic Modeling Results for Bumping and

Wymer Reservoirs • Groundwater Storage • Teanaway Community Forest • Habitat Enhancement and Agricultural

Conservation Projects

Ongoing Projects

Page 3: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Path Forward July 2013 to June 2015

Page 4: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Planning Stage Design Stage Solicitation Construction Stage Operations

30% Design

90% Design Bid

Construction Complete

Appraisal Study

Feasibility Study

Final Design Contract Construction

Prel

imin

ary

Cos

tEs

timat

es

Appr

aisa

l Cos

tEs

timat

es

Feas

ibili

ty C

ost

Estim

ates

Perc

ent D

esig

nC

ost E

stim

ates

Prev

alid

atio

n C

ost

Estim

ates

Fina

l Cos

t Est

imat

e

Award

Reclamation’s Planning and Construction Schedule

Page 5: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Keechelus-to-Kachess Conveyance and Kachess Drought Relief Pumping Plant

Page 6: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Project Locations

Keechelus-to-Kachess Conveyance

Kachess Drought Relief Pumping Plant

Cle Elum Pool Raise Cle Elum Dam Fish Passage

Page 7: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

KKC and KDRPP

• Draft EIS issued January 2015 • Comment period closed on March 10 • Next steps:

– Review comments and update analyses as needed

– Reopen comment period for 60 days – Hold additional public meetings in May 2015

• Geologic investigations are continuing with further drilling planned in 2015

Page 8: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Keechelus-to-Kachess Conveyance

Page 9: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Keechelus-to-Kachess Conveyance North Tunnel and South Tunnel Alternatives

Page 10: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

r:Ke ec helus Re s ervoir

Kachess --­Res e r v oir

~ Existing Roads

Keechelus

Intake and Fish Screens

Existing Structures Kachess Lake Road Portal and

Discharge Structure v;

Cleared Area

Conveyance Option B

CTunnel~ -~ ~-:::, - ~ -- ...... ::::::::

-- -- 4 --- -------:: ~:::: ...... ---Keechelus Portal Culvert

with drop shaft and plunge pool

Stilling Basin

Temporary Kachess Lake Road

1 ( Realignment

I Rip-rap

Diversion Dam

Yakima River____/'

Conveyance Option A

Mechanical Building Kachess Lake Road ---\\

Not to

scale

DEPARTMENT OF

~~ECOLOGY State of Washington -~/

KKC Intake and Discharge Works(not to scale)

Page 11: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Mitigation – Keechelus-to-Kachess Conveyance • Develop a surface water quality monitoring program

in cooperation with Ecology to monitor changes in water quality associated with the project.

• Prior to construction, conduct site-specific geotechnical studies to identify subsurface issues,unstable slopes, and other local factors that could contribute to slope instability and increase erosion potential.

• Prior to construction, Reclamation would conduct on-the-ground wetland surveys to avoid wetland impacts. If impacts occur, Reclamation would comply with mitigation measures as established in permit conditions from applicable agencies.

Page 12: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Kachess Drought Relief Pumping Plant

Page 13: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Kachess Drought Relief Pumping Plant • Provide up to 200,000 acre-feet in a drought year for

proratable irrigation districts • Droughts occur on average every 5-10 years • Up to 80-foot drawdown below existing minimum

pool

Page 14: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Alt. 2 - South Pumping Plant

Kachess Drought Relief Pumping Plant Alt. 1 - East Shore Pumping Plant

Page 15: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

KDRPP – Area between upper and lower reservoirs

Page 16: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Kachess Reservoir Pool Elevations Under Alternative 2A

Page 17: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Mitigation – Kachess Drought Relief Pumping Plant • Provide fish passage between Box Canyon Creek

and Kachess Reservoir and between the Little Kachess and Kachess basins to offset impacts of additional drawdown at Kachess Reservoir.

• Conduct passage improvement activities within Kachess and Keechelus reservoirs.

• Monitor wells near Kachess Reservoir to determine if water levels are lowered by additional reservoir drawdown. Develop appropriate mitigation strategies if water levels are impacted.

Page 18: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Bull Trout Enhancement • Reclamation and Ecology have coordinated with

USFWS, USFS, Yakama Nation, WDFW, and NMFS to formulate Bull Trout Enhancement program.

– Gold Creek – Cold Creek – Nutrient Enhancement – Assessments

• BTE is part of all action alternatives in KKC/KDRPP EIS

• MOU with Reclamation, Ecology, Yakama Nation, USFWS, WDFW, USFS

Page 19: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Cle Elum Pool Raise

Page 20: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Cle Elum Pool Raise • Final EIS is now being

prepared, responding to comments on Draft EIS

• ROD scheduled 2015

Page 21: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Reservoir Fish Passage

Page 22: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Cle Elum Fish Reintroduction 2013 – First Sockeye to be born and raised in the Yakima River Basin in over 100 years return, released into Cle Elum Reservoir Year Spawning sockeye

released in reservoir Returning Sockeye

2009 1,000 2010 2,500 2011 4,100 2012 10,000 2013 4,000 800

2014 10,000 2,600

Page 23: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Phase I - Bridge & Access Road Construction – begin 2015 Phase II – Fish Passage Facilities Final EIS Spring 2015

Page 24: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Tieton Dam Fish Passage Facilities Study

Appraisal Assessment Report - Fall 2015

Page 25: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Bumping Enlargement Geological Investigation

Page 26: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Bumping Dam and Reservoir Enlargement

Page 27: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Bumping Lake Enlargement

(Geotechnical Investigation - Phase 1)

..-'-. •" ~.;.,..,~ e.:.~"~"'"

ntAn'flit' .. ,.lf:Mio!ll.t

~l'folo' .. M,•HWI'I.a•,H

~ Pl'>t<oHI_. ' l- · n,., .. .l.llig•ru"'•l'<l

4 • lr1rspatd.:h . , ~F-~ 110~. 1W8. 1 ~·

l'otomUilf l<w•HiifW t;u.;w~

Jt-H3-2: t~ff. ~63521 OH 133: l444to:t ~~Ct OH-1$-1: 11·t6t'5.~~)l2

~I 0.:: C.3

t~lll"'f':hn"'l:ll' UllQo,;l'l'li'fiJ~EII"::G.GI0.(l,Cior"IDOII~C.;t.IJ"*l<lm:'-";-:

A J11 h'to ~~~" I ~,;;, ":.l.t~t1>.o'!J. "''·' ;"~Moo .. ~-..~ , f">>~' ''*lio/11 r..'ll It IW'>'III c ......... <J .. ...., r.o .. u, l)noJ. ....... u ...... '!!,......,,_ ~~ 1')'"' IIITE 01 :Or.w>t>:-t:;.,OTOOI.fOf:i.tTO r.Ei~J~o:A .. II.w,"H:Cl~.III:1$.Tt.t.C,,J.t;

IAoll.lttt'

,~_;,: :~~::.;~.~ ::~~~~~-~~~~~~~~ ~~\!. ~~:~~~ - ... ~, I N~IM"""" W. l rf""'; J-~Ir.o ~Tnfi~/1:-Ai~

\~::'lc. bw>:it'l · &«J~v:: •::t.:J::H> u;,.~ tiY llf:ll':at O.I'XJJ:r "'~n tt·:>4,:oot w•,s­..... ~':J><~~am-u.»cJIUIGif"~-s-o:n."""'Mor C(t3ll2o>WJ•l"·'t::l

[fz:~~::~~-~;·~~~~;;;z~~~~=:7t.~::~~rr!'~~ .. ~-~~.,-v 1..:'1<1-H

~~!~? ~: i.~.~.,:j~':';'S,: 'i:~~~.;" ;;;:..~.::·~'1;; ~-~~~~:.·.-~~-v;t!:::;.~~~·=-::; .;.~·:.';N , •. "'lhno<l~ l>"''>atCIII.Y.I .·o ;,octt~ ... ~...:ll~a)."1!Ql!JioliGI:IDw-I:Doftr :n, O:n:»p:.; !f'!J"Qf>u" II~V:'CI-d. Ill"~ ~~~ ''~ ~·""~ ,. • ., ,,,~>< IN-._,,.:;.- lo.IM .,, .. ,.,,~ 1 lh.~ol"U" '1'""' .,,.,:, ••w' •"" ,_,...,.. "•~oe--loA " ""' ,..,,UJ,:. u..o.o , ,.,...... I ~ ._..,.,...,.,., .... ,~..,,_.,.,..,..,r .. ~ .. ,. .,n. •. u ,,.....,. • ....,. .... ,111'. ,.., ... ,_.,.,_.,., • oW''"'""''·"'wUo OI)!W;I~t'"~"lf:IC).<Illf__._,.._, ·~I:J'~rlll"!o~;._,""'''·~)k:I;• . .,.J~ .v.oo llll14~tn ~!tfl~l:7:ttJ'I• ~..> ~0:,.,1001'00~ toyft~ l-tt:l=.,.ID:•.s-t:.J~~'IS:<r,41n tl4 1hftt-:l~'"f- l<:t IJ!'ftol•«f;l>"!»'f!IIY11!tf.S'NI~CIU:o" ~·5·'1"1~~Uh~CIIII ... !f.ll:O')•• "MIU!·I'"o"•l•<•:~

DEPARTMENT OF

~=-ECOLOGY --~-- St•te of washington

Geotechnical Investigations

Page 28: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Hydrologic Modeling Results for Bumping and Wymer Reservoirs

Page 29: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Hydrologic Modeling Activities

• Modeling of Initial Development Phase projects completed summer 2014

• Modeling of Wymer Dam and Reservoir and Bumping Reservoir Enlargement completed December 2014

• Coming next: more detailed examination of how water conservation affects return flows and lower basin supply availability

• Modeling includes protocols to guide how the model stores and releases water at different reservoirs

• As projects come on line, these protocols will need further definition, with stakeholder participation

Page 30: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

How do we Measure Results?

• Water Supply – Change in

prorationing level – Change in Total Water

Supply Available – Change in deliveries

to water users – Examine effects

under a range of supply conditions

– One-year droughts vs. multiyear droughts

Page 31: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

How do we Measure Results?

• Streamflow and Fisheries – How closely can we match

flow objectives defined by biologists in Integrated Plan?

• Various rivers/reaches • Different seasons

– What’s the magnitude of improvement? How much of the time will it occur?

– Which species and life stages will benefit?

Page 32: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Scenarios Modeled

Scenario # Name Water Supply Objective Instream Flow Objective BASELINE IP0* IP1 IP2 IP3 IP4 IP5 IP6

Baseline Future without IP Future Conservation Future without IP KKC Only No Additional KKC & KDRPP Improve Prorationing KKC, KDRPP, & CEPR Improve Prorationing IP3 + WDR Improve Prorationing IP3 + BRE Improve Prorationing All Five Projects 70% Prorationing

Existing Requirements Varies by project Keechelus Reach Keechelus Reach Cle Elum River Upper Yakima, Cle Elum, Tieton Bumping, Naches, Lower Yakima All of the above

* The IP0 conservation projects are included in all subsequent scenarios.

Page 33: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Perc

ent (

%)

September 30 Prorationing (%) 100

90

80 70 % Goal 6770 62 62

5760

50

40

30

20

10

0

43 46

Baseline IP0 IDP (IP3) WDR (IP4) BRE (IP5) Full IP (IP6) Scenario

Summary of Water Supply Benefits of Each Scenario (for Years when Prorationing Would Remain Below 70%

with Initial Development Phase Completed)

Page 34: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Thou

sand

Acr

e-Fe

et (k

af)

70 % Goal 700 652619 610579600

500

400

300

200

100

0 IP0 IDP (IP3) WDR (IP4) BRE (IP5) Full IP (IP6)

488

Scenarios

Summary of Water Supply Benefits of Each Scenario (for Years when Prorationing Would Remain Below 70%

with Initial Development Phase Completed)

April 1 to Sept 30 Major Proratable Deliveries (kaf)

Page 35: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Streamflow and Fisheries Benefits of Wymer Dam and Reservoir • Easton Reach of Yakima

River (17 miles). Winter flowimproved by 30 to 60 cfs (15% - 30%).

• Cle Elum River (8 miles). Winter flow improved by80 to 120 cfs (35% - 65%).

• Keechelus Reach minimum flow increased.

• Tieton River minimum flow increased.

• Benefits spring Chinook spawning/rearing (and eventually steelhead).

Page 36: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Streamflow and Fisheries Benefits of Bumping Reservoir Enlargement • Tieton River (21 miles). Minimum flow improved

by 25 to 35 cfs to achieve 125 cfs 99% of the time. • Bumping River (17 miles) and Naches River

(45 miles). Spring pulse generated to assist outmigration (55,000 acre-feet in drought years).

• Yakima River from Yakima to Kennewick (116 miles). Higher spring flows to assist outmigration.

• Spring pulse benefits all anadromous fish.

Page 37: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Other Considerations

• Modeling includes protocols to guide storing and releasing water at different reservoirs.

• As projects come online, protocols will need further definition, with stakeholder participation.

Page 38: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Groundwater Storage

Page 39: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Groundwater Storage Activities

• Ecology has issued temporary permit to City of Yakima for ASR project – recharge is beginning now

• Long-term permit planned, pending completion of backup documentation

• Four monitoring wells completed associated with KRD

• Dry Creek stream gage in place for monitoring

Page 40: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Groundwater Managed Recharge

• Proposed Areas for managedrecharge modeling

Page 41: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Yakima River Basin Integrated Water Resources Management Plan

Shallow Groundwater Recharge Investigation

• Monitoring Well

0 Stream Gage

YAKIMA BASIN IIUILOIK4J, "f\jfURE 1'0" """''""Ell,

WLLOI..IFE 4: \\'ORICII'IG lA.OOS

(V

(\.r

IV

KRD Canals

Streams

Yakima River

Highway

Interstate N

A DRAFT

Marcil 201:.

KRD Proposed Observation Wells

Page 42: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

St•te of washington

KRD Site 1 – Start of Drilling

Page 43: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

DEPARTMENT OF

~~ECOLOGY State of Washington

KRD Site 3 – Drilling Completed

Page 44: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

KRD Monitoring Wells

Dry Creek Stream Gage

Page 45: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Teanaway Community Forest

Page 46: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Advisory Committee Charged with making recommendations to WDFW and

Forest Spring 2014 Advisory Committee scoping;

Initial field trip to understand issues and opportunities

Summer 2014 Brainstorm desired future conditions for Goals 1, 2, 3, and 4; Public open house #1; Field trip to understand recreation issues and opportunities

Fall 2014 Review objectives and strategies for Goals 1, 2, 3, and 4; Brainstorm ideas for Goal 5; Public open house #2

Winter 2014-2015

Review objectives and strategies for all Goals; Identify and resolve cross-cutting issues; Public open house #3

Spring 2015 Finalize draft management plan; Final public review via SEPA process

Summer 2015 Release Plan

WDNR on strategic plan for Teanaway Community

Page 47: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Habitat and Conservation Project Implementation

Page 48: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

-

-

- -

- -

1

23

45

6 1

2

4

6

Basinwide Project 5

Agricultural Conservation

Projects 1 Kennewick Irrigation

District (KID) Division IV Lining

2 Wapato Irrigation Project (WIP) Piping Lateral 4 414C

3 Wapato Irrigation Project Piping Satus East Lateral E73

4 Manastash Creek, Anderson Diversion Irrigation Water Acquisition

5 Manastash Creek Sprinkler Conversions

6 Yakima Tieton Irrigation District (YTID) Feasibility Study Tieton to Ahtanum Exchange

7 Manastash Consolidated Pipeline & Manastash Water Ditch Association (MWDA) Pipeline Construction

3

Habitat Enhancement

Projects 1 Gap to Gap Outfall

Relocation

2 Toppenish Fan

3 Bateman Island Causeway Modification Conceptual Design

4 Bull Trout Task Force Habitat Improvements

5 Gold Creek Habitat Assessment and Conceptual Design

6 Reed Diversion Removal

7 Little Rattlesnake Road Decommissioning

8 Cle Elum River Side Channel Restoration Project, Phase 2

9 Gap to Gap Property Acquisitions

10 Upper Wapato Riparian Restoration

11 Ellensburg Water Company / Coleman Creek Restoration

12 Reed Diversion Barrier Removal

13 Trout Meadows Acquisition / Enhancement

14 Plum Creek / Little Naches Land Acquisition

7

7

8

9

10

11

12

13

14

Yakima Integrated Plan Habitat Enhancement/Enhanced

Agricultural Conservation Projects 2013-2015

Page 49: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

~--

Habitat Enhancement – Yakima County: Gap-to-Gap Property Acquisitions

Appraisals to be conducted in near future

Page 50: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Trout Meadows Floodplain Restoration Cl-'rm~f:I A• ::qlm::. tl:m

:lh1 QiannetF>

Yak ma CoJnt'; PL b1le \oVork'i

~ r reewa:;s

-- HlgllWi:IJS

-- r ....... ,or 1-?c r;~(t!-"

-- ::-.111P.r

- Peitnnial Strea 'Jl

N

A 0 200 400 --

DEPARTMENT OF

~=-ECOLOGY --~-- St•te of washington

Habitat Enhancement – Yakima County: Trout Meadows

Close to finalizing acquisition purchase and sale agreements

Page 51: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Engineered logjam

Engineered channel roughness

Beaver dam and wetland restoration

Habitat Enhancement – Kittitas Conservation Trust: Cle Elum River Side-Channel Restoration Project • Construction completed and project

documentation being finalized • Check out YouTube video! Google

“Cle Elum R iver Side Channel Restoration”

Page 52: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Habitat Enhancement – Kittitas Conservation Trust: Gold Creek Project

• Modeling and geomorphic assessment completed

• Restoration workshop held

• Refining conceptual designs

Page 53: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Engineered logjam

Engineered channel roughness

Beaver dam and wetland restoration

Little Rattlesnake Road Decommissioning

• Road closed and asphalt removed

• New bypass road constructed

• Large wood to be used in stream restoration

Page 54: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Reed Diversion Dam Removal Design • Design process

getting underway

Page 55: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Kennewick Irrigation District

The canal lining project will be complete (water on) at end of March 2015

Page 56: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Toppenish Fan Recharge Over 1,000 acre-feet of water has been distributed from the Olney Diversion to the alluvial fan and seeped into the ground this irrigation off-season

Distributary Recharge Channel near White Swan, WA

Olney Diversion on Toppenish Creek

Page 57: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Lateral 4-414C Pipeline

Delivery Installation

Mainline Installation

Page 58: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Manastash Creek Sprinkler Conversion

Project will be completed and tested prior to the 2015 irrigation season

Page 59: Technical Projects Update - Bureau of Reclamation · Feasibility Cost Percent Design Cost Estimates Final Cost Estimate Award Reclamation’s Planning and Construction Schedule .

Manastash Consolidated Pipeline & Manastash Water Ditch Association Pipeline

MWDA Diversion – Location of Transducer that is used to monitor streamflow

SCADA System