Page 2
Interior Roof Total Coating Failure
Page 4
Interior RoofInterior RoofTotal Coating FailureTotal Coating Failure
Page 5
Interior Heavy Corrosion Interior Heavy Corrosion Pit Welding is NecessaryPit Welding is Necessary
Page 6
Total Total Coating Coating FailureFailure
Page 7
Weathered Alkyd CoatingWeathered Alkyd CoatingSystem - RoofSystem - Roof
Page 8
Heavy CorrosionHeavy CorrosionExtremely Small ManwayExtremely Small Manway
-Was Replaced-Was Replaced
Page 10
Winthrop, Winthrop, MA. MA.
1 MG. Prior 1 MG. Prior toto
RehabilitatioRehabilitationn
Page 11
Interior SSPC 10 Near Interior SSPC 10 Near White Blast GradeWhite Blast Grade
Page 14
Interior Interior Complete New Coating Complete New Coating
SystemSystem
Page 18
Strip Coat Prior to Strip Coat Prior to 2 - Epoxy Coat2 - Epoxy Coat
Page 19
Exterior new coating, Exterior new coating, damage due to interior pit damage due to interior pit
weldingwelding
Page 21
Interior pit welding Interior pit welding damagedamage
Page 22
ExteriorExteriornew coating damage due tonew coating damage due to
interior pit weldinginterior pit welding
Page 23
InteriorInteriorEpoxy Pit Filler After Epoxy Pit Filler After Blasting and PrimingBlasting and Priming
Page 26
Elastomeric Membrane Elastomeric Membrane Riveted TankRiveted Tank
Page 27
Finial Vent, New Coating Finial Vent, New Coating System and Stainless Steel System and Stainless Steel
ScreenScreen
Page 28
Heavy CorrosionHeavy CorrosionExtremely Small ManwayExtremely Small Manway
- Was Replaced- Was Replaced
Page 29
Old ManwayOld Manway
Page 30
New 18 x 24 ManwayNew 18 x 24 ManwayComplete Finish CoatComplete Finish Coat
Page 31
New 30” Shell New 30” Shell ManwayManway
Page 32
Power Power WashWash
Only Only SphereSphere
Page 33
Power Power WashWashOnlyOnly
Page 34
Extensive Power Tool Cleaning
Page 35
Extensive Power Tool Cleaning
Page 36
Extensive Power Tool Cleaning
Page 37
1.5 MG Reservoir1.5 MG Reservoir
Extensive Spot Extensive Spot RepairRepair
Overcoat SystemOvercoat System
No ContainmentNo Containment
Page 39
SpotSpot
OvercoatOvercoat
SystemSystem
Page 40
400,000 Gallon 400,000 Gallon SphereSphere
Complete Power Complete Power WashWash
Spot Clean OvercoatSpot Clean Overcoat
Pedestal OnlyPedestal Only
Page 41
Power Wash
Power Tool
Clean Pedestal
Page 42
Spotted Pedestal
Power Wash
Below Equator
Page 43
Exterior Exterior Spot Surface Spot Surface
Prep. Prep. Overcoat Overcoat SystemSystem
300,000 300,000 Gallon Gallon
Elevated Elevated TankTank
No No ContainmentContainment
Page 49
Exterior Spot Exterior Spot Surface Prep.Surface Prep.
Overcoat Overcoat SystemSystem
1 MG. Elevated 1 MG. Elevated TankTank
No No ContainmentContainment
Page 51
Completed Power Wash
Page 52
CompletedCompleted
OvercoatOvercoat
SystemSystem
Page 53
10,000 PSI Power Wash10,000 PSI Power Wash
Page 56
Exterior SSPC SP6Exterior SSPC SP6Commercial BlastCommercial Blast
Page 58
Gray Zinc Primer Gray Zinc Primer Red Epoxy ContainmentRed Epoxy Containment
Page 59
RoboticRobotic
BlastBlast
MachineMachine
Page 60
RoboticRobotic
BlastBlast
MachineMachine
Page 61
RoboticRobotic
Blast Blast
MachineMachine
Page 62
750,000 Gallon 750,000 Gallon StandpipeStandpipe
Full Blast, New Full Blast, New Coating SystemCoating System
Containment is Rigid Containment is Rigid Monaflex Monaflex
Covering System withCovering System with
Reinforced Reinforced Polyethylene Polyethylene
MembraneMembrane
Page 64
Partial Containment Work Partial Containment Work AreaArea
Sheeting is Woven Nylon, Sheeting is Woven Nylon, Silicon CoatedSilicon Coated
Page 65
ElevatedElevated
Full BlastFull Blast
New Coating New Coating SystemSystem
400,000 400,000 gallongallon
Rigid Rigid ContainmentContainment
Page 68
Exterior Exterior Full Blast, Full Blast,
NewNewCoating Coating SystemSystem
400,000 400,000 gal. Spheregal. Sphere
Full Full ContainmeContainme
ntntTepe Tepe
SystemSystem
Page 70
StandpipeStandpipe
Rigid Pipe Rigid Pipe
withwith
Shrink WrapShrink Wrap
Page 71
Full Containment, Full Containment, Standpipe,Standpipe,
Tepe SystemTepe System
Page 72
Sanford, ME.Sanford, ME.
Page 74
1 MG. Standpipe1 MG. StandpipeFull Blast, New Coating Full Blast, New Coating
SystemSystem
Page 75
600,000 Gallon Reservoir600,000 Gallon ReservoirFull Blast, New Coating Full Blast, New Coating
SystemSystemLocalized ContainmentLocalized Containment
Page 77
Containment Localized Area Only
Page 85
Winthrop Ma. Aerial ViewWinthrop Ma. Aerial ViewClose Proximity of HomeClose Proximity of Home
Page 89
Dust Collection 24,000 CFMDust Collection 24,000 CFMNegative AirNegative Air
Page 90
AntennasAntennasImportant In Agreement Important In Agreement With Carriers To Remove With Carriers To Remove
Antennas Antennas During MaintenanceDuring Maintenance
Page 91
Antenna SupportsAntenna Supports
Page 92
Foundation RepairFoundation Repair
Page 94
FoundatiFoundationon
RepairRepair
Page 95
FoundatiFoundationon
RepairRepair
Page 96
Grinding Erection WeldsGrinding Erection WeldsPrior to Blasting or Power Prior to Blasting or Power
Tool CleaningTool Cleaning
Page 98
1.5 MG Elevated Containment 1.5 MG Elevated Containment Destroyed by 70+ mile per hr. Destroyed by 70+ mile per hr.
Hurricane Force WindsHurricane Force Winds
Page 103
1 MG. 1 MG. RivetedRiveted
StandpipeStandpipeCompletedCompleted
Winthrop, Winthrop, MA.MA.
Page 104
CompletedCompleted
OvercoatOvercoat
SystemSystem
Page 109
QUESTIONS?QUESTIONS?
Page 110
Marcel A. Payeur, Inc.Marcel A. Payeur, Inc.Abrasive Blasting/Industrial Abrasive Blasting/Industrial
CoatingsCoatings
Main Office: 113 Otis Allen Main Office: 113 Otis Allen Rd.Rd.
Sanford, Maine 04073Sanford, Maine 04073
Tel: (207) 324-0786Tel: (207) 324-0786Fax: (207) 490-5843Fax: (207) 490-5843
Email: [email protected] : [email protected]