This document may not be reproduced in whole, or in part, nor may any of the information contained therein be disclosed without the prior consent of the directors of Datamine Corporate Limited. A recipient may not solicit, directly or indirectly (whether through an agent or otherwise) the participation of another institution or person without the prior approval of the directors of the Company. Any form of reproduction, dissemination, copying, disclosure, modification, distribution and or publication of this material is strictly prohibited. 1 Technical Note: NPV Scheduler Family Release 4.27 Reference: TN00203 Created: January 25, 2016 Last modified: January 25, 2016 1. NEW FUNCTIONALITIES Release 4.27 introduces several new functionalities. 1.1. Ability to generate pit with minimum bottom width Smooth pits are essential for generating practical pushbacks. The new option will remove the narrow bottoms of the ultimate LG pit. The nested LG phases generated inside the smooth pit will not be adjusted and will contain narrow bottoms. 1.2. Bench Progress report for MAO/MFO/FMS pits The new report is similar to the Incremental Report by Pushback. It shows the number of benches and rock mass for each pushback in each period.
4
Embed
Technical Note: NPV Scheduler Family Release 4downloads-cus.dataminesoftware.com/NPVS_RMS_Maxipit... · NPVS-1885 Issue refreshing MineSight models in Multimine Scheduler e. NPVS-1902
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
This document may not be reproduced in whole, or in part, nor may any of the information contained therein be disclosed without the prior consent of the directors of Datamine Corporate Limited. A recipient may not
solicit, directly or indirectly (whether through an agent or otherwise) the participation of another institution or person without the prior approval of the directors of the Company. Any form of reproduction, dissemination,
copying, disclosure, modification, distribution and or publication of this material is strictly prohibited.
1
Technical Note: NPV Scheduler Family Release 4.27 Reference: TN00203
Created: January 25, 2016
Last modified: January 25, 2016
1. NEW FUNCTIONALITIES
Release 4.27 introduces several new functionalities.
1.1. Ability to generate pit with minimum bottom width
Smooth pits are essential for generating practical pushbacks. The new option will remove
the narrow bottoms of the ultimate LG pit. The nested LG phases generated inside the
smooth pit will not be adjusted and will contain narrow bottoms.
1.2. Bench Progress report for MAO/MFO/FMS pits
The new report is similar to the Incremental Report by Pushback. It shows the number of
benches and rock mass for each pushback in each period.