T:\5162001\Documents\Civil\Reports, Briefs, Letters & Registers\Technical Notes\5162001-WS+P-CS-TN-0001- Chapel Overland Flow Path.docx Page 1 of 1 Introduction: This technical note has been prepared in response to the Department of Planning and Environment query raised by Campbelltown Council in relation to the overland flow path north of the proposed chapel. DPE comment: Campbelltown Council comment regarding the overland flow path of stormwater behind chapel. Despite comment provided by the Stormwater engineer, we have not included a drawing detailing the measures to mitigate the overland flow on Road 1 north (and upstream) of the Chapel.” Response: The proposed stormwater network consists of a swale (adjacent to Road 1) as well as a pit and pipe system within Road 1 kerb and gutter adjacent to and (north) of the proposed chapel. The swales located north of the road will capture any overland flow sheeting down the hill before reaching the road. This flow will then be conveyed through the pit and pipe system located under the road kerb and gutter. The stormwater system has been designed based on a minor and major system in line with Campbelltown Council ’s Development Control Plan. The minor system, designed to a 10-year ARI, will contain all flows within the proposed system therefore resulting in no overland flow near the chapel. The major system, designed to a 100-year ARI, is designed to safely convey major storm flows when the capacity of the minor system is exceeded. The proposed stormwater system north of the chapel safely conveys overflows within the road network without any potential impact to buildings or public safety in the 100-year ARI. Any surcharge from pits near the proposed chapel will be conveyed within the road network away from the chapel. Please refer to attached sketch ‘5162001-WS+P-SK-41 Chapel Overland flow path’ for further details of overland flow paths. Table 1 below also identifies overland flows encountered between each pit near the chapel in the 100yr ARI event. It is evident that the overflows are minor in nature with maximum depths of 89mm. Table 1: Overland Flows (100 year ARI) TECHNICAL NOTE 01: Overland Flow Path adjacent to Chapel Project name: Macarthur Memorial Park Issued to: Dept of Planning & Environment Project no: 5162001 Prepared by: Niall Quinn Reviewed by: Michael Cahalane Client: CMCT Date issued: 18/10/2018 Document No: 5162001-WS+P-CS-TN-0001 Revision: 1 Overland Flow Route Max Flow (l/s) Max Depth (mm) Pit 1/1 to Pit 1/4 22 77 Pit 1/4 to Pit 1/5 6 39 Pit 1/5 to 7/1 1 21 Pit 2/9 to Pit 3/9 0 0 Pitt 3/9 to Pit 4/9 10 89
2

TECHNICAL NOTE 01: Overland Flow Path adjacent to Chapel · Please refer to attached sketch ‘5162001-WS+P-SK-41 Chapel Overland flow path’ for further details of overland flow

Oct 19, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TECHNICAL NOTE 01: Overland Flow Path adjacent to Chapel · Please refer to attached sketch ‘5162001-WS+P-SK-41 Chapel Overland flow path’ for further details of overland flow

T:\5162001\Documents\Civil\Reports, Briefs, Letters & Registers\Technical Notes\5162001-WS+P-CS-TN-0001- Chapel Overland Flow Path.docx Page 1 of 1

Introduction:

This technical note has been prepared in response to the Department of Planning and Environment query raised by Campbelltown Council in relation to the overland flow path north of the proposed chapel.

DPE comment: “Campbelltown Council comment regarding the overland flow path of stormwater behind chapel. Despite comment provided by the Stormwater engineer, we have not included a drawing detailing the measures to mitigate the overland flow on Road 1 north (and upstream) of the Chapel.”

Response:

The proposed stormwater network consists of a swale (adjacent to Road 1) as well as a pit and pipe system within Road 1 kerb and gutter adjacent to and (north) of the proposed chapel. The swales located north of the road will capture any overland flow sheeting down the hill before reaching the road. This flow will then be conveyed through the pit and pipe system located under the road kerb and gutter.

The stormwater system has been designed based on a minor and major system in line with

Campbelltown Council’s Development Control Plan. The minor system, designed to a 10-year ARI, will

contain all flows within the proposed system therefore resulting in no overland flow near the chapel.

The major system, designed to a 100-year ARI, is designed to safely convey major storm flows when

the capacity of the minor system is exceeded. The proposed stormwater system north of the chapel

safely conveys overflows within the road network without any potential impact to buildings or public

safety in the 100-year ARI. Any surcharge from pits near the proposed chapel will be conveyed within

the road network away from the chapel. Please refer to attached sketch ‘5162001-WS+P-SK-41 Chapel

Overland flow path’ for further details of overland flow paths. Table 1 below also identifies overland

flows encountered between each pit near the chapel in the 100yr ARI event. It is evident that the

overflows are minor in nature with maximum depths of 89mm.

Table 1: Overland Flows (100 year ARI)

TECHNICAL NOTE – 01: Overland Flow Path adjacent to Chapel Project name: Macarthur Memorial Park Issued to: Dept of Planning & Environment

Project no: 5162001 Prepared by: Niall Quinn

Reviewed by: Michael Cahalane

Client: CMCT Date issued: 18/10/2018

Document No: 5162001-WS+P-CS-TN-0001 Revision: 1

Overland Flow Route Max Flow (l/s) Max Depth (mm)

Pit 1/1 to Pit 1/4 22 77

Pit 1/4 to Pit 1/5 6 39

Pit 1/5 to 7/1 1 21

Pit 2/9 to Pit 3/9 0 0

Pitt 3/9 to Pit 4/9 10 89

Page 2: TECHNICAL NOTE 01: Overland Flow Path adjacent to Chapel · Please refer to attached sketch ‘5162001-WS+P-SK-41 Chapel Overland flow path’ for further details of overland flow

C

H

5

0

C

H

3

5

0

C

H

300

C

H

3

5

0

C

H

4

0

0

C

H

4

5

0

C

H

5

0

0

C

H

5

5

0

1:6

1:6

1:6

1:3

ROAD 1

ROAD1

ROAD 7

1:6

1:6

1:6

1:3

ROAD 1

ROAD1

ROAD 7 Ø450

Ø

450

Ø

3

7

5

Ø375

Ø

3

7

5

Ø

3

7

5

Ø

4

5

0

Ø

4

5

0

Ø

3

7

5

129

99

497

89

2105

1105

197

297

397

79

69

59

412

312

49

211

210

39

29

19

11

21

31

14

41

51

15

61

27

37

71

16

Ø

3

7

5

Ø

3

7

5

Ø

3

7

5

Ø

3

7

5

Ø

3

7

5

Ø

4

5

0

Ø

3

7

5

Ø

3

7

5

Ø

3

7

5

Ø450

Ø

4

5

0

Ø

3

7

5

Ø

3

7

5

Ø

3

7

5

Ø

3

7

5

Ø

3

7

5

Ø

3

7

5

Ø

3

7

5

Ø

3

7

5

Ø

375

Ø

4

5

0

Ø

4

5

0

Ø

4

5

0

Ø375

Ø375

Ø450

Ø

3

7

5

Ø

3

7

5

Ø

3

7

5

110

112

23

13

1123

111

212

Ø

3

7

5

109

119

Ø

3

7

5

17

PROPOSED CHAPEL

VERTICAL CREST

LEGEND

OVERLAND FLOW ROUTE

SWALE

NOT TO SCALE

A1SHEET SIZE:

Xrefs

: X-5

1620

01-D

E_Ch

ains-A

nno;

X-51

6200

1-DE

_Des

ign; X

-516

2001

-SU_

Grou

nd; X

-516

2001

-SU_

Conto

ur; X

-516

2001

-DE_

RetW

alls;

X-51

6200

1-TB

_A1H

; X-5

1620

01-S

W_L

ayou

t; X-5

1620

01-A

RCH_

Chap

el Gr

ound

Plot

Date:

18.10

.2018

@18

:24:42

Lo

gin N

ame:

NQuin

n

Cad

File

: T:\5

1620

01\D

rawi

ngs\A

utoCA

D\Ci

vil\D

esign

\Civi

l 2D\

Sketc

hes\5

1620

00-W

S+P-

CS-S

K-41

- Ch

apel

Over

land F

low P

ath.dw

g

DRAWN DESIGNED CHECKED APPROVED

STATUSAND PARTNERS.FROM WARREN SMITHWRITTEN PERMISSIONOR WHOLE WITHOUTTO BE COPIED IN PARTTHIS DRAWING IS NOT

COMMENCEMENT OF& LEVELS BEFOREVERIFY ALL DIMENSIONSDRAWINGS, CHECK &DO NOT SCALE FROM

ANY WORK.

AMENDMENTREVISION DATE

PROJECT

CLIENT

JOB No.

DATE

SCALE

TITLE

DRAWING No. ISSUE

AMENDMENTREVISION DATE

MACARTHUR MEMORIAL

PARK

5162001

N.Q. M.C.

ISSUE FOR INFORMATION

PREPARED BY

1

18/10/18

SK-41

M.Cz.M.Cz.NTS

CHAPEL OVERLAND

FLOW PATH

PR

EL

IM

IN

AR

Y - N

OT

F

OR

C

ON

ST

RU

CT

IO

N

1 FOR INFORMATION 18/10/18