Dagatronics Corp. Technical Document NO. DGM-DM-001 Revision date 2013. 9.11 Ziehl-Neelsen AFB Auto Stainer Model : AT-2000Z Revision ver. 3 Page 1 / 19 Dagatronics Corporation Table of Contents 1. The Purpose of documentation 2. The coverage of application 3. Technical description of product 4. Used materials 5. Performance and Technical specification of product 6. Standards and Methods of Incoming Quality Check 7. Standards and Methods of Intermediate Quality Check for Semi assembled product 8. Standards and methods of Final Quality Check for finished product 9. Marking and Labeling History of Revision Rev. NO. Revision date Effective date Contents of Revision Write Review Approval 0 2007.04.01 2007.04.01. Establish to start Quality management system for manufacturing IVD device in company. 1 2007.07.02. 2007.07.02. Revise for amending and adding standards and methods of tests for Materials, and Finished product. 2 2009.10.06 2009.10.06 CE Marking(EMC, LVD) 3 2013. 9. 17 2013. 9. 11 Revise for changing components(Pumps and Valves) □ Managed □ Unmanaged /
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Dagatronics Corp.
Technical Document NO. DGM-DM-001
Revision date 2013. 9.11
Ziehl-Neelsen AFB Auto Stainer
Model : AT-2000Z
Revision ver. 3
Page 1 / 19
Dagatronics Corporation
Table of Contents
1. The Purpose of documentation
2. The coverage of application
3. Technical description of product
4. Used materials
5. Performance and Technical specification of product
6. Standards and Methods of Incoming Quality Check
7. Standards and Methods of Intermediate Quality Check
for Semi assembled product
8. Standards and methods of Final Quality Check for finished product
9. Marking and Labeling
History of
Revision
Rev. NO. Revision date
Effective date Contents of Revision Write Review Approval
0 2007.04.01 2007.04.01.
Establish to start Quality management system for manufacturing IVD device in company.
1 2007.07.02. 2007.07.02.
Revise for amending and adding standards and methods of tests for Materials, and Finished product.
2 2009.10.06 2009.10.06 CE Marking(EMC, LVD)
3 2013. 9. 17 2013. 9. 11 Revise for changing components(Pumps and Valves)
Managed
Unmanaged /
Dagatronics Corp.
Technical Document NO. DGM-DM-001
Revision date 2013. 9.11
Ziehl-Neelsen AFB Auto Stainer
Model : AT-2000Z
Revision ver. 3
Page 2 / 19
Dagatronics Corporation
1. The Purpose of documentation
This technical document, for the purpose, prescribes the general information-standards and
characteristics of product, process of manufacturing, test, inspection, labeling and etc. in
Ziehl-Neelsen AFB Auto Stainer(In Vitro Diagnostic Medical Device for the acid-fast automatic
staining of smear slides in mycobacteriology by using Ziehl-Neelsen (ZN) staining method,
Model: AT-2000Z), manufactured in Dagatronics Corporation. It is the purpose for this
document that the product satisfies the general requirements.
2. The coverage of Application
This technical document shall apply to the following product manufactured in Dagatronics
Corporation.
Group of item In vitro diagnostic Medical Device(IVD)
Product name Item name Model name
Ziehl Neelsen AFB Auto Stainer AT-2000Z
Classification NO. A24020 Grade General
Company Dagatronics Corporation
Country Republic of Korea
3. Technical description of Device
1) Summary of product
AT-200Z is a laboratory instrument for the acid-fast automatic staining of smear slides in
mycobacteriology. The instrument enables the automatic staining of one to 10 slides in one
run using the Ziehl-Neelsen (ZN) staining method and it provides that users can classify
infected mycobacteria in color.
Dagatronics Corp.
Technical Document NO. DGM-DM-001
Revision date 2013. 9.11
Ziehl-Neelsen AFB Auto Stainer
Model : AT-2000Z
Revision ver. 3
Page 3 / 19
Dagatronics Corporation
2) Appearance and structure
(1) Appearance(Photos)
(2) The details of each part
① Main body: Maintain the appearance, protect the product.
② Lid Cover: Protect chamber and slide tray from dust, moisture, temperature of outside. The
product is not operating if this lid cover is opened.
③ Grip: To open or close Lid cover.
④ Display: Show the progress of operation of product on LCD monitor.
⑤ Holder for reagents: Holder to fix reagents bottles and can be disconnected from main
Dagatronics Corp.
Technical Document NO. DGM-DM-001
Revision date 2013. 9.11
Ziehl-Neelsen AFB Auto Stainer
Model : AT-2000Z
Revision ver. 3
Page 4 / 19
Dagatronics Corporation
body.
⑥ Foot: Support for not sliding and the height can be adjustable.
⑦ Power switch: Turn on or off the power.
⑧ Function select switches: Select the functions and control the operation of product.
⑨ FAN: Ventilate and radiate inside the product.
⑩ Fuse: Protect the product by breaking itself when over-current is flowing.
⑪ Power inlet: Connect power cord to supply AC power.
⑫ Drain output: Connect drain hose to drain the wastewater inside of chamber.
⑬ Rating Label: Marking and labeling for the information of product.
⑭ Tube for injecting reagent: Connect between stainer and reagent bottles and it can be
disconnected.
⑮ Terminal for grounding: Connection between internal ground and external ground.
⑯ Hinge: Connecting between Lid cover and main body for fixing.
⑰ Reagent connector: Connection for reagent injection tube to pumping system of product.
Connecting multi tester to pump connecter, adjust jet-press control valve to required voltage. -Clockwise: CLOSE -Counterclockwise: OPEN
Lot test
Leak test
Do not enter the air in pump, hose, seams between pump and valve. Reagents do not leak. Especially, inspect seams carefully. If bubble is in hose, reassemble seams or instrument around seams.
Visual inspection
(Macrograph) Operation test
Lot test
Test of LCD operation
Identify showing of state at LCD monitor.
Visual inspection
(Macrograph) (identify marks with user’s manual)
Lot test
Dagatronics Corp.
Technical Document NO. DGM-DM-001
Revision date 2013. 9.11
Ziehl-Neelsen AFB Auto Stainer
Model : AT-2000Z
Revision ver. 3
Page 16 / 19
Dagatronics Corporation
Test of motor operation
CHECK operation current of motor ADC OFF : 1.6A ~1.8A
Choosing to measure DC voltage rang, red rod mounted on motor drive PCB CC+, black rod mounted on CC-, choosing off at ADC in deep switch, identify current when motor works. In controlling, spin RUN VR on motor drive PCB exactly.
Lot test
Test of sensor operation
Not enough reagent 1)on working: warning sound, red light on panel 2)after end of working : Warning sound, warning message on LCD, red light on panel
Check operation in attaching bottles to holder after holder connects equipment. If reagent lacks, identify amount of reagent in bottles.
Lot test
8. Standards and methods of Final Quality Check for finished product
By KFDA notice. * By test of continual leakage current and measuring patients, current.
2 Grounding resistance test
1. Impedance between metal parts and protective earth terminal: below 0.1Ω (0.2Ω).
By KFDA notice * By test of protective grounding, functional grounding, light electricity
Dagatronics Corp.
Technical Document NO. DGM-DM-001
Revision date 2013. 9.11
Ziehl-Neelsen AFB Auto Stainer
Model : AT-2000Z
Revision ver. 3
Page 17 / 19
Dagatronics Corporation
3 Power input test 1. 800W ± 10% By KFDA notice * By test of power input
4 Looks and structure 1.Allowed: proper to appearance(photos) and parts specification.
By standard document of operation
5 Labeling and packing 1. Allowed: Same front, left, right, top, bottom labeling as equipment 2. Not allowed: having packing problems
By standard document of operation
2) Test of performance
No Object Standard Method Remarks
1 Test of safety device
1.Except forced open, cover doesn’t open at all.
Actual driving test Lot test (Operation test) 2. Not close, not operate with
warning sound and message.(stain operation, dry at dry mode: spinning inside)
2
Test of searching Starting location
1. Slide tray stops at hall sensor housing for starting location in a counterclockwise direction.
1.Actual driving test 2.With cover open and power on, find slide 1.(Slide 1 has magnet attaching front) 3. Hall sensor housing is inside chamber.
Lot test (Operation test) 2. Slide 1 is located in front of
hall sensor housing when tray stops.(Magnet in slide tray 1 finds starting point)
No. Object Standard Method
3
Test of temperature of Carbol Fuchsin operation
1.Temperature : 50± 15%
1.Measure temperature of slide tray(center position) 2.After spraying water or reagent to slide tray 1~10, wait. After 45 sec ~1 min, measure sprayed water or reagent’s temperature. 3.To success, supply exactly water or reagent 4.Use noncontact thermometer.
Lot test (Operation test)
Dagatronics Corp.
Technical Document NO. DGM-DM-001
Revision date 2013. 9.11
Ziehl-Neelsen AFB Auto Stainer
Model : AT-2000Z
Revision ver. 3
Page 18 / 19
Dagatronics Corporation
4
Test of temperature before decolorizing
1.Measure surface temperature of slide tray 1~10. (standard surface temperature: below 34)
1. After dry operation in washing(3) operation, immediately measure temperature. 2. Measure temperature of slide tray(center position). 3. To success, supply exactly water or reagent 4.Use noncontact thermometer.
Lot test (Operation test)
5 Test of spraying location
1. Identify spraying fluid into slide tray. ※ slide Tray inner dimension: - width(77mm) x length(27mm)
1. Visual inspection
(Macrograph) 2. To success, supply exactly water or reagent.
Lot test (Operation test)
6 Operation time 18Min±10% 1.Measure with clock. 2. To success, supply exactly water or reagent.
Lot test (Operation test)
7 Motor RPM 200rpm± 10% Measure digital tachometer when dry mode operation.
Lot test (Operation test)
8 LCD DISPLAY
Refer to users manual
1. Actual driving test 2. Visual inspection
(Macrograph)
Lot test (Operation test)
9 Test of sensor for reagent holder
Not enough reagent 1)on working: warning sound, red light on panel 2)after end of working : Warning sound, warning message on LCD, red light on panel
1. Check operation(on/off) in attaching bottles (half filled with water or reagent) to holder after holder connects equipment. 2.If reagent lacks, identify amount of reagent in bottles.
Lot test (Operation test)
10
Test of reagents spraying amount
1) CF : 250/min± 10%
2) MB : 250/min± 10%
3) AA : 250/min± 10%
4) Et : 250/min± 10%
5) D.W : 250/min± 10%
1.Dip reagent hose into beaker having graduation filed with reagent after measuring amount of reagent. 2.Spray for 1 min using operation voltage. 3.Measure amount of rest reagent with cylinder. 4.Amount spraying=before using-rest