Bentec GmbH Drilling & Oilfield Systems Deilmannstraße 1, D- 48455 Bad Bentheim Germany Page 1 of 33 Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HT - TD-500-HT DE P01 Technische Information
33

Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Mar 27, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Bentec GmbH Drilling & Oilfield Systems Deilmannstraße 1, D- 48455 Bad Bentheim Germany

Page 1 of 33

Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HT

-

TD-500-HT

DE P01

Technische Information

Page 2: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive Index

Page 2 of 33

1 Introduction............................................................. 4 1.1 Overview ........................................................................... 5

2 Technical Data ......................................................... 6 2.1 Dimension drawing ........................................................... 6 2.2 General.............................................................................. 7 2.3 Performance Data ............................................................. 7 2.3.1 Torque Speed Diagram...................................................... 8 2.4 Connection values ............................................................. 9 2.5 Operation conditions ......................................................... 9

3 Setup and Function ................................................... 10 3.1 Module description.......................................................... 10 3.1.1 Drilling Unit ..................................................................... 11 3.1.2 Pipehandler ..................................................................... 16 3.1.3 Carriage Package............................................................. 20 3.1.4 Torque Beam Assembly................................................... 20 3.1.5 Hoisting equipment ......................................................... 21 3.1.6 Tool Kit............................................................................ 21 3.2 Top Drive Control ............................................................ 22 3.2.1 Service Loop ................................................................... 22 3.3 Drillers Control ................................................................ 23 3.4 VFD Power control System.............................................. 23 3.4.1 VFD – Power Supply ....................................................... 24 3.4.2 VFD – Power Stack & VFD Controls ................................ 24 3.4.3 VFD – Motor Control center (MCC) ................................. 24 3.4.4 VFD – Braking Chopper Module & Resistor..................... 24 3.4.5 VFD – Transformer.......................................................... 25 3.4.6 VFD – UPS System.......................................................... 25 3.4.7 VFD – ESD System.......................................................... 25 3.4.8 VFD – Air Conditioning Unit............................................. 25 3.5 Incoming Power Cable .................................................... 25

4 Transport............................................................... 26

5 Recommended Option - Rig survey ................................ 27

6 Recommended Option - Implementation Kit...................... 27

7 Option - Training...................................................... 28 7.1 Training Course – Operation............................................ 28 7.2 Training Course – Hydraulics .......................................... 28 7.3 Training Course – Electrics.............................................. 28 7.4 Training Course – Mechanics .......................................... 29

Page 3: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive Index

Page 3 of 33

8 Option - Yearly Maintenance Service.............................. 29

9 Option - Recommended Spare Parts for one year ............... 29

10 Option - Lubricants for one year.................................... 29

11 Option - Service Loop Container.................................... 30

12 Option – Saver Sub Set .............................................. 30

13 Option – Tool Joint Adapter Kit ..................................... 30

14 Option – Wireline Adapter........................................... 30

15 Option – Top Drive Control Driller’s Chair implementation .... 30

16 Option – Color Camera system ..................................... 31

17 Option – Top Drive Genset (Independent Power source)........ 32

18 Option – Offshore Certification ..................................... 32

19 Contact ................................................................. 33

Page 4: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Introduction

Page 4 of 33

Pos: 1.1.1 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/Technical Bulletin/1000 1. Einführung @ 4\mod_1279695641388_581.doc @ 38564

1 Introduction Pos: 1.1.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4001 4.0.0 Einführung @ 4\mod_1279025442084_581.doc @ 37340

The Bentec Top Drive is designed as transportable as well as permanent installed unit for deep drilling rigs with different mast types. The System is powered by an AC motor. The Top Drive is controlled by a separate control panel.

The standard Top Drive version includes the following items:

Hanger assembly with integrated Counterbalance cylinders

Standard washpipe

Link-tilt-system with position monitoring designed for high impacts

Remote-controlled and manual IBOP

Backup Clamp to make up and break the Top Drive drill pipe connection

Guide rail system inducing the torque within the mast.

Electrical service loop

Onboard hydraulic unit.

The blower rate for the motor cooling is variable and depends on the motor temperature.

The drives of the system have been carefully chosen to meet current noise protection regulations.

Page 5: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Introduction

Page 5 of 33

Pos: 1.1.3.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/4. Aufbau und Funktion/4100 4.1. Übersicht @ 4\mod_1278926224268_581.doc @ 36606

1.1 Overview Pos: 1.1.3.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4100 4.1.0 Übersicht _Bild @ 4\mod_1279025653859_581.doc @ 37360

Right Side

Left side

Rear

Front

Abb. 1 Pos: 1.2 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 6: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Technical Data

Page 6 of 33

Pos: 1.3.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3000 3. Technische Daten @ 4\mod_1278919879993_581.doc @ 36436

2 Technical Data Pos: 1.3.2.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3100 3.1. Maßblatt @ 4\mod_1278920457472_581.doc @ 36449

2.1 Dimension drawing Pos: 1.3.2.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3100 3.1.0 Maßblatt @ 4\mod_1279023392166_0.doc @ 37256

764

16001708

660

535

843 865

Abb. 2

Page 7: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Technical Data

Page 7 of 33

Pos: 1.3.3.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3200 3.2. Allgemeine Angaben @ 4\mod_1278920832597_581.doc @ 36466

2.2 General Pos: 1.3.3.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3200 3.2.0 Allgemeine Angaben @ 4\mod_1279023470335_581.doc @ 37261

Description Value Dimension

Weight 16200 kg

Length 6730 mm

Width 1780 mm

Height 1540 mm Pos: 1.3.4.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3500 3.5. Leistungswerte @ 4\mod_1278924144825_581.doc @ 36536

2.3 Performance Data Pos: 1.3.4.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3500 3.5.0 Leistungswerte Tabelle @ 4\mod_1279024204468_581.doc @ 37296

Description Value Dimension

API Load Capacity (350t Top Drive) 350

3125

ton

kN

API Load Capacity (500t Top Drive) 500

4480

ton

kN

Pressure Rating 500

7500

bar

PSI

Power Rating 758

1030

kW

HP

Drill Speed 0 to 115/230 1 min-1

Drilling Torque 63.000

46.500

Nm

ft lbs

Make up / Break out Torque 100.000

73.760

Nm

Ft lbs

Static Break Torque 105.000

77.440

Nm

ft lbs

Link Tilt Lifting Capacity 2500 kg

5500 lbs

@1,4 m

@4 ½ “

Gear box Ratio 1. Gear 14:1

Page 8: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Technical Data

Page 8 of 33

Pos: 1.3.4.3 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/3510 3.5.1. Drehmoment Geschwindigkeitskurve @ 4\mod_1279024483787_581.doc @ 37310

2.3.1 Torque Speed Diagram Pos: 1.3.4.4 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3510 3.5.1.0 Drehmoment Geschwindigkeits kurve @ 4\mod_1279024399758_581.doc @ 37306

Abb. 3 Pos: 1.3.5.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3300 3.3. Anschlusswerte @ 4\mod_1278922039727_581.doc @ 36480

Page 9: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Technical Data

Page 9 of 33

2.4 Connection values Pos: 1.3.5.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3301 3.3.0 Hauptantrieb-elektrisch @ 4\mod_1279023631471_581.doc @ 37266

Main drive electric

Description Value Dimension

Voltage D 575 V AC

Current load (max.) 880 A

Power input (max.) 750 kW Pos: 1.3.5.3 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3302 3.3.0 Motorlüfter-elektrisch @ 4\mod_1279023682516_581.doc @ 37271

Main drive cooling electric

Description Value Dimension

Voltage D 400 / S690 V AC

Current load (max.) 14,3 / 8,3 A

Power input (max.) 7,5 kW Pos: 1.3.5.4 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3303 3.3.0 Antrieb Hydraulikaggregat-elektrisch @ 4\mod_1279023752545_581.doc @ 37276

Hydraulic Power Unit

electric

Description Value Dimension

Voltage D 400 / S690 V AC

Current load (max.) 14,3 / 8,3 A

Power input (max.) 7,5 kW Pos: 1.3.5.5 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3304 3.3.0 Antrieb Getriebeschmierung-elektrisch @ 4\mod_1279023839105_581.doc @ 37281

Gearbox Lubrication

electric

Description Value Dimension

Voltage D 400 / S690 V AC

Current load (max.) 14,3 / 8,3 A

Power input (max.) 7,5 kW Pos: 1.3.6.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/3. Technische Daten/3400 3.4. Betriebsbedingungen_Titel @ 4\mod_1278923125180_581.doc @ 36504

2.5 Operation conditions Pos: 1.3.6.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/3400 3.4.0 Umgebung Temperatur @ 4\mod_1279024098112_581.doc @ 37291

Environment

Description Value Dimension

Temperature range -45...+ 55 °C Pos: 1.4 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 10: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 10 of 33

Pos: 1.5.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/4. Aufbau und Funktion/4000 4. Aufbau und Funktion @ 4\mod_1278925574849_581.doc @ 36582

3 Setup and Function Pos: 1.5.2 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/4. Aufbau und Funktion/4200 4.2. Baugruppenbeschreibung @ 4\mod_1278926559989_581.doc @ 36620

3.1 Module description Pos: 1.5.3 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4200 4.2.0 Baugruppenbeschreibung_Bild @ 4\mod_1279025724825_581.doc @ 37370

The Machine is divided in subassemblies as follows:

Drilling Unit

Pipehandler

Elevator/Links

Carriage Package

Service Loop

Guide Rails

Abb. 4 Pos: 1.5.4 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 11: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 11 of 33

Pos: 1.5.5 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4210 4.2.1.0 Drilling unit @ 4\mod_1279025726107_581.doc @ 37375

3.1.1 Drilling Unit

The Drilling Unit consists of the following subassembly groups:

Hydraulic Unit

Mud Supply

Hanger Assembly

Protection Frame

Drive

Abb. 5

Page 12: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 12 of 33

Pos: 1.5.6 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4211 4.2.1.1 Aufhängung @ 4\mod_1279026404233_581.doc @ 37395

3.1.1.1 Hanger Assembly

1

2

3

Abb. 6

The Hanger Assembly consists of:

Yoke (1)

Two upper links (2)

Counterbalance system (3). The counterbalance system (3) is integrated within the Upper Links and consists of:

– two Hydraulic cylinders – two hydraulic accumulators

The cylinders are assembled between Yoke (1) and Upper Links (2). The Counterbalance System can compensate a maximum distance of 200 mm. When starting the operation the counterbalance system is charged by the hydraulic system. During operation the hydraulic system refills the counterbalance system to the adjusted pressure.

Pos: 1.5.7 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4212 4.2.1.2 Antrieb @ 4\mod_1279026462857_581.doc @ 37399

3.1.1.2 Drive

Drive

The drive system contains of the following components:

1 Engine Cooling System 2 Brake 3 AC motor 4 Gearbox 5 Mainshaft

2

3

4

5

1

Abb. 7

Page 13: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 13 of 33

Pos: 1.5.8 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42121 4.2.1.2.0 Motorkühlung @ 4\mod_1279026560245_581.doc @ 37403

1

2

3

4

5

Abb. 8

Motor Cooling System A frequency controlled motor (2) drives the engine fan (1). The fan speed depends on the motor temperature which is determined by sensors. (COD) Cooling on Demand. Cooling air is conducted via a noise reduced suction hood (3) through a blower channel (4) into the ac motor of the Top Drive and transmission oil cooler. (5).

Pos: 1.5.9 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42122 4.2.1.2.0 Drehstrommotor @ 4\mod_1279026663023_581.doc @ 37407

Abb. 9

AC Motor The rated power of the motor is 758 KW / 1030HP. It is controlled by a frequency drive and temperature monitored. The maximum operating temperature is controlled by sensors in the motor.

Pos: 1.5.10 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42123 4.2.1.2.0 Drehgeber Haltebremse @ 4\mod_1279026733959_581.doc @ 37411

21

Abb. 10

Rotary encoder(1) The rotary encoder is assembled to the holing brake and - via shaft extension - directly connected to the engine shaft

Brake (2) The disc brake is hydraulic closed and spring force opened. It can absorb a torque of 105.000 Nm.

Page 14: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 14 of 33

Pos: 1.5.11 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42124 4.2.1.2.0 Getriebe @ 4\mod_1279026804645_581.doc @ 37415

12

3

Abb. 11

Gearbox The two-stage gearbox is helical cut with a total transmission ratio of 14:1. The speed of the engine is reduced twice before it is transferred to the bullgear (1) of the gearbox. The bullgear is located on the thrust bearing. The mainsahft is concentrically located in the bullgear and connected to it via multiple splining. The gearbox is lubricated with combined splash/pressure lubrication (3). If the gear oil has reached its maximum temperature it is piped via a bypass through an oilcooler. The oilcooler is included in the ventilation system of the motor.

Pos: 1.5.12 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42125 4.2.1.2.0 Mainshaft @ 4\mod_1279026871377_581.doc @ 37419

1

3

2

4

5

Abb. 12

Mainshaft The mainshaft (4) – powered by the bullgear - is located in the gearbox together with the thrust bearing (2). It is conducted via lower bearing (3). In order to execute drilling fluid a washpipe (1) is connected. At the bottom of the mainshaft there is an API pin as connection to the drill string. The drill string is powered by the mainshaft. The mainshaft holds the load collar (5) which bears the link adapter the drill pipe during elevator operation.

Pos: 1.5.13 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4213 4.2.1.3 Spülungszufuhr @ 4\mod_1279027224570_581.doc @ 37423

3.1.1.3 Mud Supply

12

34

Abb. 13

The mud feeding comprises a 3“ washpipe and a goose neck with 2“ Fig 1502 input for wireline operation as well as a 4” Fig 1002 mud hose connection. The mud feeding disposes of a pressure rating of 7500 PSI.

Pos: 1.5.14 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4214 4.2.1.4 Integriete Hydraulikeinheit @ 4\mod_1279027344582_581.doc @ 37427

Page 15: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 15 of 33

Pos: 1.27 /Bentec Produkte/Top Drive /TD-500-HT/4. Aufbau und Funktion/421 4.2.1.4 Baugruppe Hydraulikeinheit @ 1\mod_1259752821452_581.doc @ 24520

3.1.1.4 Onboard Hydraulic Unit

1

3

45

2

Abb. 14

The hydraulic unit disposes of

Speed controlled internal gear pump(1)

Valve block for the hydraulic unit (2)

Valve block for the pipehandler (3).

Main valve block (4)

Valves are operated by robust 24 volt coil. A low-noise pump is integrated in the stainless steel system tank (5).

Pos: 1.5.15 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4215 4.2.1.5 Schutzrahmen @ 4\mod_1279027429641_581.doc @ 37431

3.1.1.5 Protection Frame

Abb. 15

The protection frame is fixed at the front of the Top Drive. A service platform(1) can be swung out for installation and repair work

Pos: 1.5.16 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 16: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 16 of 33

Pos: 1.5.17 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4220 4.2.2.0 Pipehandler @ 4\mod_1279028087730_581.doc @ 37435

3.1.2 Pipehandler

The Pipehandler consists of the following sub assembly groups:

IBOP / Saversub

Link tilt

Linkadapter housingSupport

Rotary Actuator / Arresting Device

Hydraulic Swivel

Back Up Clamp

Abb. 16 Pos: 1.5.18 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 17: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 17 of 33

Pos: 1.5.19 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4221 4.2.2.1. Drehantrieb @ 4\mod_1279028184883_581.doc @ 37439

3.1.2.1 Rotary Actuator

1

23

Abb. 17

Hydraulic Rotary Actuator The pipehandler is infinitely rotatable by 360 °. The main gear wheel (3) is run by the pinion. The pinion is moved by a hydraulic drive.

Pos: 1.5.20 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4222 4.2.2.2. Feststeller @ 4\mod_1279028265677_581.doc @ 37443

3.1.2.2 Arresting device

1

23

Abb. 18

Arresting Device The gear segment (2) is moved by a hydraulic cylinder (1). It grabs at the main gear wheel(3) and arrests the pipehandler in intervals of 3°.

Pos: 1.5.21 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4223 4.2.2.3 Drehdurchführung @ 4\mod_1279028306863_581.doc @ 37447

3.1.2.3 Hydraulic Swivel

Abb. 19

Hydraulic swivel Hydraulic lines of the consumer of the Pipehandler are transferred through the hydraulic swivel. Free channels are available, enabling the connection of additional consumers.

Pos: 1.5.22 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4224 4.2.2.4. Linkadapterhousing @ 4\mod_1279028366362_581.doc @ 37451

3.1.2.4 Linkadapterhousing

Abb. 20

Linkadapterhousing The linkadapter (2) positioned in the linkadapterhousing (1). The link adapter is supported by the Liftingspring (3). While drilling the liftingspring raises the linkadapter thus enabling free rotation of the mainshaft. The load collar (4) holds the linkadapter during elevator operation. The load collar transfers the load into mainshaft. The load collar consists of two half-shells with grooves that grap into the mainshaft. A housing keeps the shells together..

Page 18: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 18 of 33

Pos: 1.5.23 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4225 4.2.2.5 Linktilt @ 4\mod_1279028676383_581.doc @ 37455

3.1.2.5 Linktilt

Abb. 21

Linktilt Two hydraulic cylinders (2) move Links and Elevator. Hereby the elevator can be placed in any position necessary for picking the pipes. The system can lift a maximum of 2,5 t at a distance of 1,4 m to centre well.

Pos: 1.5.24 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42251 4.2.2.5.0 Linktilt Reichweite Tabelle @ 4\mod_1279028770661_581.doc @ 37459

The Link tilt system is able to move Links with in the following Limits

Link Typ L f b

[mm] [``] [mm] [``] [mm] [``]

108`` 2743 108 1473 58 2013 79

120`` 3048 120 1637 64 2237 88

132`` 3353 132 1081 71 2460 97

144`` 3658 144 1964 77 2684 106

168`` 4267 168 2292 90 3131 123

180`` 4572 180 2455 97 3355 132 Pos: 1.5.25 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42252 4.2.2.5.0 Linktilt Reichweite Abb @ 4\mod_1279028858033_581.doc @ 37463

L

Abb. 22

Page 19: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 19 of 33

Pos: 1.5.26 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4226 4.2.2.6 Linktilt Überwachung @ 4\mod_1279028969186_581.doc @ 37467

3.1.2.6 Pipe handler Monitoring

1

2

3

Abb. 23

Pipe handler Monitoring The position of the elevator is determined at all times. A hydraulic cylinder (3) communicates via hydraulic swivel (2) with a measuring cylinder (1) transferring the elevator position to a connected Drawworks Anti Collision System. Depending on the Anti Collision System a number of different link positions can be teached in, to be approached during drilling operation.

Pos: 1.5.27 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4227 4.2.2.7 Haltezange @ 4\mod_1279029119916_581.doc @ 37471

3.1.2.7 Back up Clamp

1

2

Abb. 24

The purpose of the backup Clamp(2) is making up and breaking drill pipe connections between Top Drive (Saversub) and drill string. The back up clamp is connected to the Linkadapterhousing via torque beam.(1)

Pos: 1.5.28 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/42271 4.2.2.7.0 Backeneinsätze @ 4\mod_1279029214834_581.doc @ 37475

1

2

Abb. 25

The Jaw Assemblies(1) are moved by a hydraulic cylinder(2). Using different kinds of jaw assemblies allows making up and breaking of drill pipe with various OD`s. The Top Drive is equipped with one Jaw size. Additional Sizes for other Tool Joint OD’s are available as the option “Tool Joint Adapter Kit”

Jaw size Tool Joint OD

I 4“ – 5“

II 5 ¼“ – 6 ¼“

III 6 ¼“ – 7 ½“

IV 7 ½“ – 8 ½“

Page 20: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 20 of 33

Pos: 1.5.29 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4228 4.2.2.8. IBOP Saver Sub @ 4\mod_1279029762582_581.doc @ 37491 Pos: 1.39 /Bentec Produkte/Top Drive /TD-500-HT/4. Aufbau und Funktion/422 4.2.2.7 Baugruppe IBOP,Saversub, Load Collar @ 1\mod_1260947387369_581.doc @ 24940

3.1.2.8 IBOP/ Saversub

1234

Abb. 26

The IBOP (2) is connected to the mainshaft via API pin

Internal

Blow

Out

Preventer

The saver sub (4) is screwed between IBOP (2) and pipe. Dielocks (1,3) prevent the threaded joints from over torque from the mainshaft to the IBOP and accordingly from the IBOP to the saver sub.

Pos: 1.5.30 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4230 4.2.3. Führungswagen @ 4\mod_1279029308425_581.doc @ 37479

3.1.3 Carriage Package

Abb. 27

The Top drive is guided by a carriage package. It transfers the torque from the top drive into the Guide rails.

The Carriage Package consists of a frame(1) with slide shoes(2), it transfers the Torque it to the Mast structure. The glide shoes are equipped with vibration dampers (3). Adjustment to centre well is performed by adjusting devices(4)

Pos: 1.5.31 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4240 4.2.4. Führungsschiene @ 4\mod_1279029433655_581.doc @ 37483

3.1.4 Torque Beam Assembly

Abb. 28

The Torque beam assembly absorbs the torque of the guide dolly and transfer it to the mast structure. The Torque beam assembly is segmented into 4 sections and delivered within a transport frame. The Transport frame allows easy and safe handling during transport and Rig up.

Page 21: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 21 of 33

Pos: 1.5.32 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4250 4.2.5. Hoisting equipment @ 4\mod_1279029563808_581.doc @ 37487

3.1.5 Hoisting equipment

Abb. 29

The Top Drive can be equipped with the following Links(1) and elevators(2)

Load Size

350 ton 2 ¾” x 120” (recommended)

350 ton 2 ¾” x 132”

500 ton 3 ½” x 120” (recommended)

500 ton 3 ½” x 144”

Other elevator link sizes are available on request.

Elevator links for Casing running Tools are available on request.

Manual Elevators are available in the following sizes:

350 ton

500 ton

A Bushing set of the for the following Drillpipe sizes will be attached:

3 ½” , 4 ½” , 5” , 5 ½” , 6 5/8”

Bushings for other Drillpipe sizes are available on request.

Hydraulic elevators are available on request. Hydraulic connections for a hydraulic elevator are already available.

Pos: 1.5.33 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

3.1.6 Tool Kit

The top drive will be delivered with

IBOP Hex wrench

IBOP repair tools

Manual oil pump

Page 22: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 22 of 33

Pos: 1.5.34 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4260 4.2.6. Topdrive Control - Konsole @ 4\mod_1279721650920_581.doc @ 38630

3.2 Top Drive Control

The Top Drive Control System consist of the following parts

Service Loop

Drillers Control

Terminalbox

Drillers Control CableDrillfloor

Drillers Control CableGround Level

Supply Cable

Incoming Power Cable

VFD Power Control System

Abb. 30 Pos: 1.5.35 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

3.2.1 Service Loop

Abb. 31

The Top drive has a Power Loop (1) that supplies electrical power to the motor and a Control Loop (2). The control Loop holds all control lines and the electrical power supply for the auxiliary drives.

The Loop Length is based on the existing rig specifications.

The Length of the Supply Cable is determined by customer or recommended by Bentec.

The Length of the Incoming Power Cable is determined by customer or recommended by Bentec.

Page 23: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 23 of 33

Pos: 1.5.36 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4261 4.2.6.1. Service Loop @ 4\mod_1279030085626_581.doc @ 37499 Pos: 1.5.37 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4262 4.2.6.2 VFD Power Control System @ 4\mod_1279030274654_581.doc @ 37503 Pos: 1.5.38 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4263 4.2.6.3. Driller Control Konsole @ 4\mod_1279703324803_581.doc @ 38600

3.3 Drillers Control

The Top Drive is controlled by the Panel shown below. This panel is used as a standalone unit installed within the doghouse.

An implementation within the Drillers Chair is available on request.

Abb. 32 Pos: 1.5.39 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

3.4 VFD Power control System

Abb. 33

The VFD Power Control contains all control devices and frequency converters that are needed to operate the Top drive.

Container Dimensions: Width: 3m / Length: 3,4m / Height: 3m

ISO Container with Lifting Edges & Pad eyes for rigging

Sun shed roof, entrance door and removable front

Heat insulation

Environmental temperature -45°C to +55°C

2 Air conditions 15kW each

1 heating unit 2kW

Incoming switchboard 600V/60Hz or 690V/50Hz 3Phase

1000A draw out circuit breaker

Plug panel 400mm² power pins 6 each

Power choke and rectifier

Air cooled VFD Inverter 1600A for main motor

MCC for all auxiliary drives with VFD’s for support drives

Chopper unit 200kW intermittent

Default incoming power cable

Page 24: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 24 of 33

3.4.1 VFD – Power Supply

The Power Supply consists of an AC Bus (600/690V) to feed the transformer, the MCC Consumers a Diode Bridge with choke and fuses and the incoming circuit breaker (which feeds the DC Bus). The DC Bus feeds the VFD-Unit for the TD Main Motor.

Technical Data: Supply Voltage: 600/690V DC Current: 1700A Diode Bridge B6U

The plug panel for Power Supply is installed outside of the container. For each Phase there are two (2) Power Pins available. (3x2 Power Pins)

3.4.2 VFD – Power Stack & VFD Controls

The BENTEC VFD Units are designed not only to meet but exceed the customer requirements. The fool-proof design allows an easy & safe operation for the staff, field-bus connected PLC's are used to offer a comfortable maintenance, even via Internet (Option). Technical Data: Supply Voltage: 820…950 V DC Output Voltage: 575 V AC Output Current: 1600A Programmable Logic Controller: MODICON Schneider Cooling System: Air Cooled

Alarms are displayed in clear languages including histogram and display of actual system data for maintenance and troubleshooting purpose in one central Display.

All controls for the Top Drive like Link tilt, etc. are included in the VFD System.

The plug panel for the connection of the Top Drive is installed outside of the container.

3.4.3 VFD – Motor Control center (MCC)

The MCC is equipped with starters and feeders to the requirements of the Bentec Top Drive. Each starter will be complete with a magnetic only breaker, a contactor and an ambient compensated overload element (heater). All Status and Alarm messages will be indicated on a separate Human machine interface.

3.4.4 VFD – Braking Chopper Module & Resistor

The braking chopper module is installed to feed the braking resistor for regenerative braking.

Technical Data:

Chopper Module 200kW intermittent

Braking resistor 50kW continuous

Page 25: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Setup and Function

Page 25 of 33

3.4.5 VFD – Transformer

One transformer fed by AC Supply panel to fed 460/400/230V consumers of the MCC and small power distribution.

Technical Data: Rated power: 50kVA Primary voltage: 600/690V Secondary voltage: 400/460V

3.4.6 VFD – UPS System

One battery buffered UPS system to feed all control systems with uninterruptable stable power supply to allow for safe operation.

Technical Data: Input 400VAC, 50/60Hz Output: 24-28V DC / 40A Buffer battery capacity: 24V50Ah

3.4.7 VFD – ESD System

This safety system is split in two parts as follows:

Emergency Shut Down:

Single systems VFD, MCC, TD Control will be shut down in a controlled safe way

Blackout:

All systems will be shut down in a safe way and all power will be shut off.

3.4.8 VFD – Air Conditioning Unit

Two air conditioners are installed inside of the container to monitor and control the temperature inside of the container at a level of 25°C. The air is also used to cool all controls as well as the air cooled VFD.

3.5 Incoming Power Cable

Cables for connection of the VFD container with the Existing SCR unit. Other lengths are available on request. The Cables are pluggable on both sides. Customer supply power 690V/50Hz or 600V/60Hz – 760kW

Page 26: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Transport

Page 26 of 33

Pos: 1.5.40 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-Module/4300 4.3. Tool Kit @ 4\mod_1279030454400_581.doc @ 37511

Pos: 1.6 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805 Pos: 1.7.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/5. Transport und Zwischenlagerung/5000 5.Transport @ 4\mod_1278928593693_581.doc @ 36659

4 Transport Pos: 1.7.2 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/5001 5.0.0. Tarnsportmaße-Dubble Rail-Rahmen @ 4\mod_1279095056207_581.doc @ 37578

Transport Data

Description Value Dimension

Length 7400 mm

Width 2880 mm

Height 2880 mm

Weight 20.000 kg

Pos: 1.7.3 /Betriebsanleitungen-Mechanisch/Bentec Produkte/Top Drive/TD-500-HT/5002 5.0.0 Transortmaße-Dartsellung Double Rail Rahmen @ 4\mod_1279095056488_0.doc @ 37583

2880

7400

Abb. 34 Pos: 1.8 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

Page 27: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Recommended Option - Rig survey

Page 27 of 33

Pos: 1.9.1 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/Technical Bulletin/Z000 Z. Schulung @ 4\mod_1279691844542_581.doc @ 38541

5 Recommended Option - Rig survey For a turnkey Top Drive implementation Bentec recommends a rig survey in advance to fit the Top Drive system in an optimal way into the existing rig. The Rig survey takes two days and will be performed by two Bentec engineers. The Following Points will be surveyed.

Survey Contents:

Measurements at Mast

Measurements on Drill floor

Measurements on fingerboard Level

Measurements for Tieback kit

Check of Mast for Service Loop implementation

Check of Mast for possible collisions with the Top Drive

Check of Doghouse for control implementation

Check of Power supply Pos: 1.10 /Standardmodule /nL.......... Seitenumbruch .......... @ 0\mod_1226928886124_0.doc @ 805

6 Recommended Option - Implementation Kit An Implementation kit can be offered after a rig survey to provide a turnkey implementation for the Bentec Top Drive. The Implementation kit includes the following parts. Size and design of these parts are depends on the results of the rig survey.

Implementation kit Contents:

Hang off Links for Crown Block Section

Intermediate Tiebacks

Lower Tieback

Misc. Beams for implementation

The Implementation of Bentec Top Drives may influence the statics of the Mast. Bentec will submit static relevant data’s within a confirmation drawing after purchase order. The client is responsible for the verification of the Mast statics.

To implement the Top Drive in an efficient way Bentec need the following technical Drawings (CAD-File or scanned file):

Mast / Derrick – detailed Drawings

A-Frame (if available)

Drillfloor Layout

Fingerboard

Crown Block

Rig Layout

Standpipe Information

Drillpipe sizes which should be use on the Rig

Elevator Links & Elevator Information

Travelling Block Information

Page 28: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Option - Training

Page 28 of 33

7 Option - Training The following Training courses are available in advance or onsite.

Pos: 1.9.2 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/Technical Bulletin/Z100 Z.1. Bedienerschulung beim Hersteller @ 4\mod_1279691999830_581.doc @ 38545

7.1 Training Course – Operation

This training course includes the complete operation of the Top Drive System. This course contains one theoretical part and one practical part.

Training Contents:

Top Drive commissioning & decommissioning

Top Drive operational functions

Detailed training of the mechanical systems

Detailed training of the electrical systems

System safety

Participants:

This Course is provided for: Driller, Toolpusher, Repair- and Maintenance

Crews or people who are directly responsible for the Top Drive Pos: 1.9.3 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/Technical Bulletin/Z200 Z.2. Bedienerschulung An der Bohranlage @ 4\mod_1279692449776_581.doc @ 38549

7.2 Training Course – Hydraulics

This training course includes a deep training of the hydraulic system and their parts of the Top Drive.

Training Contents:

Hydraulic plans

Hydraulic pressure unit (HPU)

Operation of all hydraulic circuits.

Maintenance of the hydraulic system

Installation of the hydraulic pump

Installation of control elements

Participants:

This Course is provided for: Repair- and Maintenance Crews or people who are

directly or indirectly responsible for the hydraulic functions of the Top Drive.

7.3 Training Course – Electrics

This training course includes a deep training of the electric system and their parts of the Top Drive.

Training Contents:

Electrical plans

Power Supply

AC-Motors – VFD-Technology / PLC Controls

Maintenance of the Electrical System

Safe operation at the electrical systems

Participants:

This Course is provided for: Electric Crews or people who are directly or indirectly responsible for the electrical functions of the Top Drive.

Page 29: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Option - Yearly Maintenance Service

Page 29 of 33

7.4 Training Course – Mechanics

This training course includes a deep training of the mechanic system and their parts of the Top Drive.

Training Contents:

Mechanical plans

Load Path

Main Assemblies

Sub Assemblies

Lubrication & hydraulic System

Recommended Maintenance

Safe operation at the mechanical systems

Participants:

This Course is provided for: mechanic & maintenance Crews or people who are

directly or indirectly responsible for the mechanical functions of the Top Drive.

8 Option - Yearly Maintenance Service The Yearly Maintenance service will be done by Bentec onsite. Within the yearly Maintenance Service Our Top Drive Maintenance Specialists will be check all the Top Drive Parts, systems and functions. The following points are all points that have to be done according to the technical documentation. If there are some parts or systems need to be repaired or replaced Bentec will charge the costs separately

Maintenance Service Contents:

Maintenance of all Motors

Maintenance of the gearbox

Maintenance of the complete hydraulic system

Maintenance of the complete mechanical system

Maintenance of the complete electrical system

Function Test

9 Option - Recommended Spare Parts for one year The recommenced spare part package contains wear parts and spare parts that needed during normal operation for one year. The Spare Part kit guarantees a safe uptime of the Top Drive due to spare parts availability at the rig or base.

10 Option - Lubricants for one year Lubricants for the Top Drive are

Summer Lubricants

Hydraulic Oil: Shell Omala HD 150

Gear Oil: Shell Tellus 32

Winter Lubricants (recommended for Temperatures <0°C)

Hydraulic Oil: Shell Tivela 150

Gear Oil: Shell Tellus 32 Arctic

Page 30: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Option - Service Loop Container

Page 30 of 33

11 Option - Service Loop Container The Service Loop Container is an open Top 20 ft open top container. The Service Loop and Service Loop saddle can be stored within this container during rig move. The Service loop will be stored within this container in optimal environments and avoid any damages during transport and storage.

12 Option – Saver Sub Set The Top Drive is equipped with a one Saver Sub Set + one Saver sub for spare. The Thread Connection to the Drillpipe is NC50. Additional Saver subs and thread Connections are available on Request. The Following sizes are available. Saver subs quality control is according to API 7-1

NC 38

NC 40

NC 46

NC 50

5 ½” FH

6 5/8” FH

Special threads are available on request.

13 Option – Tool Joint Adapter Kit To clamp different Tool Joint sizes an Adapter Kit is available. The Adapter Kit consist a Jaw Assembly and a stabbing guide which fits to the Tool Joint Range.

The Following Tool Joint OD’s are possible:

4”-5”

5 ¼” – 6 ¼”

6 ¼” – 7 ¾”

7 ½” – 8 ½”

14 Option – Wireline Adapter The Wireline adapter allows using Wireline Tools with the Bentec Top Drive. The Wireline Adapter will be mounted below the Pipehandler Main Frame.

15 Option – Top Drive Control Driller’s Chair implementation The Top Drive controls can be implemented into an existing Driller’s Chair. The Implementation work onsite will be executed by a Bentec Service engineer. Technical Information’s about the Drillers chair are necessary in advance

Page 31: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Option – Color Camera system

Page 31 of 33

16 Option – Color Camera system A Color Camera system is a fixed or pan- and tiltable Color Camera. This Camera can be installed at any position on the rig to monitor hazardous areas like finger board level, drillfloor level, and crown block level. The preferred position of the camera needs to be determined by the customer. The Monitor the Camera is mounted in the Driller’s Cabin. The Number of Camera’s and Cable Lengths has to be determined by the customer. The printed boards for the controls are mounted in a separate Ex’d’ box. Cablings from the camera to the Ex’d’ box is directly connected without plugs. ATEX certified plugs are available on request.

Specifications Camera

EX de housing with temperature controlled space heater

Stainless steel weather protection hood

Size: 120 x 120 x 400 mm / 5kg

Automated brightness control

Motor operated zoom & Autofocus

Excellent clear picture even bad light conditions

Specifications Monitor & Control

Housing IP65, made in stainless steel with installation holder

Size: ca. 450 x 350 x 280 mm / 10kg

12'' (1024x768) TFT Color Screen Panel - IP65

Light intensity 1.300 candelas

Galvanic separation of video signal

50m multicore control cable halogen free for connect each camera

Camera selection switch

Zoom in/out / pan left & right / tilt up & down

Switches military standard

Specifications Pan/Tilt Unit

Pan angle: 356° Tilt Angle 176° & end stop limits

Size: 165 x 286 x 228 mm / 18kg / max. load 35 kg / Ex 'd' housing

Power Supply

230V AC 50/60Hz

Page 32: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Option – Top Drive Genset (Independent Power source)

Page 32 of 33

17 Option – Top Drive Genset (Independent Power source) The Top Drive can be equipped with a Genset Module to operate the Top Drive an independent unit.

18 Option – Offshore Certification For Offshore applications the Top Drive system will be certified by a third-party organisation. This Certificate is formally known as a Case-by-Case approval.

Supported Certification Organisations

DNV – Det Norske Veritas

ABS – American Bureau of Shipping

Lloyds British

The Certification includes design verification and product verification. Furthermore all load-path included parts will be Type approved. Interface related points between the existing rig system and the Top Drive System need to be clarified during an interface clarification meeting between Bentec and client.

Page 33: Technical Bulletin Top Drive TD-500-HT Top Drive TD-350-HTdrillzone.ru/uploads/files/18476723584dad37f38b896.pdf · 2011. 4. 19. · Technical Bulletin Top Drive Technical Data Page

Technical Bulletin Top Drive

Contact

Page 33 of 33

Pos: 1.11 /Betriebsanleitungen-Mechanisch/Bedienungsanleitungen-Alle/13. Adressen/16. Adressen @ 4\mod_1279544177034_581.doc @ 38495

19 Contact

Germany

Headquarters Production Service Sales

Bentec GmbH Drilling & Oilfield Systems Deilmannstraße 1 48455 Bad Bentheim Postfach 1253 • 48443 Bad Bentheim

Phone: +49-5922/72-80 Fax: +49-5922/72-457

E-Mail: [email protected] Web: www.bentec.com

Russia

Bentec GmbH Drilling & Oilfield Systems Respubliki –str. 252, bild.1 office 1-06 625014 Tyumen

Phone: +73452261479

E-Mail: [email protected]

Bentec GmbH Drilling & Oilfield Systems Russia Representation Office 1. Kasatschij per. 7, room 13 109017 Moscow

Phone: +7 495 234 42 38 or 39 Fax: +7 495 234 42 40

E-Mail: [email protected]

Turkmenistan

Bentec GmbH Drilling & Oilfield Systems Turkmenistan Representation Office Azadi Street 95 / 2011 744000 Ashgabat

Phone: +99 312 395 561 Fax: +99 312 352 169

E-Mail: [email protected]

Kazakhstan Bentec GmbH Drilling & Oilfield

Systems Kazakhstan Branch Kabanbai Street 172 RK 480012 Almaty

Phone: +7 32 92 571 321 Fax: +7 3292 571 321

E-Mail: [email protected]

Oman IDTEC

International Drilling Technology Co.LLC P.O.Box 1278 PC 133 Al Khuwair

Phone: +968-2459-0103 Fax: +968-2459-0163

E-Mail: [email protected]