Page 2
To identify the development issues and potential of the upazilla and
make a long term development vision for the upazilla and to prepare a
Master Plan in accordance with the vision for the development.
To ensure and promote growth of the upazilla in line with the guiding
principles of the Master Plan and control any unplanned growth by any
private and public organization.
Objectives
(2)
Page 3
Points which should be considered :
Lack of Detail and Specific Description
Stakeholder Analysis
Sample Size
Sample Population
Population Projection
Comments on ToR
(3)
Page 4
Consultants General Understanding -Brief Socio-Economic Profile
Bakerganj Upazilla
District : Barisal
Area : 417.21 sq. km.
Union : 14
Mouzas: 156
Population : 3,36,706
Main Occupation : Agriculture
Fig. : Map of Bakerganj Upazilla (Banglapedia, 2006)
(4)
Page 5
Constraints
Salinity of water
Shortage of essential services
Unplanned and haphazard development
Potentials
Extensive river network
Fertile land
Production of Coconut & Battle Nut
Consultants General Understanding – Constraints and Potentials of the Area
(5)
Page 6
Technical Proposal – Planning Approach
Sl.No. Type of Plan Coverage Time Frame Purpose
1. Structure Plan Whole study area 20 years To determine overall strategy of urban development in the area
2. Master Plan/ Urban Area Plan
Whole study area 20 years To provide development guidance for area where most of the urban development activities will take place. Development control, land reservation for infrastructure and essential purposes.
(i) Land Use Plan Whole study area 20 years To provide guidance about the future land use of the area and suggest best possible zoning system considering all the factors.
(ii) Transportation and Traffic Management Plan
Whole study area 20 years To provide suggestion and enforcement measures for transportation management.
(iii) Drainage and Environmental Management Plan
Whole study area 20 years Guidelines and controls to protect unplanned physical development in urban environment.
3. Local Action Plan Individual area of the upazilla where priority action is needed.
Short Term (possibly 5 Years)
Guidance for development where action is expected in the short term.
Relationship among the plans as specified in the ToR
(6)
Page 7
Technical Proposal – Planning Approach
Relationship among the plans as specified in the ToR
Structure Plan- Overall Strategies- Policy Framework
Master Plan/Urban Area Plan- Details of Structure Plan’s Goals
and Objects
Transportation and Traffic Management Plan
- Output of Master Plan/Urban Area Plan’s Goals and Objectives
Drainage and Environmental Management Plan
- Output of Master Plan/Urban Area Plan’s Goals and Objectives
Land Use Plan- Output of Master Plan/Urban
Area Plan’s Goals and Objectives
Local Action Plan- Specific Programs, Schemes in the Light of Master Plan /Urban Area Plan’s Goals and Objectives
(7)
Page 8
Technical Proposal – Planning Approach
Steps in Plan Preparation
Assessment of Planning Parameter
Identification of Goals and Objectives
Identification of Problem/Constraints, Opportunities/Potentials
Resource and Need Assessment
Plan Formulation
Project/Schemes Identification, Feasibility and Prioritization
Development of Alternative Options
Plan Finalization
People’s Consultation
Review of Current Development Initiatives
Source: SCPL-DPM, 2008 (Modified Version Adopted) (8)
Page 9
Technical Proposal – Planning Approach
Steps in Plan Preparation
Assessment of Planning Parameter
- Basic data on population, employment, land use, infrastructure, environmental
conditions etc. for plan preparation
- Information from existing studies, plans and programs, government publications, public
authorities, statistical previous year book, the records of upazilla and other development
agencies working in the concerned upazilla area
Population Projection
- 2030 (plans lifetime) following the Age Cohort wise projection system
- Age cohort structure and growth rate of BBS will be used
- Base population year : 1991, 2001 and 2011
(9)
Page 10
Technical Proposal – Planning Approach
Steps in Plan Preparation
Identification of Goals and Objectives
- Broad scale strategy of the Plan
- Specific issue to cover
Identification of Problem/Constraints & Opportunities/Potentials
- Rapid scanning survey of problems affecting different groups and having different
impacts through discussions with different interest groups
- Exact nature and quantification of the problems: data from secondary sources
- Potentials of the issue in the plan area
- Opportunities during plan preparation process
(10)
Page 11
Technical Proposal – Planning Approach
Steps in Plan Preparation
Review of Current Development Initiatives
-Sectoral projects in the study area by different organizations will be identified
- As required in the ToR, projects will be mapped using thematic overlays
- Review of current urban and sectoral policies and programs, design standards etc.
Resource and Need Assessment
- Availability of technical and physical resources
- Availability of funds in the short term
- Physical and Economic need of the plan area
- Long term and short term need
(11)
Page 12
Technical Proposal – Planning Approach
Steps in Plan Preparation
Consultation
- People's Participatory Planning Approach will be applied
- Parties to be consulted with
(i) The Government/Public Agencies
(ii) Local Communities/Beneficiaries
(iii) Private Sectors
(iv) Non-Government Organizations (NGOs)
- Stages of Consultation
(i) First Consultation - Draft Structure Plan
(ii) Second Consultation – Draft Master Plan
(12)
Page 13
Technical Proposal – Planning Approach
Steps in Plan Preparation
Plan Preparation- Finalizing preparation of the plans is the last stage of the planning process
- Plans will be supported by
i. review of the database and information
ii. assessment of the existing functional structure
iii. problems in developing process
iv. formulation of conceptual plan
v. formulation of planning principles
vi. analysis of alternative plans
vii. integration of optimum plans
viii. priority phasing
ix. development control, zoning
x. financial-economic, social, environmental impact assessment, legal support, etc.
(13)
Page 14
Technical Proposal – Planning Approach
Prioritization of Project
Compatibility with other projects Acceptability to all parties concerned
Equity consideration Sustainability
Whether self financing or not Environmental impacts
Formulation of Bankable Projects
Low Cost Housing Telephone
New Construction Gas
Upgrading of Old ones Private Electricity Generation
Employment Generation Projects Services
Utility Services Projects Market and Shops
Water Supply and Sanitation Education
Flood Control Embankment Religious
Drainage Infrastructure Recreation
(14)
Issues Considered
Page 15
Technical Proposal – Technical Approach and Methodology
Mobilization of Resources, Reconnaissance Survey, Project Design
- Inception Report (After 30 working Days)
Collection and Review of Database, Information, Maps, Reports
Preparation and Compilation of Base Map, Demarcation of Project Area
- Study Area Report with Map (After 90 working Days)
Physical and Environmental Feature Survey; Topographic Survey
Land Use Survey
Socio-Economic Survey
Transportation Survey
- Survey Report (After 150 working Days)
Draft Structure Plan Preparation - Interim Report (After 210 working Days)
Draft Master Plan and Local Action Plan Preparation - Draft Report (After 300 working Days)
Final Structure Plan and Master Plan Preparation - Final Report (After 360 working Days)
Methodology of Base Map Preparation
Collection of RS and CS Mouza Maps
Scanning of Mouza Maps
Selection of Ground Control Point (GCP)
GCP Survey
Digitization of Mouza Maps
Checking/Editing of Maps
Joining and Printing of Mouza Maps
Methodology of Physical Feature Survey
Physical Feature and Physical Infrastructure –
Mauza/Base Map
Location and dimension of physical
infrastructures-Total Station (TS)
Location of point features- Data Logger ProXR
DGPS (Differential Global Positioning System)
Later on Data will be transferred to GIS
Database
Methodology of
Topographic Survey
Land Level/Spot
Level at 50m interval
Total Station
Methodology of Environmental
Feature Survey
Existing Infrastructure – physical
feature survey
Environmental Hazard –
questionnaire survey and secondary
source
Methodology of Land Use survey
Based on Mouza Map
Total Station/DGPS
Methodology of Socio-Economic Survey
Questionnaire Survey
Sample Size - 384 at 95% confidence level and 5%
confidence interval
20% additional sample for piloting and error
minimizing
Methodology of Transportation Survey
An inventory of the circulation system (roads and
waterways) according to ToR
A series of Volume and O-D survey
Pedestrian Count
(15)
Page 16
Technical Proposal - Work Schedule
(16)
Page 17
Technical Proposal – Network Diagram of Principal Activities
(17)
Page 18
Technical Proposal – Staffing Schedule
(18)
Page 19
Technical Proposal – Organogram
Team Leader
Deputy Team Leader
Urban Planner-1
Transport
Planning
Expert
Civil Engine
er
Municipa
l Engineer
Urban Planner-2Demographer/
Statistician
Environmental
Analyst
Hydrologist
Urban
Developmet
Economist
GIS Specialist Architect
Office ManagerOffice Manager
PeonPeon
(19)
Page 20
Technical Proposal – Responsibility Linkage
Activity
Team Leader
Deputy Team Leader
Urban Planner-1
Urban Planner-2
Architect
GIS Specialist
Transport Planning Expert
Civil Engineer
Demographer/Statistician
Environmental Analyst
Hydrologist
Municipal Engineer
Urban Development Economist
Office Manager
Peon
Mobilization, Reconnaissance Survey, Project Design, Submission of Inception Report
P P P P
Collection and Review of Database, Information, Maps, Reports S S P P
Preparation and Compilation of Base Map, Demarcation of Project Area, Study Area Report with Map
P P P P P
Physical and Environmental Feature Survey; Topographic Survey S S S P P P P
Land Use Survey S S P P P S S
Socio-Economic Survey S S S P P P
Transportation Survey S S P P P S
All Survey Report Compilation and Submission of Survey Report S S P P S S S S
Draft Structure Plan Preparation and Interim Report P P P P S S S S S S S S S
Draft Master Plan and Local Action Plan Preparation; Draft Report P P P P P P P P P P P P P
Final Structure Plan and Master Plan preparation; Final Report P P P P P P P P P P P P P
Office and Account Management P
Office Maintenance P
N. B. - “P” for Primary Activity and “S” for Secondary Activity
(20)
Page 21
Financial Proposal - Staff Remuneration Sl. No. Position Monthly Salary (BDT) Working
MonthTotal (BDT)
StaffA. Professional Staff 1. Team Leader 70,000 17 11,90,0002. Deputy Team Leader 60,000 17 10,20,0003. Urban Planner-1 50,000 17 8,50,0004. Urban Planner-2 45,000 17 7,65,0005. Architect 45,000 10 4,50,0006. GIS Specialist 45,000 17 7,65,0007. Transport Planning Expert 40,000 15 6,00,0008. Civil Engineer 35,000 15 5,25,0009. Demographer/Statistician 30,000 14 4,20,00010. Environmental Analyst 30,000 15 4,50,00011. Hydrologist 30,000 9 2,70,00012. Municipal Engineer 30,000 9 2,70,00013. Urban Development Economist 30,000 14 4,20,000
Sub Total A 79,95,000B. Supporting Staff 14. Office Manger 30,000 17 5,10,00015. Peon 12,000 17 2,04,000
Sub Total B 7,14,000Grand Total of Project Staff Remuneration 87,09,000
(21)
Page 22
Financial Proposal – Reimbursable Cost
Sl. No.
Description Unit Unit Cost
in BDT
Quantity Total in BDT
1. Rental Cost of Office (Including Utility Bill) Month 30,000 17 5,10,000
2. Rental Cost of Office Setup Month 50,000 17 8,50,000
3. Cost of Office Stationary Month 5,000 17 85,000
4. Communication Costs Between "Base Office" and "Field Office"
Month 5,000 17 85,000
5. Rental Vehicle Cost for Transport (1 no.) Month 30,000 17 5,10,000
6. Cost of Procurement of Mauza Maps Number 300 780 2,34,000
7. Secondary Data Collection Cost Number of Organization
1,000 50 50,000
8. Cost of Construction and Installation of Benchmark/Ground Control Point
Number 3,000 156 18,72,000
9. Cost of GIS Database Preparation on the Basis of Subcontract - Scanning, Digitizing of Maps and Reproduction
Number 500 780 3,90,000
(22)
Page 23
Financial Proposal – Reimbursable Cost Sl. No.
Description Unit Unit Cost
in BDT
Quantity Total in BDT
10. Cost of Survey i) Physical and Environmental Feature Survey;
Topographic SurveyAcre 350 103097 3,60,83,950
ii) Land Use Survey Acre 150 103097 1,54,64,550iii) Socio-Economic Survey Per HH 150 460 69,000iv) Transportation Survey Package 100,000 1 1,00,000
11. Cost of Map Printing i. Base/Mouza Map Number 500 30 15,000
ii. Survey Maps Number 500 180 90,000iii. Structure Plan Number 500 30 15,000
12.
Cost of Reports for the Service (Including Printing, Binding and Photocopy Cost)
i. Inception Report Number 500 25 12,500
ii. Study Area Report Number 750 25 18,750
ii. Survey Report Number 2,000 25 50,000
iii. Interim Report Number 2,000 25 50,000
iv) Draft Final Report Number 3,000 25 75,000
v) Final Report Number 3,500 25 87,500
Grand Total of Projects Reimbursable Cost 5,67,77,250
(23)
Page 24
Financial Proposal – Per Month Cost Schedule
(24)
Cost Schedule Per MonthSI. No. Item Year-2012 Year-2013
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
A. Reimbursable Cost
1 Office Rent 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000
2 Setup Rent 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000
3 Office Stationary 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
4 Communication Cost 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
5 Vehicle Cost 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000
6 Mouza Map Procurement Cost 2,34,000
7 Secondary Data Cost 10,000 10,000 10,000 10,000 10,000
8 Cost of BM, GCP 18,72,000
9 GIS Database Cost 1,30,000 1,30,000 1,30,000
10 Cost of Surveys
i) Physical& Environmental Feature; Topographic Survey
72,16,790 72,16,790 72,16,790 72,16,790 72,16,790
ii) Land Use Survey 30,92,910 30,92,910 30,92,910 30,92,910 30,92,910
iii) Socio-Economic Survey 17,250 17,250 17,250 17,250
iv) Transportation Survey 20,000 20,000 20,,000 20,,000 20,000
11 Cost of Map Printing
i. Base/Mouza Map 15,000
ii. Survey Maps 90,000
iii. Structure Plan 5,000 5,000 5,000
iv) Master Plan 30,000 30,000
12 Cost of Reports
i. Inception Report 12,500
ii. Study Area Report 18,750
ii. Survey Report 50,000
iii. Interim Report 50,000
iv) Draft Report 75,000
v) Final Report 87,500
B. Staff Remuneration (Including 10% Income Tax)
1. Team Leader 73,535 73,535 73,535 73,535 73,535 73,535 73,535 73,535 73,535 73,535 73,535 73,535 73,535 73,535 73,535 73,535 73,535
2. Deputy Team Leader 63,030 63,030 63,030 63,030 63,030 63,030 63,030 63,030 63,030 63,030 63,030 63,030 63,030 63,030 63,030 63,030 63,030
3. Urban Planner-1 52,525 52,525 52,525 52,525 52,525 52,525 52,525 52,525 52,525 52,525 52,525 52,525 52,525 52,525 52,525 52,525 52,525
4. Urban Planner-2 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273
5. Architect 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273
6. GIS Specialist 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273 47,273
7. Transport Planning Expert 42,020 42,020 42,020 42,020 42,020 42,020 42,020 42,020 42,020 42,020 42,020 42,020 42,020 42,020 42,020
8. Civil Engineer 36,768 36,768 36,768 36,768 36,768 36,768 36,768 36,768 36,768 36,768 36,768 36,768 36,768 36,768 36,768
9. Demographer/Statistician 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515
10. Environmental Analyst 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515
11. Hydrologist 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515
12. Municipal Engineer 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515
13. Urban Development Economist 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515
14. Office Manager 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515 31,515
15. Peon 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,606 12,606
C. Miscellaneous Cost 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675 2,90,675
Monthly Total Cost (without VAT) 10,62,712 28,43,212 1,14,78,715 1,14,97,465 1,12,68,435 1,12,58,435 1,14,13,435 9,64,038 10,27,068 10,77,068 10,22,068 10,22,068 10,52,068 11,27,068 10,22,068 10,22,068 11,09,568
Monthly Total Cost (with VAT) 11,10,534 29,71,157 1,19,11,657 1,19,11,657 1,19,11,657 1,19,11,657 1,19,11,657 10,07,420 10,73,286 11,25,536 10,68,061 10,68,061 10,99,411 11,77,786 10,68,061 10,68,061 11,59,499
Grand Total (Project Life Time Cost) (Including VAT, Income Tax, Msc. Cost) 7,40,56,599
Page 25
Financial Proposal – Per Month Cost Schedule
(25)
Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-130
2000000
4000000
6000000
8000000
10000000
12000000
14000000
Monthly Total Cost
Months
Tot
al c
ost
in t
k
Page 26
Financial Proposal – Summary of Costs
Cost Component Cost in BDT
Reimbursable Expenses 5,67,77,250
Staff Remuneration 87,09,000
Sub-Total 6,54,86,250
Miscellaneous Cost (7.5%) 49,11,469
Total Cost 7,03,97,719
Local Taxes 39,99,607
Grand-Total 7,43,97,326
(26)
Page 27
Financial Proposal – Breakdown of Taxes
Sl.No.
Description Unit Unit Cost Quantity in Taka
Total in Taka
Remarks
1. Value Added Tax (VAT)
Percent 4.50 7,03,97,719
31,67,897
(Reimbursable Cost + Staff
Remuneration + Msc. Cost) *
4.5 %2. Advance Income Tax
(AIT)Percent 10.00 83,17,095
8,31,710
(Taxable Staff Remuneration)
* 10.00%
Total Taxes Cost in Taka
39,99,607
(Local Tax)
(27)
Page 28
Q/A
Thanks for your patience….
(28)
Page 29
References
Banglapedia. (2006). Bakerganj Upazilla. Retrieved December 5, 2011, from Banglapedia: http://www.banglapedia.org/httpdocs/HT/B_0064.HTM
BBS. (2007). Zilla Profile; Zilla: Barishal, Upazilla: Bakerganj. Retrieved 11 15, 2011, from Bangladesh Bureau of Statistics: http://www.bbs.gov.bd/RptZillaProfile.aspx
DPM, S. (2008). Technical Proposal: Consultancy Services for The Preparation of Master Plan for the Pourashavas. Dhaka: Sheltech Consultacy Private Limited & Design Planning Management Consultants.
Kashem, M. S., Shabnam, F., Jahan, I., & Zaman, S. (2005). Consultancy Services for The Preparation of DAP for DMDP Area. Dhaka: BURP, BUET.
(29)