Egypt Said Elsayed Elarabi Mohamed Diab Senior Electrical Design Engineer ( Design &Estimation Manger ) Saudi Mobil: +966500901503 & +966592005499 EGYPT Mobil: +201156149905 & +2055-3880419 Email: [email protected] , [email protected]------------------------------------------------------------------ SUMMARY OF CAPABILITIES: Eng. Said has 13 years of experience in: High Experience of Electric |Material Estimation cost. High Experience of Electrical Design. Time Management skills. High experience for all specification of ministries As (Ministry of water& Electricity, Ministry of Health& Ministry of knowledge)). Ability to Work well under pressure. Ability to learn new tasks quickly Ability to work, individually and as a Team member. Self-motivated and enjoy challenges. Good in handling problems. Leadership skills. Register Master (high study) in [power plant, fault analysis By A.N.N s] EXPERIENCE:- Eng. Said has 13 years of experience in: PREVIOUS EXPERIENCE:- ESTIMATIONS. DESIGN,ERECTION , OPERATION & MAINTENANCE OF WATER TREATMENT PLANTS & SEWAGE TREATMENT PLANTS & WATER PUMP STATION AND DESALINATION STATION CONSULTANT ENGINEER FOR SUPERVISION OF INFRA-STRUCTURE PROJECTS TRAINING EXPERIENCE (COURSES):- SCHNIEDER DESIGN PROGRAM (ECODIAL). ABB DESIGN PROGRAM (DECWIN). ABB COMPANY (OPERATION AND MAINTENANCE FOR PUMPS & & ELECTRICAL SWITCH GEAR (HIGH AND LOW VOLTAGE) AND TRANSFORMER ELECTRICAL POWER PLANTS IN TRAINING CENTER FOR ELECTRICAL AND MECHANICAL POWER. FIRE ALARM & FIRE FIGHTING SYSTEM.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Egypt
Said Elsayed Elarabi Mohamed Diab Senior Electrical Design Engineer
( Design &Estimation Manger ) Saudi Mobil: +966500901503 & +966592005499
------------------------------------------------------------------ SUMMARY OF CAPABILITIES:
Eng. Said has 13 years of experience in: High Experience of Electric |Material Estimation cost.
High Experience of Electrical Design.
Time Management skills.
High experience for all specification of ministries As (Ministry of water&Electricity, Ministry of Health& Ministry of knowledge)).
Ability to Work well under pressure.
Ability to learn new tasks quickly
Ability to work, individually and as a Team member.
Self-motivated and enjoy challenges.
Good in handling problems.
Leadership skills.
Register Master (high study) in [power plant, fault analysis By A.N.N s]
EXPERIENCE:- Eng. Said has 13 years of experience in:
PREVIOUS EXPERIENCE:-
ESTIMATIONS. DESIGN,ERECTION , OPERATION & MAINTENANCE OFWATER TREATMENT PLANTS & SEWAGE TREATMENT PLANTS & WATER PUMP STATION AND DESALINATION STATION
CONSULTANT ENGINEER FOR SUPERVISION OF INFRA-STRUCTUREPROJECTS
TRAINING EXPERIENCE (COURSES):- SCHNIEDER DESIGN PROGRAM (ECODIAL).
ABB DESIGN PROGRAM (DECWIN).
ABB COMPANY (OPERATION AND MAINTENANCE FOR PUMPS & &ELECTRICAL SWITCH GEAR (HIGH AND LOW VOLTAGE) AND TRANSFORMER
ELECTRICAL POWER PLANTS IN TRAINING CENTER FOR ELECTRICAL ANDMECHANICAL POWER.
FIRE ALARM & FIRE FIGHTING SYSTEM.
2
# Electrical Design Engineer
Design Codes, Standards, and Manuals IEC STANDARD IEEE STANDARD NEC STANDARD NFPA &ICE CODES SCHENIDER& ABB & ALL CABLES HAND BOOK Preparation Technical submittal for all Electrical equipment. Preparation Operation & Maintenance Manual. Preparation of techno-commercial proposals for new tenders. Dealing with consultants/clients for comment clarifications. Dealing with suppliers. Material Take Off (MTO). Replay and Writing letters to owner and subcontractor.
Work Responsibility
Designing Water & Waste Water Treatment Plant & Generating : Single Line Diagram (SLD). MCC Wiring Control, & Power Factor Correction. Electrical system Calculations (Load Demand, SC current, C.B Sizing). High Voltage Substation (Ring Main Unit, Switch Gear). Low Voltage Distribution Switch Boards. Transformer Sizing Calculations. Sizing of Standby Power Source (Generator Calculations). Overhead Line (Drawing + Calculations). Piping and Instrumentation Diagrams (P&ID). General site layout. Internal & External Lighting System. Earthling System & Lightening System. Fire Alarm & Fire Fighting System. Telephone System
All Electrical works related building (Low Current & Low Voltage System)
2004 Site &Technical Engineer (Maintenance Engineer)
Consultant Site MangerSaudi Consulting Services, Saudi Arabia
Technical Engineer (Senior Electrical Engineer)
From Aug 2013 up to now , Present (3 years) Riyadh, Saudi Arabia
Carrying out site surveys. Review all Electrical Calculations Submittal According to InternationalStandard and Project Requirements. Coordinate with Contractor to Fulfill the Project Requirements and to Solve
Any Arises Problems. Review Material’s Technical Submittals According to the Approved Design. Attending Factory Acceptance Test (FAT) for the Approved Materials. Follow up the Construction Team to solve any Arises Problems in Site.
Supervision of the Rehabilitation and Maintenance of Water and Waste Waterfacilities,
Riyadh 2nd Industrial City (STP 35,000 M3/DAY & STP Net Work with Length 30 KM) (Strategic tank 40,000 M3/DAY& Water Net Work with Length 40 KM)
Qaseem 1st Industrial City (STP 7,000 M3/DAY & Waste Water Net Work with Length 10 KM) (WTP 3,000 M3/Dewater Net Work with Length 10 KM)
4
Tendering &Design Manger( Electrical Section) DongHo Korean Saudi Ltd Company, Saudi Arabia
From July 2012 up July 2013, (1 years) Riyadh, Saudi Arabia
Attend client meetings. Carrying out site surveys. Preparing all Required Electrical Calculations According to InternationalStandard and Project Requirements and Follow up Until get the Approval. Coordinate with the other Disciplines to Fulfill the Project Requirements and to
Solve any Arises Problems. Prepare Material’s Technical Submittals According to the Approved Design. Review sub-contractors and Suppliers Contracts Required for Project. Attending Factory Acceptance Test (FAT) for the Approved Materials. Follow up the Construction Team to solve any Arises Problems in Site.
(El Wasia Lot -4 PWRO 500,000 M3/DAY) Total Power (60 MVA) (El Wasia Lot -1 , Total Power (45 MVA) (El Wasia Lot -2 , (El Wasia Lot -6 , Total Power (120 MVA) (New Industrial City PWRO 10X6,000 M3/DAY), Total Power (5 MVA) (El tabouk PWRO 150,000 M3/DAY), Total Power (16 MVA) (Kharj PWRO 90,000 M3/DAY), Total Power ( 20 MVA)
From Nov. 2009 up to May 2012, Present (3 years) Riyadh, Saudi Arabia
Preparing of work breakdown structure (WBS) &plan schedule for electrical scope ofwork.
Review of Electrical Submittals (design and material).Follow up with Client to Obtain ApprovalPreparing of Design Standard.Pricing of Electrical Scope for New Projects.Review M.R & co-ordinate with Procurement Manger
(El Aflaj PWRO 25,000 M3/DAY), Total Power (6 MVA) (El Dilam PWRO 10,000 M3/DAY), Total Power (3 MVA) (El Hareeq PWRO 10,000 M3/DAY), Total Power (3 MVA) (El Rass PWRO 50,000 M3/DAY) ,Total Power (12 MVA) (Unaizah PWRO 25,000 M3/DAY), Total Power (6 MVA) (El Dawdmy PWRO 40,000 M3/DAY), Total Power (8 MVA) (El Dawdmy STP 15,000 M3/DAY), Total Power (6 MVA) (Mahail Aser PWRO 5,000 M3/DAY), Total Power (1 MVA) (Small Plant PWRO 14x800 M3/DAY), Total Power (8 MVA)
Site &Estmation Manger Khaled Elefaleh Est.,Saudi Arabia Project Manger
From Jan. 2006 up to Sep.2009 (3 years ,8 Month) Arar , Saudi Arabia Manger Of (Arar P.S Plant 10,000 M3/DAY) Project Manger Of Medical Dental Center Project Manger Of Salehia School (2nos) Project