T TE C ECH COA STA ELECT DIES JOCK HN AL F ATI TRIC FIRE EL FIRE P KEY PUMP NIC FIR ION PUMP.Cap PUMP Cap. P Cap.12 M CA RED N,BA p.2000 Gp 2000 Gpm M3/H @ 10 AL PO ABE m@9 Ba m @ 9 Bar 00 Meter T P 07 07 07 DA OWE ELA ar Total He Total Hea Total Head AU PT. ROD 7 /17/20 7 /17/20 7 /17/20 AT ER AN ead ad d URORA DA NU 13- 0 014 014 014 TA A PUMP RMALA 05-2015 P A 5
95
Embed
Tech Data 2000 Gpm-For Fuel Handling System Rev.01
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
T
TEC
ECHCOASTA
ELECTDIESJOCK
HNAL FATITRIC FIRE EL FIRE PKEY PUMP
NIC FIRIONPUMP.CapPUMP Cap.P Cap.12 M
CAREDN,BAp.2000 Gp2000 GpmM3/H @ 10
AL POABEm @ 9 Bam @ 9 Bar 00 Meter T
P
070707
DAOWEELAar Total HeTotal HeaTotal Head
AU
PT. ROD
7 /17/207 /17/207 /17/20
ATER AN
ead ad d
URORA
DA NU
13-0
014 014 014
TA
A PUMP
RMALA
05-2015
P
A
5
Project : Coal Fired Power Station, Babelan INDUSTRIAL DIVISION
325 DSO DJARUM TANDES JAWA TIMUR INDUSTRI FIRE PUMP 2013
326 PANTAI INDAH KAPUK MAL & HOTEL JAKARTA BUILDING FIRE PUMP 2013
327 SAHID SUDIRMAN CENTER JAKARTA BUILDING FIRE PUMP 2013
328 HARRIS HOTEL & YELLO HOTEL HAYAM WURUK JAKARTA BUILDING FIRE PUMP 2013
329 HOTEL HOLIDAY INN EXPRESS - CIKINI JAKARTA BUILDING FIRE PUMP 2013
330 MENTENG PARK JAKARTA BUILDING FIRE PUMP 2013
331 HOTEL AMARIS PASAR MINGGU JAKARTA BUILDING FIRE PUMP 2013
11
332 HOTEL 101 LEGIAN BALI BUILDING FIRE PUMP 2013
333 HOTEL 101 JOGYAKARTA JOGYAKARTA BUILDING FIRE PUMP 2013
334 UPH KARAWACI TANGERANG BUILDING FIRE PUMP 2013
335 BINTARO PARK VIEW JAKARTA BUILDING FIRE PUMP 2013
336 HOTEL ALILA SCBD JAKARTA BUILDING VERTICAL TURBINE – FIRE PUMP, PLUMBING PUMP, SUBMERSIBLE PUMP
2013
337 SOHO PODOMORO CITY JAKARTA BUILDING FIRE PUMP 2014
338 WOLRD VISION INDONESIA JAKARTA BUILDING FIRE PUMP 2014
339 LOBP BATAKAN BALIKPAPAN KALIMANTAN TIMUR OIL & GAS FIRE PUMP 2014
340 PERTAMINA TBBM NABIRE PAPUA OIL & GAS FIRE PUMP 2014
341 PERTAMINA TBBM MASOHI MALUKU TENGAH OIL & GAS VERTICAL TURBINE 2014
342 PABRIK PENGOLAHAN DAGING DI PURWAKARTA
JAWA BARAT INDUSTRI FIRE PUMP 2014
343 HOTEL BEST WESTERN SOLO SOLO BUILDING FIRE PUMP 2014
344 ELPIS RESIDENCE JAKARTA BUILDING FIRE PUMP 2014
345 BANDARA SUPADIO PONTIANAK BUILDING FIRE PUMP 2014
346 HOTEL 101 BOGOR BOGOR BUILDING FIRE PUMP 2014
347 PURI INDAH FINANCIAL TOWER JAKARTA BUILDING FIRE PUMP 2014
348 ONE BELPARK MALL JAKARTA BUILDING FIRE PUMP 2014
349 BATULICIN KALIMANTAN SELATAN OIL & GAS VERTICAL TURBINE 2014
350 SENORO SULAWESI TENGAH OIL & GAS FIRE PUMP 2014
351 CENTRAL KITCHEN THE DUCK KING TANGERANG INDUSTRI FIRE PUMP 2014
352 GEDUNG GIS JAKARTA BUILDING FIRE PUMP 2014
353 THE MANSION @ TOWER BOUGENVILLE JAKARTA BUILDING FIRE PUMP 2014
354 MENARA SENTRAYA JAKARTA BUILDING FIRE PUMP 2014
355 HOTEL BEDROCK BALI BUILDING FIRE PUMP 2014
12
356 GOR PKP CIRACAS JAWA BARAT BUILDING FIRE PUMP 2014
357 GARDEN WING APARTMENT KARAWANG
JAWA BARAT BUILDING FIRE PUMP 2014
358 HOTEL ASTON & TRAINING CENTER, SENTUL JAWA BARAT BUILDING FIRE PUMP 2014
359 PABRIK PRINTING FLEXO DI SIDOARJO
JAWA TIMUR INDUSTRI FIRE PUMP 2014
360 PERTAMINA TBBM KOTA BARU & DEPOT LPG BALIKPAPAN KALIMANTAN OIL & GAS VERTICAL TURBINE – FIRE
PUMP 2014
361 PABRIK DUA BERLIAN JAKARTA INDUSTRI FIRE PUMP 2014
362 PERTAMINA ELNUSA DEPO PLUMPANG JAKARTA OIL & GAS FIRE PUMP 2014
363 PERTAMINA EP ASSET 1 LIRIK FIELD RIAU OIL & GAS FIRE PUMP 2014
364 PERTAMINA TBBM SANANA MALUKU OIL & GAS VERTICAL TURBINE 2014
365 MAXX BOX KARAWACI BUILDING FIRE PUMP 2014
366 HOTEL HARRIS BENOA BALI BUILDING FIRE PUMP 2014
367 HOTEL TIJILI SEMINYAK BALI BUILDING FIRE PUMP 2014
368 MALL & HOTEL PIK JAKARTA BUILDING PLUMBING PUMP 2014
369 CONVENTION HALL SAMARINDA BUILDING FIRE PUMP 2014
370 KAMPUS ITB – TAHAP II
BANDUNG BUILDING FIRE PUMP 2014
371 PERTAMINA AREA SULAWESI – BITUNG SULAWESI OIL & GAS VERTICAL TURBINE 2014
372 PERTAMINA DPPU SAM RATULANGI MANADO
SULAWESI OIL & GAS FIRE PUMP 2014
373 PERTAMINA FIELD TARAKAN SULAWESI OIL & GAS FIRE PUMP 2014
374 PERTAMINA SULAWESI – KOLONEDALE
SULAWESI OIL & GAS JOCKEY PUMP 2014
375 PERTAMINA BALONGAN BALONGAN OIL & GAS VERTICAL TURBINE 2014
376 PABRIK ETERNA GELORAPUTRA CIKUPA INDUSTRI FIRE PUMP 2014
377 ANCOL DOUBLE DECKER JAKARTA BUILDING FIRE PUMP 2014
378 CENTENIAL TOWER JAKARTA BUILDING FIRE PUMP 2014
379 HOTEL ALILA SCBD JAKARTA BUILDING VERTICAL TURBINE-JOCKEY PUMP 2014
13
380 OAK TOWER JAKARTA BUILDING FIRE PUMP 2014
381 ST. REGIS - HOTEL JAKARTA BUILDING FIRE PUMP 2014
382 ST. REGIS - OFFICE JAKARTA BUILDING FIRE PUMP 2014
383 HOTEL GUNUNG GEULIS BOGOR BUILDING FIRE PUMP 2014
384 NPK GRANULAR II PT. PUPUK KUJANG CIKAMPEK INDUSTRI FIRE PUMP 2015
385 PGN JAWA BARAT OIL & GAS FIRE PUMP 2015
386 PERTAMINA DEPOT SINTANG KALIMANTAN BARAT OIL & GAS FIRE PUMP 2015
387 PABRIK KERTAS CIKARANG BARAT INDUSTRI FIRE PUMP 2015
388 PERTAMINA SANGA SANGA KALIMANTAN OIL & GAS FIRE PUMP 2015
389 PABRIK ETERNIT GRESIK JAWA TIMUR INDUSTRI FIRE PUMP 2015
390 PABRIK VALEO PURWAKARTA INDUSTRI VERTICAL TURBINE & JOCKEY PUMP
2015
391 HOTEL ARCS JAMBULUWUK BALI BUILDING FIRE PUMP 2015
392 MEDAN CENTER POINT – APARTMENT CENTRUM & CENTRIA
MEDAN BUILDING FIRE PUMP 2015
393 MENARA PALMA II JAKARTA BUILDING FIRE PUMP 2015
394 ST. MORITZ II - OFFICE TOWER JAKARTA BUILDING FIRE PUMP 2015
395 PLAZA SADIRA PEKANBARU BUILDING FIRE PUMP 2015
396 PERTAMINA FIELD TANJUNG KALIMANTAN SELATAN
OIL AND GAS FIRE PUMP 2015
1
Complete Solutionsfor Fire Protection Fluid Handling
2
Aurora Pump is a global manufacturer of pumps and systems for the commercial, municipal, industrial and fire protection markets. We provide the solutions to meet your pumping needs.
NOTE: Front case wearing rings are standard on all size pumps. Rear case rings are standard on all sizes except
the 2x2x9C. The 2x2x9C does not require a wear ring.
911 Series 911.5 Series
Single Stage Inline Fire Pump
Model 383
Flows: 50 to 1,500 GPM (11.3 to 340 m3/hr) Pressures: 40 to 205 PSI (2.7 to 14.1 bar)
With over ninety years of experience, Aurora’s commitment to excellence goes beyond the product line by being dedicated to keeping our customers, distributors and employees constantly educated and updated on the leading developments in technology. Our computer software programs assist with selecting the best pumps and systems along with providing pump drawings and specifications. These programs save valuable time in the selection and evaluation of pumps and systems.
As an ISO 9001 registered company, Aurora Pump is committed to quality. In addition, to meet your quick ship requirements, the Aurora Distribution Center is stocked with parts and pumps to handle same day shipments. These components, along with our outstanding customer service program, will keep your Aurora Pump system at peak performance for years to come. You can rely on Aurora Pump and our qualified distribution network to provide total fluid flow solutions.
Aurora Pump provides fire protection pumping for a variety of solutions throughout the world.
NOTES1. All dimensions are in inches.2. Dimensions may vary ± 3/8".3. Not for construction purposes unless certified.4. Coupling gap may vary 1/8" thru 2-1/16".5. Conduit box is shown in approximate location. Dimensions are
not specifed as they vary with each motor manufacturer.6. Suction and discharge flanges are ANSI standard flat face.
* D is 10-1/2” when using frames 324TS - 365TS.** D is 12 when using frames 404TS - 445TS.*** Pump sizes 6-481-11HH & 6-481-14HH are furnished as standard
with 125# suction flange & 250# discharge flange.+D is 10-1/2” when using frames 404TS - 405T and D is 11 when
UP TO 175 P.S.I. 5-7/8” (149) 3-3/4” (95)OVER 175 P.S.I. 6-11/16” (170) 5-5/8” (143)
FLOAT OPERATED AIR RELEASE VALVE
Rian
Highlight
Rian
Highlight
Rian
Highlight
Rian
Rectangle
Rian
Highlight
Rian
Highlight
Rian
Highlight
Rian
Rectangle
Rian
Highlight
Rian
Rectangle
roda nurmla
Text Box
Rian
Rectangle
Rian
Highlight
admin
Oval
Section 916 Page 206Date June 2002
Supersedes Section 916 Page 206Dated July 2001
Pentair Water
AURORA FIRE PUMPSAUTOMATIC AIR RELEASE VALVE
1/2 NPT" OUTLET4-3/4 (121)
5-1/4 (133)
1/2" NPT INLET
HYDR8AC(VAL-MATIC VM15A)
OR APPROVED EQUAL USEDWITH HORIZONTAL FIRE PUMPS
WORKING PRESSURE UP TO 300 PSI(FM APPROVED)
9-1/2 (241)
2" NPT OUTLET
12 (305)
2" NPT INTLET
HYDR8AD(VAL-MATIC #102)
USED WITH VERTICAL TURBINE FIRE PUMPSWORKING PRESSURE UP TO 300 PSI
NOTES:1. All dimensions are in inches (mm) and may vary ± 1/4 (6).
Rian
Highlight
Rian
Highlight
Rian
Text Box
The drawings included in this package are for controllers covered under our standard offering. Actual AS BUILT drawings may differ from what is shown in this package
Submittal Data Sheet Model GPY Electric Fire Pump Controller
FM Global New York City
CE Mark
� NEMA 12 NEMA 4X-304 sst painted IP54NEMA 3 NEMA 4X-304 sst brushed finish IP55 NEMA 3R NEMA 4X-316 sst painted IP65NEMA 4 NEMA 4X-316 sst brushed finish IP66
Accepted for use in the City of New York by the Department of Buildings
Built to NFPA 20 (latest edition)
Optional
Standard, Listings,
Approvals and Certifications
Paint Specifications
Underwriters Laboratory (UL)� UL218 - Fire pump controllers� CSA C22.2 No. 14 Industrial Control EquipmentClass 1321/1323
Various EN, IEC & CEE directives and standards
Protection Rating������ Standard: NEMA 2 (IP31)Optional
Enclosure
� Red RAL3002� Powder coating
*Please see Disconnecting Means details on page 2.
Optional 150,000 A 100,000 A
Shortcircuit Withstand Rating
208V to 480V - 3ph - 50/60Hz 600V - 3ph - 60Hz
Standard 100,000 A 50,000 A
1July 2012
Across-the line starting
Locked rotor current
Full load current
Percent of motor speed (%)
Line
cur
rent
% o
f ful
l loa
d
20 40 60 80 100
600
Transition current
Wye delta starting
Open transition
210
Starting Method: Reduced Voltage Wye-delta openTypical Voltage Applied at Start: 100% Inrush Current: 33% of normal load currentStarting Torque: 33%Motor Type: Wye-deltaNo. of Contactors: 2 at 58%, 1 at 33% of motor FLC Min. ampacity of motor conductors: 6 at 125% x 58% of FLC
T2
T1
T31M
T4
T6
T52M
1S
3L2
1M
CR4
2M
CR5
1S
CR5 2M
1S
3L1
3L2
3L3
3L1
M
From normal incoming power through Disconnecting Means (IS/CB)*
Rian
Highlight
Rian
Highlight
Rian
Highlight
Rian
Highlight
Rian
Highlight
Submittal Data Sheet Model GPY Electric Fire Pump Controller
Surge Suppression
Service Entrance
Rating
Door interlocked in the ON position
Emergency Start Handle � Integrated limit switch
� Across the line start (direct on line)
� Flange mounted
� Operate shunt trip to open circuit breaker� Factory set at 600% of motor full load current
� Voltage phase to phase (normal power)� Amperage of each phase when motor is running
Pressure Sensing
� Drain connection 3/8"
� Pressure transducer and run test solenoid valve assembly for fresh water application� Pressure sensing line connection 1/2Ž Female NPT
� Rated for 0-500PSI working pressure (calibrated at 0-300psi)� Externally mounted with protective cover
� Under regular maintained operation, events can be stored in memory for up to 5 years. � Data viewable on operator interface display screen
Surge arrestor rated to suppress surges above line voltage
� Isolating switch and circuit breaker assembly:
Isolating switch rated not less than 115% of motor full load currentCircuit breaker continuous rating not less than 115% of motor full load currentOvercurrent sensing non-thermal type, magnetic only Instantaneous trip setting of not more than 20 times the motor full load current
� Common flange mounted operating handle
� Trip between 8 and 20 seconds
� Downloadable by USB port to external memory device
� Continuous system pressure display� Cut-in and Cut-out pressure settings
� Pressure readings with date stamp� Event recording with date stamp
Pressure Readings
Pressure and Event
Recorder
Disconnecting Means
Suitable as service entrance equipment
� Pull and latch activation
Locked Rotor Protector
Electrical Readings
2July 2012
Submittal Data Sheet Model GPY Electric Fire Pump Controller
Audible Alarm
� Power available � Locked rotor � Manual start� Phase reversal � Periodic test � Deluge valve start � Motor run � Fail to start � Remote automatic start � Pump room alarm � Low discharge pressure � Remote manual start � Motor trouble � Low pump room temperature � Overcurrent� Phase loss � Pump room temperature (ºF or ºC) � Undercurrent� Phase unbalance � Pump on demand/Automatic start � Undervoltage� Low water level ��Emergency start � Overvoltage
D15 TropicalizationD18 CE Mark with factory certificate D19 French labelingD20 Spanish labelingD21 Other languagesD26 Modbus RTU provisionD26A Modbus TCP/IP provision
D27Motor heater connection (external single phase power source and heater on/off contact)
D27AMotor heater connection (internal single phase power source and heater on/off contact)
D28 Customized drawing set D34 Field programmable I/O board - 8 Input / 5 outputD35 Field programmable I/O board - 8 Input / 10 output
D36Redundant pressure transducer for fresh water rated for 0-500PSI (calibrated at 0-300PSI)
D36ARedundant pressure transducer for sea water rated for 0-500PSI (calibrated at 0-300PSI)
D37 Window kit for operator interface
4July 2012
Note: Options chosen from this page are not electrically represented on the wiring schematics in this submittal package.
A4 Flow switch provision
A8Foam pump application w/o pressure transducer and run test solenoid valve
A9 Low zone pump control functionA10 Medium zone pump control function A11 High zone pump control function
A13Non-pressure actuated controller w/o pressure transducer and run test solenoid valve
A16Lockout/interlock circuit from equipment installed inside the pump room Built in alarm panel (120V.AC supervisory power) providing indication for:
� Audible alarm & silence pushbutton for motor run, phase reversal, loss of phase.
� Pilot lights for loss of phase & supervisory power available
B11BBuilt in alarm panel same as B11 but 220-240VAC supervisory power
B19High motor temperature thermistor relay c/w visual indication and alarm contact (Form C-SPDT)