2012.11.29 COUNCIL MEETING TEANECK MUNICIPAL COMPLEX
19

Teaneck Municipal coMplex

May 12, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Teaneck Municipal coMplex

2012.11.29 council meeting

Teaneck Municipal coMplex

Page 2: Teaneck Municipal coMplex

1-1

• Approval needed to begin bid process

• Discuss goals informing current plan

• Recap Design Process

agenda / purpose of MeeTing

Page 3: Teaneck Municipal coMplex

AeriAl context: existing

2-1

N

teAn

eck

RoAD

libRARy

bRo

AD s

tRee

t

couRt /chAmbeR

foRmeR Police

Page 4: Teaneck Municipal coMplex

AeriAl context: phAse 1

2-2

N

teAn

eck

RoAD

foRmeR Police

PhAse 1link + foRmeR Police

libRARy

bRo

AD s

tRee

t

couRt /chAmbeR

Page 5: Teaneck Municipal coMplex

AeriAl context: phAse 2

2-3

N

teAn

eck

RoAD

foRmeR Police

PhAse 2futuRe woRk

libRARy

bRo

AD s

tRee

t

couRt /chAmbeR

Page 6: Teaneck Municipal coMplex

3-1

building imAges: existing view from pArking lot

Page 7: Teaneck Municipal coMplex

3-2

building imAges: view from pArking lot

Page 8: Teaneck Municipal coMplex

3-3

building imAges: existing view from teAneck roAd

Page 9: Teaneck Municipal coMplex

3-4

building imAges: view from teAneck roAd

Page 10: Teaneck Municipal coMplex

4-1

• All employees out of basement • building Department • Zoning Department • health Department • Violations (Phase 2)

• ADA Accessibility

• long term storage and access to records

• improve / increase meeting spaces

goals inforMing currenT plan

Page 11: Teaneck Municipal coMplex

5-1

proposed building plAns: ground floor

Page 12: Teaneck Municipal coMplex

5-2

proposed building plAns: bAsement level

Page 13: Teaneck Municipal coMplex

5-3

proposed building plAns: second level

Page 14: Teaneck Municipal coMplex

6-1

• Automatic and low flow Plumbing fixtures

• high efficiency hVAc system (VRV heat Pump system)

• high efficiency lighting (leDs and occupancy sensors)

• efficient window and building envelope systems

• Recycled and low off-Gassing materials

• Reuse of former Police building

green poinTs

Page 15: Teaneck Municipal coMplex

7-1

Addition and Renovation to be supported by new emergency generator.

eMergency generaTor

locAtion of new emeRGency GeneRAtoR

Page 16: Teaneck Municipal coMplex

8-1

TiMeline1) council meeting and Project Presentation

2) owner / building Dept Review Period and final coordination for 100% construction Documents (3 weeks)

3) Public bidding Period (6 weeks)

4) contact and Award Period (6 weeks)

5) construction (14 months)

11.29.2012

11.29.2012 - 12.20.2012

12.27.2012 - 02.07.2013

02.07.2013 - 03.21.2013

04.2013 - 06.2013

Page 17: Teaneck Municipal coMplex

9-1

phAse 2 composite plAns: ground floor

PhAse 2

Page 18: Teaneck Municipal coMplex

9-2

phAse 2 composite plAns: bAsement level

PhAse 2

Page 19: Teaneck Municipal coMplex

9-3

phAse 2 composite plAns: second level

PhAse 2