Top Banner
Team Team Project Project Information Information EIN 3390 Manufacturing Processes EIN 3390 Manufacturing Processes Spring, 2012 Spring, 2012
14

Team Project Information EIN 3390 Manufacturing Processes Spring, 2012

Jan 17, 2016

Download

Documents

Ilia Ostrovsky

Team Project Information EIN 3390 Manufacturing Processes Spring, 2012. holds team meetings to discuss project works with team to search and find a product/part for team project works with team to develop specification of the product/part - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

TeamTeam Project Project InformationInformation

EIN 3390 Manufacturing ProcessesEIN 3390 Manufacturing ProcessesSpring, 2012Spring, 2012

Page 2: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Team Leader: Team Leader: holds team meetings to discuss projectworks with team to search and find a

product/part for team projectworks with team to develop specification of

the product/partworks with team to develop product/part

strategy/plancreates project schedule with milestonescoordinates and controls all processescoordinates communication between

engineersorganizes and coordinates team

presentation, andturns in team project report on time.

Page 3: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Design EngineerDesign Engineerworks with team leader to develop

specification of your product/partdevelops conceptual designdevelops functional designmakes structure/geometric design with

toleranceprovides design draft/prototypeimproves design from feedback, and provides final design

Page 4: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Material EngineerMaterial Engineerunderstands design requirementevaluates selected approaches

case-history approachmodification of existing productsentirely new productpros and cons

considers factors and make decisionfunctional and geometric concernsphysical, mechanical propertiesmanufacturabilitycostgreen environment

Page 5: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Manufacturing EngineerManufacturing Engineermakes manufacturing processes design,

including- technical requirement and descriptions

- product materials, geometry (size, shape, thickness)

- production rate, volume, lead time- automation level, amount of labor

creates manufacturing plan, includingtasks for each operation stepprocedures to show how and what to do

for each steprequired machines, tools, materials for

each step

Page 6: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Industrial EngineerIndustrial Engineermakes manufacturing System design

interrelationship between design & properties of materials

interrelationship between processes & properties of materials

facilities layout, choice of machines, equipments

conducts manufacturing system controlproduction schedule, time studyproduct qualityoutput ratecost estimation and evaluation

Page 7: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Tentative presentation date: 4/12/2012

Team Leader: Mere, Alfredo

Manufacturing Engineer: Fernandez Jr, Guillermo

Material Engineer: Alrashidi, Abdullah Mohammad

Material Engineer: Miller, Corey Adrian

Industrial Engineer: Pinheiro, Fernando H Design Engineer: Solomon, Aaron

Team 1Team 1Topic: Drilling processTopic: Drilling process

Page 8: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Tentative presentation date: (2/23/2012)

Team Leader: Lopez, Ricardo David

Design Engineer: Castro, Orestes Miguel

Industrial Engineer: Fuentes, Lorraine

Manufacturing Engineer: Infante, Alejandro

Material Engineer: Larrarte Torres, Jorge L

Team 2Team 2Topic: Multiple-use mold processTopic: Multiple-use mold process

Page 9: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Tentative presentation date: 3/27/2012

Team Leader: Parjus, Alejandro

Manufacturing Engineer: Deland, Erik A

Design Engineer: Fernandez, Jimmy Alberto

Industrial Engineer: Gutierrez, Henry

Material Engineer: Jie Tjoe Foek, Karel Otmar

Team 3Team 3Topic: Sheet forming processTopic: Sheet forming process

Page 10: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Tentative presentation date: 3/20/2012

Team Leader: Gonzalez, Maryel Andrea

Manufacturing Engineer: Garcia, Eduardo F

Material Engineer: Iriate, Francisco

Industrial Engineer: Moribe, Alex Andres

Material/Mfg Engineer: Portorreal, Ronald

Design Engineer: Rivera, Cesar Fabian

Team 4Team 4Topic: Rolling/forging processTopic: Rolling/forging process

Page 11: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Tentative presentation date: 4/19/2012

Team Leader: Diaz, Alejandro

Material Engineer: Gonzales, Sahivy

Manufacturing Engineer: Jadusingh, Richard

Design Engineer: Pijeira, Daniel Carlos

Industrial Engineer: Ramos, Luis

Manufacturing Engineer: Zuleta, Alexander

Team 5Team 5Topic: Milling process Topic: Milling process

Page 12: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Tentative presentation date: 4/10/2012Team Leader: Garo, RamonMaterial Engineer: Frometa, William Vicente

Manufacturing Engineer: English Li, Edgar C

Industrial Engineer: Hernandez, Marybel

Design Engineer: Medina, Maria E

Team 6Team 6Topic: Turning processTopic: Turning process

Page 13: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Presentation date: 3/29/2012

Team Leader: Simonis, Antonia Jean

Material Engineer: Reyes, Daniel E

Design Engineer: Sanz, Rafael B

Material Engineer: Sequera, Christopher H

Manufacturing Engineer: Morales, Lazaro J

Industrial Engineer: Kotun, Abdulkareem W.

Team 7Team 7Topic: Extrusion/Drawing processesTopic: Extrusion/Drawing processes

Page 14: Team Project  Information EIN 3390   Manufacturing Processes Spring, 2012

Grading Policy for ProjectGrading Policy for Project1. Presentation: 45%

- Presentation format, logic, and contents - Presentation description - Understanding project- Knowledge and implementation- Q/A  

2. Attendance of team activities 10%

3. Final project report: 45% -------

100%