Top Banner
WU ZHI QIAO BRIDGE DESIGN COMPETITION LAYOUT PLAN MX/001 1 : 50 IN A3 Dragon Bridge Flexible alignment The alignment of the bridge can be modified by changing the angle between each connecting triangle.
2

Team No.63

Mar 22, 2016

Download

Documents

Arup Cause

Team No.63
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Team No.63

Concept and Inspiration

Connection details

WU ZHI QIAO BRIDGE DESIGN COMPETITION

LAYOUT PLAN

MX/001

1 : 50 IN A3

Flexible Alignment

Construction sequence

Dragon Bridge

Flexible alignmentThe alignment of the bridge can be modified by changing the angle between each connecting triangle.

TypicalSection

Elevation

Page 2: Team No.63

Concept and Inspiration

Connection details

WU ZHI QIAO BRIDGE DESIGN COMPETITION

LAYOUT PLAN

MX/001

1 : 50 IN A3

Flexible Alignment

Construction sequence

Dragon Bridge

Flexible alignmentThe alignment of the bridge can be modified by changing the angle between each connecting triangle.

TypicalSection

Elevation