Top Banner
Syngas Production from Petroleum Coke Gasification Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering April 5, 2011 1
45

Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Dec 14, 2015

Download

Documents

Cael Pennell
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Syngas Production from Petroleum Coke Gasification

Team Hotel:Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala

Advisors:Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering

April 5, 2011 1

Page 2: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Project Purpose

What we are doing? Producing syngas from petcoke Using entrained flow gasifier Implementing a rigorous syngas

cleaning

Why we are doing this? Making syngas for acetic acid

production Chemical production team specs▪ CO to H2 molar ratio of 0.409▪ CO2 and N2 mixed in

2

http://coalgasificationnews.com/tag/petcoke-gasification/

4/5/2011

Page 3: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Overall Block Flow

3

4/5/2011

Page 4: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Recap

Discussed Our Aspen Simulation Gasifier Sulfur Removal Water Gas Shift CO2 Removal Claus Process

Heat Loads Optimization

Equipment Costs and Sizes Individual Economics

Sensitivity Analysis Location

44/5/2011

Page 5: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Agenda

PFD

Initial Control Scheme

Plant Layout (General Arrangement)

Calculations

Refined Economics54/5/2011

Page 6: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

PFD: Overall Process

64/5/2011

Page 7: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

PFD: Gasification

74/5/2011

Page 8: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

PFD: Hydrogen Sulfide Removal

84/5/2011

Page 9: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

PFD: Water Gas Shift

94/5/2011

Page 10: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

PFD: CO2 Absorption

104/5/2011

Page 11: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

PFD: CO2 Sequestration

114/5/2011

Page 12: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

PFD: Claus Process

4/5/2011 12

Page 13: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Control Scheme: H2S Removal

4/5/2011 13

Page 14: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

144/5/2011

Page 15: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

4/5/2011 15

Page 16: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Control Scheme: Water Gas Shift

164/5/2011

Page 17: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Plant Layout: Overall

4/5/2011 17

Page 18: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Plant Layout: Gasification Island

4/5/2011 18

Page 19: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Plant Layout: H2S Removal

4/5/2011 19

Page 20: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Calculations

4/5/2011 20

Page 21: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Refined Economics:Raw Material Cost

Raw Materials

Quantity (lbm/day) Price ($/lbm)

Total Cost (day)

Cost ($)/(year)

Petcoke (T/D) 4,409,200 0.034 $ 150,000 $ 52,500,000

Zinc Oxide (lbm/day) 392.73 55.00 $21,600 $ 7,560,053

Selexol 6,200,000 3.20 $19,840,000 $ 19,840,000

Ferro-chrome 53,001 1.33 $ 70,492 $ 24,672,215

Aluminium Oxide 450 23.17 $ 10,416 $ 3,645,468

Oxygen 4,232,832 0.028 $ 117,120 $ 40,992,000

Total     $

149,209,735

21

Page 22: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

4/5/2011 22

Annual Operating Cost

Raw Ma-

terial Cost14984%

Labor0.91%

CW+NG+E

lec21.512%

Maintenance7

4%

Annual Operating Cost

Raw Material costLaborCW+NG+ElecMaintenance

Page 23: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Capital Cost Analysis

Gasifier, 74%$135 mm

Sulfur Removal, 9%

$17 mm

CO2 Sequa-tration, 17%

$31 mm

4/5/2011 23

Page 24: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Economics Summary

  1st year 2nd Year 3Rd year 4th year 19th Year

Revenue $ - $ - $ - $ 129,570,000 $ 240,352,994

Cap. Cost $ 25,546,569 $ 104,011,033 $ 72,990,199 $ 20,072,305 $ -

Op. Cost $ - $ - $ - $ 111,070,226 $ 242,943,820

Total Expense $ 25,546,569 $ 104,011,033 $ 72,990,199 $ 151,307,886 $ 281,203,980

Income tax 40%

$ - $ - $ - $ 13,144,845 $ 83,909,549

Income After Tax

$ - $ - $ - $ 19,717,268 $125,864,323

Cumulative Cash Flow

$ 25,546,569 $129,557,602 $202,547,801 $ 168,810,442 $1,540,424,893

NPV$89,282,710

IRRN/A

Interest8%

24

Page 25: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

-$250

-$50

$150

$350

$550

$750

$950

$1,150

$1,350

$1,550Cumulative Cash Flow ($MM/year)

Years

($M

M/Y

R)

4/5/2011 25

Page 26: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Sensitivity Analysis

$150.00 $170.00 $190.00 $210.00 $230.00 $250.00 $270.00 $290.00 $310.00 $330.00

-$100.00

$0.00

$100.00

$200.00

$300.00

$400.00

$500.00

$600.00

NPV Vs. Syngas Prices

NPV

Syngas($/ton)

Net

Pre

sent

valu

e (

$m

illion)

4/5/2011 26

Page 27: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Sensitivity Analysis

$150.00 $170.00 $190.00 $210.00 $230.00 $250.00 $270.00 $290.00 $310.00 $330.00

-15.00%

-10.00%

-5.00%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

IRR vs. Syngas Price

IRR

Syngas ($/ton)

Inte

rnal R

ate

of

retu

rn

4/5/2011 27

Page 28: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Sensitivity Analysis

60 70 80 90 100 110 120 130 140 150 1600

100

200

300

400

500

600

NPV Vs. Petcoke Prices

NPV

Petcoke($/ton)

Net

Pre

sent

valu

e (

$m

illion)

4/5/2011 28

Page 29: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Sensitivity Analysis

50 70 90 110 130 150 1700.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

IRR vs. Petcoke Price

IRR

Petcoke ($/ton)

Inte

rnal R

ate

of

retu

rn

4/5/2011 29

Page 30: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Conclusion

PFD

Control Schemes

Plant Layout

Calculations

Refined Economics

4/5/2011 30

Page 31: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Next Steps

Revise report

4/5/2011 31

Page 32: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Questions?

4/5/2011 32

Page 33: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

References

Richard Parkinson.  “Where Does It Go? An Introduction to the Placement of Process Equipment.”  UOP  PowerPoint.  2009.  2 April 2011.

4/5/2011 33

Page 34: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Report Outline

Final Report: Executive Summary IP Discussion IP Recommendations IP

Appendices Design Basis: Done Block Flow Diagram: Done Process Flow Showing Major Equip.:

Done344/5/2011

Page 35: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Report Outline

Appendices (Continued) Material and Energy Balances: Done Calculations: IP Annotated Equip. List: Done Econ. Eval. Factored from Equip. Costs:

Done Utilities: IP Conceptual Control Scheme: Done Major Equipment Layout: Done

354/5/2011

Page 36: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Report Outline

Appendices (Continued) Distribution and End-use Issues:

IP Constraints Review: IP Applicable Standards: IP Project Communications File: IP Information Sources and References:

IP

364/5/2011

Page 37: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

37

Control Scheme: CO2 Absorption

4/5/2011

Page 38: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

38

Control Scheme: CO2 Sequestration

4/5/2011

Page 39: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

39

Control Scheme: Gasifier

4/5/2011

Page 40: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

40

Control Scheme: Claus Process

4/5/2011

Page 41: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

41

Energy Balance Around WGS Reactor

4/5/2011

Page 42: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Energy BalanceAround WGS ReactorInlet Fraction Clean Syngas Component

Flow for WGS Reactor (lbmoles/hr) for WGS Cp (btu/lbmole* F)

Outlet Syngas Comp (lbmole/hr) from

(WGS)

CO 4946.233 7.118 123.395

H2O 6424.688 15.367 1601.850

N2 199.954 7.158 199.954

H2* 2960.168 6.948 7783.006

CO2 469.211 10.559 5292.049

CH4* 0.255

12.432 0.255

H2S 0.000 0.000 0.000

COS 0.000 0.000 0.000

Total 15000.509 15000.509

424/5/2011

Page 43: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

Heat Loads

Gasifier Equipment Heat Load (MMBtu/hr)

Gasifier -34.7

HP Steam Heat Exchanger 139.0

MP Steam Heat Exchanger 281

Cooler -106.8

Flash 2.99

Sulfur Clean Up Equipment Heat Load (MMBtu/hr)

Sulfur Stripper Reboiler 57.0

Sulfur Stripper Cooler -200.0

Selexol Cooler -40.7

Rich / Lean Heat Exchanger 274.94/5/2011 43

Page 44: Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept.

44

CO2 Sequestration

CO2 in our syngas is absorbed on Selexol to be selectively removed

Delete only one CO2 slide.

4/5/2011