Top Banner
Team: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem BionicUrbanGroundSystem
17

Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

Dec 26, 2015

Download

Documents

Ginger Bradford
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

Team:Team: David Konyu – Project Manager,David Konyu – Project Manager,

Ramon Sanchez – Communication Engineer, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint PresenterChris Lantto – PowerPoint Presenter

BionicUrbanGroundSystemBionicUrbanGroundSystem

Page 2: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

B.U.G.S.B.U.G.S.

Page 3: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

IntroductionIntroduction

The goal of our project is to construct The goal of our project is to construct a walking robot and integrate a walking robot and integrate wireless communication with it. A wireless communication with it. A robotic kit was purchased from robotic kit was purchased from CrustCrawler: Robotic Design and CrustCrawler: Robotic Design and Development, to compensate for Development, to compensate for time restraints and lack of previous time restraints and lack of previous robot construction experience. robot construction experience.

Page 4: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

GoalGoal

Our intent is to have a robot that is Our intent is to have a robot that is controlled from a laptop computer controlled from a laptop computer via Bluetooth connection with voice via Bluetooth connection with voice recognition / control software. recognition / control software.

Page 5: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

CommunicationCommunication

We have decide to go with Bluetooth We have decide to go with Bluetooth because it is low power consumption and because it is low power consumption and also because there is less interference also because there is less interference with other wireless devices. with other wireless devices.

It has a short distance range about 100 It has a short distance range about 100 meters or 326 feet with a maximum meters or 326 feet with a maximum permitted power of 100mW. permitted power of 100mW.

Page 6: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

BluetoothBluetoothBluetooth Dongle which will be used through a laptop.

                                       

  

Embedded Blue eb500-SERBluetooth Serial Adapter

Which will be used on our robot bread board.

Page 7: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

For Visual we have decide to go with a wireless Video and Audio system which will transmit everything BUGS is viewing through a TV monitor.

Page 8: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

In addition, we are working with In addition, we are working with specific limitations like cost, on-specific limitations like cost, on-board power restraints, weight, and board power restraints, weight, and functionality. functionality.

Page 9: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

OBJECTIVEOBJECTIVE

The project objective is to represent The project objective is to represent several areas of study from our several areas of study from our previous electronic and previous electronic and communications courses, while communications courses, while utilizing project management skills. utilizing project management skills.

Page 10: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

ROLE ASSIGNMENTROLE ASSIGNMENT

WEB CONSTRUCTION / WEB CONSTRUCTION / MAINTENANCEMAINTENANCE

POWERPOINT CONSTRUCTION / POWERPOINT CONSTRUCTION / MAINTENANCEMAINTENANCE

BUDGET MANAGEMENTBUDGET MANAGEMENT PROJECT MANAGEMENTPROJECT MANAGEMENT RESEARCH / DOCUMENTATIONRESEARCH / DOCUMENTATION TEAM CONSTRUCTIONTEAM CONSTRUCTION

Page 11: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

Web-SiteWeb-Site

On our web-site you will find….On our web-site you will find…. ProposalProposal BiographyBiography PicturesPictures X-ray picturesX-ray pictures ResourcesResources LinksLinks DocumentsDocuments

www.bugscapstone07.comwww.bugscapstone07.com

Page 12: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.
Page 13: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

Pictures Pictures

Page 14: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

PROJECT MANAGEMENTPROJECT MANAGEMENT

Page 15: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

BUDGET MANAGEMENTBUDGET MANAGEMENT

Page 16: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

EXPANSION POSSIBILITIESEXPANSION POSSIBILITIES

TEXT TO SPEECHTEXT TO SPEECH SPEECH TO CONTROLSPEECH TO CONTROL INTEGRATION OF ADDITIONAL INTEGRATION OF ADDITIONAL

SENSORSSENSORS ADDITIONAL CAMERASADDITIONAL CAMERAS VIDEO / SENSORS TURRETVIDEO / SENSORS TURRET

Page 17: Team: David Konyu – Project Manager, David Konyu – Project Manager, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint Presenter BionicUrbanGroundSystem.

STAY TUNEDSTAY TUNED

www.bugscapstone07.com www.bugscapstone07.com