TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing 2970 S. Walton Walker, Suite 101 Dallas, TX 75211 (214) 331-4395 Fax (214) 331-4458 3101 Pleasant Valley, Suite 101 Arlington, TX 76015 (817) 467-5500 Fax (817) 468-9920 February 4, 2016 TEAM Project No. 152151G City of Arlington Arlington Parks and Recreation Department 717 W. Main Street Arlington, Texas 76013 Attention: Mr. Jadey James Park Project Manager GEOTECHNICAL INVESTIGATION DITTO GOLF COURSE IMPROVEMENTS CITY OF ARLINGTON, TEXAS Dear Mr. James: Presented here is our report of the geotechnical services for the above referenced project. This investigation was accomplished in general accordance with our Proposal No. 15A098, dated November 2, 2015, and authorized by Purchase Order No.: PO02-PKPL12001 dated November 2, 2015. We appreciate the opportunity to assist with the design phase of this project. Should you have any questions or need further assistance, please call the undersigned at (817) 467-5500. Sincerely, TEAM Consultants, Inc. Sabino Martin, EIT Staff Engineer Edward Gomez, P.E. Project Engineer EG/sm Copies submitted: (3)
84
Embed
TEAM Consultants, Inc. - arlington-tx.gov · ERMS AND . S. YMBOLS ... parameters to guide design and construction of proposed facilities. ... TEAM Consultants, Inc. Geotechnical,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
2970 S. Walton Walker, Suite 101 Dallas, TX 75211 (214) 331-4395 Fax (214) 331-4458 3101 Pleasant Valley, Suite 101 Arlington, TX 76015 (817) 467-5500 Fax (817) 468-9920
February 4, 2016 TEAM Project No. 152151G
City of Arlington Arlington Parks and Recreation Department 717 W. Main Street Arlington, Texas 76013 Attention: Mr. Jadey James Park Project Manager
Presented here is our report of the geotechnical services for the above referenced project. This investigation was accomplished in general accordance with our Proposal No. 15A098, dated November 2, 2015, and authorized by Purchase Order No.: PO02-PKPL12001 dated November 2, 2015.
We appreciate the opportunity to assist with the design phase of this project. Should you have any questions or need further assistance, please call the undersigned at (817) 467-5500.
Sincerely, TEAM Consultants, Inc. Sabino Martin, EIT Staff Engineer Edward Gomez, P.E. Project Engineer
EG/sm Copies submitted: (3)
GEOTECHNICAL INVESTIGATION
DITTO GOLF COURSE IMPROVEMENTS CITY OF ARLINGTON, TEXAS
GENERAL SITE AND SUBSURFACE CONDITIONS ...................................................................... 4 SITE CONDITIONS ............................................................................................................................... 4 SUBSURFACE CONDITIONS ................................................................................................................. 4
ANALYSIS OF RESULTS AND RECOMMENDATIONS ................................................................. 5 GENERAL ............................................................................................................................................ 5 FOUNDATION SOIL MOVEMENT ......................................................................................................... 5 CLUBHOUSE FOUNDATION RECOMMENDATIONS ............................................................................... 6
General ........................................................................................................................................... 6 Foundation type, depth, and allowable bearing pressure ............................................................... 7 Floor Slabs ...................................................................................................................................... 8 Shallow Foundations .................................................................................................................... 10
TRAINING FACILITY FOUNDATION RECOMMENDATIONS ................................................................. 11 General ......................................................................................................................................... 11 Foundation type, depth, and allowable bearing pressure ............................................................. 12
RESTROOM FACILITY FOUNDATION RECOMMENDATIONS ............................................................... 13 General ......................................................................................................................................... 13 Foundation type, depth, and allowable bearing pressure ............................................................. 14
CLUBHOUSE PARKING PAVEMENT RECOMMENDATIONS ................................................................. 14 GOLF CART PATH PAVEMENT RECOMMENDATIONS ........................................................................ 16 GENERAL SITE & POND SOIL CONDITIONS ...................................................................................... 16 SOLUBLE SULFATES ......................................................................................................................... 17 SITE PREPARATION AND CONSTRUCTION CONSIDERATIONS ........................................................... 18
Plate SITE VICINITY MAP ................................................................................................................................ 1 PLAN OF BORINGS .................................................................................................................................. 2 SITE GEOLOGIC MAP .............................................................................................................................. 3 SOIL BOREHOLE LOGS ..................................................................................................................... 4 – 42 KEY TO BOREHOLE LOG TERMS AND SYMBOLS .................................................................................. 43 SUMMARY OF LABORATORY TEST RESULTS ................................................................................... 44-48 ESTIMATED POTENTIAL VERTICAL RISE OF FOUNDATION SOILS ........................................................ 49
APPENDICES
APPENDIX A: FIELD AND LABORATORY TEST PROCEDURES APPENDIX B: SITE PREPARATION
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
City of Arlington 1 February 4, 2016 TEAM Project No. 152151G
INTRODUCTION This report presents the results of a geotechnical investigation for the City of Arlington
Parks and Recreation Department in connection with the planned improvements at the
Chester W. Ditto Golf Course located at 801 Brown Boulevard, Arlington, Texas, 76011.
The improvements consist of the addition of four new building structures, pavement parking
areas, golf cart paths, and modifications to the existing golf course. The new building
structures include a new clubhouse, training facility, maintenance building, and bathroom
structure. It is our understanding that the proposed structures will all be single story
structures. The approximate project location is shown on the Site Map, Plate 1, in the
Illustrations Section of this report.
The study included the proposed drilling of 45 sample borings located at the Chester W.
Ditto Golf Course; however, only 39 borings were completed. Recommendations and
borings representing the maintenance building and associated parking area are to be relocated
and completed at a later date and are not discussed in this report. Included in this study are
the results of a series of laboratory tests on selected samples obtained in the completed
borings, analysis of the field and laboratory data, and development of geotechnical related
parameters to guide design and construction of proposed facilities. The results of the test
borings and the laboratory tests for the remaining facilities are included herein.
FIELD INVESTIGATION Subsurface conditions at the proposed construction areas were evaluated by 39 sample
borings drilled at the approximate locations as shown on the Plan of Borings, Plate 2, in the
Illustrations Section of this report. Sample depths, soil descriptions and classifications
(based on the Unified Soil Classification System) are presented on the Soil Borehole Logs,
Plates 4 through 42. A key to descriptive terms and symbols used on the logs is presented on
Plate 43.
Soil formations encountered were sampled using thin-walled, seamless, Shelby tube
samplers (ASTM D-1587), two-inch diameter split-spoon samplers in conjunction with the
Standard Penetration Test (ASTM D-1586) and Texas Cone Penetration Test (TEX-132-E),
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
City of Arlington 2 February 4, 2016 TEAM Project No. 152151G
as appropriate. Upon recovery, samples were extruded in the field, visually classified,
wrapped and labeled according to the boring number and depth. As part of the soil sampling
procedures, the consistency of undisturbed cohesive soil samples was evaluated in the field
using a hand penetrometer. The results of these determinations are tabulated on the Soil
Borehole Log under the heading “Pocket Penetrometer”. The maximum capacity of the
penetrometer is 4.5 tons per square foot (tsf).
The Standard Penetration Test (SPT) is defined as the number of blows of a 140-pound
hammer falling freely through a distance of 30-inches required to drive the split-spoon
sampler one foot into the ground. The standard penetration or “N” value gives an indication
of the relative density of granular soils and the strength of cohesive soils. When subsurface
materials were sufficiently hard the Texas Department of Transportation (TxDOT) Texas
Cone Penetration (TCP) Test was utilized to prevent damage to the split-spoon sampler in
conjunction with the SPT test. The “Ntcp” value determined with the TCP test correlates
roughly to two (2) and one and a half (1.5) times the SPT or “N” value in sands and clays,
respectively. Correlations were used for evaluation of skin friction and point-bearing
capacity using Texas Department of Transportation (TxDOT) developed charts based on the
Texas Cone Penetration (TCP) data for drilled shaft and pile designs. The values from the
Standard Penetration Test and Texas Cone Penetration Test performed in the field are
reported on the Soil Borehole Logs as blows per six-inches of penetration or a maximum of
50 blows and the corresponding sampler penetration in inches.
The borings were advanced between samples using dry auger drilling procedures to their
completion depths. Groundwater observations made in the borings during drilling activities
are presented on the Soil Borehole Logs.
LABORATORY INVESTIGATION All recovered samples were transported to the laboratory where tests were performed on
selected samples in order to determine engineering characteristics and verify field
classifications. These tests included:
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
City of Arlington 3 February 4, 2016 TEAM Project No. 152151G
1. Visual and laboratory classification (Unified Soil Classification System); 2. Natural moisture content; 3. Atterberg limit determinations on natural soils; 4. Atterberg limit determination on soils with lime additive; 5. Percent passing No. 200 sieve; 6. Unconfined compression test on soil; and 7. Soluble sulfates.
Laboratory procedures followed current standards as set forth by the American Society
for Testing and Materials (ASTM).
CLASSIFICATION TESTS
Classification of soils was verified by tests that determine natural moisture content,
Atterberg limits (liquid and plastic limits), and percent passing No. 200 sieve. These tests
were performed in general accordance with ASTM Methods D-2216, D-4318 and D-1140,
respectively. The results of these tests are tabulated at corresponding sample depths on the
Soil Borehole Logs and on the Summary of Laboratory Results, Plates 44 through 48.
The effect of adding hydrated lime to the natural clay soils was evaluated by a soil/lime
series. The Atterberg Limits are defined for the clay soil stabilized with varying amounts of
hydrate lime. Test results are presented on the Summary of Laboratory Test Results.
STRENGTH TESTS
Strength characteristics of subgrade soil specimens were evaluated by laboratory
unconfined compressive strength tests. In this test, a cylindrical specimen is subjected to axial
load at a uniform rate of strain until failure occurs. Test procedures follow criteria specified by
ASTM Method D-2166. Compressive strengths determined during unconfined compressive
strength testing are tabulated at the corresponding sample depth on the Soil Borehole Logs.
Natural moisture content and unit wet weight values, determined as a routine part of the
compressive strength test, are also tabulated at the respective sample depth on the Soil
Borehole Logs and on the Summary of Laboratory Test Results.
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
City of Arlington 4 February 4, 2016 TEAM Project No. 152151G
SULFATE TESTING
Geologic deposits in this area have the possibility of containing soluble sulfates. Soluble
sulfates can react with the calcium in lime (or cement) resulting in significant volume
changes or have a deleterious effect on concrete. Accordingly, soil samples were examined
closely in the laboratory for indications of sulfates (usually visible as crystalline inclusions or
shiny flakes). Crystalline deposits were observed in several of the samples recovered from
the borings and selected samples were submitted for analytical testing to evaluate soluble
sulfate content. The selected samples were analyzed for soluble sulfates using Test Method
TEX-145-E test procedure. The test results are tabulated at the respective sample depths on
the borehole logs and the Summary of Laboratory Test Results.
GENERAL SITE AND SUBSURFACE CONDITIONS SITE CONDITIONS
The Chester W. Ditto Golf Course is located at 801 Brown Boulevard, Arlington, Texas,
76011. The golf course includes existing clubhouse, restroom facilities, parking areas, and
golf course with associated cart paths. The general topography of the area consists of rolling
hills with maintained grass and occasional wooded areas.
SUBSURFACE CONDITIONS
The project site is geologically located in an area overlain by the Woodbine Formation
(Kwb) of Upper Cretaceous geologic age as mapped on the Geologic Atlas of Texas (GAT),
published by the Bureau of Economic Geology, University of Texas at Austin. The mapped
geologic formations shown on Plate 3, Site Geologic Map, were created from a digital GAT
version, provided by the Texas Natural Resources Information System (TNRIS), using
ESRI's ArcGIS 10.3 geographic information systems software. Published information
indicates the Woodbine Formation typically consists of sandstone, clay and shale, commonly
interbedded. Residual soils produced by weathering of the parent rock tend to be sandy in
texture when derived from sandstone and clay-like when derived from shale. Subsurface
materials encountered in the boring locations are described on the Soil Borehole Logs.
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
City of Arlington 5 February 4, 2016 TEAM Project No. 152151G
As presented on the Soil Borehole Logs, no groundwater was encountered in the borings
during drilling activities. It should be noted that groundwater levels may not remain static
and will fluctuate seasonally with variations in precipitation, landscape irrigation and
surficial runoff.
ANALYSIS OF RESULTS AND RECOMMENDATIONS GENERAL
Based on subsurface conditions encountered in the borings, foundation design should
consider the type of construction, bearing capacity, potential expansive movement of the
foundation soils, movement tolerance of the structure and associated facilities, and economy
of foundation construction. Lightly loaded structures that can tolerate some vertical and/or
differential movements may be designed for support on shallow footings while structures
sensitive to vertical and/or differential movements may be supported on a deep pier and
grade beam foundation system. Recommendations for the clubhouse, training facility,
restroom facility, parking and paving areas are based on subsurface conditions encountered
in the borings for their respective locations. These alternate foundation systems are
discussed in the following sections.
FOUNDATION SOIL MOVEMENT
Vertical movement of foundation soils is commonly referred to as Potential Vertical Rise
(PVR) and can occur due to increases in soil moisture content. Accepted methods of
estimating PVR include the use of empirical relationships and/or the results of laboratory
swell tests.
An empirical method for estimating PVR developed by Gary L. Schneider and Arthur R.
Poor, P.E., PhD, "The Prediction of Soil Heave and Swell Pressures Developed by an
Expansive Clay", Research Report TR-9-74, University of Texas at Arlington, Texas, Nov.,
1974, is based on the relationship between soil plasticity properties and moisture content.
Heave can occur when the soil moisture increases from the “dry” moisture level to the “wet”
level. These conditions are considered the extreme range in moisture content. Texas
Department of Transportation (TxDOT) defines the “dry” condition as 0.2LL + 9, the
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
City of Arlington 6 February 4, 2016 TEAM Project No. 152151G
moisture content from which little shrinkage is experienced, and where volumetric swell
potential is greatest. The “LL” variable is defined as the Liquid Limit. The “wet” condition
(defined as 0.47LL +2) corresponds to the maximum capillary absorption observed in
laboratory tests on specimens molded at optimum moisture and surcharged with one pound
per square inch (psi) load. This is also analogous to moisture contents found beneath old
pavements and other lightly loaded structures. The PVR for each of the proposed structures
is discussed in the following respective sections.
CLUBHOUSE FOUNDATION RECOMMENDATIONS
GENERAL
Subsurface conditions at the proposed clubhouse construction area were evaluated in six
(6) sample borings (Borings B-31 through B-36). The subsurface materials were grouped
into strata as follows:
Average Stratum Depth, Ft. Soil Description
I 0 – 17.75 Brown CLAY (CH)
Ia 0 – 8.0 Tan Sandy CLAY (CL) (B-32 & 33)
II 17.75 – 23.0 Tan and Gray Clayey SAND (SC)
III 23.0 – Completion Gray CLAY (CH).
The materials of Stratum I consist of high plasticity brown clay and encountered to an
average depth of 17.75 feet below the surface. The brown clay has liquid limits ranging from
54 to 68 with an average of 60 and plasticity indices ranging from 35 to 44 with an average
of 39. Stratum Ia was encountered in Boring B-32 and B-33 and consists of tan sandy clay to
an average depth of 8 feet. Stratum Ia has liquid limits ranging from 36 to 45 with an
average of 41 and plasticity indices ranging from 21 to 28 with an average of 25. The clay
and sandy clay soils of Stratum I and Ia have shear strengths ranging from 1,450 to 10,800
pounds per square foot (psf). The soils of Stratum I and Ia are suitable for support of light to
moderately loaded structures that can tolerate some differential movement on shallow footing
or moderately loaded structures on drilled and underreamed piers. Underlying Stratum I and
Ia is dense to very dense tan and gray clayey sand (Stratum II) to an average depth of 23 feet.
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
City of Arlington 7 February 4, 2016 TEAM Project No. 152151G
The clayey sand is underlain by gray clay (Stratum III) to the completion depth of the
borings. The gray clay of Stratum III has shear strengths ranging from 1,640 psf to 8,120 psf
and are suitable for support of moderately loaded structural loads on deep foundations below
the sand stratum.
Laboratory data show that average plasticity characteristics in the vicinity of the proposed
clubhouse construction area together with the estimated “wet” and “dry” moisture contents
are as follows:
Average Plasticity Moisture Liquid Index Content, %
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
City of Arlington 17 February 4, 2016 TEAM Project No. 152151G
In general, higher plasticity soil can be found in the central to south-west region of the
property in the vicinity of the proposed clubhouse and lower plasticity soils are encountered
toward the eastern portion of the property.
The proposed northern pond subsurface soils encountered in Borings B-9 through and B-
11 have liquid limits ranging from 38 to 51 with an average of 44 and plasticity indices
ranging from 19 to 33 with an average of 26. The proposed central pond subsurface soils
encountered in Boring B-13 and Borings B-15 through 18 have liquid limits ranging from 43
to 59 with an average of 49 and plasticity indices ranging from 26 to 34 with an average of
29.
SOLUBLE SULFATES
The results of the soluble sulfate tests performed on a selected samples indicate that
sulfates are present in the subgrade soil ranging from <100 parts per million (ppm) to 4,533
ppm. Published information indicate sulfate levels between 3,000 ppm and 5,000 ppm are of
moderate concern. Generally, these sulfate levels do not result in harmful disruption, but on
occasions have caused localized distress often due to higher sulfate concentrations not
detected in testing. It is imperative to follow good construction techniques and special
attention to using excess water during mixing, mellowing and curing as referenced in the
previous pavement section recommendations.
External sulfate attack is a chemical breakdown mechanism where the sulfate ions from
an external source, such as sulfates in soil and/or groundwater penetrate and attack
components of the cement paste. Crystals of gypsum and ettringite formed during the
external sulfate attack may cause concrete to crack and scale. The effect of these changes is
an overall loss of concrete strength.
In order to prevent corrosion of the reinforcement steel, care should be taken to provide
complete embedment for all reinforcing steel. Embedment tolerances should provide a
minimum coverage of approximately double the maximum aggregate size in the concrete.
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
City of Arlington 18 February 4, 2016 TEAM Project No. 152151G
SITE PREPARATION AND CONSTRUCTION CONSIDERATIONS
Site preparation may require minor cuts and fills to bring the site to desired grade.
Clearing, grubbing, and stripping of organic topsoil and unsuitable materials should be
accomplished in all construction areas and all areas to be filled. The stripping depth may
vary from as little as four inches in the grassed areas to 36 inches or more where removal of
stumps and roots are involved. Usable topsoil should be stockpiled for later reuse in
landscaping as desired. Topsoil is defined as the surface soil layer containing organic matter
and plant nutrients. Structural, pavement, and fill areas should then be proofrolled with a
loaded dump truck, scraper, or similar pneumatic-tired equipment. The proof rolling serves
to densify loose surficial soils and detect any areas of weakness. The proof rolling should be
performed in accordance with Texas Department of Transportation (TxDOT) Standard
Specifications for Construction of Highways, Streets and Bridges, Item 216, "Proof Rolling",
or equivalent. Any soils deflecting excessively under moving load should be undercut to
firm soils and recompacted. The proof rolling operations should be observed by an
experienced geotechnician. Recommended earthwork construction procedures are included
in Appendix B.
As part of the site preparation, good surface drainage should be initiated at the beginning
of construction and maintained thereafter to prevent ponding of water in the foundation areas.
SECONDARY CONSIDERATIONS The following considerations have been incorporated after examination of numerous
problems dealing with active soils throughout the area. It is presented here for your
consideration. If these features are incorporated in the overall design of the project, the
performance of the structure will be improved.
1. Prior to construction, the areas to be covered by the structures should be prepared so that water will not pond beneath or adjacent to the structures following rains.
2. Roof drainage should be collected by a system of gutters and downspouts and transmitted by pipe to a storm drainage system or to a paved surface where the water can drain without entering the foundation area soils.
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
City of Arlington 19 February 4, 2016 TEAM Project No. 152151G
3. Sidewalks should be sloped away from the structures so that water will drain away from the structures.
4. Paved areas and the general ground surface should be sloped away from the structures on all sides so that water will always drain away from the structures. Water should not be allowed to pond near the structures after the slabs have been placed.
5. Care should be exercised to assure that ditches for utility lines do not serve as conduits that transmit water beneath the structures. The top of the ditch should be sealed with at least 12 inches of clay to prevent influx of water during inclement weather periods.
6. Ornamental shrubbery, grasses and flower beds should be properly maintained by use of a regularly scheduled watering program to prevent loss of subgrade moisture to those plants.
7. Trees, in general, should not be planted closer to structures than the mature height of the tree. A tree planted closer to a structure than the recommended distance may extend its roots beneath the structure, resulting in removal of subgrade moisture.
OBSERVATION AND TESTING Many problems can be avoided in the field if proper observation and testing services are
provided. It is recommended that site preparation, lime/cement stabilization activities,
pavement construction, installation of piers, select fill pad construction, and floor slab
construction be monitored by a qualified engineering technician. Density tests should be
performed to verify compaction and proper moisture content of any earthwork. Observations
and tests should be performed prior to and during concrete placement procedures. Should
you desire, we will be happy to recommend a budget for these services.
LIMITATIONS
The recommendations presented in this report are based on the assumption that the
subsurface properties throughout the construction area are reasonably uniform to those
exhibited within the boring. The recommendations and conclusions presented in this report
should be reevaluated by TEAM Consultants, Inc. should there be any changes in the type,
design, location, or conditions during construction of the proposed project.
TEAM Consultants, Inc. Geotechnical, Environmental, Construction Materials Testing
City of Arlington 20 February 4, 2016 TEAM Project No. 152151G
This study was conducted for the exclusive use of the City of Arlington Parks and
Recreation Department. The reproduction of this report or any part thereof, in plans or other
documents supplied to persons other than the owner, should bear language indicating that the
information contained therein is for general design purposes only and not for bidding
purposes, unless so indicated, and that the owner and TEAM Consultants, Inc., are not liable
for any misrepresentation made therein.
ILLUSTRATIONS
N Co
ll ins
St
N Co
oper
St
E Lamar Blvd
FMRoad
157
Brown Blvd
NE Green Oaks Blvd
E Lamar B lvd
Linco
ln Dr
Washington Dr
Furrs
St
Ha rwell Dr
Brown Blvd
Cantor Dr
E Beady Rd
Baird
Far
m Rd
Polk Dr
Whistler Dr
Sunlight D r
Hinsdale Dr
Taft Dr
Eldoro Dr
Wils
on D
rFr
ankli
n Dr
Boardwalk St
Madis
onDr
Winding
Hollow Ln
Giltin Dr
Anter
o Dr
Van Buren Dr
Sunr
ise D
r
Laure
l Val ley Ln
Chaffee Dr
Gunnison Dr
Kyle Dr
Coo li
d ge
Dr
T ish Cir
Misty Glen Trl
A d ams
Dr
Hillview Dr
Rose B
rown May Pkwy
Botts
Dr
Bert Dr
Bluffview Ct
Ashfo rd LnBut t ermilk
Dr
Horizon Trl
Ston ele igh Ct
Rive
r Hills
Dr
Cypress Chase Dr
Country Green Ln
Mill Lake Dr
Wayland Dr
Rolling
Hills TrlGlen
bury
Ct
Lawr ence Rd
Brentford Pl
Crescent Dr
Northmeadow Dr
Eisenhower DrPebble Way
Lincoln Ct
Anson Ct
Wet N Wild Way
Memory Ln
Aztec
Asher CtSh
avan
o Ct
Douglas Ct
Atlee Ct
West Fo rk Trini ty Ri v er
Six Flags Hurricane Harbor
Chester W Ditto Golf
Course
Rolling Hills Country Club
River Legacy Parks
River Legacy Parks East
TEAM Consultants, Inc.
GEOTECHNICAL SERVICESDITTO GOLF COURSE
ARLINGTON, TARRANT COUNTY, TEXASCITY OF ARLINGTON
SITE VICINITY MAP
DATE: February 2016PLATE 1
Ü Map created using ESRI ArcGIS 10.3
0 1 Mile0.50.25
PROJECT LOCATION
+U +U+U
+U
+U
+U
+U
+U
+U
+U
+U
+U
+U
+U +U
+U
+U +U
+U
+U
+U
+U
+U
+U
+U
+U +U
+U
+U+U
+U
+U+U +U
+U
+U+U+U
+U
+U +U
+U+U
+U+U
B-33Training Facility
Parking Lot
Clubhouse
MaintenanceFacility
RestroomFacility
B-9
B-8
B-7
B-6
B-5
B-4
B-3B-2B-1
B-45
B-44
B-43B-42
B-41B-40
B-39
B-38
B-37 B-36
B-35
B-34
B-32
B-31 B-30B-29
B-28
B-27B-26
B-25
B-24B-23
B-22
B-21
B-20B-19
B-18B-17B-16
B-15B-14
B-13
B-12
B-11
B-10
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
TEAM Consultants, Inc.
GEOTECHNICAL SERVICESDITTO GOLF COURSE
ARLINGTON, TARRANT COUNTY, TEXASCITY OF ARLINGTON
PLAN OF BORINGS
DATE: February 2016PLATE 2
0 1,000 2,000500 Feet
Ü Map created using ESRI ArcGIS 10.3
N Co
ll ins
St
N Co
oper
St
E Lamar Blvd
FMRoad
157
Brown Blvd
NE Green Oaks Blvd
Green Oaks Blvd
NE Green Oaks Blvd
E Lamar B lvd
Linco
ln Dr
Washington Dr
Furrs
St
Ha rwell Dr
Brown Blvd
Cantor Dr
E Beady Rd
Baird
Far
m Rd
Polk Dr
Whistler Dr
Sunlight D r
Hinsdale Dr
Randy Snow Rd
Taft Dr
Eldoro Dr
Wils
on D
rFr
ankli
n Dr
Pitkin
Dr
Boardwalk St
Madis
onDr
Winding
Hollow Ln
Giltin Dr
Anter
o Dr
Van Buren Dr
Sunr
ise D
r
Laure
l Val ley Ln
Chaffee Dr
Gunnison Dr
Kyle Dr
Coo li
d ge
Dr
T ish Cir
Misty Glen Trl
A d ams
Dr
Hillview Dr
Rose B
rown May Pkwy
Botts
Dr
Bert Dr
Bluffview Ct
Ashfo rd LnBut t ermilk
Dr
Horizon Trl
Rive
r Hills
Dr
Cypress Chase Dr
Country Green Ln
Mill Lake Dr
Wayland Dr
Rolling
Hills Trl
Riverpla ce Dr
Ridings Pl
Lawr ence Rd
Brentford Pl
Ridgeglen Dr
Northmeadow Dr
Eisenhower DrPebble Way
Lincoln Ct
Anson Ct
Wet N Wild Way
Memory Ln
Aztec
Asher CtSh
avan
o Ct
Douglas Ct
Atlee Ct
TEAM Consultants, Inc.
GEOTECHNICAL SERVICESDITTO GOLF COURSE
ARLINGTON, TARRANT COUNTY, TEXASCITY OF ARLINGTON
SITE GEOLOGIC MAP
DATE: February 2016PLATE 3
Ü Map created using ESRI ArcGIS 10.3
0 1 Mile0.50.25
PROJECT LOCATION
LegendQuaternary
CretaceousEagle Ford Group undivided (Kef)Woodbine Formation (Kwb)
Alluvium (Qal)Fluviatile terrace deposits (Qt)
Reddish Tan CLAY
-w/ calcareous nodules and iron stains
(CH)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
4.5(+)
4.5(+)
62 2117.592.6
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 4TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B- 1
OF
Reddish Brown Sandy CLAY w/ iron stains
(CL)
Reddish Brown SAND w/ clay seams, lightly cemented
(SC)
Notes: (1) Completion Depth = 6.5 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
4.5(+)
18.7
14/16/18
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 5TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B- 2
OF
Reddish Brown Sandy CLAY
-w/ calcareous nodules and iron stains
(CL)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
4.5(+)
4.5(+)47 2211.4
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 6TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B- 3
OF
Reddish Brown Sandy CLAY w/ iron stains
(CL)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
4.5(+)
4.5(+)
14.5
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 7TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B- 4
OF
Grayish Tan Sandy CLAY w/ iron stains and calcareous nodules
-reddish Brown
(CL)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
--
--
29 1312.079.9
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 8TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B- 5
OF
Reddish Brown Sandy CLAY
(CL)
Reddish Brown Clayey SAND
(SC)
Notes: (1) Completion Depth = 6.5 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.00
4.5(+)
4.5(+)
12.8
11/13/14
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 9TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B- 6
OF
Brown Sandy CLAY
(CL)
Tan clayey Sand, lightly cemented
(SC)
Notes: (1) Completion Depth = 5.5 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
1.50
--5.6
18/26/31
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 10TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B- 7
OF
Brown Clayey SAND
(SC)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
3.00
4.5(+)
4.5(+)
24 1714.041.0
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 11TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B- 8
OF
Reddish Brown Sandy CLAY
(CL)
Tan Clayey SAND
(SC)
Notes: (1) Completion Depth = 12.5 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
3.00
4.5(+)
14.4
10.8
25/28/47
17/17/50-4.75"
45/41/14-2.00"
20/50-5.00"
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 12TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B- 9
OF
Tan CLAY
-reddish brown
-tan w/sandstone fragments
(CH)
Tan and Gray Sandy CLAY
(CL)
Tan and Gray Clayey SAND, w/ sandstone fragments
(SC)
Notes: (1) Completion Depth =11.5 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
1.50
4.5(+)
4.25
51
38
18
19
17.4
16.9
11/10/16
10/14/25
12/41/47
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 13TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-10
OF
Brown Clayey SAND
(SC)
Brown and Gray Sandy CLAY w/ iron stains
(CL)
Brown Clayey SAND
-tan
(SC)
Notes: (1) Completion Depth = 11.5 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
1.25
0.50
3.00
4.5(+)
4.5(+)
42 16
15.2
15.7
48.7
16/38/46
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 14TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-11
OF
Reddish Brown Sandy CLAY
(CL)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
4.5(+)
4.5(+)
44 1711.1
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 15TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-12
OF
Reddish Brown Sandy CLAY
(CL)
Reddish Brown Clayey SAND, lightly cemented, w/ iron stains
-tan
(SC)(TCP Test)
Notes: (1) Completion Depth = 12.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
2.00
1.50
0.50
43 1718.5
8.4
28/50-4.50"
50-5.75"
50-1.00"/50-0.25"
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 16TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-13
OF
Reddish Brown Sandy CLAY
- reddish gray w/ iron stains, sand seams
(CL)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
1.50
4.5(+)
11.9
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 17TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-14
OF
Tan Sandy CLAY w/ iron stains and sandstone fragments
(CL)
Gray CLAY, shaley
(CH)
Notes: (1) Completion Depth = 12.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
2.75
4.5(+)
4.5(+)
4.5(+)
4.5(+)
4.5(+)
59 25
10.5
16.1
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 18TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-15
OF
Reddish Brown Sandy CLAY w/ iron stains
(TCP Test)(CL)
Notes: (1) Completion Depth = 12.5 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
5.0
1.9
61.5
14/32/35
29/50-1.50"
50-3.00"
50-0.75"/50-0.25"
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 19TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-16
OF
Reddish Brown Sandy CLAY w/ calcareous nodules, iron stones
-tan
(TCP Test)(CL)
Notes: (1) Completion Depth = 12.5 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
3.00
6.7
3.5
17/20/50-5"
34/50-3.25"
50-3.25"
50-1"/50-0.5"
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 20TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-17
OF
Reddish Brown Sandy CLAY w/ iron stains
(CL)
Gray CLAY, Shaley
(CH)
Notes: (1) Completion Depth = 12.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
1.50
4.5(+)
4.5(+)
2.50
45 1810.4
13.4
12/14/18
5/9/14
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 21TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-18
OF
Reddish Brown Sandy CLAY w/ iron stains
-reddish gray
(CL)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
3.00
2.50
19.6
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 22TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-19
OF
Reddish Brown Sandy CLAY w/ iron stains
(CL)
Tan Clayey SAND
(SC)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
2.50
8.715/17/20
23/38/35
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 23TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-20
OF
Tan Clayey SAND
-brown w/sand seams
-tan
(SC)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
4.5(+)
4.5(+)
NP NP2.6
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 24TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-21
OF
Brown and Tan Sandy CLAY w/ sandstone fragments
(CL)
Tan Clayey SAND
(SC)
Notes: (1) Completion Depth = 5.5 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
10.310/21/46
45/41/14-1.75"
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 25TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-22
OF
Light Gray and Tan CLAY, shaley
(CH)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
4.5(+)
4.5(+)52 1913.5
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 26TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-23
OF
Tan and Brown Sandy CLAY w/ sandstone fragments and iron stains
(CL)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
4.5(+)
4.5(+)
14.0
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 27TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-24
OF
Light Brown Sandy CLAY
-tan w/ iron stains and sandstone fragments
(CL)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
4.5(+)
4.5(+)
40 1610.1
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 28TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-25
OF
Brown Sandy CLAY
-tan w/ sandstone fragments, iron stains
(Soluble Sulfate Content = 233 ppm)
(CL)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
3.50
4.5(+)
4.5(+)
49 1910.8
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 29TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-26
OF
3" Asphalt Pavement LayerBrown CLAY
(CH)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
2.00
2.00
1.50
77 2527.2
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 30TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-27
OF
3" Asphalt Pavement LayerBrown CLAY
(CH)
Reddish Brown Sandy CLAY
(CL)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
2.50
2.00
4.5(+)
57 1923.5
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 31TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-28
OF
Brown CLAY
(Soluble Sulfate Content: <100 ppm)
- tan
(CH)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
1.75
1.75
2.25
62 2223.2
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 32TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-29
OF
Light Brown Sandy CLAY
- calcareous nodules
(CL)
Notes: (1) Completion Depth = 6.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
2.50
2.25
4.5(+)
46 1820.0
1
5.0
10.0
15.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
W.L
.
I.B
.
W.L
.D
RIL
LE
R
PLATE 33TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-45ANGLE
11-24-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-24-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-30
OF
136.5
135.2
131.2
Brown CLAY
-calcareous inclusions
(CH)
Tan and Gray Clayey SAND
(SC)
Gray CLAY w/ gypsum crystals
(CH)
Notes: (1) Completion Depth = 30.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.00
2.75
4.5(+)
4.5(+)
4.5(+)
4.25
1.50
4.5(+)
4.5(+)
61 24
15.1
17.8
19.0
18.1
94.9
19/25/30
5.33/14.7%
2.35/2.56%
8.12/1.66%
1
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
I.B
.D
RIL
LE
R
PLATE 34TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-75ANGLE
11-23-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-23-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-31
OF
133.5
131.0
141.3
126.4
130.2
Brown Sandy CLAY
- calcareous inclusions
- iron stones
(CL)
Tan CLAY
-gray, shaley
(Soluble Sulfate Content = 3,600 ppm)
(CH)
Reddish Tan Clayey SAND
(SC)
Gray CLAY w/sand seams
-w/ gypsum crystals
(Soluble Sulfate Content = 4,533 ppm)(CH)
Notes: (1) Completion Depth = 30.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
4.5(+)
4.5(+)
4.5(+)
4.5(+)
3.75
4.5(+)
--
4.50
4.50
36
61
15
21
16.3
14.6
11.8
16.1
14.8
12.7
20.3
20.9
93.4
19/23/30
4.84/10.5%
9.15/3.7%
10.8/7.07%
5.71/0.87%
2.42/1.21%
1
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
I.B
.D
RIL
LE
R
PLATE 35TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-75ANGLE
11-23-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-23-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-32
OF
127.2
135.6
125.7
111.3
Brown Sandy CLAY
- w/ iron stains
(CL)
Brown CLAY
-brown and tan
(CH)
Reddish Tan Clayey SAND
-w/iron stains
(SC)
Gray CLAY, shaley
(Sample Non-Testable for Strength) (CH)
Notes: (1) Completion Depth = 30.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
1.00
4.5(+)
4.5(+)
4.00
3.00
4.5(+)
4.5(+)
4.5(+)
3.50
45 17
25.0
15.9
13.5
13.7
18.8
48.3
30/50-6.00"
16/26/40
1.45/5.15%
5.48/7.54%
1.46/3.44%
1
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 36TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-75ANGLE
11-23-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-23-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-33
OF
133.2
126.3
136.1
137.6
122.0
Brown CLAY w/ sand seams
- iron stones
- calcareous inclusions
(CH)
Brown Clayey SAND w/iron stains, cemented
(SC)
Brown CLAY w/iron stains, calcareous inclusions
(CH)
Notes: (1) Completion Depth = 30.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
1.75
4.5(+)
3.75
4.5(+)
4.5(+)
4.5(+)
2.75
4.5(+)
4.5(+)
68
57
24
21
22.7
16.6
19.0
20.0
18.0
11.9
11.9
17.6
5.65/4%
4.04/4.52%
7.99/8.71%
5.39/7.98%
2.85/2.21%
1
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 37TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-75ANGLE
11-23-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-23-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-34
OF
127.8
129.8
123.3
Brown CLAY w/sand seams
-w/iron stains
- calcareous nodules
-w/sand seams
-tan
(CH)
Tan Clayey SAND, w/ iron stones, lightly cemented
(SC)
Gray CLAY w/ iron stains, calcareous inclusions
(CH)
Notes: (1) Completion Depth = 30.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
1.50
4.00
4.5(+)
4.5(+)
4.50
4.5(+)
4.5(+)
4.5(+)
4.5(+)
58 23
22.9
19.8
22.0
13.7
94.4
29/50-3.00"
1.46/12.03%
1.86/9.63%
4.77/4.42%
1
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 38TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-75ANGLE
11-23-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-23-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-35
OF
131.1
132.4
126.8
Brown CLAY
-calcareous nodules
-iron stones
(CH)
Brown and Tan Clayey SAND
(SC)
Tan and Gray CLAY w/ sand seams and iron stains
-gypsum crystals
(Soluble Sulfate Content = 1,606 ppm)
(CL)
Notes: (1) Completion Depth = 31.5 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
2.50
4.5(+)
4.5(+)
4.5(+)
--
--
4.5(+)
4.5(+)
4.5(+)
62
54
19
19
25.2
17.0
17.0
17.6
20.8
15.1
18.4
50-4.50"
16/50-5.00"
26/36/38
3.32/6.14%
2.15/3.85%
1.64/2.35%
1
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 39TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-75ANGLE
11-23-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-23-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-36
OF
Brown Sandy CLAY
- iron stains
tan, iron stains, lightly cemented
Tan Clayey SAND
- clay seams
(SC)
Notes: (1) Completion Depth = 30.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
0.75
1.00
2.00
4.00
2.50
30
36
16
15
16.3
17.0
16.1
17.0
11.2
46.0
57.1
15/50-3.00"
15/25/40
50-5.50"
26/36/38
1
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 40TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-75ANGLE
11-23-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-23-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-37
OF
136.1
128.8
Reddish Tan Sandy CLAY
- iron stains
-tan and gray CLAY
(CL)
Tan Clayey SAND
(SC)
Notes: (1) Completion Depth = 29.5 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
3.50
2.50
4.5(+)
4.5(+)
4.5(+)
4.5(+)
16.3
13.489.8
15/25/40
50-5.50"
50-5.00"
2.28/10.71%
1.65/5.38%
1
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 41TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-75ANGLE
11-23-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-23-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-38
OF
135.2
Reddish Brown Clayey SAND w/ iron stains
- occasional gravel
-w/iron stone seams
-tan
(SC)
Notes: (1) Completion Depth = 30.0 Feet (2) No Groundwater Observed During Drilling (3) Borehole Backfilled Upon Completion of Drilling
0.75
--30 14
14.0
11.1
8.2
5.9
3.6
40.9
27/50-5.00"
50-5.50"
28/50-3.00"
50-5.00"
50-4.50"
50-4.50"
30/50-2.75"
2.16/2.57%
1
5.0
10.0
15.0
20.0
25.0
30.0
35.0
0.0
1
SOIL BOREHOLE LOG
TE
AM
Con
sult
ants
, Inc
.
LO
GG
ED
BY
CH
K'D
BY
Tra
ckin
g C
odes
: 15
2151
LO
GS
.GP
J, C
US
T1S
OI,
2/3
/16
DR
ILL
ING
CO
NT
R
M.D
.
I.B
.
C.L
.D
RIL
LE
R
PLATE 42TEAM Consultants, Inc.
DESCRIPTION OF MATERIALS
SY
MB
OL
SA
MPL
E
PO
CK
ET
DE
PT
H I
N F
EE
T
CO
MPR
ES
SIV
E
UN
IT W
ET
RE
C%
/ RQ
D%
PL
AS
TIC
WE
IGH
T (
pcf)
LIM
IT %
WA
TE
RC
ON
TE
NT
%L
IQU
IDL
IMIT
%
ST
RE
NG
TH
(ts
f)
ON
SA
MP
LE
RB
LO
WS
/6 I
N.
PE
NE
TR
OM
ET
ER
PA
SS
ING
#200
SIE
VE
%
GEOTECHNICAL INVESTIGATION
CME-75ANGLE
11-23-15
TIME
Hollow Stem Auger
NA
SITE NAME AND LOCATION
DATE DATEAT BOTTOM OF LOG
SHEET
SEE PLAN OF BORINGS
DRILLINGCITY OF ARLINGTON
WATER LEVEL TIME TIME
11-23-15
FINISH
------
SAMPLING METHOD:
DRILL RIG
NASEE NOTE NO. 2
NOTE: BOREHOLE DRILLED @ STAKED LOCATION
Undisturbed/Disturbed
LOCATION:
BORING NO.
Vertical
DRILLING METHOD:
BEARING
ARLINGTON, TARRANT COUNTY, TEXAS
CAVED DEPTH
START
ELEVATION (MSL-FT)
DATE
DITTO GOLF COURSE
B-39
OF
KEY TO SOIL CLASSIFICATIONS AND SYMBOLSSOIL TYPE SAMPLE TYPE
Sand Silt ClayGravel Undisturbed Auger Split No
Sandy Silty Clayey Spoon RecoveryPredominant type shown heavy
TERMS DESCRIBING CONSISTENCY OF CONDITIONCOARSE GRAINED SOILS
(Major portion retained on No. 200 sieve)
Includes (1) clean gravels and sands described as fine, medium or coarse, depending on distribution of grain sizes and (2) silty or clayey gravels and sands.Condition is rated according to relative density, as determined by laboratory tests or estimated from resistance to sampler penetration.
Penetration Resistance Descriptive RelativeBlows/Foot** Term Density*
0 - 10 Loose 0 to 40%10 - 30 Medium dense 40 to 70%30 - 50 Dense 70 to 90%Over 50 Very dense 90 to 100%
* From tests on undisturbed sand sample** 140# hammer, 30-inch drop
Relative density is also used to describe condition of low plasticity (P I<10) fine grained soils such as sandy silts.
FINE GRAINED SOIL(Major portion passing No. 200 sieve)
Includes (1) inorganic and organic silts and clays, (2) gravelly, sandy, or silty clays, and (3) clayey silts. Consistency is rated according to shearingstrength, as indicated by penetrometer readings or by unconfined compression tests for soils with plasticity indices > 10.
Compressive StrengthDescriptive Term Tons/Sq. Ft.Very soft less than 0.25Soft 0.25 to 0.50Firm 0.50 to 1.00Stiff 1.00 to 2.00Very stiff 2.00 to 4.00Hard 4.00 and higher
Note: Slickensided and fissured clays may have lower unconfined compressive strengths than shown above,because of planes and weakness or shrinkage cracks in the soil. The consistency ratings of such soilsare based on penetrometer readings.
TERMS CHARACTERIZING SOIL STRUCTURE
Fissured - containing shrinkage cracks, Slickensided - having inclined planes of weakness thatfrequently filled with fine sand are slick and glossy in appearance.or silt; usually more or less vertical Degree of slickenside development:
Sensitive - pertaining to cohesive Slightly slickensided - slickensides are present at intervals of 1-2soils that are subject feet and soil does not easily break alongto appreciable loss of these planes.strength when remolded
Moderately slickensided - slickensides are spaced at intervales of 1-2Laminated - composed of thin layers feet and soil breaks easily along these
of varying color and texture planes.
Interbedded - composed of alternate Extremely slickensided - slickensides are spaced at intervals 4-12layers of different soil types inches, are continuous and interconnected.
Soil breaks easily along the slickensides. Calcareous - containing appreciable Resulting size of broken pieces three to
quantities of calcium carbonate six inches.
Well graded - having wide range in Intensely slickensided - slickensides are spaced at intervals of lessgrain sizes and sub- than four inches and are continuous in allstantial amounts of all directions. Soil breaks down along planesintermediate particle sizes into nodules 0.25 - 2 inch in size.
Poorly graded - predominately of one grain size,or having a range of sizes withsome intermediate size missing
TEAM Consultants, Inc. PLATE 43
Strain Unit Ultimate CohesionDeformation (ε50)Wet Passing Soluble Compressive or Shear @ 50% @ 50%
B-39 1-2 Reddish Brown Clayey SAND 14.02-4 Reddish Brown Clayey SAND 135.2 11.1 30 14 16 40.9 2.16 1.08 0.0677 0.011584-5 Reddish Brown Clayey SAND 8.26-8 Reddish Brown Clayey SAND 5.98-9 Reddish Brown Clayey SAND 3.6
PLA
TE
48
Notes:1) Structural fill should consist of clayey sands with Liquid Limit (LL) less than 30 and
Plasticity Index (PI) between 6 and 15.2) Potential Vertical Rise (PVR) has been calculated using procedures outlined by Gary L. Schneider
and Arthur R. Poor, P.E., PhD, "The Prediction of Soil Heave and Swell Pressures Developed byan Expansive Clay ", Research Report TR-9-74, University of Texas at Arlington, Texas, Nov., 1974.
3) The zone of moisture content change (Active Zone ) thickness was assummed to be 12 feet.It has been determined by the Texas Department of Transportation (TxDOT) that 0.2*LL + 9 is the "dry" condition from which little shrinkage is experienced, but where volumetric swell potential is greatest. It is the minimum moisture content swelling clays usually dry to. (TxDOT Test Method Tex-124 E)
4) PVR estimates are total movements, differential heave may be estimated at 2/3 of total PVR.
TEAM Consultants, Inc. PLATE 49
ESTIMATED POTENTIAL VERTICAL RISEOF FOUNDATION SOILS
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.00.00 0.50 1.00 1.50 2.00 2.50
Dep
th o
f Sel
ect F
ill o
r Fo
unda
tion
Pad
Bel
ow G
roun
d Su
rfac
e, F
eet
Potential Vertical Rise (PVR), Inches
"Dry" Condition
"Dry" Condition
APPENDIX A FIELD & LABORATORY TEST PROCEDURES
FIELD & LABORATORY TEST PROCEDURES Standard field drilling and sampling procedures and laboratory testing procedures are described
in the following paragraphs. FIELD DRILLING AND SAMPLING
Borings are advanced in soil formations by either auger or wash drilling methods. Soil samples were obtained at the designated sampling intervals using the following sampling techniques.
UNDISTURBED SAMPLES
Undisturbed samples of cohesive soils are obtained using a Shelby tube sampler. The sampler is a three-inch diameter (O.D.), thin-walled steel tube which is pushed into cohesive soils using the hydraulic pull down and weight of the drill rig. Shelby tube sampling procedures are in general accordance with ASTM Method D-1587. Recovered Shelby tube samples are extruded in the field, logged, and finally sealed airtight in plastic bags.
The consistency of undisturbed cohesive soil samples is evaluated in the field using a
penetrometer. This device measures the pressure necessary to push a 0.25-inch-diameter piston into the undisturbed specimen. The resistance at 0.25-inch penetration has been correlated with the laboratory unconfined compressive strength; thus, a representative estimate of soil consistency is obtained. The penetrometer results are tabulated on the Soil Borehole Logs. The maximum capacity of the penetrometer is 4.5 tsf.
Soils maybe sampled utilizing a two-inch diameter, split-spoon sampler in conjunction with the Standard Penetration Test (ASTM D-1586). This test utilizes a 140 pound hammer that drops a free fall vertical distance of 30 inches. The number of blows required for 18 inches of penetration is recorded for each six-inch increment and either the value for the last 12-inches of penetration, the penetration obtained within 100 blows, or the penetration achieved when a total of 50 blows have been applied during any six-inch increment, whichever occurs first, is reported as the standard penetration value.
Auger Samples
Disturbed soil samples are obtained from soil cuttings brought to the ground surface while advancing a boring with six-inch diameter, continuous-flight augers. The recovered soil samples are sealed in plastic bags. In addition, bulk samples, usually weighing 50 to 75 pounds, are obtained at selected auger boring locations to provide a sufficient quantity of soil for performing laboratory tests on remolded specimens.
Rock Core Samples
In instances where coring is necessary to advance borings through rock formations, rock coring is performed using a "NX" double-tube core barrel equipped with a tungsten carbide or diamond drill bit. The diameter of the recovered rock cores generally ranges from 1.875 inches ("NX" wire line size) to 2.125 inches (standard "NX" size) depending upon the particular type of "NX" core barrel employed. Rock cores are sealed in plastic and placed in cardboard or wooden core boxes. The amount of core recovered (REC), expressed as a percentage of the coring interval, is tabulated at the respective depths on the logs of boring. An index or measure of the quality of a rock mass, termed the rock quality designation (RQD) and computed by summing the lengths of intact pieces of core >
10 cm. in length, expressed as a percentage of the coring interval, is also tabulated at the respective depths on the logs of boring.
LABORATORY TESTS
Laboratory tests are performed using the following testing procedures: CLASSIFICATION TESTS
Field classification of soil samples and rock cores is verified in the laboratory through visual classification of samples by a qualified geotechnical engineer or geologist. Samples are classified according to color, texture, predominant material type, and consistency (if soil) or hardness (if rock).
Laboratory tests are performed on representative soil samples to determine natural moisture
content, liquid and plastic limits, and percent passing the No. 200 mesh sieve. These tests are performed in general accordance with ASTM Methods D-2216, D-4318, and D-422, respectively. Classification test results are tabulated at the corresponding sample depths on the boring logs and are also shown on the generalized soil profiles.
Both the soil classification test results and the visual classifications are used to determine the
Unified Soil Classification System symbol(s) for each generalized soil stratum. These symbols are shown on the logs of boring at the lower right corner of each stratum under the heading "Soil Description". Procedures for determining the Unified Soil Classification are in accordance with ASTM Method D-2487.
UNCONFINED COMPRESSION TESTS
Unconfined compression tests are performed on undisturbed cohesive soil specimens trimmed from samples extruded from Shelby tubes or Pitcher barrel tubes. In this test, a cylindrical specimen having a height-to-diameter ratio of approximately 2.0 is subjected to an axial load without lateral confinement. The axial load is applied at a uniform strain rate of 0.025 inch per minute until the peak compressive stress is reached. The shear strength is equal to one-half the peak compressive stress. Test procedures follow criteria specified by ASTM Method D-2166. Compressive strengths determined from these tests are tabulated at the corresponding sample depths. The natural moisture content and dry density of each specimen are recorded opposite the strength values.
Unconfined compression tests are also performed on intact rock core specimens in accordance
with ASTM Method D-2938. Test results are reported as indicated in the preceding paragraph. CONFINED COMPRESSION TESTS
Confined compression tests are performed on undisturbed soil specimens trimmed from samples extruded from Shelby tubes or Pitcher barrel tubes. In this test, a cylindrical specimen having a height to diameter ratio of approximately 2.0 is subjected to an axial load with a lateral confining pressure applied. A confining pressure, equal to the effective overburden pressure, is applied without allowing drainage of the specimen. Use of the confining pressure is intended to prevent premature failure of the specimen during loading due to slickensides, unconsolidated silt or sand lenses, etc. Following application of the confining pressure, the specimen is subjected to an axial load which is applied at a uniform strain rate of about 0.025 inch per minute until the peak compressive stress is reached. The shear strength is equal to one-half the peak compressive stress. Test procedures are in general accordance with criteria specified by ASTM Method D-2850. Compressive strengths determined from these tests are tabulated at the corresponding sample depths.
The natural moisture content and dry density of each specimen are recorded opposite the strength values.
DIRECT SHEAR TESTS
Consolidated-drained direct shear tests are performed on specimens trimmed from either undisturbed samples or remolded samples to define strength parameters corresponding to the drained or effective stress condition. In this test, a specimen (0.75-inch thick and 2.5 inches in diameter) is subjected to a normal stress, inundated, and allowed to consolidate. Horizontal shearing loads are then applied at a sufficiently slow rate (approximately 1.5 x10-4 in/min) to ensure that complete drainage of the specimen occurs during shear. Three different values of normal stress are applied to three separate specimens and the maximum shearing strength is measured for each normal stress. After initial shear, the peak strength is defined and the specimens are repeatedly sheared to define the minimum or residual strength. Test procedures are in general accordance with criteria specified by ASTM Method D-3080. A plot of shearing strength, as a function of normal stress, defines the angle of internal friction, φ, and cohesion, c, of the specimen for both the initial and residual shear strengths.
APPENDIX B SITE PREPARATION
SITE PREPARATION
The recommended earthwork construction procedures are as follows:
1. Remove all vegetation, organic topsoil and any undesirable materials from the
construction area. Average stripping depth is normally six inches
2. Structural areas should then be proofrolled with a loaded dump truck, scraper, or similar
pneumatic-tired equipment. The proof rolling serves to densify loose surficial soils and
detect any areas of weakness. The proof rolling should be performed in accordance with
Texas Department of Transportation (TxDOT) Standard Specifications for Construction
of Highways, Streets and Bridges, Item 216, "Proof Rolling", or equivalent. Any soils
deflecting excessively under moving load should be undercut to firm soils and
recompacted. The proof rolling operations should be observed by an experienced
geotechnician.
3. Scarify the subgrade, add moisture if necessary and recompact to 95 percent of the
maximum dry density determined by Standard Proctor (ASTM D-698) test procedures.
The moisture content of the fill at the time of compaction should be from zero to plus
four percent of the optimum proctor value.
4. Fill may consist of onsite or off-site inorganic soils with a plasticity index not greater
than 30. Fill should be placed in loose lifts not exceeding eight inches in loose thickness
and should be compacted to a minimum of 95 percent of the maximum dry density
determined by Standard Proctor (ASTM D-698) test procedures. The moisture content of
the fill at the time of compaction should be from one to four percent above of the
optimum proctor value.
5. In cut areas, the soil should be excavated to grade and the surface proofrolled and
scarified to a minimum depth of six inches and recompacted to the previously mentioned
density and moisture content.
6. The subgrade moisture content and density must be maintained until floor slabs are
Description Quantity Unit Unit Cost AmountSCHEDULE A
1. Staging Area a. Mobilization 1 LS2. Staking of Features and Grades 1 LS3. Clearing and Grubbing a. Tree Removal 276 EA b. Clearing & Underbrushing 18.00 AC c. Transplant Trees 26 EA4. Environmental Protection a. Silt Fence 14,000 LF b. Basin Silt Protection 235 EA c. SWPPP 1 LS5. Demolition a. Cart Path/Curb 170,000 SF b. Pump House 1 LS c. Water Tower (on driving range) 1 LS d. Concrete Pipe 925 LF e. Split-Rail Fence 700 LF f. Stone Retaining Wall & Step (behind range tee) 260 LF g. Rail-Road Tie Retaining Wall 175 LF h. Rail-Road Tie Steps 100 SF i. Wooden Walking Bridge (12' x 4') 1 LS j. Driving Range Net & Poles 425 LF k. Chain-link fence behind Driving Range 215 LF
Total Schedule ASCHEDULE B MASS GRADING (Furnish & Install Complete)
1. Strip and Replace Topsoil (4") 70,000 CY2. Cut and Fill (Bank Yards) a. Haul Dirt 60,000 CY b. Push Dirt 190,000 CY3. Feature Shaping 1 LS Total Schedule B
SCHEDULE C GOLF COURSE DRAINAGE (Furnish & Install Complete)1. Drainage Pipe - corrugated plastic smooth wall (CPP) a. 4" Diameter 14,500 LF b. 6" Diameter 11,475 LF c. 8" Diameter 6,175 LF d. 10" Diameter 1,325 LF e. 12" Diameter 780 LF f. 18" Diameter 300 LF3. Drainage Structures a. 12" Round Grate 210 LF b. 18" Round Grate 25 LF c. Bubbler 17 EA4. Fiber Optics Conduit a. 1 /2" Diameter with 3' of cover 1,725 LF Total Schedule C
MOBILIZATION, CLEARING AND SITE PREPARATION (Furnish & Install Complete)
Description Quantity Unit Unit Cost AmountSCHEDULE D STORM DRAINAGE (Furnish & Install Complete)
1. DuroMaxx SRPE Pipe a. 66" Diameter 235 LF b. 60" Diameter 593 LF c. 54" Diameter 558 LF d. 36" Diameter with Flowable Fill 61 LF2. Flowable Fill for 36" Pipe 40 CY3. 6' x 6' Manhole 3 EA4. 6' x 6' Manhole with 36" Riser with Grate 1 EA5. 66" Headwall (TxDOT CH-PW-0) 1 EA6. Concrete Apron with Baffle Blocks 21 CY7. Rock Riprap (at Discharge Point, 18") 14 CY8. Trench Safety 1,450 LF Total Schedule D
SCHEDULE E FEATURE CONSTRUCTION (Furnish & Install Complete)1. Green Drainage a. 4" Perforated Pipe 16,385 LF b. Vents/Cleanouts/Markers 96 EA2. USGA Greens Construction (26 Greens) a. Mix (for greens and collars) 163,850 SF b. Pea Gravel (for greens and collars) 163,850 SF c. Tracer Wire 7,200 LF d. Barrier Liner 7,200 LF3.Nursery Green Drainage a. 4" Perforated Pipe 600 LF b. Vents/Cleanouts/Markers 4 EA4. Nursery Green Construction a. Mix 6,000 SF b. Pea Gravel 6,000 SF c. Tracer Wire 300 LF d. Barrier Liner 300 LF5. Bunker Construction a. 4" Perforated Pipe 12,500 LF b. Bunker Sand (4" in the bottom 2" on the faces) 125,000 SF c. Bunker Liner - Better Billy Bunker 125,000 SF d. Hand Edging 72 EA6. Beach Bunker Construction a. 4" Perforated Pipe 635 LF b. Bunker Sand (4" in the bottom 2" on the faces) 6,350 SF c. Bunker Liner - Better Billy Bunker 6,350 SF d. Hand Edging 2 EA7. Target Bunker Construction a. Drainage Basin 8 EA b. Bunker Sand (1/2") 7,500 SF c. Bunker Liner - Bunker Solutions 7,500 SF8. Artificial Tee a. Artificial Tee w/Waterjet Customization (Allowance) 1 LS b. Artificial Tee Installation (Allowance) 1 LS b. Decomposed Granite Base and walkway 2,000 SF
Total Schedule E
Description Quantity Unit Unit Cost AmountSCHEDULE F
1. Irrigation Lake Construction (Holes 4 & 5) a. Clay Liner (12" Compacted) 4,100 CY c. Fountains/Aerators 1. Aqua Master Air IV System 1 EA 2. 2 HP Mixers 2 EA2. Lake Construction (Holes 8 & 12) a. Clay Liner (12" Compacted) 1,500 CY b. Drop Structure 1. 24" Drop Structure w/grate 1 EA 2. 12" Connector Pipe 360 LF c. Fountains/Aerators 1. Aqua Master Air II System 1 EA3. Stream Construction a. Steam Construction with Liner 1,250 LF b. Weirs 6 EA b. Rock Features 1 LS c. Pumps 1 LS
Total Schedule FSCHEDULE G HARDSCAPE & BRIDGES (Furnish & Install Complete)
1. Cart Path Construction (Fiber Mesh) a. Concrete Cart Path (8' Path unless noted) 230,000 SF b. Concrete Curb 12,000 LF2. New Stone Bridges a. Bridge on Hole 5 1 LS b. Bridge on Hole 9 1 LS c. Bridge on Hole 10 1 LS3. Existing Bridge Relocation (60' x 10') - Hole 3 a. New Bridge Abutments 1 LS b. Relocate Bridge 1 LS4. Concrete Strip for Artificial Tee (5' Width) 2,125 SF
Total Schedule GSCHEDULE H SOIL PREPARATION AND GRASSING (Furnish & Install Complete)
1. Soil Preparation - Fine debris, removal, fine grade and fertilize a. Greens & Collars (Includes Nursery Green) 169,850 SF b. Tees 232,000 SF c. Sodded Areas 30 AC d. Sprigged Areas 68 AC e. Bunker Faces 3 AC f. Native Area 11 AC g. Fescue Area 13 AC2. Grassing - Sod a. 419 Bermudagrass 30 AC b. "Eco" Buffalograss 3 AC3. Grassing - Sprigging a. Greens & Collars (MiniVerde) 169,850 SF b. Tees (419) 232,000 SF c. 419 Bermudagrass 68 AC4. Grassing - Seeding a. Native Blend 10 AC b. Fescue 12 AC
Total Schedule H
WATER FEATURE CONSTRUCTION (Furnish & Install Complete)
Description Quantity UnitSCHEDULE I TREE PLANTING (Furnish & Install Complete)
1. Live Oak - 6" Caliper 20 EA2. Bur Oak - 4" Caliper 20 EA3. Shumard Red Oak - 4" Caliper 20 EA4. Chinquapin Oak - 3" Caliper 15 EA5. Lacebark Elm - 4" Caliper 20 EA6. Pecan - 3" Caliper 15 EA7. Ginko (Male) - 4" Caliper 15 EA8. Autumn Blaze Maple - 4" Caliper 20 EA9. Elderica Pine - 3" Caliper 20 EA10. Eastern Red Cedar - 8' - 10' Height 25 EA11. Eastern Red Cedar - 10' - 12' Height 30 EA12. Eastern Red Cedar - 12' - 14' Height 35 EA13. Nelly R Stevens Holly - 30 gallon 30 EA
SCHEDULE K IRRIGATION (Furinsh & Install Complete)1. New Irrigation System a. Hunter System b. Rainbird System c. Toro System
OWNER'S CHOICE
2. New Pump Station a. Motor Controls, Inc. b. Rain Bird Corp. c. Xylem Flowtronex d. Watertronics3. Pump Station Handling4. Wet Well & Foundation Slab5. Removal of Existing Irrigation Components6. Satellite Station Verification & Review (Allowance)7. Yardage Tag Markers (Allowance)
Total Schedule KSCHEDULE L FINISH OUT (Furnish & Install Complete)
1. Clean up, equipment removal 1 LS2. As-Built 1 LS
Total Schedule LSUBTOTALPERFORMANCE & PAYMENT BOND LSPROJECT TOTAL