Team #1 PICA: Design Decisions and Current Status Report A. Ball K. Wiersma N. Jen A. Sterk
11

Team #1 PICA: Design Decisions and Current Status Report

Feb 22, 2016

Download

Documents

kenda

Team #1 PICA: Design Decisions and Current Status Report. A. BallK. Wiersma N. JenA. Sterk. Outline. Reintroduction of project and problem Major Design Decisions Accomplishments Obstacles Summary. Our Project. Major Design Decisions. Power Supply Solid State Relays - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Team #1 PICA: Design Decisions and Current Status Report

Team #1 PICA: Design Decisions and Current Status Report

A. Ball K. Wiersma N. JenA. Sterk

Page 2: Team #1 PICA: Design Decisions and Current Status Report

Reintroduction of project and problem Major Design Decisions Accomplishments Obstacles Summary

Outline

Page 3: Team #1 PICA: Design Decisions and Current Status Report

Our Project

Page 4: Team #1 PICA: Design Decisions and Current Status Report

Power Supply Solid State Relays Microprocessor Selection

Major Design Decisions

Page 5: Team #1 PICA: Design Decisions and Current Status Report

Power Supply

Page 6: Team #1 PICA: Design Decisions and Current Status Report

Solid State Relays for Breakers

Page 7: Team #1 PICA: Design Decisions and Current Status Report

Microprocessor Selection

Page 8: Team #1 PICA: Design Decisions and Current Status Report

Successful testing of the Solid State Relays Successful testing of the analog inputs to

the ADE7763 chips. Run code on LEON3 processor Designed a Power Supply PCB MSPGCC 4.X compiled so we can now

compile (and debug) code for the MSP430 Demoed capability to read from the ADC in

the MSP430 Got Linux to compile and boot using LEON3

Accomplishments

Page 9: Team #1 PICA: Design Decisions and Current Status Report

Building the rest of the software needed to complete the base station.

None of the systems have worked together yet.

Integrating surface mount components into DIP breadboards

Toolchain compiles not working well due to very out dated code

Dealing with demo software, which limits the size of compilation

Obstacles

Page 10: Team #1 PICA: Design Decisions and Current Status Report

Many design decisions have been made Many accomplishments as well as obstacles Confident that the prototype will be ready

by April 29.

Summary