TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint: https://espace.cern.ch/sba-worksp ace/tcc2wg/LS1%20worksite%20meeti ng/
6

TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting

Mar 28, 2015

Download

Documents

Tyler Morrish
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting/

TDC2TCC2 Réunion de chantier 7

13.12.2013In sharepoint:

https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/

Page 2: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting/

Statut

• Retrait MDLV • Mise en place protection table plug-in TCSC• Manutention et stockage chambre a vide• Visite GS-CE à planifier en S51• Bilan des doses

Page 3: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting/

MDLV

Page 4: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting/

MDLV

Page 5: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting/

Protection TCSC

Page 6: TDC2TCC2 Réunion de chantier 7 13.12.2013 In sharepoint:  workspace/tcc2wg/LS1%20worksite%20meeting/

Liste des ImpactsIntitule Numero Dose cumulee (uSv)

Retrait TCSC 37401 (closed) 363

Suite et remontage TCSC 38522 209

Retrait 5 aimants 37405 2369

Consolidation vide 37404 81

Survey EN-EL 39450 0

Signalisation TDC2-TCC2 39150 9

Total 3031