2-May-05 TCC11 v1.015-Dec-03 RCCen11 b 1525-Mar-03 RCCen11 b 1421-Dec-01 RCCen11 b 1320-Dec-01 RCCen11 b 1214-Dec-01 RCCen11 b 11
12-Sep-01 RCCen11 b 10
18-Jun-01 RCCen11 b 912-Jun-01 RCCen11 b 83-May-01 RCCen11 b 7
All advice or information from the British Cement Association and/or The Concrete Centre is intended for those who will evaluate the significance and limitations of its contents and take responsibility for its use and application. No liability (including that for negligence) for any loss resulting from such advice or information is accepted by the BCA, TCC or their subcontractors, suppliers or advisors. Users should note that all TCC software and publications are subject to revision from time to time and should therefore ensure that they are in possession of the latest version.
This spreadsheet should be used in compliance with the accompanying publication 'User Guide RC Spreadsheets: v3' available from The Concrete Bookshop, www.concretebookshop.com, Tel +44 (0)700 4 607777 or +44 (0)1276 607140
Revision history TCC11 Element Design
3-Apr-01 RCCen11 b 67-Mar-01 RCCen11 b 52-Mar-01 RCCen11 b 4
4-Apr-00 RCCen11 b 3
28-Mar-00 RCCen11 b 222-Mar-00 RCCen11 b 1
Action788
Correction to x limit at TEE~BEAM M8. 787766
Improvement to L/d calculation. 761Corrections to text in SLAB!C25, COLUMN!K7 and COLUMN! K11 760
v3 release. Page nos, User Guide and registration details amended. 760
773
Placement setting of controls set to 1. 778
778
RE-BADGED 768Page added for indirect supports. 479
305Expression for Asw/S (max) corrected on SHEAR. 311
R Moss comments incorporated. 310311
312
239Correction to strain calculation in COLUMN 241
239
All advice or information from the British Cement Association and/or The Concrete Centre is intended for those who will evaluate the significance and limitations of its contents and take responsibility for its use and application. No liability (including that for negligence) for any loss resulting from such advice or information is accepted by the BCA, TCC or their subcontractors, suppliers or advisors. Users should note that all TCC software and publications are subject to revision from time to time and should therefore ensure that they are in possession of the latest version.
This spreadsheet should be used in compliance with the accompanying publication 'User Guide RC Spreadsheets: v3' available from The Concrete Bookshop, www.concretebookshop.com, Tel +44 (0)700 4 607777 or +44 (0)1276 607140
This spreadsheet is shareware. It may be distributed freely, but may not be used for commercial purposes until the user has
registered with the TCC via The Concrete Bookshop.
Revision history TCC11 Element DesignSize (kB)
Covers clarified as Cnom. Improvement to calculation of bt for flanges in tension.
Correction to ψ2 for vehicular useage.
Differentiation made between αcc for flexure (=0.85) and αcc for shear (=1.00).
Brittle partitions switches highlighted. Use of ψ2 clarified. Concrete gades 28 and 32 added.
National Annex sheet added and referenced. Updated to November draft.
Variable flange modification factor added in TEE~BEAM, and UPDATED to FINAL DRAFT.
Min main bar spacing to be > bar f and coorection for possible negative square root in calculation of x.
As' changed to As2, d' changed to d2, and net steel stresses used in COLUMNS
Correction to cover warnings & use of d in 310/ss. Also SHEAR:M6 and M15 corrected.
Full SLS moment used for L/d checks 239SHEAR:D15 & M5 corrected 239
Updated to EC2 second draft. 240
242
238Updated to EN by RMW - for comment 241
Table 7.5 updated, deflection enhancement correction, gs omitted from SHEAR., and support tension steel distributed over flange width in
TEE~BEAM.Correction to Tee Beam cracking formulae (tension/compression