IL FUTURO DI SELI Condivisione di obiettivi e traguardi TBM FOR MINING APPLICATIONS SME 2011 ‐ DENVER ‐ REMO GRANDORI
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
TBM FOR MINING APPLICATIONS
SME 2011 ‐ DENVER ‐ REMO GRANDORI
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
TBM DESIGN EVOLUTION
SME 2011 ‐ DENVER ‐ REMO GRANDORI
NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s
TBM DESIGN INNOVATION HAS BEEN FOCUSED ON:•SOFT GROUND SLURRY AND EPB SHIELDED TBMS•SHIELDED TBM FOR MIX ROCK AND SEGMENTAL LINING INSTALL.
HARD ROCK OPEN TBMS REMAINS VIRTUALLY UNCHANGED
NEVER A SPECIFIC TBM FOR MINING APPLICATION WAS DEVELOPED
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
IN 2008 SELI DEVELOPED A NEW TYPE OF TBM FOR AN ANGLO AMERICA MINE
SME 2011 ‐ DENVER ‐ REMO GRANDORI
THE LOS BRONCHES COPPER MINE IN CHILE
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
THE LOS BRONCHES EXPLORATORY TUNNEL
SME 2011 ‐ DENVER ‐ REMO GRANDORI
8 KM LONG
REDUCED PORTAL SPACE
MODIFIED ALIGNMENT
ORIGINAL ALIGNMENT
4,5 m bore diameter
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
FORESEEN TUNNEL GEOLOGY
SME 2011 ‐ DENVER ‐ REMO GRANDORI
•Quartz monzonite for 3.150 m•Andesite for 1.700 m•Rhyodacite porphyry for 1.300 m•Tourmaline breccia for 1.850 m•Chlorite breccia for 100 m•Faults for 25 m
Andesite for 1.700 mRhyodacite porphyry for 1.300 mTourmaline breccia for 1.850 mChlorite breccia for 100 mFaults for 25 m
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
DSU COMPACT TBM SYSTEM DESIGN TARGETS
SME 2011 ‐ DENVER ‐ REMO GRANDORI
COPE WITH WIDE RANGE OF ROCK AND CONDITIONS
ABLE TO INSTALL AN COMPLETE SUPPORT SYSTEM AS NEAR AS POSSIBLE TO THE FACE (ALL IN L1 SECTION)
INCREASE SAFETY STANDARDS
IMPROVE LOGYSTIC (EASY TO TRANSPORT, FAST ASSEMBLY/DISASSEMLY, REDUCED PORTAL INSTALLATIONS)
REDUCED LABOUR FOR OPERATION AND MAINTENANCE
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
INTEGRATED SYSTEM DESIGN
SME 2011 ‐ DENVER ‐ REMO GRANDORI
•NEW TBM TYPE
•NEW COMPACT BACKUP DESIGN
•COMPLEMENTARY TUNNEL TRANSPORT SYSTEMS AND LINES
•COMPACT PORTALS INSTALLATION
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
DSU COMPACT TBM
SME 2011 ‐ DENVER ‐ REMO GRANDORI
FLAT CHD 19” CUTTERS
SHORT CO
NICAL SHI
ELDS
LARGE GRIPPER PADS
GROUND TREATMENTS 360°PATTERN HOLES
ROOF FINGER SHIELD FOR ROCK BOLTS AND STEEL
SETS PREFABRICATED
PANELS
AUXILIARY THRUST TO ADVANCE
THROUGH FAULTS
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
DSU COMPACT TBM
SME 2011 ‐ DENVER ‐ REMO GRANDORI
AUXILIARY GRIPPERS
LARGE BUCKEST WITH GRILL BARS
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
DSU COMPACT TBM
SME 2011 ‐ DENVER ‐ REMO GRANDORI6 M LONG CONICAL SHIELDS
NO STEPS TELESCOPIC JOINT
ROOF AND PROBE DRILLS
STEEL SETS PANELS ERECTOR
300 mm THICK PLATE CHD
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
COMPACT BACKUP SYSTEM
SME 2011 ‐ DENVER ‐ REMO GRANDORI
ONLY 60 M LONG
SEVEN CONTAINERISED DECKS
TUNNEL CONVEYOR
L1
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
PORTAL LOCATION
SME 2011 ‐ DENVER ‐ REMO GRANDORI
DIFFICULT ACCESS IN WINTER
MINE TRUCK TRAFFIC
HARD WINTER CLIMATE
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
PORTAL INSTALLATIONS
SME 2011 ‐ DENVER ‐ REMO GRANDORI
PORTAL INSTALLATIONS
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
WINTHER WEATHER
SME 2011 ‐ DENVER ‐ REMO GRANDORI
WINTER WEATHER IMPOSED TBM ASSEMBLY AND INSTALLATIONS TO BE LOCATED INSIDE THE TUNNEL
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
TBM ASSEMBLY
SME 2011 ‐ DENVER ‐ REMO GRANDORI
WINTER WEATHER IMPOSED TBM ASSEMBLY AND INSTALLATIONS TO BE LOCATED INSIDE THE TUNNEL
AUX. THRUST ON STEEL SETS
PANELS
BOLTED STRUCTURES FOR ASS/DISASS. UNDERGROUND
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
WINTHER WEATHER
SME 2011 ‐ DENVER ‐ REMO GRANDORI
WINTER WEATHER IMPOSED TBM ASSEMBLY AND INSTALLATIONS TO BE LOCATED INSIDE THE TUNNELINSTALLATIONS ENTIRELY UNDERGROUND
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
SME 2011 ‐ DENVER ‐ REMO GRANDORI
ROCK BOLTS
STEEL SET
PANELS
ROCK SUPPORTING SYSTEM
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
SME 2011 ‐ DENVER ‐ REMO GRANDORITBM STARTED TO BORE IN A FAULT AREA
RUNNING BLOCKS IN FRONT OF CHD
RESIN TREATED BLOCKS THROUGH
BUKETS
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
WINTH
SME 2011 ‐ DENVER ‐ REMO GRANDORI
WINTER WEATHER IMPOSED TBM ASSEMBLY AND INSTALLATIONS TO BE LOCATED INSIDE THE TUNNEL
STEEL PANELS ERECTED THROUGH THE FAULT
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
SME 2011 ‐ DENVER ‐ REMO GRANDORI
VERY
HARD
ROCK
OVER
300
MPA
TUNNEL ALIGNMENT MOVED TO HIGH COVERS AND BETTER ROCK CONDITIONS
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
SME 2011 ‐ DENVER ‐ REMO GRANDORI
SOUND
ROCK
FREE
FROM
FRACTURES
SOUND
ROCK
FREE
FROM
FRACTURES
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
SME 2011 ‐ DENVER ‐ REMO GRANDORI
WATER
INFLOWS
UP TO
300
LT/SEC
WATER
INFLOWS
UP TO
300
LT/SEC
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
HIGH PRESSURE WATER INFLOWS FROM
PROBE HOLE
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
SME 2011 ‐ DENVER ‐ REMO GRANDORIPUMPING WATER IN THE TUNNEL INVERT
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
SME 2011 ‐ DENVER ‐ REMO GRANDORISYSTEMATIC ROCK BURSTS UNDER HIGH COVER
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
SME 2011 ‐ DENVER ‐ REMO GRANDORISYSTEMATIC ROCK BURSTS UNDER HIGH COVER
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
PERFORMANCES
SME 2011 ‐ DENVER ‐ REMO GRANDORI
TBM EXCAVATED 4500 m SO FAR
WAS ABLE TO ADVANCE THROUGH ALL ROCK CONDITIONS
N GOOD HARD ROCK REACHED PEAKS OF 46 m/day AND 575 m/month
AVERAGE ADVANCES UNDER MIX ROCK CONDITIONS ARE IN THE REGION OF 1820 m/day
THESE AVERAGES ARE MORE THAN DOUBLE THAN ANGLO AMERICAN FORECASTS IN SAME ROCK CONDITIONS/DISTRIBUTION
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
PERFORMANCES
SME 2011 ‐ DENVER ‐ REMO GRANDORI
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
SAFETY
SME 2011 ‐ DENVER ‐ REMO GRANDORI
SAFETY EQUIPMENT AND PROCEDURES WERE DESIGNED TO COPE WITH STRINGENT ANGLO AMERICAN STANDARDS
2 HOURS PER DAY WERE DEDICATED TO SAFETY TRAINING OF THE TUNNEL CREWS WITH NO PRODUCTION
NO SIGNIFICANT ACCIDENTS OCCURRED DESPITE THE ENCOUNTERED DIFFICULT GROUND CONDITIONS
IL FUTURO DI SELI
Condivisione di obiettivi e traguardi
CONCLUSIONS
SME 2011 ‐ DENVER ‐ REMO GRANDORI
THE DSU COMPACT SYSTEM TBM PROVED TO OUTPERFORMS UNDER SEVERAL POINT OF VIEW IN A MINING ENVIRONMENT
THE LOS BRONCHES MINE IS SATISFIED ABOUT PRODUCTION, SAFETY AND QUALITY OF THE WORKS PERFORMED AND HAS EXTENDED BY ADDITIONAL 3+2=5 KM THE TOTAL TONNEL TO BE BORED BY TBM METHOD
THIS SUCCESS PROVE THAT THERE IS STILL A LOT OF SPACE FOR INNOVATION AND SPECIAL TBM APPLICATIONS FOR MINING