TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

May 20, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

TBM FOR MINING APPLICATIONS

SME 2011 ‐ DENVER ‐ REMO GRANDORI

Page 2: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

TBM DESIGN EVOLUTION 

SME 2011 ‐ DENVER ‐ REMO GRANDORI

NO  DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s

TBM DESIGN INNOVATION HAS BEEN FOCUSED ON:•SOFT GROUND SLURRY AND EPB SHIELDED TBMS•SHIELDED TBM FOR MIX ROCK AND SEGMENTAL LINING INSTALL.

HARD ROCK OPEN TBMS REMAINS VIRTUALLY UNCHANGED

NEVER A SPECIFIC TBM FOR MINING APPLICATION WAS DEVELOPED

Page 3: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

IN 2008 SELI DEVELOPED A NEW TYPE OF TBM FOR AN ANGLO AMERICA MINE 

SME 2011 ‐ DENVER ‐ REMO GRANDORI

THE LOS BRONCHES COPPER MINE IN CHILE

Page 4: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

THE LOS BRONCHES EXPLORATORY TUNNEL

SME 2011 ‐ DENVER ‐ REMO GRANDORI

8 KM LONG

REDUCED PORTAL SPACE

MODIFIED ALIGNMENT

ORIGINAL ALIGNMENT

4,5 m bore diameter

Page 5: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

FORESEEN TUNNEL GEOLOGY

SME 2011 ‐ DENVER ‐ REMO GRANDORI

•Quartz monzonite for 3.150 m•Andesite for 1.700 m•Rhyodacite porphyry for 1.300 m•Tourmaline breccia for 1.850 m•Chlorite breccia for 100 m•Faults for 25 m

Andesite for 1.700 mRhyodacite porphyry for 1.300 mTourmaline breccia for 1.850 mChlorite breccia for 100 mFaults for 25 m

Page 6: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

DSU COMPACT TBM SYSTEM DESIGN TARGETS

SME 2011 ‐ DENVER ‐ REMO GRANDORI

COPE WITH WIDE RANGE OF ROCK AND CONDITIONS

ABLE TO INSTALL AN COMPLETE SUPPORT SYSTEM AS  NEAR AS POSSIBLE TO THE FACE  (ALL IN L1 SECTION)

INCREASE SAFETY STANDARDS

IMPROVE LOGYSTIC (EASY TO TRANSPORT,  FAST ASSEMBLY/DISASSEMLY, REDUCED PORTAL INSTALLATIONS)

REDUCED LABOUR FOR OPERATION AND MAINTENANCE

Page 7: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

INTEGRATED SYSTEM  DESIGN

SME 2011 ‐ DENVER ‐ REMO GRANDORI

•NEW TBM TYPE

•NEW COMPACT BACK­UP DESIGN

•COMPLEMENTARY  TUNNEL TRANSPORT SYSTEMS AND LINES

•COMPACT PORTALS INSTALLATION

Page 8: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

DSU COMPACT TBM

SME 2011 ‐ DENVER ‐ REMO GRANDORI

FLAT CHD 19” CUTTERS

SHORT CO

NICAL SHI

ELDS

LARGE GRIPPER PADS

GROUND TREATMENTS 360°PATTERN HOLES

ROOF FINGER SHIELD FOR ROCK BOLTS AND STEEL 

SETS PREFABRICATED 

PANELS

AUXILIARY THRUST TO ADVANCE 

THROUGH FAULTS

Page 9: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

DSU COMPACT TBM

SME 2011 ‐ DENVER ‐ REMO GRANDORI

AUXILIARY GRIPPERS

LARGE BUCKEST WITH GRILL BARS

Page 10: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

DSU COMPACT TBM

SME 2011 ‐ DENVER ‐ REMO GRANDORI6 M LONG CONICAL SHIELDS

NO STEPS TELESCOPIC  JOINT

ROOF AND PROBE DRILLS

STEEL SETS PANELS ERECTOR

300 mm THICK PLATE CHD

Page 11: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

COMPACT BACK­UP SYSTEM

SME 2011 ‐ DENVER ‐ REMO GRANDORI

ONLY 60 M LONG

SEVEN CONTAINERISED DECKS

TUNNEL CONVEYOR

L1

Page 12: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

PORTAL LOCATION

SME 2011 ‐ DENVER ‐ REMO GRANDORI

DIFFICULT ACCESS IN WINTER

MINE TRUCK TRAFFIC

HARD WINTER CLIMATE

Page 13: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

PORTAL INSTALLATIONS

SME 2011 ‐ DENVER ‐ REMO GRANDORI

PORTAL INSTALLATIONS

Page 14: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

WINTHER WEATHER

SME 2011 ‐ DENVER ‐ REMO GRANDORI

WINTER WEATHER  IMPOSED TBM ASSEMBLY AND INSTALLATIONS TO BE LOCATED INSIDE THE TUNNEL

Page 15: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

TBM ASSEMBLY

SME 2011 ‐ DENVER ‐ REMO GRANDORI

WINTER WEATHER  IMPOSED TBM ASSEMBLY AND INSTALLATIONS TO BE LOCATED INSIDE THE TUNNEL

AUX. THRUST ON STEEL SETS 

PANELS

BOLTED STRUCTURES FOR ASS/DISASS. UNDERGROUND

Page 16: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

WINTHER WEATHER

SME 2011 ‐ DENVER ‐ REMO GRANDORI

WINTER WEATHER  IMPOSED TBM ASSEMBLY AND INSTALLATIONS TO BE LOCATED INSIDE THE TUNNELINSTALLATIONS ENTIRELY UNDERGROUND

Page 17: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

SME 2011 ‐ DENVER ‐ REMO GRANDORI

ROCK BOLTS

STEEL SET

PANELS

ROCK SUPPORTING SYSTEM

Page 18: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

SME 2011 ‐ DENVER ‐ REMO GRANDORITBM STARTED TO BORE IN A FAULT AREA

RUNNING BLOCKS IN FRONT OF CHD

RESIN TREATED BLOCKS THROUGH 

BUKETS

Page 19: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

WINTH

SME 2011 ‐ DENVER ‐ REMO GRANDORI

WINTER WEATHER  IMPOSED TBM ASSEMBLY AND INSTALLATIONS TO BE LOCATED INSIDE THE TUNNEL

STEEL PANELS ERECTED THROUGH THE FAULT

Page 20: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

SME 2011 ‐ DENVER ‐ REMO GRANDORI

VERY

HARD

ROCK

OVER

300 

MPA

TUNNEL ALIGNMENT MOVED TO HIGH COVERS AND BETTER ROCK  CONDITIONS

Page 21: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

SME 2011 ‐ DENVER ‐ REMO GRANDORI

SOUND

ROCK

FREE

FROM

FRACTURES

SOUND

ROCK

FREE

FROM

FRACTURES

Page 22: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

SME 2011 ‐ DENVER ‐ REMO GRANDORI

WATER

INFLOWS

UP TO 

300

LT/SEC

WATER

INFLOWS

UP TO 

300

LT/SEC

Page 23: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

HIGH PRESSURE WATER INFLOWS FROM 

PROBE HOLE

Page 24: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

SME 2011 ‐ DENVER ‐ REMO GRANDORIPUMPING WATER IN THE TUNNEL INVERT

Page 25: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

SME 2011 ‐ DENVER ‐ REMO GRANDORISYSTEMATIC ROCK BURSTS UNDER HIGH COVER

Page 26: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

SME 2011 ‐ DENVER ‐ REMO GRANDORISYSTEMATIC ROCK BURSTS UNDER HIGH COVER

Page 27: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

PERFORMANCES

SME 2011 ‐ DENVER ‐ REMO GRANDORI

TBM EXCAVATED 4500 m SO FAR

WAS ABLE TO ADVANCE THROUGH ALL ROCK CONDITIONS

N GOOD HARD ROCK REACHED  PEAKS  OF 46 m/day AND 575 m/month 

AVERAGE ADVANCES UNDER MIX ROCK CONDITIONS  ARE IN THE REGION OF 18­20 m/day 

THESE AVERAGES ARE MORE THAN DOUBLE THAN ANGLO AMERICAN FORECASTS IN SAME ROCK CONDITIONS/DISTRIBUTION

Page 28: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

PERFORMANCES

SME 2011 ‐ DENVER ‐ REMO GRANDORI

Page 29: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

SAFETY 

SME 2011 ‐ DENVER ‐ REMO GRANDORI

SAFETY EQUIPMENT AND PROCEDURES WERE DESIGNED TO COPE WITH STRINGENT ANGLO AMERICAN STANDARDS

2 HOURS PER DAY WERE DEDICATED TO SAFETY  TRAINING OF THE TUNNEL CREWS WITH NO PRODUCTION

NO SIGNIFICANT ACCIDENTS OCCURRED DESPITE THE ENCOUNTERED DIFFICULT GROUND CONDITIONS

Page 30: TBM FOR MINING APPLICATIONS - Selitunnel...SME 2011 ‐DENVER ‐REMO GRANDORI NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960’s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: •SOFT

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

CONCLUSIONS 

SME 2011 ‐ DENVER ‐ REMO GRANDORI

THE DSU COMPACT SYSTEM TBM PROVED TO OUTPERFORMS UNDER SEVERAL POINT OF VIEW IN A MINING ENVIRONMENT

THE LOS BRONCHES MINE IS SATISFIED ABOUT PRODUCTION, SAFETY AND QUALITY OF THE WORKS PERFORMED AND HAS EXTENDED BY ADDITIONAL 3+2=5 KM THE TOTAL TONNEL TO BE BORED BY TBM METHOD

THIS SUCCESS PROVE  THAT THERE IS STILL A LOT  OF SPACE FOR INNOVATION AND SPECIAL TBM APPLICATIONS  FOR MINING