http://www.gratisexam.com/ Testkings.TB0-121.99 questions Number : TB0-121 Passing Score : 800 Time Limit : 120 min File Version : 6.2 http://www.gratisexam.com/ TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is the best VCE I ever made. Try guys and if any suggestion please update this. Many new questions are added, Good for review go ahead and pass the exam now. 100% Valid in US, UK, Australia, India and Emirates. All my friends in group have these same questions. Fixed the Exhibit size and Drag drops/hot spot questions. It gave me the real atmosphere of the exam and also the questions of the same were of good standard .
50

TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

Mar 06, 2018

Download

Documents

doannga
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Testkings.TB0-121.99 questions

Number: TB0-121Passing Score: 800Time Limit: 120 minFile Version: 6.2

http://www.gratisexam.com/

TB0-121

TIBCO ActiveMatrix BPM Solution Designer

This is the best VCE I ever made. Try guys and if any suggestion please update this.

Many new questions are added, Good for review go ahead and pass the exam now.

100% Valid in US, UK, Australia, India and Emirates. All my friends in group have these same questions.

Fixed the Exhibit size and Drag drops/hot spot questions.

It gave me the real atmosphere of the exam and also the questions of the same were of good standard .

Page 2: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Page 3: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Exam A

QUESTION 1Which three are participant types? (Choose three.)

A. SystemB. CapabilityC. PositionD. Organization UnitE. RoleF. Group

Correct Answer: ADESection: (none)Explanation

Explanation/Reference:good answer.

QUESTION 2Which three multiplicity indicators can be associated with a Composition connection? (Choose three.)

A. 0.*B. 1C. 1.0D. NE. n.*

Correct Answer: ABDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 3Which statement is true about deploying and starting an updated version of a process?

Page 4: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. Two independent versions of the process will now be available for the user to choose to run against.B. All of the existing process instances regardless of state will be migrated to the new version.C. Only the latest version of the process will continue to run as the older version of the process will be auto-deprecated.D. Some process instances may be migrated to the newer process version depending on the state of the process instances.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 4As a part of a new release for a business process, the process was updated by fixing a defect in a business process task.

What is the sequence for updating the runtime instance of the DAA?

A. Export the DAA to the ActiveMatrix Administrator, map the DAA to a new node, deploy the DAAB. Export the project as a DAA, upload the DAA to ActiveMatrix Administrator, choose the new version, save and deployC. Export the project MAA to a DAA, upload the DAA to ActiveMatrix Administrator, choose the new version, save and deployD. Export the project as a DAA, upload the DAA to ActiveMatrix Administrator, map the DAA to BPM node, save and deploy

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 5Which expression is valid for selecting the HealthSafety group resource?

http://www.gratisexam.com/

Page 5: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. Group(name="HealthSafety")B. Name(Group="HealthSafety")C. Groupname("HealthSafety")D. HealthSafety(name="group")

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 6Click the Exhibit button.

The use case requires that a manager is notified when an activity misses a deadline. If the activity is completed before the manager opens the notification, thenotification should be withdrawn from the work list.

Which two configurations must be implemented to satisfy this requirement? (Choose two.)

A. The Timer Event must be configured as Continue Task on Timeout,

Page 6: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

B. The Timer Event must be configured as Withdraw Task on TimeoutC. The Throw Signal Event must have a unique Signal Name.D. The Catch Signal Event must have a unique Signal Name.

Correct Answer: ACSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 7What are two outcomes when a process instance is cancelled? (Choose two.)

A. All work items that are associated with the process instance are deleted.B. Cancelled process instances are automatically purged from the system.C. The cancelled process instance remains in the process instance list but cannot be started.D. All work items that were pended are retained in the work item lists.

Correct Answer: ABSection: (none)Explanation

Explanation/Reference:fine answer.

QUESTION 8Which three statements are true about the System Log in the Forms Preview tabs? (Choose three.)

A. It is possible to choose the log level for the System Log in both GI and GWT Preview tabs.B. Messages logged by user scripts will be shown in the INFO logging level.C. The logging level chosen in the preview pane will apply only to that preview session.D. You can change the default logging level in the User Preferences.E. It is only possible to choose the log level for the System Log in the GI Preview tab.

Correct Answer: ACDSection: (none)Explanation

Page 7: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Explanation/Reference:Explanation:

QUESTION 9Which statement is true about process migration?

A. Process migration is controlled either by the use of migration points or the use of migration rules.B. All tasks are valid migration pointsC. A migration rule defines when, how and to what version a process instance will migrate.D. Process migration can only be performed in the Workspace client.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 10In which three ways can participants be defined in a User task? (Choose three.)

A. DynamicallyB. Round-robinC. RandomlyD. StaticallyE. Using expressions

Correct Answer: ADESection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 11Which two statements are true about the configuration of reusable sub-processes? (Choose two.)

A. All sub-process instances can use all or overlapping subsets of data at the start of that instance.

Page 8: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

B. All sub-process instances must use the same full set of data at the start of the sub-process.C. Data changes can be passed from one instance to another when the instances are running in parallel.D. Data changes can be passed from one instance to the next when the instances are running sequentially.

Correct Answer: ADSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 12Which three statements are true about process testing? (Choose three.)

A. Only the current values of process instance data are available to assist in debugging.B. A full update history of process instance data is available to assist in debugging.C. Process Service tasks can only be fully tested after deploying the project.D. The Process Event Log can assist in checking that process routing functions are operating correct*/.E. The Process Event Log always contains details of all process instance data changes.

Correct Answer: ACDSection: (none)Explanation

Explanation/Reference:most appropriate answer.

QUESTION 13Click the Exhibit button.

Page 9: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

http://www.gratisexam.com/

The process shown in the exhibit contains User tasks A, B, C, D, E, F. These task can all be enabled at the same time. Another User task. Client Cancels, isenabled all of the time to handle any unexpected contact from the customer.

It is required that when Client Cancels is completed, User tasks A, B, D, E must be withdrawn if they are still enabled. However, tasks C and F must be leftunchanged. A Throw Signal Event is placed after Client Contacts completes.

Which two patterns might be used to satisfy this use case? (Choose two.)

A. Place a matching Catch Signal Event on the boundary of each of User tasks A, B, D, EB. Place User tasks A, B.D.E in an embedded sub-process, and put a Catch Signal Event on its boundary

Page 10: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

C. Place an End Event of type Terminate Process after the Client Cancels User taskD. Place a Catch Error Event on the boundary of each of User tasks A, B, D, E

Correct Answer: ABSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 14Which two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose two.)

A. The form can be used from a process Script task.B. The form can be used from a process User task.C. The form can be used from a process gateway.D. The form can be used before the process has been started, if it is used in a Business Service PageflowE. The form can be used before the process has been started, if it is invoked as a stand-alone form.

Correct Answer: BDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 15A TIBCO ActiveMatrix BPM Process Template fails to start.

What is the location of the necessary information for determining why this has occurred? (Choose three.)

A. TIBCO Business Studio Error LogB. TIBCO Business Studio Deployment ConsoleC. Openspace Logger gadgetD. Workspace Event ViewerE. Workspace Application MonitorF. Openspace Business Service gadget

Page 11: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Correct Answer: CDESection: (none)Explanation

Explanation/Reference:updated answer.

QUESTION 16Click the Exhibit button.

Which statement is true about using an Inclusive Decision/Merge (OR) Gateway with multiple incoming paths and one outgoing path?

A. The gateway waits for the first incoming path to complete, then passes control to the outgoing path and ignores all other incoming paths.B. The gateway waits for every incoming path to complete before passing control to the outgoing path.C. The gateway waits for all "active" incoming paths to complete before passing control to the outgoing path.D. The gateway can contain logic to define how many paths must complete before it passes control to the outgoing path.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 17Click the Exhibit button.

Which service types could be selected to fix the Service task configuration error shown in the exhibit?

A. E-Mail, Database, RESTful

Page 12: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

B. Database, RESTful, Web ServiceC. Java, JMS, Web ServiceD. Java, Database. E-Mail

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 18Which three statements are true about changing the major version number of an Organization Model? (Choose three.)

A. You must change the version number of the Organization Model project in the Lifecycle property.B. You must change the version number of the Organization Model project in the Project References property.C. You must refactor the project to update the version numbers of all project assets.D. Project assets do not need to have the same major version number as the Organization Model.E. You must change the version numbers of all projects that reference the Organization Model.F. Projects referencing the Organization Model do not need to have the same major version number.

Correct Answer: ACESection: (none)Explanation

Explanation/Reference:sorted answer is correct.

QUESTION 19What are two reasons that work items in a work item list may be hidden? (Choose two.)

A. The process instance is being cancelled.B. The user does not have permission to view the work itemC. The work items are associated with a process instance that has been suspended.D. The work items have been pended until a specified date/time.

Correct Answer: CDSection: (none)

Page 13: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Explanation

Explanation/Reference:Explanation:

QUESTION 20What must be used to ensure that each incoming message is received by the process instance to which it applies?

A. Correlation dataB. Reference numberC. Data fieldD. Receive Event

Correct Answer: DSection: (none)Explanation

Explanation/Reference:sophisticated answer.

QUESTION 21Which two methods can be used to assign a participant in a User task at design time? (Choose two.)

A. Selecting an Organization Model entityB. Using a performer data field or parameterC. Using a participant expressionD. Using an LDAP reference

Correct Answer: ADSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 22Which statement is true about system participants?

A. A system participant is assigned to a Service task.

Page 14: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

B. A system participant identifies an activity that is performed by a human.C. A system participant is assigned to any type of task.D. A system participant identifies the ActiveMatrix BPM system.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 23Which three Resource Patterns are used in a process to control how work is assigned to users? (Choose three.)

A. Chained ExecutionB. Retain FamiliarC. PilingD. Load BalancingE. External Reference

Correct Answer: ABCSection: (none)Explanation

Explanation/Reference:properly selected answer.

QUESTION 24On which three process objects can scripting be used? (Choose three.)

A. Conditional sequence flowB. Complex Decision/Merge GatewayC. Embedded sub-processD. Service taskE. Inclusive Decision/Merge GatewayF. Default sequence flow

Correct Answer: ADE

Page 15: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Section: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 25In TIBCO Business Studio, what are two ways to investigate errors in the Problems View? (Choose two.)

A. Right-click the error and select Quick FixB. Right-click the error and select Go ToC. Right-click the error and select PropertiesD. Right-click the error and select Show In

Correct Answer: CDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 26Which two statements are true about deploying Organization Models? (Choose two.)

A. The major version number is only changed manually.B. Each minor version is treated as a complete and separate Organization Model.C. The major version number must be changed if the update is destructive.D. The minor version number is automatically incremented.

Correct Answer: CDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 27Which two statements are true about gateways and User tasks? (Choose two.)

Page 16: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. A User task can be used when interaction with a user via a form is required.B. A User task can have more than one associated Timer Catch Event.C. A gateway can be used when routing is based on process data.D. A gateway can be used for interaction with a user when a decision is required from the user.

Correct Answer: ACSection: (none)Explanation

Explanation/Reference:reliable answer.

QUESTION 28Which statement is true about using participants to create tasks?

A. It can be done by dragging a participant to a blank area of the process canvas.B. Only one participant at a time can be used to create a task.C. A participant can be used to create any type of task.D. It can be done using a right-click menu option in Project Explorer.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:most suitable answer.

QUESTION 29Which statement is true about a Business Object Model package?

A. A package is a description of a set of properties that create a meaningful unit.B. Associations between classes are limited to a single package.C. A package can contain other packages.D. Packages are available to include in a Child Diagram.

Correct Answer: CSection: (none)Explanation

Page 17: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Explanation/Reference:Explanation:

QUESTION 30Which three statements are true about the relationship between User tasks and forms? (Choose three.)

A. A User task and a form have their own separate models for input and output parameters.B. A User task and a form share the same model for input and output parameters.C. When a form is created from a User task, the form parameters are automatically set to match those in the User task.D. When a form is created from a User task, the parameters need to be manually bound to form controls.E. The Synchronize Form operation on the User task will update the form parameters to match the User task parameters.F. The Synchronize Form operation on the form will update the User task parameters to match the form parameters.

Correct Answer: ACESection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 31You are modeling the business processes for a technical call center. In the Organization Model, which action should you take to ensure that a service requestalways goes to a call center executive who has the necessary language skills and a specific technical certification?

A. Assign Privileges to a Capability to route the callB. Assign Qualifiers to a Category to route the callC. Assign Qualifiers to a Capability to route the callD. Assign Properties to a Capability to route the call

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 32Which two statements are true about import/export in TIBCO Business Studio? (Choose two.)

Page 18: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. Workspaces can be imported or exported.B. An Organization Model can be exported as HTML.C. Process fragments can be imported into the workspace.D. It is not necessary to have a unique project name when importing an MAA.

Correct Answer: BCSection: (none)Explanation

Explanation/Reference:actual answer.

QUESTION 33Which two factors must be considered when exposing processes as services? (Choose two.)

A. For any of the events that are exposed as one-way operations, there are no Message End Events.B. For any task or event to be exposed as a service, a JMS transport is required.C. For any of the Receive tasks that are exposed as a service, there could be a Message End Event.D. For any of the Receive tasks that are exposed as a service, there could be a Message Start Event that generates a reply.

Correct Answer: ACSection: (none)Explanation

Explanation/Reference:satisfactory answer.

QUESTION 34Which three capabilities are available to assist in testing a Service task that accesses a database? (Choose three.)

http://www.gratisexam.com/

Page 19: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. Ability to save a local copy of the database schemaB. Ability to test SQL statements at design timeC. Ability to map a Business Object Model to the input of a stored procedureD. Ability to create a Business Object Model using the input to the stored procedureE. Ability to create a Business Object Model to store the response from an SQL query

Correct Answer: ABESection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 35Click the Exhibit button.

In which three locations are capabilities assigned, once those capabilities representing the skills required have been defined? (Choose three.)

Page 20: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. ResourcesB. EntitiesC. PositionsD. GroupsE. Locations

Correct Answer: ACDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 36Which two statements are true about Supervised Views? (Choose two.)

A. By default, there is one pre-defined Work View in the Supervised Work folder.B. A Supervised View can only be temporary and lasts for the duration of a session.C. Supervised Views of an organizational entity can contain both Offered and Allocated work items.D. There are two types of Supervised Views: Individual Resource and Organizational Entity.

Correct Answer: CDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 37Which Control Pattern is defined as "The ability to execute a task or sub-process repeatedly"?

A. Structured LoopB. Interleaved RoutingC. Arbitrary CyclesD. Deferred Choice

Correct Answer: A

Page 21: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Section: (none)Explanation

Explanation/Reference:genuine answer.

QUESTION 38Match each icon with its description.

Select and Place:

Correct Answer:

Section: (none)Explanation

Explanation/Reference:

QUESTION 39Select the correct steps to create an LDAP Shared Resource and place them in the correct order.

Select and Place:

Correct Answer:

Section: (none)Explanation

Explanation/Reference:

QUESTION 40In TIB CO Openspace, the process Instance State buttons are used to display the status of process instances for a process template.

Match each Process Instance State button with its description.

Select and Place:

Correct Answer:

Page 22: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Section: (none)Explanation

Explanation/Reference:

QUESTION 41Which two statements are true when you suspend a process instance? (Choose two.)

A. All work items are suspended, except in a Supervisor Work View.B. If a work item is open when the process instance is suspended, the work item can still be submitted.C. All work items remain in an allocated state until the process instance is resumed.D. All suspended work items become hidden in the work item list.

Correct Answer: ADSection: (none)Explanation

Explanation/Reference:accurate answer.

QUESTION 42Which two functions are available to the user when using a Supervisor Work View? (Choose two.)

A. Allocate selected work items to selfB. pend selected work itemsC. Cancel selected work itemsD. Allocate selected work items to offer setE. Open selected work items

Correct Answer: CDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 43Which two statements are true about scripts? (Choose two.)

Page 23: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. A script can be associated with a multi-instance task.B. Business analysis capability is required to enter JavaScript to a Script taskC. It is possible to highlight all tasks that contain scripts in a process.D. A script can be executed on a Start Timer Event.

Correct Answer: BDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 44Which two statements are true about Organization Models? (Choose two.)

A. They can be configured against multiple LDAPs.B. They cannot be deployed independently of BPM applications.C. They are optional if the BPM application is fully automated.D. They can be shared by multiple BPM applications.

Correct Answer: BCSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 45What are two uses of form bindings? (Choose two.)

A. To update a control property, based on a control valueB. To associate a rule with a private or shared actionC. To associate a control value with a form parameterD. To update a rule, based on a form eventE. To allow an action to be shared with multiple rules

Correct Answer: AC

Page 24: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Section: (none)Explanation

Explanation/Reference:definite answer.

QUESTION 46Click the Exhibit button.

In this scenario, the Complex Decision / Merge is configured as follows:

Join Type = Continue When 'n' Parallel Flows Arrive

Parallel Split Gateway = Send Requests

Number of Incoming Flow = 3

What happens when the process is run?

A. When any three of the Approval tasks has completed, one copy of the Review task will be sent out.The remaining Approval task will be processed then ignored.

B. When any three of the Approval tasks has completed, one copy of the Review task will be sent out.

Page 25: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

The remaining Approval task will be cancelled immediately.C. When each of the first three Approval tasks completes, one copy of the Review task will be sent out, resulting in three Review tasks. The remaining Approval

task will be processed then ignored.D. When each of the first three Approval tasks completes, one copy of the Review task will be sent out, resulting in three Review tasks. The remaining Approval

task will be cancelled immediately.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:definite answer.

QUESTION 47Which statement is true when the User task's specified distribution method is Offer to All?

A. The work item is available to all users who are members of the specified organizational entity.B. The work item is distributed to, and completed by all members of the specified organizational entity.C. Work items are distributed to members of the specified organizational entity in strict rotational order.D. Work items are distributed to members of the specified organizational entity in random order.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 48Which two statements are true about signals? (Choose two.)

A. A Catch Signal Event on a task boundary always results in that task being withdrawn.B. A Catch Signal Event on a task boundary always results in that task remaining outstanding.C. One thrown signal can be caught by more than one Catch Signal Event.D. A Catch Signal Event on a task boundary can be configured to withdraw the task or leave it outstanding.E. A Throw Signal Event can have data values attached to it, to be passed to any Catch Event.

Correct Answer: ACSection: (none)

Page 26: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Explanation

Explanation/Reference:Explanation:

QUESTION 49Which statement is true about migration points?

A. Start Events can be used as migration points.B. Task names in source and destination process templates must be the sameC. Task names can be duplicated.D. Any tasks inside embedded sub-processes can be migration points.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 50Which three JavaScript loops are supported? (Choose three.)

A. do {BLOCK \} while (CONDITION);B. for (INITIALISER; CONDITION; INCREMENT) { BLOCK \}C. for (FIELD in ARRAYFIELD){ BLOCK \}D. do {INCREMENT \} for (INCREMENT);E. while (CONDITION) {BLOCK\}

Correct Answer: ACDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 51What are two valid ways to define a participant? (Choose two.)

Page 27: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. As an external reference to an Organization ModelB. As an Organization Model queryC. As a Business Object Model queryD. As an external reference to a Business Object Model

Correct Answer: ABSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 52Which two statements are true about the Composition relationship between objects? (Choose two.)

A. Composition is represented by a hollow triangle connected to the general form.B. When you create a composition in Business Object Modeler, by default its navigability is from the source class to the target class.C. Composition is represented as a filled diamond shape connected to the containing class.D. When you create a Composition in Business Object Modeler, by default its navigability is from the target class to the source class.E. Composition is represented as a clear diamond shape connected to the containing class.

Correct Answer: BCSection: (none)Explanation

Explanation/Reference:best suitable answer.

QUESTION 53Which two statements are true about Exclusive Data-based Gateways? (Choose two.)

A. Only one output path will be followed.B. All output paths that evaluate to True will be followed.C. The default path will always be followed.D. Several Conditional output paths can be modeled.E. Only one Conditional output path can be modeled.

Correct Answer: AD

Page 28: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Section: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 54Which two statements are true about the TIBCO Business Studio Form Designer's Design and Preview tabs? (Choose two.)

A. There are four tabs in total: Design, GI Preview, GWT Preview and Mobile Preview.B. The GI Preview tab allows you to compare how the form will look at runtime in both GI and GWT environmentsC. The appearance of the form in the Preview tabs is determined by the Presentation Channel Settings.D. The Mobile Preview tab shows the URL used to navigate and preview the mobile forms on a mobile device.E. The appearance of the form in the Preview tabs is determined by the User Task's Appearance properties.

Correct Answer: ADSection: (none)Explanation

Explanation/Reference:accurate answer.

QUESTION 55Which two statements are true about deploying projects to an ActiveMatrix BPM server node from TIBCO Business Studio? (Choose two.)

A. There must be two deployment servers configured: one for runtime and one for deployment,B. All process errors must be resolved in TIBCO Business Studio before it can be deployed.C. The Solution Designer capability must be enabled to create and use deployment servers.D. There must be one Organization Model in each project that is deployed.

Correct Answer: BCSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 56How do you create or obtain an Organization Model to use with a process? (Choose two)

Page 29: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. By refactoring a process that already uses Basic Type participantsB. By importing existing participantsC. By creating it from scratch, using the Organization ModelerD. By selecting Participant and choosing Generate

Correct Answer: ACSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 57Controls are used to capture user input in TIBCO Business Studio Forms. Which control should be used in order to enter a block of HTML into a form?

A. Pass-throughB. LabelC. HyperlinkD. ImageE. Text

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 58Which type of file is used to deploy processes to the ActiveMatrix BPM server node?

A. DAAB. EARC. JARD. MAA

Correct Answer: A

Page 30: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Section: (none)Explanation

Explanation/Reference:Explanation:https://docs.tibco.com/pub/activematrix_bpm/1.3.1_july_2012/doc/pdf/tib_amx_bpm_concepts.pdf page 82.

QUESTION 59A process with multiple parallel branches from a single path must converge into a single path. When the activities in one branch are completed and reach the pointof convergence, control must be passed to the single path without waiting for the other branches to complete.

Which Workflow Control Pattern should be used to achieve this functionality?

A. Structured DiscriminatorB. Cancelling DiscriminatorC. Structured Synchronizing MergeD. Multi-Merge

Correct Answer: ASection: (none)Explanation

Explanation/Reference:real answer.

QUESTION 60Click the Exhibit button.

Page 31: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Which two options are available when adding a binding to a form parameter in TIBCO Business Studio? (Choose two.)

A. Is Updated ByB. Synchronizes WithC. Externally UpdatedD. Scripted

Correct Answer: ABSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 61Which requirement must be met by User tasks that are chained together?

Page 32: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. They must be offered to different participants.B. They must have Offer to All as their distribution strategy.C. They must have Offer to One as their distribution strategy.D. They must be allocated to different participants.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 62Which two statements are true about ActiveMatrix BPM scripts? (Choose two.)

A. All script functions are available in every type of script.B. The script editor highlights syntax errorsC. The script editor can auto-correct syntax errorsD. The only deployable script language in ActiveMatrix BPM is a subset of JavaScript.E. The script language can be changed to the developer's preferred scripting tool.

Correct Answer: BDSection: (none)Explanation

Explanation/Reference:absolute answer.

QUESTION 63Click the Exhibit button.

Page 33: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

In the Organization Model shown in the graphic, the Operations Account Opening Team must be able to reallocate work to other resources. PrivilegeopReallocateWorkPrivilege has been created. The System task "Work Item Allocation" exists at both Organization Unit and Organization Model levels. What mustbe done to make it possible for the team to reallocate work to other resources? (Choose two.)

A. The privilege must be assigned to the Organization Unit.B. The privilege must be associated with the System task for this Organization Unit,C. The privilege must be associated with the System task for the Organization Model.D. The privilege must be assigned to the Organization Model.

Correct Answer: ABSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 64Which three requirements must be met in order to enable the Runtime clients to be opened from TIBCO Business Studio? (Choose three.)

Page 34: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. A deployment server must be created and configured.B. The login URL for the Administrator interface must be configured.C. The login URL for the Workspace interface must be configured.D. The login URL for the Open space interface must be configured.E. The URL for the WebDAV server must be configured.F. The URL of the clients must be the same as the administrator.

Correct Answer: ABFSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 65Which requirement must be met in order to create a deployment server?

A. A Custom User task related to use forms must be created before deployment.B. You must ensure that no validation errors related to the project are displayed.C. The Solution Design capability must be turned on.D. Any scripts in a process must be implemented as JavaScript.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 66The use case requires a service to be exposed to allow a process to be called as a business service Which Start Event type must be defined to allow the WSDL tobe generated?

A. MessageB. ConditionalC. MultipleD. Signal

Page 35: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Correct Answer: ASection: (none)Explanation

Explanation/Reference:finely answer.

QUESTION 67Which two statements are true about an Organization Model? (Choose two.)

A. It can be used to see how the organization is distributed geographically.B. It provides independence from using directory services.C. It can be synchronized with an LDAP serverD. It can aggregate users and groups from multiple directory services.

Correct Answer: ADSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 68Which three statements are true about rules and actions in TIBCO Business Studio Forms? (Choose three.)

http://www.gratisexam.com/

A. Two types of actions can be created: Script and Computation.B. Rules consist of events and actions.C. Rules only consist of actions.D. The Rules Summary Table provides an overview of all rules.E. Actions are invoked from forms only on a Pageflow process.

Page 36: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Correct Answer: ABDSection: (none)Explanation

Explanation/Reference:proper answered.

QUESTION 69A use case requires a business process to start when a client submits a completed online application form. If after completing the form, the client chooses not tocontinue, the data should be discarded and the business process should not be started.

Which two actions satisfy this requirement? (Choose two.)

A. Gather the application data in a PageflowB. Gather the application data in the first User task of the processC. Gather the application data in a bespoke form, then start the process via a serviceD. Gather the application data in a Process task, then cancel the process if the client cancels the form

Correct Answer: ACSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 70Which two statements are true about version control, and deployment packages? (Choose two.)

A. Multiple versions of packages can be shared with other designers as long as they share the same workspace,B. Multiple versions of packages can be shared with other designers via a source control system such as SVN or CVS.C. The current version of a package can be compared with previous versions in local history.D. Objects can highlighted on the process map and will display the history of that object.

Correct Answer: BCSection: (none)Explanation

Explanation/Reference:Explanation:

Page 37: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

QUESTION 71At what level can parameters be created?

A. At the process levelB. At the package levelC. At the activity levelD. At the property level

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 72Which three statements are true about Pageflow processes? (Choose three.)

A. A single Pageflow process can only be associated with one User task.B. A single Pageflow process can be associated with more than one User task.C. A process cannot be refactored into a Pageflow process.D. A process can be refactored into a Pageflow process.E. A Pageflow process can only have a single participant assigned to it at design time.F. A Pageflow process cannot have participants assigned to it at design time.

Correct Answer: BDFSection: (none)Explanation

Explanation/Reference:choice of answer is right.

QUESTION 73What are the three types of sequence flows? (Choose three.)

A. DefaultB. Message

Page 38: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

C. UnconditionalD. UncontrolledE. ConditionalF. Standard

Correct Answer: ADESection: (none)Explanation

Explanation/Reference:real answer.

QUESTION 74Which two actions might be needed when importing projects that were created in a previous version of TIBCO Business Studio? (Choose two.)

A. RenameB. Problem CheckerC. Project CleanD. Quick Fix

Correct Answer: CDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 75Which three statements are true about Personal or Supervised Work Views? (Choose three.)

A. To supervise work items of other users, you must have the View Work List Scoped system action.B. The Personal Work View can be removed and replaced with a Supervisor Work View.C. The Personal Work View can only contain Allocated work items.D. Supervised Work Views of an organizational entity can contain Offered and Allocated work items.E. By default, there are no Work Views in the Supervised Work folder.

Correct Answer: ADESection: (none)

Page 39: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Explanation

Explanation/Reference:good answer.

QUESTION 76Which class contains the system action to cancel process instances?

A. Organization ModelB. OrganizationC. Organization UnitD. Group

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 77Which two statements are true about embedded forms? (Choose two.)

A. An embedded form can have navigation and message panes.B. An embedded form cannot have navigation or message panes.C. The embedded form parameters can be accessed only via the parent form.D. The embedded form parameters can be accessed directly.

Correct Answer: BCSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 78As part of a business process, an organization wants to ensure that work items are performed by the correct human resource by allocating them to users in thecorrect part of the organization. Which two patterns can be used to achieve this? (Choose two.)

Page 40: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. Role-Based AllocationB. AuthorizationC. Direct DistributionD. Automatic ExecutionE. Distribution on Enablement

Correct Answer: ACSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 79What are three valid process instance states during execution? (Choose three.)

A. ACTIVEB. COMPLETINGC. SUSPENDINGD. RUNNINGE. EXITING

Correct Answer: ABCSection: (none)Explanation

Explanation/Reference:actual answer.

QUESTION 80To achieve the most efficient use of workers' capabilities, an organization wants a user to process a number of tasks of the same type from different processinstances.

Which Workflow Pattern should be employed when designing the business process?

A. PilingB. ChainingC. Separation of Duties

Page 41: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

D. Retain FamiliarE. Pageflow

Correct Answer: ESection: (none)Explanation

Explanation/Reference:updated answer.

QUESTION 81Which two statements are true about Permanent and Temporary Views? (Choose two.)

A. The icons for Temporary Views are grayed out; the icons for Permanent Views are displayed in color.B. If a Temporary View is selected in the view list, the Save View and Save View As... Buttons are not enabled on the list of items.C. Temporary View is automatically deleted from the view list when you log out.D. Temporary Views can only be created for Work Item Views and Process Views.

Correct Answer: ACSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 82What are the two differences in the relationships a form has with a process when it is associated with a Pageflow process and as a single form associated with aUser task in a process? (Choose two.)

A. When the form is submitted in a Pageflow process, the action is audited; when it is submitted in a process, the action is not audited.B. When a form is submitted in a Pageflow process the action is not audited; when it is submitted in a process, the action is audited.C. When each form is submitted in a Pageflow process, the data that was updated on the form is saved.

When the form is submitted in a process, the data is not saved.D. When each form is submitted in a Pageflow process, the data that was updated on the form is not saved. When the form is submitted in a process, that data is

saved.

Correct Answer: BDSection: (none)Explanation

Page 42: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Explanation/Reference:definite answer.

QUESTION 83Which two statements are true about Scoped system actions? (Choose two.)

A. They are set on specific Groups, Organization Units and Positions.B. They are used to control Supervised Work Views.C. They are set on the Organization Model.D. They are used to control process instances.

Correct Answer: ABSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 84What are three valid elements in a Business Object Model? (Choose three.)

A. ClassesB. CapabilitiesC. Primitive TypesD. GroupsE. PositionsF. Enumerations

Correct Answer: ACFSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 85Which two statements are true about Pageflow processes? (Choose two.)

Page 43: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

A. Pageflow User tasks can be separated by Service tasks.B. Service tasks are not allowed in Pageflow processes.C. All User tasks in one Pageflow instance are processed by a single user.D. User tasks in one Pageflow instance can be offered to different users.

Correct Answer: ACSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 86A process requires that multiple paths of an activity are performed simultaneously. A subsequent activity can only be performed when every path has completed.

Which Process Control Pattern satisfies the requirement?

A. SynchronizationB. Simple MergeC. Cancelling DiscriminatorD. Multi-choice

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 87Which two types of Work Distribution Models are supported by ActiveMatrix 3PW (Choose two)

A. Pulled DistributionB. Pushed DistributionC. Allocated DistributionD. Random Distribution

Correct Answer: ABSection: (none)

Page 44: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Explanation

Explanation/Reference:Explanation:

QUESTION 88When importing processes, what are two supported import formats in TIBCO Business Studio? (Choose two.)

A. BSTB. ArchiveC. XFRD. MAA

Correct Answer: ACSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 89Which two statements are true about TIBCO Business Studio Asset Central? (Choose two.)

A. It only allows for multiple versions of projects to be retained in the local workspace.B. It allows for multiple versions of projects to be shared between multiple users via a source control serverC. It requires that process designers are permanently connected to the source control server.D. It allows for a project to be checked out of the source control server and modified offline.

Correct Answer: BDSection: (none)Explanation

Explanation/Reference:accurate answer.

QUESTION 90What is the function of Re-Offering work item(s)?

A. It allows users to offer one or more work items to themselves or any available user.

Page 45: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

B. It allows users to change currently allocated work items back to an OFFERED state.C. It moves the work items to the work list of users to whom they were allocated, with a state of ALLOCATEDD. It allows users to re-allocate one or more work items to another user from the original offer set.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 91Which two statements are true when a process instance is suspended? (Choose two.)

A. If a work item is already open, it cannot be cancelled, closed or submittedB. All related work items can be worked on (i e. opened, allocated, re-offered, or cancelled).C. The process instance list is not automatically refreshed to update the instance status.D. All work items that are associated with that process instance will become suspendedE. All work items that are associated with that process instance are hidden in the work item list.

Correct Answer: DESection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 92Which two statements are true about Service and Script tasks? (Choose two.)

A. A Service task can be used to control a forms-based dialog with a user.B. A Service task can be used when interaction is required with a system external to BPM.C. A Script task can be used for the BPM Server to make calculations, based on process data.D. A Script task can be used to control a sequence of form dialogs with a user.

Correct Answer: BCSection: (none)Explanation

Page 46: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Explanation/Reference:Explanation:

QUESTION 93On which three process objects can scripting be used? (Choose three.)

A. Script taskB. Conditional sequence flowC. Uncontrolled sequence flowD. Complex Decision/Merge GatewayE. Embedded sub-process

Correct Answer: ABESection: (none)Explanation

Explanation/Reference:properly answered.

QUESTION 94Which three actions are mandatory when preparing for simul-ation? (Choose three.)

A. add the participant and associate the participant with an activityB. assign a unit cost to a participantC. set the number of simul-ation cases to be greater than 200D. add the data fields and associate them with activitiesE. assign an activity duration

Correct Answer: ABESection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 95Click the Exhibit button.

Page 47: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

Gateway 1 has multiple Output sequence flows.

Given the information provided in the exhibit, in what order will the flows be processed?

A. flow 1, flow2, thenflow3B. depends on the order in which the sequence flows were drawnC. randomlyD. flow 2, then flow 1 and flow 3 simultaneously

Correct Answer: BSection: (none)Explanation

Explanation/Reference:reliable answer.

QUESTION 96During testing of a process, the process instance is released from User Task A but has not arrived at its expected destination at User Task B.

Which three actions can you take to help identify the problem? (Choose three.)

A. Examine the ActiveMatrix BPM node log file(s)B. Check the Event View for that process instance, to identify what routing has been followedC. Insert a MessageBox display function in the Initiate script for User Task BD. Check for failures in any Service tasks in the process between User Tasks A and B

Page 48: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

E. Check whether User Task B has been set to "skipable" in the TIBCO Business Studio Model

Correct Answer: ABDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 97Which three statements are true about working with different versions of packages? (Choose three.)

A. Multiple versions of packages can be shared with other designers as long as they share the same workspace.B. The current version can be compared with other versions from the source control system.C. Different versions of packages can be in use by different designers, depending on the source control system in use.D. The current version of a package can be compared with previous versions in the local history.E. When there are multiple processes in one package, each process can be individually checked in and out.

Correct Answer: BCDSection: (none)Explanation

Explanation/Reference:most suitable answer.

QUESTION 98What is a valid Pageflow Usage Pattern?

A. Business Service: Collect data, send to processB. Chained Execution: Add transactional behavior, better auditingC. Long Running Services: Asynchronous request response, correlation requiredD. Data Persistence: Save data after each form

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

Page 49: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose

http://www.gratisexam.com/

QUESTION 99Click the Exhibit button.

What is a possible way to fix the error on the Login task?

A. The Login task is a Manual task. You provide a form to specify the username/password inputs to the Manual task.B. The Organization Model query is malformed. You fix the SQL to query the Organization Model on the Login task.C. You configure the Login task to use a participant who can be inferred from the Organization Model.D. The Login task has a multi-instance loop, which requires a loop script to be specified.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:reliable answer.

Page 50: TB0-121 TIBCO ActiveMatrix BPM Solution Designer This is ... · PDF fileWhich two statements are true about using TIBCO Business Studio Forms in conjunction with a process? (Choose