EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658
MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU
MADEN. SAN. VE TC.. LTD. .0/387EYNER ENERJ RETM VE TC. LTD.
.TALIKAYA REGLATR VE HES (22,658MWm/ 22,052 MWe),KIRMA-ELEME VE
HARNTES TESSLEREVRESEL ETK DEGERLENDRME RAPORUARTVN L, ARHAV LES,
BALLI DEREAGUSTOS-2011EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA
REGLATR VE HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR
NTES TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD. .1/387Proje
SahibininAd EYNER ENERJ RETM VE TC. LTD. ST.AdresiKarsllar Mah.
82001 Sok. No:3 Emir Apart.Zemin Kat ukurova/ADANATelefonu 0 322
231 06 26Faks Nosu 0 322 231 22 12Projenin AdTASLIKAYA REGLATR VE
HES (22,658MWm/ 22,052 MWe),KIRMA-ELEME VE HARNTES TESSLERProje
Bedeli 32.031.941
TLProjeinSeilenYerin(Reglatr,HES,BetonSantraliveKonkasr Tesisi) Ak
Adresi (Ad,Mevkisi,BirdenFazlalveyaledeYerAlyorsaBunlarTanmlayan
Yrenin Ad)Artvin li, Arhavi lesi, Kapistre Deresinin yanKolu Olan
Ball Dere zeriProjeinSeilenYerinKoordinatlar, ZoneKoor. Sras:
Saga-YukarDatum : ED-50Tr : UTMDOM : 39Zon : 37lek Faktr : 6
derecelikKoor. Sras: Enlem-BoylamDatum : WGS-84Tr : UTMDOM :
CografikZon : -lek Faktr : -Reglatr Alan
Koordinatlar698619.765:4565318.440698559.446:4565272.701698616.450:4565180.393698716.927:4565254.418698674.545:4565329.867698647.452:4565306.88741.21324334:41.3690345741.21284648:41.3683007941.21200171:41.3689502141.21264329:41.3701718041.21333274:41.3696911941.21313257:41.36936081letim
Tneli Alan
Koordinatlar697787.896:4568487.890697802.391:4568491.757697816.885:4568495.618698655.904:4565345.988698659.617:4565332.052698647.452:4565306.887698633.609:4565312.664698619.765:4565318.440698626.698:4565335.053698626.915:4565338.26641.24197263:41.3601458741.24200389:41.3603199741.24203510:41.3604940441.21348241:41.3694742541.21335607:41.3695139741.21313257:41.3693608141.21318796:41.3691976941.21324334:41.3690345741.21339116:41.3691226041.21342002:41.36912623Ykleme
Havuzu Alan
Koordinatlar697754.381:4568512.713697835.437:4568536.360697848.984:4568486.082697770.454:4568469.19141.24220424:41.3597542841.24239725:41.3607284641.24194142:41.3608737041.24180861:41.35993184Cebri
Boru Alan
Koordinatlar697307.131:4568954.034697327.148:4568976.370697768.476:4568581.019697790.669:4568562.623697808.907:4568513.070697794.830:4568507.889697780.754:4568502.708697765.305:4568544.681697748.888:4568558.28941.24628545:41.3545639241.24648159:41.3548098441.24281556:41.3599444841.24264457:41.3602031541.24219412:41.3604045741.24215093:41.3602350441.24210775:41.3600655141.24248929:41.3598949041.24261578:41.35970355EYNER
ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658 MWm/22,052
MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE
TC.. LTD. .2/387Santral Alan
Koordinatlar697314.997:4569059.225697236.080:4569036.820697203.928:4569005.649697194.673:4568955.482697237.541:4568887.295697307.131:4568954.034697327.148:4568976.37941.24723027:41.3546917241.24704787:41.3537434041.24677517:41.3533499241.24632591:41.3532233541.24570176:41.3537125041.24628545:41.3545639241.24648167:41.35480984ProjeninEDYnetmeligikapsamndakiyeri(sektr,altsektr)17.07.2008Tarihve26939SaylResmiGazetedeYaynlanarakYrrlgeGirenevreselEtkiDegerlendirmesiYnetmeligininMadde
7 (b) bendi b) Seme Eleme Kriterlerinetabi olup (EK-2 Listesi,
Madde 28 - Kurulu
gc0,5MWvezeriolannehirtipisantraller),"evreselEtkiDegerlendirmesiGereklidir"
karar verilen projelere evresel
EtkiDegerlendirmesiRaporuhazrlanmaszorunludur.Raporu
HazrlayanKuruluunAdTOPUOGLU MAD. SA N. VE TC. LTD. ST.Adresi 8.Cad.
(Bikek) 123/5 Emek/ANKARATelefonu 0312 213 31 38Faks Nosu 0312 213
31 48YeterlilikBelgesiNosu ve Tarihi8720/04/2010Raporu Sunum Tarihi
(Gn/Ay/Yl) /08/2011EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR
VE HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES
TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD. .3/387NDEKLER LSTESNDEKLER
LSTES
.....................................................................................................
3TABLOLAR
.......................................................................................................................
9EKLLER
.......................................................................................................................
12EKLSTES
....................................................................................................................
13KISALTMALAR
...............................................................................................................
14BLM I: PROJENN TANIMI VE AMACI
......................................................................
17(Proje konusu faaliyetin tanm, mr, hizmet amalar, pazar veya
hizmet alanlar
vebualanierisindeekonomikvesosyalyndenlke,blgeve/veyaillegindenem
ve gereklilikleri)
...................................................................................................
17BLM II: PROJE N SELEN YERN KONUMU
..................................................... 24II.1
Projenin Yeri (krma-eleme tesisi ile beton santrali dahil) (lgili
Valilik veya Belediyetarafndan dogrulugu onanm olan proje yerinin,
lejant ve plan notlarnn da yer
aldgonanlevreDzeniPlanvemarPlanlarzerinde,buplanlaryoksamevcutarazikullanm
haritas zerinde gsterimi,)
.........................................................................
24II.2.ProjeKapsamndaki(betonsantralivekonkasrtesisidahil)nitelerinKonumu,TeknikAltyapniteleri,dariveSosyalniteler,VarsaDigerniteler,BunlarinBelirlenenKapalveAkAlanByklkleri,BunitelerinProjeAlanindekiKonumlarnnVaziyetPlanveyaKrokizerindeGsterimi,DigerTekniklerleTemsiliveya
Maket Gsterimler,)
...........................................................................................
27BLM III: PROJENN EKONOMK VE SOSYAL BOYUTLARI
.................................... 41III.1. Projenin Gereklemesi
ile lgili Yatrm Program ve Finans Kaynaklar, ........... 41III.2.
Projenin Gereklemesi ile lgili Akm Semas veya Zamanlama Tablosu
....... 44III.3. Projenin Fayda-Maliyet Analizi
...........................................................................
47III.4. Proje Kapsamnda Olmayan Ancak Projenin Gereklemesine Bagl
Olarak,
ProjeSahibiveyaDigerYatrmclarTarafndanGerekletirilmesiTasarlananDigerEkonomik,
Sosyal ve Altyap Projeleri,
.......................................................................
49III.5.ProjeKapsamndaOlmayanAncakProjeninGerekleebilmesiiinZaruriOlanve
Proje Sahibi veya Diger Yatrmclar Tarafndan Gerekletirilmesi
Planlanan DigerEkonomik, Sosyal ve Altyap Projeleri,
.......................................................................
49III.6. Kamulatrma ve/veya Yeniden Yerleimin Nasl Yaplacag
.............................. 51III.7. Diger Hususlar
...................................................................................................
51BLM IV: PROJE KAPSAMINDA YER ALAN REGLATR, HES, BETON
SANTRALVEKONKASRTESSPROJESNDENETKLENECEKALANINBELRLENMESVEBU ALAN
NDEK MEVCUT EVRESEL ZELLKLERN AIKLANMASI (*) ...........
53IV.1.ProjedenEtkilenecekAlannBelirlenmesi,(etkialannnnaslveneyegrebelirlendigi
aklanacak ve etki alan harita zerinde gsterilecek)
.............................
53IV.2.EtkiAlanerisindekiFizikselveBiyolojikevreninzellikleriveDogalKaynaklarn
Kullanm,
...............................................................................................
54IV.2.1. Meteorolojik ve klimsel zellikler
..............................................................
54IV.2.2.Jeolojikzellikler(jeolojikyapnnfiziko-kimyasalzellikleri,tektonikhareketler,
mineral kaynaklar, heyelan, benzersiz oluumlar, g, sel, kaya
dmesibalklaraltndaincelenmesi, 1/100000,1/25000 ve/veya 1/5000lik
jeolojikharitave
lejand),............................................................................................................
59IV.2.3. Hidrojeolojik zellikleri (yer alt su seviyeleri, halen
mevcut her trl keson,derin artezyen vb. kuyular, proje alanna
mesafeleri, emniyetli ekim degeri,
suyunfiziksel,kimyasal,bakteriyolojikzellikleri,yeraltsuyununmevcutveplanlanankullanm),.............................................................................................................
65IV.2.4.YeraltveTermalSu
KaynaklarnnHidrojeolojikzellikleri(suseviyeleri,miktarlar,emniyetliekimdegerleri,kaynaklarndebileri,mevcutveplanlanankullanm,).............................................................................................................
67IV.2.5. Hidrolojik zellikler (yzeysel su kaynaklarnn deniz, gl,
akarsu ve digerEYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE
HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES
TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD.
.4/387sulakalanlar-fiziksel,kimyasal,bakteriyolojikveekolojikzellikleri,akarsularndebileri,mevsimlikdegiimleri,taknlar,sutoplamahavzas,sedimantasyon,drenaj,
tm su kaynaklarnn ky kullanmlar, ekolojik zellikleri),
........................ 68IV.2.6. Yzeysel Su Kaynaklarnn Mevcut ve
Planlanan Kullanm (ime, kullanma,sulama suyu, gl, glet, su rnleri
ihtihsali, ulam, turizm, elektrik retimi, spor
vebenzeriamalsuve/veyakykullanmlar,digerkullanmlar)vebunlarnprojesahasna
gre konumlar, mesafeleri,
...................................................................
71IV.2.7.KurulacakReglatrn SuToplamaHavzasilelgili,Balldereye
likinenaz10YllkAylkMaksimum,AylkMinimumveAylkOrtalamaDebilerininm3/snolarak
verilmesi,
...................................................................................................
78IV.2.8.ProjeninYerAldgHavzannSuKullanmDurumu,Yag-Aklikisi,Ekolojik
Potansiyeli, Projenin Kurulacag Su Kaynagnn/Kaynaklarnn Uzun
YllaraAitAylkOrtalamaDegerleri(m3/sn),AkmGzlemstasyonlarveReglatrYerleriniTemsilEdenUzunYllaraAitAkmDegerlerinin,
lgiliKurum(buverilerintemin edildigi kurum) Onay Alnarak Sunulmas
..................................................
79IV.2.9.ToprakzellikleriveKullanmDurumu(topragnfiziksel-kimyasalvebiyolojikzellikleri,arazikullanmkabiliyetisnflamas,erozyon,topragnmevcutkullanm),.............................................................................................................
85IV.2.10.TarmAlanlar(tarmsalgeliimprojealanlar,zelmahsulplantasyonalanlar)SuluveKuruTarmArazilerininByklg,rnDesenleriveBunlarnYllk
retim Miktarlar,
.........................................................................................
89IV.2.11.OrmanAlanlar(agatrlerivemiktarlar,kapladgalanbyklklerivekapallg
bunlarn mevcut ve planlanan koruma ve/veya kullanm amalar,
ormaninceleme degerlendirme formu),
...........................................................................
92IV.2.12.KorumaAlanlar(MilliParklar,TabiatParklar,SulakAlanlar,TabiatAntlar,TabiatKorumaAlanlar,YabanHayatKorumaAlanlar,BiyogenetikRezervAlanlar,BiyosferRezervleri,DogalSitveAntlar,Tarihi,KltrelSitler,zelevreKorumaBlgeleri,zelevreKorumaAlanlar,TurizmAlanveMerkezleri,
Mera Kanunu kapsamndaki alanlar),
.................................................
95IV.2.13.Sulaklardaki(gl,akarsu)CanlTrleri(butrlerintabiikarakterleri,ulusalveuluslararasmevzuatlakorumaaltnaalnantrler;bunlarnreme,beslenme,sgnmaveyaamaortamlar;buortamlariinbelirlenenkorumakararlar,),
...........................................................................................................
102IV.2.14. Flora ve Fauna (trler, endemik zellikle lokal endemik
bitki trleri,
alandadogalolarakyaayanhayvantrleri,ulusalveuluslararasmevzuatlakorunaaltnaalnantrler,nadirveneslitehlikeyedmtrlervebunlarnalandakibulunuyerleri,avhayvanlarnnadlar,poplasyonlarvebunlariinalnanMerkez
AvKomisyonu Kararlar)ProjeAlanndakiVejetasyonTiplerininBir
HaritazerindeGsterilmesi.ProjedenvealmalardanEtkilenecekCanllarinAlnmasGerekenKorumanlemleri(inaatveiletmeaamasnda).ArazideYaplacakFloraalmalarnnVejetasyonDnemindeGerekletirilmesiveBuDnemin
Belirtilmesi,
..........................................................................................
113IV.2.15. Peyzaj Degeri Yksek Yerler ve Rekreasyon Alanlar
........................... 147IV.2.16. Madenler ve Fosil Yakt
Kaynaklar (rezerv miktarlar, mevcut ve planlananiletilme durumlar,
yllk retimleri ve bunun lke veya yerel kullanmlar iin nemive
ekonomik degerleri),
......................................................................................
150IV.2.17. Hayvanclk (trleri, beslenme alanlar, yllk retim
miktarlar, bu rnlerinlke ekonomisindeki yeri ve degeri),
...................................................................
157IV.2.18. Devletin Yetkili Organlarnn Hkm ve Tasarrufu Altnda
Bulunan
Araziler(AskeriYasakBlgeler,kamukurumvekurulularnabelirliamalarlatahsisedilmi
alanlar, vb.),
...........................................................................................
158IV.2.19. Proje Yeri ve Etki Alannn Hava, Su, Toprak ve Grlt
Asndan MevcutKirlilik Yknn Belirlenmesi
..............................................................................
158EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658
MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU
MADEN. SAN. VE TC.. LTD. .5/387IV.2.20. Diger zellikler.
.....................................................................................
161IV.3. Sosyo Ekonomik evrenin zellikleri
............................................................
161IV.3.1. Ekonomik zellikler (yrenin ekonomik yapsn oluturan balca
sektrler,yreseligcnnbusektrleredaglm,sektrlerdekimalvehizmetretimininyre
ve lke ekonomisi iindeki yeri ve nemi, diger bilgiler),
............................. 161IV.3.2. Nfus (yredeki kentsel ve
krsal nfus, nfus hareketleri; gler, nfus artoranlar, ortalama hane
halk nfusu, diger bilgiler),
...........................................
163IV.3.3.Gelir(yredekigelirinikollarnadaglm,ikollaritibariylekiibanaden
maksimum, minimum ve ortalama gelir),
.................................................. 165IV.3.4.
sizlik (yredeki isizlik nfus ve faal nfusa oran)
................................
167IV.3.5.YredekiSosyalAltyapHizmetleri(egitim,saglkkltrhizmetlerivebuhizmetlerden
yararlanlma durumu),
...................................................................
168IV.3.6.Kentsel veKrsal Arazi
Kullanmlar(yerlemealanlarnndaglm,mevcutveplanlanankullanmalanlar,bukapsamdasanayiblgeleri,konutlar,turizmalanlar
vb.),
.......................................................................................................
172IV.3.7. Diger zellikler
........................................................................................
173BLMV:PROJENNBLMIVDETANIMLAMAMALANZERNDEKETKLERVE ALINACAK
NLEMLER:
........................................................................................
175(BuBlmde;projeninfizikselvebiyolojikevrezerineetkileri,buetkilerinlemek,
en aza indirmek ve iyiletirmek iin alnacak yasal, idari ve teknik
nlemlerV.I ve V.2 baIklar iin ayr ayr ve ayrntI bir ekilde aklanr).
...........................
175V.1.ArazininHazrlanmas,naatveTesisAamasndakiProjeler,FizikselveBiyolojikevrezerineEtkileriveAlnacaknlemler(Reglatr,HES,iletimhatt(tnel
ve kanal), Beton Santrali, konkasr tesisi dahil), (inaat aamasndaki
etkiler
herbirreglatr,HESvebunlaraaitiletimtesislerivedigeryaplariinayrayrirdelenecektir)
..........................................................................................................
175V.1.1.ArazininHazrlanmasinYaplacaklerKapsamndaNerelerdeveNeKadarAlandaHafriyatYaplacag,HafriyatMiktar,HafriyatArtgToprak,Ta,Kumvb.MaddelerinNerelereTanacaklar,NerelerdeDepolanacaklarveyaHangi
Amalar in Kullanlacaklar, Hafriyat Dkm Sahalarnn Konumu,
HafriyatSrasnda Kullanlacak
Malzemeler,....................................................................
175V.1.2. Takn nleme ve Drenaj
lemleri...........................................................
179V.1.3. Arazinin Hazrlanmas Srasnda ve Ayrca nitelerin nasnda
KullanlacakMaddelerdenParlayc,Patlayc,Tehlikeli,ToksikveKimyasalOlanlarnTanmlar,DepolanmalarveKullanmlar,BulerinKullanlacakAletlerveMakineler,...........................................................................................................
180V.1.4. Proje Alan indeki Su Ortamlarnda Herhangi bir Amala
GerekletirilecekKaz, Dip Taramas vb. lemler Nedeni ile karlacak Ta,
Kum, akl ve
benzeriMaddelerinMiktarlar,NerelereTanacaklarveyaHangiAmalariinKullanlacaklar,
..................................................................................................
185V.1.5.ReglatrveHESYapmDolaysylaKullanlacakOlanMalzemeninNereden
ve Nasl Temin Edilecegi
.....................................................................
185V.1.6.KonkasrTesisininKapasitesi,Teknolojisi,retimMiktarlarnnalmaSreleri(gn-ay-yl),UlamAltyapsPlan,Altyapnnnasilelgililemler,Kullanlacak
Makine Ekipmanlar,
.......................................................................
185V.1.7. Beton Santrali Tesisinin Kapasitesi, Teknolojisi, retim
Miktarlarnn
almaSreleri(gn-ay-yl),UlamAltyapsPlan,Altyapnnnasilelgililemler,Kullanlacak
Makine Ekipmanlar,
.......................................................................
189V.1.8.naatEsnasndaKrma,gtme,TamaveDepolamagibiTozYayclemler,
Kmlatif Degerler,
..............................................................................
193V.1.9. Zemin Emniyeti ve Su Kaag Olmamas iin Yaplacak lemler,
............
219V.1.10.ArazininHazrlanmasvenaatAlaniinGerekliArazininTeminiAmacylaKesilecekAgalarnTrveSaylar,KesilecekAgalarnBlgedekiEYNER
ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658 MWm/22,052
MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE
TC.. LTD.
.6/387OrmanEkosistemizerineEtkileri,OrtadanKaldrlacakTabiiBitkiTrleriveNeKadar
Alanda Bu lerin Yaplacag, Flora ve Fauna zerine Olabilecek Etkiler,
220V.1.11.naatlemleriSresinceSuOrtamnda,DereYatagndaveProjeAlannda
Mevcut Canl Trlerine (karasal ve sucul flora-fauna) Olabilecek
Etkiler veHassas Trlerin Ne Sekilde Korunacag, Alnacak nlemler,
.............................
222V.1.12.ArazininHazrlanmas,naatAlaninGerekliArazininTemini
AmacylaEldenkarlacakTarmAlanlarnnByklg,BunlarnAraziKullanmKabiliyetleri
ve Tarm rn Trleri,
.....................................................................
225V.1.13.ArazininHazrlanmasndanBalayaraknitelerinAlmasnaKadarYaplacaklerdeKullanlacakYaktlarnTrleri,zellikleri,OluacakEmisyonlar,
........................................................................................................
226V.1.14.ProjeKapsamndaKullanlacakSuyunTeminEdilecegiKaynaklardanAlnacak
Su Miktarlar, Su Temini Sistemi ve Bu Sularn Kullanm Amalarna
greMiktarlar, Oluacak Atk Sularn Cins ve miktarlar, Dearj Edilecegi
Ortamlar, .
229V.1.15.ArazininHazrlanmasndanBalayaraknitelerinAlmasnaDekMeydana
Gelecek Kat Atk Miktarlar, Ne Sekilde Bertaraf Edilecegi,
................
238V.1.16.ArazininHazrlanmasndanBalayaraknitelerinAlmasnaDekYaplacak
ler Nedeni ile Meydana Gelecek Vibrasyon, Grltnn Kaynaklar
veSeviyesi, Kmlatif
Degerler,..............................................................................
241V.1.17.ArazininHazrlanmasndanBalayaraknitelerinAlmasnaDekYerineGetirilecek
lerde alacak Personelin ve Bu Personele Bagl Nfusun Konut veDiger
Teknik/Sosyal Altyap htiyalarnn Nerelerde ve Nasl Temin
Edilecegi,..
257V.1.18.ArazininHazrlanmasndanBalayaraknitelerinAlmasnaDekSrdrlecek
lerden, nsan Saglg ve evre iin Riskli ve Tehlikeli Olanlar, ...
257V.1.19.naatFaaliyetlerininKarasal ve SuculFlora/Faunazerine
OlasEtkilerve Alnacak Tedbirler, Btncl Etki
Degerlendirmesi,........................................ 258V.1.20.
Proje Alannda, Peyzaj geleriYaratmak veyaDiger Amalarla
YaplacakSahaDzenlemelerinin(agalandrmave/veyayeilalandzenlemelerivb.)NeKadar
Alanda, Nasl Yaplacag, Bunun iin Seilecek Bitki ve Aga Trleri,
...... 267V.1.21. Proje Alan Beton Santrali ve Konkasr Tesisi Dahil
Olmak zere Yeralt
veYerstndeBulunanKltrveTabiatVarlklarna(gelenekselkentseldokuya,arkeolojikkalntlara,korunmasgereklidogaldegerlere)OlabilecekEtkilerinBelirlenmesi,.......................................................................................................
268V.1.22. Diger zellikler
.......................................................................................
268V.2.ProjeninletmeAamasndakiProjeler,FizikselveBiyolojikevrezerineEtkileri
ve Alnacak
nlemler,...................................................................................
268V.2.1ProjeKapsamndakiTmnitelerinzellikleri,HangiFaaliyetlerinHanginitelerdeGerekletirilecegi,Kapasiteleri,nitelerderetilecekMalve/veyaHizmetler,
Nihai ve Yan rnlerin retim Miktarlar,
...........................................
268V.2.2.UlusalveUluslararasMevzuatlaKorunmasGerekenAlanlarzerineEtkiler,
................................................................................................................
272V.2.3.KaynagnKullanlmasveReglatrYaplarndaSuTutulmasSonucuSuKalitesineveSuOrtamndaki
CanllaraOlabilecekEtkiler, ProjeiinTespit EdilenBalk Trlerine Ait
Gei Yaplar,
.......................................................................
272V.2.4.DereYatagnaBraklacakSuHesab(havzaakmlar,yag-akilikisi,ekolojikpotansiyel,son10yllkortalamadebiler,varsaulusalveuluslararasmevzuatla
korunan balk trleri ve muhtemel ihtiyalar, su haklar
(ime-kullanma,sulama,alabalkyetitiriciligi)
v.bdikkatealnmal,mansapcansuyukyeriningsterildigi aklayc izim)
................................................................................
275V.2.5.SuyunTeminEdilecegiKaynagnKullanlmas,SuTutulmasSonucuMansapta
Olabilecek Degiimler, Bu Degiimlerin Su Kalitesine ve Su
OrtamndakiCanllara Etkileri, Dogal Yaam zerine Etkiler (heyelan,
erozyon, nehir hidrolojisi,sucul yaam, sediment gelii vb.)
.......................................................................
299EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658
MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU
MADEN. SAN. VE TC.. LTD.
.7/387V.2.6.ProjeninMembaaveMansabndaVarsaDigerProjelerin(baraj,reglatr,HES
vb.) Belirtilmesi, Ekosistem zerindeki Etkilerinin
Degerlendirilmesi, ......... 303V.2.7.KaynagaAit VarsaDigerKullanm
SekilleriveEtkileri,(proje alannayaknyerleim yerlerine ait su
haklar ve tarmsal faaliyetlere ilikin degerlendirme) .... 305V.2.8.
Yeralt ve Yzeysel Su Kaynaklarna Olabilecek Etkiler,
.......................... 305V.2.9.OrmanAlanlarnaOlabilecekEtki
veBuEtkilereKarAlnacak TedbirlerinTanmlanmas,
...................................................................................................
306V.2.10.TarmAlanlarnaOlabilecekEtkilerveBuEtkilereKarAlnacakTedbirlerin
Tanmlanmas,
..................................................................................
307V.2.11.KarasalveSuculFlora/FaunazerineOlasEtkilerveAlnacakTedbirler,
............................................................................................................
307V.2.12. Projenin letilmesi Srasnda alacak Personelin ve Bu
Personele
BaglNfusunKonutveDigerSosyal/TeknikAltyaphtiyalarnnNerelerde,NaslTemin
Edilecegi,
.................................................................................................
310V.2.13.dariveSosyalnitelerdemeveKullanmaAmalSularnKullanmSonrasndaOluacakAtkSularnArtlmasiinUygulanacakArtmaTesisiKarakteristigi,ProsesininDetaylandrlmasveArtlanAtkSularnHangiAlcOrtamlara,
Ne Miktarlarda, Nasl Verilecegi,
....................................................... 310V.2.14.
Konut, Sosyal ve dari Tesislerden Oluacak Kat Atk Miktar ve
zellikleri,BuAtklarnNerelereveNaslTanacaklarveyaHangiAmalariinveNeSekilde
Degerlendirilecegi,
.................................................................................
312V.2.15. Proje nitelerinin letilmesi Srasnda Oluacak Grltnn
Kaynaklar veKontrol iin Alnacak
nlemler,.........................................................................
314V.2.16. Diger zellikler.
......................................................................................
314V.3. Projenin Sosyo-Ekonomik evre zerine Etkileri
..............................................
315V.3.1.ProjeleGereklemesiBeklenenGelirArtlar;Yaratlacakstihdammkanlar,
Nfus Hareketleri, Gler, Egitim, Saglk, Kltr, Diger Sosyal ve
TeknikAltyap Hizmetleri ve Bu Hizmetlerden Yararlanlma Durumlarnda
Degiiklikler vb.,
..........................................................................................................................
315V.3.2. evresel Fayda-Maliyet Analizi.
...............................................................
315V.3.3.ProjeninGereklemesineBaglOlarakSosyalEtkilerinDegerlendirilmesi................................................................................................
316BLMVI:LETMEPROJEKAPANDIKTANSONRAOLABLECEKVESRENETKLER VE BU
ETKLERE KARI ALINACAK NLEMLER .....................................
318VI.1. Arazi Islah,
......................................................................................................
318VI.2.ProjeAlanveKonkasrTesisindeYaplacakAraziIslahveReklamasyonalmalar,
..............................................................................................................
318VI.3. Mevcut Su Kaynaklarna Etkiler,
......................................................................
319BLM VII: PROJENN ALTERNATFLER
.................................................................
321(Bu blmde yer seimi, teknoloji, alnacak nlemler, alternatiflerin
karlatrlmasve tercih sralamas
belirtilecektir.).............................................................................
321BLM VIII: ZLEME PROGRAMI
................................................................................
323VIII.1. Faaliyetin naat iin nerilen zleme Program, Faaliyetin
letmesi ve letmeSonras iin nerilen zleme Program ve Acil Mdahale
Plan, ...............................
323VIII.2.EDOlumluBelgesininVerilmesiDurumundaYeterlikTebligindeYeterlikBelgesi
alan kurum/kurulularn ykmllkleri Balgnn kinci Paragrafnda Yer
AlanHususlarn Gerekletirilmesi ile lgili Program.
........................................................ 328BLM IX:
HALKIN KATILIMI
.....................................................................................
330(Projeninetkilenmesimuhtemelyrehalknnnaslvehangiyntemlerlebilgilendirildigi,
proje ile ilgili halkn grlerinin ve konu ile ilgili aklamalarn
EDRaporuna
yanstlmas)................................................................................................
330BLMX:YUKARIDAKBALIKLARALTINDAVERLENBLGLENTEKNKOLMAYAN BR ZET
..................................................................................................
332EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658
MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU
MADEN. SAN. VE TC.. LTD.
.8/387(Projenininaatveiletmeaamalarndayaplmasplanlanantmalmalarnveevreseletkileriinalnmasngrlentmnlemlerin,mmknolduguncabasit,teknik
terim iermeyecek ekilde ve halkn anlayabilecegi sadelikte
anlatlmas) .. 332BLM XI: SONULAR
...............................................................................................
337(Yaplantm aklamalarnzeti,projeninnemli
evreseletkilerininsralandgveprojenin gereklemesi halinde olumsuz
evresel etkilerin nlenmesinde ne
ldebaarsaglanabileceginingenelbirdegerlendirme,projekapsamndaalternatifleraras
seimler ve bu seimlerin nedenleri)
................................................................
337NOTLAR VE KAYNAKLAR
...........................................................................................
355EKLER
..........................................................................................................................
360EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658
MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU
MADEN. SAN. VE TC.. LTD.
.9/387TABLOLARTablo1.ProjeSahasnaEnYaknYerleimYerleriVeBunlarnProjenitelerineGreKonumlar..................................................................................................................
27Tablo 2. Proje nitelerine Ait Koordinatlar ve nitelerin
Kapladklar Alanlar ................................. 28Tablo 3.
Talkaya Reglatr ve HES Maliyet Hesaplamalar
...................................................... 42Tablo 4.
Talkaya Reglatr Tesis
Yaplar................................................................................
44Tablo 5. Yatrm Program
............................................................................................................
46Tablo 6. Firm Enerji, Sekonder Enerji ve Pik G Faydalar
.......................................................... 47Tablo
7. Firm Enerji, Sekonder Enerji ve Pik G Faydalar
.......................................................... 47Tablo
8. Tablolarda Kullanlan Formller
......................................................................................
47Tablo 9. Ekonomik Analiz Sonular (6 & 3,3 Cent/kW)
.................................................................
47Tablo 10. Ekonomik Analiz Sonular (6 & 6
Cent/kW)..................................................................
48Tablo 11. Talkaya Reglatr ve HES Toplam Maliyet ve Giderleri
............................................ 48Tablo 12. Talkaya
Reglatr ve HES Toplam Fayda ve Giderleri (6&3,3 cent/kW)
................... 48Tablo 13. Talkaya Reglatr ve HES Toplam Fayda
ve Giderleri (6 & 6 cent/kW) .................... 48Tablo 14.
Talkaya Reglatr ve HES Karllk Oran (6 & 3,3 cent/kW)
.................................. 49Tablo 15. Talkaya Reglatr ve
HES Karllk Oran (6 & 6 cent/kW)
..................................... 49Tablo 16. Artvin li Aylara
Gre Scaklk
Degiimleri......................................................................
54Tablo 17. Artvin li Yag Durumu
.................................................................................................
55Tablo 18. Artvin li Ortalama Ak, Bulutlu, Kapal Gnler Says
................................................... 55Tablo 19.
Artvin li Nem
Durum.....................................................................................................
56Tablo 20. Artvin line Ait Rzgar Durumu
......................................................................................
56Tablo 21. Artvin li Aylk Ortalama Rzgar Hzlar (m_sec)
............................................................
57Tablo 22. Artvin li Aylk Esme Saylar Toplam Tablosu
..............................................................
58Tablo 23. aglayan Formasyonuna ait Q Kaya Snflamas (Barton vd,
1974) .............................. 62Tablo 24. Artvin li Scak su
ve Madensuyu Kaynaklar
.................................................................
66Tablo 25. Artvin li Jeotermal Su Kaynaklar ve Kullanm Amalar
................................................ 67Tablo 26. Artvin
li Scak su ve Madensuyu Kaynaklar
.................................................................
68Tablo 27. Artvin lindeki Akarsularn Feyezan Debileri
..................................................................
69Tablo 28. Artvin lindeki Gller
.....................................................................................................
70Tablo 29. Thornthwaite Yntemine Gre Artvin linin Su Bilanosu
.............................................. 70Tablo 30. Artvin
li Snrlar erisindeki me Suyu Tesisleri
.......................................................... 73Tablo
31. letmedeki Takn Koruma, Erozyon Ve Rusubat Kontrol Tesisleri
............................... 73Tablo 32. na Halindeki Takn
Koruma, Erozyon Ve Rusubat Kontrol Tesisleri
........................... 75Tablo 33. Proje Havzasnda Bulunan
Diger Tesisler ve Konumlar
................................................ 76Tablo 34.
Talkaya Reglatr Yeri Aylk Ortalama Akmlar (1978-2009)
..................................... 78Tablo 35. DM- Ortacalar
Meteoroloji stasyonu Aylk Yag Degerleri
(mm).................................. 80Tablo 36. DS- Sargl
Meteoroloji stasyonu Aylk Toplam Yag Degerleri (mm)
......................... 81Tablo 37. Akm Gzlem stasyonlarna Ait
Karakteristik Bilgiler ve Gzlem Periyotlar...................
84Tablo 38. Artvin li Genel Toprak Yaps
Daglm..........................................................................
85Tablo 39. Artvin li 2009 Yl Tarm Alan Daglm
.........................................................................
89Tablo 40. Artvin li 2009 Yl Tarm Alan Daglm
.........................................................................
89Tablo 41. Artvin linde Bulunan Milli Parklar
..................................................................................
95Tablo 42. Artvin linde Bulunan Tabiat Parklar
.............................................................................
96Tablo 43. Artvin linde Bulunan Tabiat Koruma Alanlar
...............................................................
97Tablo 44. alma Blgesinin Tatlsu Alg Trleri
.........................................................................
104Tablo 45. alma Blgesinin Zooplanktonik
Organizmalar........................................................
105Tablo 46. alma Alanndaki Bentik Omurgasz Trleri
.............................................................
106Tablo 47. alma Blgesinin Balk Trleri
.................................................................................
107Tablo 48. Talkaya Reglatr ve Hes Proje Sahas Floirstik Listesi
......................................... 117Tablo 49.
Artvin-Arhavi, Talkaya-HES Proje Alan kiyaaml Trleri ve Koruma
Statleri ......... 131Tablo 50.Artvin -Arhavi, Talkaya-HES Proje
Alan Srngen Trleri ve Koruma Statleri ....... 131Tablo 51.
Artvin-Arhavi, Talkaya-HES Proje Alan Ku Trleri ve Koruma
Statleri...................
132Tablo52.Artvin,ArhaviTalkaya-HESProjeAlan
veYaknevresindeBelirlenenMemeliHayvan Trleri ve Koruma Statleri
.........................................................................
136Tablo 53. Proje Alan Snrlar erisinde ve Yakn evrede Kaydedilmi
Olan Trler ArasndanAv Hayvan Statsne Sahip Olan Ku ve Memeli Hayvan
Trleri. ........................ 145Tablo 54. Artvin li Linyit
Yataklar...............................................................................................
155EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658
MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU
MADEN. SAN. VE TC.. LTD. .10/387Tablo 55. Artvin li 2009 Yl
Verilerine Gre Bykba Hayvan Varlg
....................................... 157Tablo 56. Artvin li 2009
Yl Verilerine Gre Kkba Hayvan Varlg
....................................... 157Tablo 57. Artvin
lindeletme Byklklerine Gre Hayvan Daglm
........................................ 157Tablo 58. Artvin linin
2009 Yl Sonu tibariyle Hayvansal retim Miktarlar
................................ 158Tablo 59. Adrese Dayal Nfus
Kayt Sistemi 2009 Verileri
......................................................... 164Tablo
60. Yllara Gre Arhavi Nfus Verileri
...............................................................................
164Tablo 61. Genel Nfus Saymlarna gre Tahmini Nfus Degiimi
.............................................. 164Tablo 62.
2008-2009 Yl G Miktar
.........................................................................................
165Tablo 63. Hane Halk Byklgne Gre Hane Halk Says
....................................................... 165Tablo
64. Artvin 2001 Yl Gayri Safi Yurt i Hasla
....................................................................
166Tablo 65. 2009 Yl sizlik Oran Tablosu
....................................................................................
167Tablo 66. stihdama ilikin SKUR Temel Gstergeleri
................................................................
167Tablo 67. Artvin SKUR Mdrlgne kaytl sizlerin Mesleki Daglm
..................................... 167Tablo 68. Okuma Yazma
Durumu Ve Cinsiyete Gre Nfus ( 6 +ya ) - 2009
............................. 168Tablo 69. Egitim Seviyesine Gre
Okul Says
............................................................................
169Tablo 70. Diger Egitim Kurumlar
................................................................................................
169Tablo 71. niteler ve Yaklak Hafriyat Miktarlar
........................................................................
177Tablo 72. Hafriyat leri ve naat Aamasnda Kullanlacak Ekipmanlar
..................................... 178Tablo 73. Krma-Eleme
Tesisinin Zamana Bagl retim Degerleri
............................................... 186Tablo 74.
Krma-Eleme Tesisine Ait Koordinatlar
........................................................................
186Tablo 75. Makine ve Ekipman
Listesi..........................................................................................
189Tablo 76. Har nitesi Tesisiin Zamana Bagl retim
Degerleri.............................................. 190Tablo
77. Har nitesi Tesisine Ait Koordinatlar
.........................................................................
190Tablo 78. Har nitesi Tesisinde Kullanlacak Makine ve Ekipman
Listesi .................................. 192Tablo 79. Proje
Alanndaki Kaz Miktarlar ve Tanacaklar
Yerler.............................................. 193Tablo 80.
Reglatr Sahasndan Kaynakl Oluacak Emisyon Miktar
......................................... 194Tablo 81. letim
Tnelinden Kaynakl Oluacak Emisyon Miktar
................................................. 195Tablo 82.
Ykleme Havuzunda Yaplacak Hafriyattan Kaynakl Oluacak Emisyon
Miktar ......... 196Tablo 83. Yaylma Snflarna Gre M Degerleri
..........................................................................
197Tablo 84. Rzgar Verilerini Snflanmas
.....................................................................................
198Tablo 85. Havada Asl Partikllerin Daglm (g/m3) (Ykleme Havuzu
Alan) ........................... 198Tablo 86. ken Tozlarn Daglm
(mg/m2-gn) (Ykleme Havuzu Alan)...................................
199Tablo 87.Proje Kapsamnda UVS ve KVS Degerlerine Ulalan
Mesafeler(Ykleme HavuzuAlan in)
................................................................................................................
200Tablo 88. En Yakn Yerleime Gre Degerleri(Ykleme Havuzu Alan
in)...............................
201Tablo89.CebriBoruveSantralBinasAlanndaYaplacakHafriyattanKaynaklOluacakEmisyon
Miktar
.......................................................................................................
202Tablo 90. Havada Asl Partikllerin Daglm (g/m3) (Cebri Boru ve
Santral Binas in) ............ 203Tablo 91. ken Tozlarn Daglm
(mg/m2-gn) (Cebri Boru ve Santral Binas in)....................
204Tablo92.ProjeKapsamndaUVSveKVSDegerlerineUlalanMesafeler(CebriBoruveSantral
Binas in)
..................................................................................................
205Tablo 93. En Yakn Yerleime Gre Degerleri(Cebri Boru ve Santral
Binas in) ...................... 205Tablo 94. Reglatr Alan Ulam
Yolu almasndan Kaynakl Oluacak Emisyon Miktar ....... 206Tablo 95.
Havada Asl Partikllerin Daglm (g/m3) (Reglatr Alan Ulam Yolu in)
............ 208Tablo 96. ken Tozlarn Daglm (mg/m2-gn) (Reglatr
Alan Ulam Yolu in) ....................
209Tablo97.ProjeKapsamndaUVSveKVSDegerlerineUlalanMesafeler(ReglatrAlanUlam
Yolu in)
.....................................................................................................
210Tablo 98. En Yakn Yerleime Gre Degerleri(Reglatr Alan Ulam Yolu
in) ...................... 210Tablo 99. Ykleme Havuzu Ulam Yolu
almasndan Kaynakl Oluacak Emisyon Miktar ..... 211Tablo 100. Havada
Asl Partikllerin Daglm (g/m3) (Ykleme Havuzu Ulam Yolu in) ........
213Tablo 101. ken Tozlarn Daglm (mg/m2-gn) (Ykleme Havuzu Ulam Yolu
in)................ 214Tablo 102.Proje Kapsamnda UVS ve KVS
Degerlerine Ulalan Mesafeler (Ykleme HavuzuUlam Yolu in)
.....................................................................................................
215Tablo 103. En Yakn Yerleime Gre Degerleri(Ykleme Havuzu Ulam
Yolu in) .................. 215Tablo 104. Santiye Sahasndan Kaynakl
Oluacak Emiyon Miktar ............................................
216Tablo 105. Havada Asl Partikllerin Daglm (g/m3) (Santiye Sahas
in) ............................... 217Tablo 106. ken Tozlarn Daglm
(mg/m2-gn) (Santiye Sahas in)
...................................... 218Tablo 107. Proje
Kapsamnda UVS ve KVS Degerlerine Ulalan Mesafeler (Santiye Sahasin)
.........................................................................................................................
219EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658
MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU
MADEN. SAN. VE TC.. LTD. .11/387Tablo 108. En Yakn Yerleime Gre
Degerleri(Santiye Sahas in)
........................................ 219Tablo 109. naat
Aamasnda Kullanlacak Makineleri
...........................................................
227Tablo 110. Motorinin zellikleri
..................................................................................................
227Tablo 111. Dizel Aralardan Yaylan Kirlenmenin Faktrleri
........................................................ 228Tablo
112. Makinelerinden Kaynaklanmas Beklenen Kirletici Degerler
................................... 228Tablo 113. Evsel Nitelikli
Atksu Dearj Kriterleri
.........................................................................
231Tablo 114. Tipik Evsel Atk Su Kirleticileri ve Ortalama
Konsantrasyonlar .................................. 232Tablo 115.
Evsel Nitelikli Atk Su erisindeki Kirletici Ykleri
......................................................
232Tablo116.ProjeKapsamndaKullanlacakSuMiktarlar,OluacakAtkSuMiktarlarveBerteraf
Yntemleri
.................................................................................................
237Tablo 117. Ses Gc Dzeyleri
..................................................................................................
242Tablo 118. Ara ve Ekipmanlarn Ses Gc Dzeyleri
................................................................
243Tablo 119. Ses Gc Dzeylerinin Oktav Bantlarna Daglm
..................................................... 245Tablo 120.
Ses Basn Dzeyleri
................................................................................................
245Tablo 121. Atmosferik Yutu
......................................................................................................
247Tablo 122.Nihai Ses Basn Dzeyleri
......................................................................................
248Tablo 123. Dzeltme
Faktrleri...................................................................................................
250Tablo 124. Ses Dzeyleri
...........................................................................................................
250Tablo 125. Lgndz Degerleri
....................................................................................................
252Tablo 126. Santiye Alan in evresel Grlt Snr Degerleri
................................................... 253Tablo
127.Mesafeye Gre Titreim Hz Degerleri (W = 2,24
kg)............................................... 254Tablo 128.
Bina Temeli Titreim Hz (Vo) Degerlerine Bagl Olarak Patlatma
Nedeniyle HasarGrebilecek Bina Trleri (Forssbland,1981)
.............................................................
255Tablo 129.Patlatma Yaplan KayaTr ve Bina Temeli AltndakiKaya
Trne Bagl
OlarakDegiimGsterenkKatsaysAsgariveAzamiDegerleri(ArmacPrintingCompany).
..............................................................................................................
256Tablo130.Montana(Tennant,1976)YntemineGreBalk,VahiYaamveRekreasyonAmal
Akarsu Aknt Oranlar
..............................................................................
277Tablo 131. TalkayaReglatr YerineAit En Kesit Parametreleri ve
Boyutsuz Islak evre veBoyutsuz Debi Degerleri
..........................................................................................
282Tablo 132. Talkaya Reglatr in Hesaplanan Can Suyu Miktar (m3/sn)
.............................. 283Tablo 133. Hesaplanan Aylk Bazda
Can SuyuMikatarna Gre Derede Meydana GelebilecekSu Seviyesi
.............................................................................................................
284Tablo 134. Hesaplanan Aylk Bazda Can SuyuMiktarna Gre Derede
Meydana GelebilecekSu Hz
....................................................................................................................
285Tablo 135. Debi Sreklilik ndisine Gre Hesaplanan Parametrelere
Ait Degerler .......................
288Tablo136.Son10YllkGnlkBazdallenAkmVerilerindenEldeEdilenve7Q10Ynteminde
Kullanlacak Olan Veri Seti
...................................................................
288Tablo137.Son20YllkGnlkBazdallenAkmVerilerindenEldeEdilenve7Q20Ynteminde
Kullanlacak Olan Veri Seti
...................................................................
289Tablo 138. Farkl Yntemlere Gre Belirlenen Can Suyu Miktar ve
Reglatr Tarafndan AylkBazda Kullanlacak Su Miktarlar (m3/sn)
.................................................................
293Tablo 139. Farkl Yntemlere Gre Hesaplanan Can Suyu Mikatarna Gre
Derede Oluan SuSeviyesi
..................................................................................................................
294Tablo 140. Farkl Yntemlere Gre Hesaplanan Can Suyu Mikatarna Gre
Derede Oluan SuHz
.........................................................................................................................
294Tablo 141. Blgedeki Balk Trlerinin Yaayabilecegi Minimum Akm ve
Derinlikler (Cows andWelcomme, 1998)
...................................................................................................
296Tablo142.EkosistemRaporundaTalkayaReglatrndenSonraBraklmasnerilenMinimum
Su Miktarlar
.............................................................................................
297Tablo 143. Talkaya. Reglatr Can suyu Miktarlar (Can suyu +
Sulama Haklar) (m3/sn) ...... 299Tablo 144. Proje Havzasnda Bulunan
Diger Tesisler ve Konumlar
............................................ 303Tablo 145. Evsel
Nitelikli Atksu Dearj Kriterleri (letme Aamas)
............................................ 311Tablo 146. Tipik
Evsel Atk Su Kirleticileri ve Ortalama Konsantrasyonlar (letme
Aamas) ..... 311Tablo 147. Evsel Nitelikli Atk Su erisindeki
Kirletici Ykleri (letme Aamas) ......................... 311EYNER
ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658 MWm/22,052
MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE
TC.. LTD. .12/387EKLLERSekil 1. Trkiyenin Birincil Enerji Talebi ve
Yerli retimi
...............................................................
20Sekil 2. Trkiyede Yerli Enerji retiminin Talebi ve/veya Tketimi
Karlama Oran ...................... 21Sekil 3. Talkaya Reglatr ve
HES Tesis Alanlarna Ait Uydu Grntleri
................................ 39Sekil 3.a. Proje Akm Semas
...................................................................................................
45Sekil 4. Artvin li Rzgarn Ortalama Hzna Gre izilmi Rzgar Gl
........................................ 57Sekil 5. Artvin li Esme
Saylarna Gre izilmi Rzgar Gl
....................................................... 58Sekil 6.
Artvin li Deprem ve Sismik Durumu
.................................................................................
64Sekil 7.Thornthwaite Yntemine Gre Artvin linin Su Bilanosu
Grafigi ....................................... 70Sekil 8. Projenin
Havzadaki Diger Tesisler likisini Gsterir Sematik Plan
.................................... 77Sekil 9. Hidrometeoroloji
Bulduru
Haritas.....................................................................................
83Sekil 10. Artvin li Topraklarnn Alansal Daglm (%)
...................................................................
87Sekil 11. Artvin line ait Arazi Kabiliyet Snflarnn Daglm (%)
.................................................... 88Sekil 13.
Artvin li Korunan Alanlar Gsterir Kroki
......................................................................
150Sekil 14. Artvin line Ait Maden
Krokisi........................................................................................
156Sekil 15. letim Tneli Patlatma Dizayn
......................................................................................
182Sekil 16. Krma-Eleme Tesislerine Ait Akm Semas (Genel)
................................................... 187Sekil 17.
Krma-Eleme Tesislerine Ait Akm Semas (Genel)
................................................... 188Sekil 18.
Krma-Eleme Tesisi rnek
Sekli...................................................................................
189Sekil 19. Har nitesi Tesisi Akm
Semas..............................................................................
191Sekil 20. Har nitesi Tesisi Akm
Semas..............................................................................
192Sekil 21. Havada Asl Partikllerin Daglm Grafigi (Ykleme Havuzu
Alan).............................. 199Sekil 22. ken Partikllerin
Daglm Grafigi (Ykleme Havuzu Alan)
....................................... 200Sekil 23. Havada Asl
Partikllerin Daglm Grafigi (Cebri Boru ve Santral Binas in)
.............. 203Sekil 24. ken Partikllerin Daglm Grafigi (Cebri
Boru ve Santral Binas in) ........................ 204Sekil 25.
Havada Asl Partikllerin Daglm Grafigi (Reglatr Alan Ulam Yolu in)
............... 208Sekil 26. ken Partikllerin Daglm Grafigi
(Reglatr Alan Ulam Yolu in) ........................ 209Sekil 27.
Havada Asl Partikllerin Daglm Grafigi (Ykleme Havuzu Ulam Yolu in)
............ 213Sekil 28. ken Partikllerin Daglm Grafigi (Ykleme
Havuzu Ulam Yolu in) ...................... 214Sekil 29. Havada Asl
Partikllerin Daglm Grafigi (Santiye Sahas in)
................................... 217Sekil 30. ken Partikllerin
Daglm Grafigi (Santiye Sahas
in)............................................. 218Sekil 31. Paket
Atk su Artma Tesisi Genel Plan
.......................................................................
234Sekil 32. Grlt Yaylm Grafigi
.................................................................................................
253Sekil 33. Debi Sreklilik Egrisi
....................................................................................................
278Sekil 34. Islak evre-Debi liskisi
................................................................................................
279Sekil 35. Baz Akm Ayrma Yntemleri
.......................................................................................
280Sekil 36. Arazide Yerinde Yaplan lmler Sonucunda Elde Edilen En
Kesit............................. 281Sekil 37. Islak evre-Debi
Arasndakiliki
................................................................................
283Sekil 38. Deredeki Su Seviyesi le Debi Arasndaki liki
.............................................................
284Sekil 39. Deredeki SuHz le Debi Arasndaki liki
...................................................................
285Sekil 41.Talkaya Reglatr Yeri Debi Sreklilik Egrisi
..............................................................
287Sekil 42. Akm-Tekerrr Aralg Arasndaki
liki..........................................................................
289Sekil 43. Akm-Tekerrr Aralg Arasndaki
liki..........................................................................
290Sekil 44. Projenin Havzadaki Diger Tesisler likisini Gsterir
Sematik Plan ................................ 304Sekil 45. Kazas in
Acil Mdahale Plan
...............................................................................
325Sekil 46. Yangn in Acil Mdahale Plan
...................................................................................
326Sekil 47. Deprem in Acil Mdahale Plan
.................................................................................
327EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658
MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU
MADEN. SAN. VE TC.. LTD. .13/387EK LSTESEK-1 1/25.000 lekli Proje
Alann Gsterir Topografik HaritaEK-2 1/5.000 lekli Proje Alann
Gsterir Topografik HaritaEK-3 1/25.000 lekli Proje Alann Gsterir
Jeolojik HaritaEK-41/25.000 lekli Ulam Yollarn Gsteriri Topografik
HaritaEK-5 1/25.000 lekli Proje Etki Alann Gsterir Topografik
HaritaEK-61/100.000 lekli Proje Alann Gsterir Arazi Varlg
HaritasEK-71/25.000 lekli Proje Alann Gsterir Mesere
HaritasEK-8Talkaya Reglatr ve HES Projesi Yer Bulduru
HaritasEK-9Talkaya Reglatr ve HES Projesi Google Earth
FotograflarEK-10Talkaya Reglatr ve HES Projesine ait
FotograflarEK-11 Talkaya Reglatr ve HES Projesine Ait Plan ve
KesitleriEK-12Talkaya Reglatr ve HES Projesi Ekolojik Degerlendirme
RaporuEK-13 Talkaya Reglatr ve HES Projesi Su Kullanm Haklar
RaporuEK-14TalkayaReglatr ve HES Projesi SKKY Tablo-1e Gre Su
Analiz RaporuEK-15Talkaya Reglatr ve HES Su Kullanm Hakk Anlamas ve
LisansEK-16Meteoroloji Genel Mdrlgnden Alnm Artvin line Ait
Meteorolojik VerilerEK-17DS Genel Mdrlgnden Alnm Onayl Reglatr Yeri
Akm DegerleriEK-18 Talkaya Reglatr ve HES ED nceleme Degerlendirme
FormuEK-19Protokol anlamasEK-20 Kaz Fazlas Malzeme Dkm Alanlar in
Alnm Kurum GrleriEK-21 Ball Deresinden Su Kullanm le lgili DS 26.
Blge Mdrlgnn GrEK-22 leksiz keltim Havuzu PlanEK-23Halkn Katlm
Toplants Gazete lanlarEK-24Nihai ED Raporu zleme Raporlar
FormuEK-25BalkGeidi izimiEK-26 Topuoglu Madencilik San. Ve Tic.
Ltd. Sti. Adna Bro Tescil Belgesi ve YeterlilikBelgesiEYNER ENERJ
RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658 MWm/22,052 MWe),
KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE TC..
LTD. .14/387KISALTMALARABD Amerika Birleik DevletleriADNKS Adrese
Dayal Nfus Kayt SistemiAg GmAG Akm Gzlem stasyonuAKM Askda Kat
MaddeAMP Acil Mdahale PlanAu AltnA.. Anonim Sirketibk. BaknzBOI
Biyolojik Oksijen htiyacC SantigratCITES Nesli Tehlikede Olan
Yabani Hayvan ve Bitki Trlerinin UluslararasTicaretine likin
Szlemecm SantimetreCu BakrED evresel Etki DegerlendirmesidBA
A-Agrlkl desibelDPT Devlet Planlama TekilatDS Devlet Su leri Genel
MdrlgEE Elektrik leri Ett daresiEPDK Enerji Piyasas Dzenleme
KurumuEA Elektrik retim A.S.ETKB Enerji ve Tabii Kaynaklar
BakanlgFe Demirg GramGSYH Trkiye Gayri Safi Yurt i Haslasha
HektarHC HidrokarbonHES Hidroelektrik Santralhm3HektometrekphPa
HektoPaskalHz HertzIUCN Nesli Tkenme Tehlikesi Altnda Olan Trlerin
Krmz ListesiBBS statistiki Blge Birimleri SnflamasKAKY Kat Atklarn
Kontrolu Ynetmeligikg KilogramKOI Kimyasal Oksijen htiyackm
KilometrekV KilovoltkVA Kilo volt amperL Litrem Metremm MilimetreMn
ManganezMTA Maden Tetkik ve Arama Genel MdrlgMW Mega Wattm/s
Metre/saniyem2Metrekarem3/sa Metrekp/saatNo. NumaraNOx Azot
oksitlerEYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE
HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES
TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD. .15/387KA nemli Ku AlanPb
KurunPM Partikl Maddesa Saats SaniyeSKHKKY Sanayi Kaynakl Hava
Kirliligi Kontrol YnetmeligiSKKY Su Kirliligi Kontrol
YnetmeligiT.C. Trkiye CumhuriyetiTEA Trkiye Elektrik letim A.S.TL
Trk LirasTPAO Trkiye Petrolleri Anonim OrtaklgTK Trkiye statistik
KurumuUSEPA Amerika Birleik Devletleri evre Koruma Ajansvb. Ve
benzerleriZn inko Derece% Yzde BindeoC Derece SantigratS/cm
mikrosiemens/santimetre mikroEYNER ENERJ RETM VE TC. LTD. T.
TALIKAYA REGLATR VE HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED
RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD.
.16/387EYNER ENERJ RETM VE TC. LTD. T.TALIKAYAREGLATR VE HES(22,618
MWm/22,052 MWe),KIRMA-ELEME VE HAR NTESTESSLERArtvin li, Arhavi
lesi Snrlar erisi,Kapistre Deresinin Bir Kolu Olan BallDeresi
zerindeBLM-IPROJENN TANIMI VE AMACIEYNER ENERJ RETM VE TC. LTD. T.
TALIKAYA REGLATR VE HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED
RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD.
.17/387BLM I: PROJENN TANIMI VE AMACI(Proje konusu faaliyetin tanm,
mr, hizmet amalar, pazar veya hizmet alanlar
vebualanierisindeekonomikvesosyalyndenlke,blgeve/veyaillegindenem
ve gereklilikleri)Hazrlanan proje; 17.07.2008 Tarih ve 26939 Sayl
Resmi Gazetede
YaynlanarakYrrlgeGirenevreselEtkiDegerlendirmesiYnetmeligininEk-IISeme-ElemeKriterleriUygulanacakProjelerListesi-Madde28Kurulugc0,5MWvezeriolannehirtipisantrallerkapsamndaolupaynynetmeliginMadde7(b)bendib)SemeElemeKriterlerinetabiolup"evreselEtkiDegerlendirmesiGereklidir"kararverilenprojelereevreselEtkiDegerlendirmesiRaporuhazrlanmaszorunludurhkmgeregisz
konusu proje; evre ve Orman Bakanlg evresel Etki Degerlendirmesi ve
PlanlamaGenelMdrlgnn05.04.2010tarihve3090/20505saylyazsndabelirlenenEDRaporu
zel Format dogrultusunda hazrlanmtr.I.a. Proje KonusuEyner Enerji
retim ve Tic. Ltd. ti. tarafndan Dogu Karadeniz Blgesi, Artvin
li,Arhavi lesi snrlar ierisinde, Talkaya Reglatr iin Kapistre
Deresinin bir kolu
olanBallDereninsularndanyararlanarakhidroelektrikenerjiretimiamacyla
TaIkayaReglatrveHES(22,658MWm/22,052MWe)
projesininyaplmasveiletilmesiplanlanmaktadr.Projekapsamndakisantralinkurulugc22.618MWolarakplanlanmtr.Projekapsamnda
yllk retilecek firm (gvenilir) enerji 23.502 GWh, sekonder
(ikincil) enerji ise69.166GWh,olacaktr.
TaIkayaReglatrveHES(22,658MWm/22,052MWe)mevcut durumdaki akmlarla
toplam 92.668 GWh enerji retilmesi planlanmaktadr.I.b. Faaliyetin
TanmTalkayareglatrKapistreDereninBallDerekoluzerindekardanallkontrolszbetonagrlklolarakplanlanmtr.TalkayareglatrilebirlikteBallDeredenevrilendogalakmlar,yineBallDereninzerindebulunanTalkayaHESteenerji
retimi amacyla
trbinlenecektir.Reglatryeri,ikikolaayrlanKapistreDereninBallderekoluzerindedir.Regltryeritopografik,jeolojikvemhendislikkoullarynndenenuygunyerdir.Talkayareglatrkretkotu990.08m,talvegkotu983.00m,temelkotu981.50m,talvegden
yksekligi 7.08 m temelden ykseklik 8.58 m
dir.TalkayaReglatrnormalsuseviyesi988.00m.olaraktespitedilmitir.Talkayareglatrtalvegdenitibaren7.08myksekligindenapkotu988.00m.
olacakekilde kapaksz olarak tasarlanmtr. Yaplan optimizasyon
almalar sonucu
reglatryerindekiyllkortalamaakmdegeriolan2.640m3/snin%86.80nienerjimaksadileevrilecektir.Santralda
6.3 kV gerilim seviyesinde retilen enerji, nite transformatrleri
vastasile 34.5 kV gerilim seviyesine ykseltilerek 34.5 kV alta
aktarlmakta ve 7 km liktek
devre477MCMiletkenlienerjinakilhattileamlcabarajnnmevcutveyaoluturulacakDagtm
Merkezine baglanarak ulusal ebekeye aktarlacaktr. Bu amala santral
binasnniineiki giri, bir lmveiihtiya fiderli, bir
adetkfiderindenteekkledentoplambe hcreli 34.5 kV metal muhafazal
kapal alt yaplmas dnlmtrEYNER ENERJ RETM VE TC. LTD. T. TALIKAYA
REGLATR VE HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR
NTES TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD.
.18/387TalkayaHidroelektriknitelerininUlusalElektrikSistemiileparalelegirmesiTalkayaHES
34.5kValtsahasndaki nite
fiderkesicilerizerindenyaplacaktr.DigerbirdeyimleTalkayaHES34.5kVbaras,ncelikleamlcaDMsinebaglenerjinakilhatlarzerindenenerjilenecekvedahasonraniteler,senkronizasyoncihaz(25)ileotomatikveyaelleparalelenitekesicilerizerindenalnacaktr.Buamalanitekesicilerdennceve34.5kValtbaralarnauygunbyklktegerilimltransformatrleri
konularak senkronizasyon iin klar
alnmtr.TalkayaHESvealtsahaskontrolkorumavelmesistemiolarakteknolojikyeniliklertakip
edilerekmerkezikontrolodasnda
bilgisayarlkontrolveizlemesistemiileLokal kontrol panolarnda PLC
kontrll sistem
dnlmtrnitelerin,altsahastehizatnnvetmyardmcsistemlerikontrollmeveizlemesi
ilemlerinin merkezi bir bilgisayar sistemi tarafndan saglanmas n
grlmtr.Santraldaretilenenerjilm,ElektrikPiyasasLisansYnetmeligineuygunolarak
34.5kV saltta tehiz edilecek lm sistemi ile
llecektir.BaglamanoktasTEASplanlamasdogrultusundagerekleecektir.ProjekapsamndayaplacakenerjiletimHattburaporkapsamndadegerlendirilmeyealnmamolup,szkonusuEnerjiletimHattProjesi17.06.2008tarihve26939saylevresel
Etki Degerlendirilmesi Ynetmeligi kapsamnda ayrca
degerlendirilecektir.I.c. Faaliyetin
mrHidroelektriksantrallerdigerretimtipleriilekyaslandgndaendkiletmemaliyetine,
en uzun iletme mrne ve en yksek verime haizdirler.TaIkayaReglatr
veHES(22,658MWm/22,052MWe) tesislerinin2yldaina edilmesi
planlanmtr. Talkaya Reglatrnn membasnda imdiye kadar bir
tesisplanlanmamolup,blgeninsosyoekonomikvetopografikkoullardikkatealndgnda,membada
yaplabilecek tesisler reglatrl depolamasz tesislerden ibaret
olacaktr.
Projekapsamndailetmemr49ylolarakbelirlenmitir.Ancakhidroelektriksantrallerininmrn
tamamlamasndan sonra yaplacak iyiletirme ve glendirme almalaryla
dahauzun mrl kullanmlar saglanabilmektedir.I.. Faaliyetin Hizmet
AmalarTaIkayaReglatrveHES(22,658MWm/22,052MWe)
tesislerininiletilmesi,Trkiyeekonomisineveenerjipazarnakatkdabulunacaggibi,cografikonumuveulamyollarilegelimepotansiyeliherzamanyksekolanyredeenerjiimkanlaryaratacak,ekonomiyeveistihdamagerekinaat,gerekseiletmednemindeimkanlargetirecektir.BununyansraTrkiyeninrettigiyeilenerjimiktarnakatkdabulunacak,
Kyoto Konferans kararlarna gre, halihazrda enerjilerinin en az
%22sini
yeilenerjiolaraktketmelerigerekenAvrupalkelerineenerjiihracatimkannadakatksaglayacaktr.Ayrca,
bu ve buna benzer santrallerin byk oranda yerli sermaye ile ina
edilerekdevreyegirmesi,devletkaynaklarnndahaverimlikullanlmasndasaglayacak,karlgndadvizdenenenerjikaynaklarnaduyulanihtiyacbirazolsunazaltacakvedegerlendirilemeyenyenilenebilirenerjikaynaklarmzndegerlendirilmesinekatkdabulunacaktr.EYNER
ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658 MWm/22,052
MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE
TC.. LTD. .19/387Hidroelektrik santrallerin avantajlar: Kuraklk
halleri hari devaml ucuz enerji retirler Bakm maliyeti dktr.
Yenilemeyen bir yakt enerji retimi yapmazlar. Enerji retiminde hava
kirliligine neden olmazlar.
Hidroelektriksantrallerinbirparasolanrezervuarlarbalkretimi,regreasyon
alan gibi amalarla da kullanlabilir.
Rezervuarlarfazlamiktardasuyudepolayarakhemsulutarmahemdeuzun sreli
enerji retimine imkan tanrlar. Rezervuarlar takn kontrolne yardmc
olurlar.
Hidroelektriksantralrezervuarlarkurulduklaryerinmansabndakiyerlerinsu
kalitesinin ykseltilmesine yardmc olurlar.I.d. Faaliyetin Pazar ve
Hizmet
AlanlarDnyadakihzlteknolojikgelimelereragmenenerji,sanayiiinmutlakgirdiolmaniteliginihalakorumaktadr.Sanayileentoplumlarnvazgeilmezihtiyalarnnbandaenerjiihtiyacgelmektedir.Zamanndayaplamayanenerjiyatrmlar,sanayileentoplumlaraagrmaliyetleryklemekte,zatensnrlolankaynaklarnnverimlikullanlmasnaengelolmaktadr.Butrtoplumlarn,zelliklefosilkkenlienerjikaynaklarnnsnrlolmas,fosilkkenlikaynaklardanenerjiretimininsnrlolmasnnyan
sra dogaya verdigi zarar nedeni ile, gelimi lkelerde,
yenilenebilir, alternatifenerjiretim kullanm kapasite her geen gn
artmakta olup, ciddi boyutlara
gelmitir.lkemizdeEnerjiveTabiiKaynaklarBakanlgtarafndanyrtlenYap-let-Devret(YD)modeli,bumodelkapsamndakiOtoprodktrreticileryntemiveiletmedebulunanHESlerinletmeHakknnDevredilmesiuygulamasileDStarafndanyrtlen%100DKrediliAnahtarTeslimimodelleriyleHESlerininaedilmesinde
nemli gelimeler kaydedilmi
bulunmaktadr.Elektrikenerjisisektrnelkemizgenelpolitikalarasndanbakldgndaennemli
unsurlar; enerji arz gvenligi, enerji retim maliyeti, da bagmllgnn
azaltlmas,yerli,yenilenebilirveevreyleuyumlukaynaklarnkullanmdr.lkemizdekullanlanelektrik
ise 2008 ylnda %82 termik (%48,6 dogalgaz, %26,2 kmr ve %7 diger)
%17sihidrolikvegeriyekalan%1iisejeotermalverzgardansaglanmtr.Bukullanlankaynaklardangrlecegizereelektrikenerjisinin%82sininyenilenebilirenerjikaynaklarndanretilmedigi,yarsndanfazlasnnithalkaynakloldugugrlmektedir.DigertaraftanEAStarafndanyaplandkprojeksiyonagre2020yliinkurulugcmzn80.000MW,yksekprojeksiyonagre100.000MWakarlmasgerekmektedir.Bunagrebugniinyaklak40.000MWkapasitelielektrikenerjikapasitesine
nmzdeki 10 ylda 40.000 MW, her yl ortalama 3.500-4.000 MW
kapasiteliilave elektrik retim tesislerinin yatrmlarn
gerektirmektedir.Buitibarlalkeolarakenerjiyeyatrmyapmakzorunlulugumuzbulunmaktadr.Ekonomikadanretimmaliyetlerinidrmek,enerjiarzgveligivelkepolitikalarasndan
da bagmllgmz azaltabilmek iin toplam enerji retimi ierisinde yerli
enerjikaynaklarnnpaynartrmak,maliyetleridrmekiinyenilenebilirenerjikaynaklarnadayalelektrikretimigelitirmekdurumundayz.lkemizingelimesinebaglolarakhidroelektrik
enerjipotansiyelive
tketiminintoplamenerjiiindekipaydaazalmaktadr.Ancak,temizenerjiolmas,degerlendirilememesihalindeakarsularmzndogalolarakdenizlereboalmnedeniylekaynakkaybnanedenolmasvebunlarnyanndaennemlisilkemizpikihtiyalarnnkarlanmasiinnemlibirksmithalyoluylaEYNER
ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658 MWm/22,052
MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE
TC.. LTD. .20/387karlananalternatiflerine
greokdahaucuz,pratikveanndasistemeverilerekihtiyablgelerine
ulatrlmas gibi avantajlara sahip olmas, hidroelektrik enerji
potansiyelimizingelitirilmesini zorunlu klmaktadr.Trkiyenin Enerji
Politikasi:Trkiye'nin toplam beklenen enerji talebi ile olanakl
grlen ve planlanan yerli
enerjiretimiarasndanemliakbulunmaktadr.T.C.EnerjiveTabiiKaynaklar
Bakanlg'nnplanlamasnagre,enerjitalebininveyerlienerjiretiminingelimetrendi
ekil1.'degsterilmitir. 2000 ylnda 59,94 Mtep1 olan ak, 2005 ylnda
89,00 Mtep'e, 2010 ylnda122,37 Mtep'e, 2020 ylnda 234,95 Mtep'e ve
2025 ylnda 311,00 Mtep'e ykselmektedir.Bu durumda, Trkiye 100 yl
sonunda enerji talep-retim ag 278,92 Mtep (Mtep:
Milyontonpetroledegeri)ile1997yltoplambirincilenerjitketiminin3,9katnaulambulunacaktr.2000-2025dnemindeyerli
retimintoplambirincil enerjitalebinikarlamaoran %34,2'den %23,6'ya
decek olup, yllara gre d ekil 2.'de verilmitir.
Bunagre,enerjiihtiyacnkarlamakiinelektrikretimkapasitesininartrlmasnnzorunluoldugu
aka
grlmektedir.lkemizde,enerjipolitikalarnnanahedefi,ihtiyacmzolanenerjininzamannda,gvenilir,ucuz,kaliteli,temizvengrlenkalknmahzilesosyalgelimeyidestekleyecekekildeteminedilmesiolarakbelirlenmitir.Enerjiretimindeverimliliginarttrlmas,
mmkn oldugu kadar, yerli kaynaklarn kullanmna ncelik verilmesi ve
yerlikaynaklarn degerlendirilmesinin yan sra, daha temiz enerji
kaynaklarnn kullanlmas
ilekaynakeitliligininsaglanmasnadazengsterilmesi,enerjipolitikalarmznnemliprensipleridir.ekil
1. Trkiyenin Birincil Enerji Talebi ve Yerli retimiekil 1.
Trkiyenin Birincil Enerji Talebi ve Yerli retimiKaynak:
http://www.tusiad.org.tr/turkish/rapor/enerji/html/sec8.htmlEYNER
ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658 MWm/22,052
MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE
TC.. LTD. .21/387ekil 2. Trkiyede Yerli Enerji retiminin Talebi
ve/veya Tketimi Karlama OranKaynak:
http://www.tusiad.org.tr/turkish/rapor/enerji/html/sec8.htmlElektrikenerjiretimindefosilvenkleeryaktltermikvedogalgazlsantralleryanndahidroelektriksantrallerinyenilenebilir
ve puantalmagibiikinemlizelligi
demevcuttur.Enerjipolitikalarbelirlenirkendikkatealnmasgerekennceliklihususlardanbiride,lkeninyerlienerjikaynaklarnndogrubir
ekildedegerlendirilmesidir.Bubaglamdahidrolik kaynaklarmz byk nem
tamaktadr.Yenilenebilirenerjikapsamndakihidroelektriksantrallerinyaplarakmevcuthidroelektrikpotansiyelindegerlendirilmesilkemizasndanbyknemtamaktadr.SanayielektrikcretiolarakAvrupadaenyksekikincicretleresahipolanlkemizde,ekonomikyapgeregi,sanayininnemligirdilerindenbiriolanelektrikenerjisiniretentesislerinartmasgerekmektedir.Buarttahammaddemaliyetiolmayanhidroelektrikenerjikritikroloynamaktadr.Enerjitketimlerignnbellisaatlerindeartmaveazalmagstermektedir.Piktaleplerikarlayabilmevegeregindekolaylkladevredenkabilmezelliginesahipenerjiretimtesislerininbanda,hidroelektrikenerjisantrallerigelmektedir.
Bunun yan sra bir lkede fert bana enerji tketimi, o lkenin kalknma
ve
yaamstandardnnbirgstergesiolarakkabuledilmektedirveTrkiyebuyndenpekoklkenin
gerisinde yer
almaktadr.lkemizdeenerjitketimartyksektirveenerjiithalatekonomideykoluturmaktadr.
Bunun en ksa srede almas iin hidroelektrik gibi yerli ve
yenilenebilirenerji tesislerinin bir an nce iletmeye alnmas
gereklidir.Bugnk ve Gelecekteki Enerji htiyac
Trkiye'de2000-2010yllararasndakienerjitalebiyksektir.Bunagre2010ylndaki
puant g ihtiyac 50,600 MW, enerji ihtiyac ise 307,970 GWh
olmaktadr.Enerji htiyacn Karlama mkanlar
Trkiye'nindaimienerjiihtiyaciintermiksantraller,piksaatlerdekiihtiyaciinhidroelektriksantrallerinkullanlmasnemlidir.Termiksantrallerleekonomikanalizlersonucukyaslananverantablbulunanhidroelektriksantrallerindedaimiihtiyasantraliolarakkullanlmasmmknolabilmektedir.BuyerliveyenilenebilirenerjikaynagEYNER
ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658 MWm/22,052
MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE
TC.. LTD. .22/387ynndenlkemiz potansiyeli uygundur.Dnya
hidroelektrikpotansiyelinin %1i,Avrupapotansiyelininise% 15i
lkemizdebulunmaktadr.Ekonomik olarak
degerlendirilebilecekhidroelektrik potansiyelimiz 122 420 Gwh
olarak ilgili kurulular tarafndan belirlenmitir.Gelime Plan Etki Ve
Sonular TaIkaya Reglatr ve HES (22,658 MWm/22,052 MWe)projesinin
iletmeyealnmas, Trkiye ekonomisine ve enerji pazarna katkda
bulunacaktr. Ayrca ekonomiyeveistihdamagerekinaat,
gerekseiletmednemindeimkanlar getirecektir.Bununyansra yerli ve
yenilenebilir enerji potansiyelinin artna da katks bulunacaktr.
Ayrca bu vebuna benzer yenilenebilir enerji santrallerinin byk
oranda yerli sermaye ile ina
edilerekdevreyegirmesi,devletkaynaklarnndahaverimlikullanlmasndasaglayacak,karlgnda
dviz denen enerji kaynaklarna duyulan ihtiyac biraz olsun
azaltacaktr.Giderekartanenerjiihtiyacnnkarlanmasndadegerlendirilmeyibekleyenhidroelektrik
enerji kaynaklar ierisinde Dogu Karadeniz Havzas 13.6 milyar kWh
hidrolikenerjipotansiyeliilebyknemesahiptir.HaritHavzasiseDoguKaradenizHavzasndayeralanyidereHavzasveFrtnaHavzasilebirlikteennemli3projealanndan
biridir. Dogu Karadeniz Blgesinin gerek Harit Vadisinden gerekse
arambaveSamsundanAnadolununykmerkezlerinebaglamlsistemiindebaglanmaimkn
mevcut ve
ekonomiktir.BunedenlerleKapistreDereninbirkoluolanBallDerezerindebulunanprojelerdenbiriolacakolan
TaIkayaReglatrveHES(22,658MWm/22,052MWe),Trkiyeninenerjipotansiyelinindegerlendirilmesivelkeekonomisinekatkdabulunmas
asndan yararl
olacaktr.ArtvinninArhaviilesindenKaradenizedklenKapistreDereninbirkoluolanBallDerezerindeolanenerjipotansiyelinidegerlendirmekamacylanerilenkardanallkontrolszbetonagrlktipindetasarlananTalkayaregltrtalvegden7.08mykseklikte,
983.00 m talveg kotunda ina edilecektir.Reglatrle evrilen sular
3284
m.likiletimtneliileyklemehavuzunagetirilecekvecebriboruileTASLIKAYAHESeulatrlacaktr.
TaIkaya Reglatr ve HES (22,658 MWm/22,052 MWe) 22.618 MWKurulu
gcnde olacak ve 23.502 GWh i gvenilir, 69.166 GWh i sekonder olmak
zere,toplam 92.668 GWh enerji
retecektir.Yaplanekonomikanalizlersonucundakanoptimumenerjitneliteknikolarakalabiliraptandahakkktgiinenkkalabilirapolan3.0malnmtr.TaIkayaReglatrveHES(22,658MWm/22,052MWe)tesisleriiinyaplanekonomik
analizler sonucundakanoptimum cebriboruap1.15m veoptimum kurulug
22.618 MW olarak
seilmitir.Tesislerinmembasndaplanlanmherhangibirprojevedepolamaltesisbulunmamaktadr.
Bunun yan sra topografik koullar gz nne alndgnda,
TaIkayaReglatrveHES(22,658MWm/22,052MWe)
asndanmembagelimelidurumbeklenmemektedir.EYNER ENERJ RETM VE TC.
LTD. T. TALIKAYA REGLATR VE HES(22,658 MWm/22,052 MWe),
KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE TC..
LTD. .23/387EYNER ENERJ RETM VE TC. LTD. T.TALIKAYAREGLATR VE
HES(22,618 MWm/22,052 MWe),KIRMA-ELEME VE HAR NTESTESSLERArtvin li,
Arhavi lesi Snrlar erisi,Kapistre Deresinin Bir Kolu Olan
BallDeresi zerindeBLM-IIPROJE N SELEN YERN KONUMUEYNER ENERJ RETM
VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658 MWm/22,052 MWe),
KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE TC..
LTD. .24/387BLM II: PROJE N SELEN YERN
KONUMUII.1ProjeninYeri(krma-elemetesisiilebetonsantralidahil)(lgiliValilikveyaBelediyetarafndandogruluguonanmolanprojeyerinin,lejantveplannotlarnndayeraldgonanlevreDzeniPlanvemarPlanlarzerinde,buplanlaryoksamevcut
arazi kullanm haritas zerinde gsterimi,)ProjesahasKaradeniz
Blgesinde,Dogu Karadeniz Havzasnda
Artvinli,Arhavilesisnrlarierisindeyeralmaktadr.TalkayaReglatryeri1/25000lekliArtvinF46/c1
numaral paftada
kalmaktadr.Reglatryeri,ikikolaayrlanKapistreDereninBallderekoluzerindedir.Regltryeritopografik,jeolojikvemhendislikkoullarynndenenuygunyerdir.Talkayareglatrkretkotu990.08m,talvegkotu983.00m,temelkotu981.50m,talvegden
yksekligi 7.08 m temelden ykseklik 8.58 m dir.letim gzergah Talkaya
Reglatr HES aras olmak zere tamamen tnel ilezlmtr. Talkaya Reglatr
HES aras toplam 3284 m tnel tasarlanmtr.
0.001egimlebasnszolarakplanlananiletimhatt988.00msukotuylabalayp,984.16myklemehavuzusukotuylasonlanacaktr.Topografyannegimidikkatealnarakatnalkesitli
tnel tasarm daha uygun bulunmu ve 3.00 m geniliginde, 1.01 m su
derinliginde,1.99m hava payiletasarmlanmtr.Tnel tasarmndaekonomik
koullaryerine teknikkoullar n plana ktg iin yaplabilirligi olan en
kk tnel ap seilmitir.letim gzergh ykleme havuzunda son bulacaktr.
Maksimum su seviyesi 984.98m olan ykleme havuzunda normal su
seviyesi 984.16 m ve minimum su seviyesi 983,77m
olacaktr.Topografikveekonomikyndensantralbinas,KapistreDereninBallDerekolunda480.75mkuyruksuyuseviyesindeyaplmakzerenerilmitir.Talkayaregltrndensaglanansuyuntrbinlenecegienuygunyerburasdr.BudurumdaTalkaya
HES kuyruk suyu seviyesi 480.75 m olacaktr. Trbin eksen kotu 485.00
m deolacaktr.TaIkayaReglatrveHES(22,658MWm/22,052MWe)
projesininarazihazrlkinaataamasnabalanmadannce3194saylmarKanununagreBelediyesnrlarvemcaviralanlardndakiyerlerdemarPlanlarArtvinlzeldaresinesunularak
onaylatlacaktr.Proje kapsamnda inaat aamasnda kullanlacak olan
krma-eleme tesisi ve harnitesi; reglatr yaknndaki antiye sahasnda
kurulacaktr (Bkz
Ek-2).Ayrcaprojekapsamnda10.08.2005tarihve25902saylResmiGazetedeyaymlanarakyrrlgegirenYeriAmavealtrmaRuhsatlarnalikinYnetmeliginin
ilgili maddesi geregince; Santral Binasna, Krma-Eleme Tesisine ve
Harnitesi Tesisine Yeri Ama ve alma Ruhsat (GSM) alnacaktr.Proje
alan Artvin linin Kuzeybatsnda yer almakta olup ku bak yaklak 40
kmmesafedeyeralmaktadr.ArhavileMerkezindenprojekapsamndanaaedileceksantralalannakadarmevcutyolbulunmaktaolup;yaklak17kmmesafededir.Santralalanndan
reglatr alanna ulam iin mevcut yol bulunmamakta olup proje
kapsamndareglatr alanna ulam saglamak amacyla 6 kmlik bir yol almas
yaplacaktr.
Ayrcaprojekapsamndainaaedilecekyklemehavuzunaulamsaglamakamacylaisedeyaklak
5 kmlik yol almas yaplacaktr. Proje kapsamnda ulam saglamak
amacylaEYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE
HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES
TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD.
.25/387kullanlacakyollar(mevcutveyeniyaplacakyollar)gsterir1/25.000leklitopografikharita
eklerde verilmitir
(Bkz.-Ek-4).Projekapsamndakullanlacakkyyollarnnulamnntrafigesrekliaktutulacakvetrafikakengellenmeyecektir.Agrtonajlaralarnkullanmdandolaykyyollarnnvesanatyaplarnnbozulmasdurumunda,gereklionarm,stabilize,betonkaplamas,yolkaplamasvb.ilerEynerEnerjiretimveTic.Ltd.Sti.tarafndanyaplacaktr.AyrcaKyyolundaOnarmveSanatYaplaryapmnaihtiyaoldugutaktirde
Ky yolunda uygulanacak olan Onarm ve Sanat Yaps yapm projesi iin
Artvin lzel daresinin gr
alnacaktr.Ayrcaprojekapsamndayaplacakyolalmalarmevcutgzergahzerindeolumsuz
etki meydana getirmeyecek ve yaplacak yollar k ve yagl mevsim
artlarndaulamaksatmayacak ekilde yaplacak ve korunacaktr.
Ayrcaalacak yollaramcrilekaplanacak veyollarnormanarazi
ierisindekalmasndantryol
geniliklerimmknmertebeenazseviyedebraklacaktr.Yolalmalarsrasndayaplacakarazihazrlkaamasndaortayakacakhafriyatmalzemesikesinlikballderesiyatagnabraklmayacakvedereevlerininfeyezandurumundaulamaengelolmayacakekildedzenleme
yaplmas iin gerekli nlemler alnacaktr.TaIkaya Reglatr ve HES
(22,658 MWm/22,052 MWe) projesi
kapsamndayreninkendinehasfloravepeyzajzelliklerininkorunmasiin,projekapsamndakurulacakReglatr,yklemehavuzu,cebriboruvesantralbinasyaplarnyreileuyum
saglayacak malzemeveteknik
ileyaplmadurumuaratrlarakvebukapsamndayaplanrnekalmalardikkatealnaraktesisdtasarmlariingereklidzenlemeleryaplacaktr.Yaplacakdzenlemelerayrcayolalanlarveantiyesahalariindeuygulanacakolupyreyehasfloravepeyzajzelliklereuyumsaglanmasiinzengsterilecektir.Ayrcaszkonusu
proje
kapsamndaparojealanveevresindebulunanakarsu,mevsimselakgsterenkurudereyataklarnnzarargrmemesiiingereklizengsterilecek
ve dere yataklarna ulamas sz konusu olabilecek yerlere pasa
malzemesi,hafriyatmalzemesi, katvesvatklar
atlmayacaktr.Dereyataklardegitirilmeyecekveevre kirliliginin
enegelelnmesi iin gerekli tm nlemler alnacaktr.Eyner Enerji retim
ve Tic. Ltd. ti. tarfndan kurulmas ve iletilmesi
planlananTaIkayaReglatrveHES(22,658MWm/22,052MWe)
pojesiArtvinili,Arhaviilesi snrlarnda yer almakta olup;Artvin
Ili40,35ile41,32Kuzeyenlemlerive41,07ile42,00Doguboylamlararasndayeralan,7.436km2geniliginde,DoguKaradenizBlgesininbirilidir.DogusundaArdahan,Batsnda
Rize, Kuzeyinde Grcistan, Gneyinde Erzurum ile komudur. Kuzey
batsndaKaradenizvardr.Kyuzunlugu34kmdir.lingeniligiTrkiyeyzlmnn(783.577km2)
% 0,9 u
kadardr.KaradenizkysnaparalelolarakuzananDoguKaradenizDaglarnnilsnrlariindekiuzantlar;Kakar,Altparmak,Kkrtl,skaristiDaglaradylasnrakadaruzanmaktadr.
Bu dag srasnn zerinde ok sayda dag ve yksek tepeler yer
alr.Karadeniz kysn takip ederek batdan doguya dogru iki sra halinde
uzanan 3937m.YksekligindekiKakarDagKaradenizDaglarnnenyksek
noktasnoluturur.BuEYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR
VE HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES
TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD.
.26/387dagnsublmizgileri;Artvin,Rize,Erzurumilsnrlarnbelirler.SavatveBorkaileleriarasndayeralan,oruhveBertavadileriileGrcistansnrnakadaruzananKaral
Dag 3428 m. Yksekligi ile ilin diger nemli bir dagdrArhavi
IlesiArhaviyzeyekilleriasndangenelolarakdaglkveengebelibirgrnmarzetmektedir.leninyzeyekillerianahatlarylaDoguKaradenizdaglarveKavak(Kapisre)
deresi ile ona baglanan derelerin derince yardg vadiler
oluturur.Arhavi de 8.km'lik sahil eridi boyunca Kavak deresinin
oluturdugu ova haricindekyolduka dikve
falezlidir.Kydzlgnnbykbirksm,iribirikintimalzemeleriileRizeHopakarayolutarafndankaplanmtr.lemerkezindegeniliginartmasileyerkum
eritleri ve kk apta plajlara da rastlanr. Ky boyunca hakim ky
ekilleri
falezler,taraalarvegirintikntlardr.AncaktaraavefalezlerRizeHopakarayoluinaatsrasndagenildetahripedildigiiinheryerdebelirgindegildir.Enbelirgininilemerkezininhemenkuzeydogusundayeralmaktadr.ArtvinHopaarasndakikarayoluulambutaraannaltndainaedilmiolantneldensaglanmaktadr.Geniligi100metre
civarnda olan bu taraann hemen eteginde yksekligi 25 30 metre
civarnda olanyrenin en belirgin falezi yer almaktadr. Yredeki tek
ova olan ile merkezinin kuruldugusaha, Kavak deresinin getirdigi
alvyonlar ve irili ufakl akl taslar ile olumutur. Kydan5 km kadar
ieriye girmektedir. Ova bati kesiminde Kavak deresinin
biriktirmesine devametmesi sonucu denize dogru bir girinti
yapmtr.lenin topografyasnn olduka engebeli ve arzal bir yap arz
etmesinde zellikleKavakderesiveonabaglananSahinkaya,
Agara,Balkl,iftekprveLomederesininaraziyiderinceyarmasveandrmasdr.Bunedenleyredenkydzlgilekabaca2000
metre arasnda bask srtlara hemen hi rastlanmaz. Kavak deresi ve ona
baglanankollarn am oldugu derin vadiler ayni zamanda iledeki en
nemli ulam
gzerghlarnoluturur.Arhavideenhakimtomografikekillerolandaglarzelliklegneyedogru3000metre-
ye kadar ykselirler. Balca zirveler Kzltepe( 3210 m.), at kaya
(2985m.), Koyunyaylas (2292 m.), Mete(2142 m.), Dikme (2068 m.),
Vat ( 1180 m.), Agra ( 1143 m.),
Bastepe(1049m.),Demiraga(1013m.)'dr.Kuzeydengneyedogruhzlaykselenaraziyapsierisindeyaylalardagneydeyertutmaktadr.302000metreykseklikteoksaydayaylabulunmaktadr.BalcalarAgara,Soguksu,Senyurt,Yazlk,Pnarlk,Aknclar,
Gneli, Mete, Aydnl yaylalardr. Buzul andrmasn etkili oldugu bu
kesimdeiriliufaklbirok gl bulunmaktadr.BunlarnbalcaGadit,Sargl,
Alacal,Bykagara,Kkagara ve
Karagllerdir.TaIkayaReglatrveHES(22,658MWm/22,052MWe)
projesineaityerbulduruharitas Ek-8de,1/25.000leklitopografikharitas
Ek-1deve1/.5000leklitopografikharitas Ek-2de
verilmitir.Ayrca,projesahasnnyerinigsteriruydufotograflar
Ek-9da,projesahasnaaitfotograflarise Ek-10da
yeralmaktadr.Fotograflardandagrlecegizere,projesahasoldukasarpbirvadininierisindeyeralmaktadr.TaIkayaReglatrveHES(22,658MWm/22,052MWe)
projesigenibiralan kaplamakta olup, tnelin yer altndan geirilecek
olmas nedeniyle yzey alan
8,3181hektardr.FaaliyetalannnsarpvadilerdenoluanTopografikyapsnedeniyletesisyaplaryaknlarndafazlayerleimbirimibulunmamaktadr.Projesahasnaenyaknyerleim
birimleri,yerleim merkezlerive bunlarnprojenitelerine grekonumlar
TabloEYNER ENERJ RETM VE TC. LTD. T. TALIKAYA REGLATR VE HES(22,658
MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR NTES TESSLERTOPUOLU
MADEN. SAN. VE TC.. LTD.
.27/3871.deverilmektedir.Yaknyerleimbirimleriilekonumlar
Ek-1de1/25.000leklitopografik harita zerinde gsterilmitir.Tablo 1.
Proje Sahasna En Yakn Yerleim Yerleri Ve Bunlarn Proje nitelerine
Gre KonumlarYERLEM YEREN YAKIN TESSNTESEN YAKIN NTEYEMESAFES(Ku
uuu)EN YAKIN NTEYEGRE KONUMUKamilet Mezraas Santral Alan 243 m
KuzeyKodi Mezraas Santral Alan 787 m KuzeydoguKkky Mezraas Santral
Alan 1686 m KuzeydoguKkky Ky Santral Alan 2575 m KuzeydoguArI Ky
Santral Alan 2089 m KuzeybatArI Mezraas Santral Alan 2854 m
KuzeybatFaaliyet alann gsterir 1/100.000 lekli Arazi Varlg Haritas
Ek-6da
verilmitir.KurulmasveiletilmesiplanlananTaIkayaReglatrveHES(22,658MWm/22,052MWe)
projesininarazihazrlkveinaataamasnabalanmadanncekesinliklekontrolbiriminebilgiverilecektir.D.S.BlgeMdrlg,OrmanBlgeMdrlg
ve l evre ve Orman Mdrlgnden oluan kontrol birimine bilgi
verilmedenarazi hazrlk ve inaat aamasna balanlmayacaktr.II.2. Proje
Kapsamndaki (beton santrali ve konkasr tesisi dahil) nitelerin
Konumu,TeknikAltyapniteleri,dariveSosyalniteler,VarsaDigerniteler,BunlarinBelirlenenKapalveAkAlanByklkleri,BunitelerinProjeAlanindekiKonumlarnn
Vaziyet Plan veya Kroki zerinde Gsterimi, Diger Tekniklerle
Temsiliveya Maket
Gsterimler,)ArtvinninArhaviilesindenKaradenizedklenKapistreDereninbirkoluolanBallDerezerindeolanenerjipotansiyelinidegerlendirmekamacylanerilenkardanallkontrolszbetonagrlktipindetasarlananTalkayaregltrtalvegden7.08mykseklikte,
983.00 m talveg kotunda ina edilecektir.Reglatrle evrilen sular
3284
m.likiletimtneliileyklemehavuzunagetirilecekvecebriboruileTalkayaHESeulatrlacaktr.
TaIkaya Reglatr ve HES (22,658 MWm/22,052 MWe) 22.618 MWKurulu
gcnde olacak ve 23.502 GWh i gvenilir, 69.166 GWh i sekonder olmak
zere,toplam 92.668 GWh enerji retecektir.Proje kapsamnda ina
edilmesi dnlen yaplar ve tesisler; Reglatr Dolusavak keltim Havuzu
Derivasyon Tesisleri Derivasyon Kanal Memba Batardosu Cebri
boruletim Yaplar (Tnel) Ykleme Havuzu Santral
Binasdr.Ayrcainaatdnemindekullanlmakzerekrma-elemetesisiveharnitesikurulmasplanlanmaktadr.Kurulacakolankrma-elemetesisiveharnitesitesisiTaIkayaReglatrveHES(22,658MWm/22,052MWe)projesinin2senelikinaatsresince
faaliyet gsterecektir.EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA
REGLATR VE HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED RAPORUVE HAR
NTES TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD. .28/387TaIkaya Reglatr
ve HES (22,658 MWm/22,052 MWe) projesi
kapsamndayreninkendinehasfloravepeyzajzelliklerininkorunmasiin,projekapsamndakurulacakReglatr,yklemehavuzu,cebriboruvesantralbinasyaplarnyreileuyum
saglayacak malzemeveteknik
ileyaplmadurumuaratrlarakvebukapsamndayaplanrnekalmalardikkatealnaraktesisdtasarmlariingereklidzenlemeleryaplacaktr.Yaplacakdzenlemelerayrcayolalanlarveantiyesahalariindeuygulanacakolupyreyehasfloravepeyzajzelliklereuyumsaglanmasiinzengsterilecektir.Blgedeyaplanjeolojikalmalardaalannbazalt-andezitardalanmaseklindegrlmekteolup(Bkz.Ek-2JeolojikHarita),inaatilerisonucukacakhafriyatnyineinaatalmalarndave
yol dzenlemelerindekullanlmasplanlanmaktadr.Sz konusuhafriyatn
tesis inasnda; antiye alannda kurulacak olan krma-eleme tesisinde
krlarak,har nitesi tesisinde agrega olarak kullanlmas
planlanmaktadr.Santralda 6.3 kV gerilim seviyesinde retilen enerji,
nite transformatrleri vastasile 34.5 kV gerilim seviyesine
ykseltilerek 34.5 kV alta aktarlmakta ve 7 km lik tek
devre477MCMiletkenlienerjinakilhattileamlcabarajnnmevcutveyaoluturulacakDagtm
Merkezine baglanarak ulusal ebekeye
aktarlacaktr.EnerjiNakilHattdaprojekapsamndayeralmaktadr.BaglamanoktasTEASplanlamas
dogrultusunda gerekleecektir. Proje kapsamnda yaplacak enerji letim
Hattburaporkapsamndadegerlendirilmeyealnmamolup,szkonusuEnerjiletimHattProjesi17.06.2008tarihve26939saylevreselEtkiDegerlendirilmesiYnetmeligikapsamnda
ayrca degerlendirilecektir.Faaliyet kapsamnda inas dnlen ve
sagl-sollu 15er m telenerek belirlenencebri boru ve iletim hatt
alanlar, proje kapsamndaki diger nite ve tesislerin
koordinatlarTablo2.deverilmiolupbunitelerinkonumlarngsterir1/25.000leklitopografikharita
Ek-1de, Uydu Fotograflar ekil 3.de verilmitir.Tablo 2. Proje
nitelerine Ait Koordinatlar ve nitelerin Kapladklar AlanlarUTM
Koordinatlar Cografik KoordinatlarKoor. Sras Saga- Yukar Koor. Sras
Enlem-BoylamDatum ED-50 Datum WGS-84Tr UTM Tr CografikD.O.M. 39
D.O.M. -Zon 37 Zon -lek Faktr 6 derecelik lek Faktr -TaIkaya
Santral AlanNokta No Y X Enlem (K) Boylam(B)1 697237.5418
4568887.2954 41.24570176 41.353712512 697194.6730 4568955.4829
41.24632592 41.353223353 697203.9288 4569005.6494 41.24677517
41.353349934 697236.0804 4569036.8208 41.24704788 41.353743415
697314.9975 4569059.2253 41.24723027 41.354691736 697372.1242
4569022.0942 41.24688214 41.355360957 697327.1488 4568976.3791
41.24648167 41.354809858 697307.1312 4568954.0341 41.24628545
41.35456392Alan 1,6237 hektarTaIkaya Cebri Boru Alan1 697307.1312
4568954.0341 41.24628545 41.35456392EYNER ENERJ RETM VE TC. LTD. T.
TALIKAYA REGLATR VE HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED
RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD. .29/3872
697327.1488 4568976.3791 41.24648167 41.354809853 697768.4769
4568581.0191 41.24281556 41.359944494 697790.6692 4568562.6235
41.24264457 41.360203165 697808.9077 4568513.0708 41.24219413
41.360404586 697794.8309 4568507.8897 41.24215094 41.360235057
697780.7541 4568502.7085 41.24210775 41.360065528 697765.3055
4568544.6813 41.24248929 41.359894909 697748.8882 4568558.2899
41.24261578 41.35970355Alan 1,9999 hektarTaIkaya Ykleme Havuzu
Alan1 697754.3811 4568512.7138 41.24220425 41.359754292 697835.4374
4568536.3604 41.24239725 41.360728463 697848.9848 4568486.0828
41.24194143 41.360873714 697770.4546 4568465.1911 41.24177261
41.35993055Alan 4231.72 m2TaIkaya letim Tneli Alan1 697787.8966
4568487.8960 41.24197269 41.360145882 697802.3912 4568491.7571
41.24200389 41.360319973 697816.8857 4568495.6183 41.24203510
41.360494054 698655.9046 4565345.9884 41.21348241 41.369474265
698659.6171 4565332.0521 41.21335607 41.369513986 698647.4520
4565306.8873 41.21313257 41.369360817 698633.6090 4565312.6640
41.21318796 41.369197698 698619.7659 4565318.4407 41.21324335
41.369034589 698626.6984 4565335.0535 41.21339116 41.3691226010
698626.9156 4565338.2661 41.21342002 41.36912624Alan 9,8756
hektarTaIkaya Reglatr Alan1 698619.7659 4565318.4407 41.21324335
41.369034582 698647.4520 4565306.8873 41.21313257 41.369360813
698674.5425 4565329.8670 41.21333274 41.369691164 698716.9724
4565254.4183 41.21264328 41.370172345 698616.4504 4565180.3932
41.21200171 41.368950226 698559.4465 4565272.7015 41.21284648
41.36830080Alan 1,2738 hektardari Bina, antiye Alan1 698663.2979
4564978.9803 41.21017747 41.369443132 698760.1762 4564920.4664
41.20962706 41.370578713 698760.1762 4564888.5188 41.20933953
41.370568324 698688.6753 4564918.8018 41.20962963 41.36972602Alan
3314.67 m2Har nitesi Alan1 698663.2979 4564978.9803 41.21017747
41.369443132 698637.9205 4565039.1587 41.21072531 41.369160223
698655.3406 4565069.3363 41.21099264 41.369377654 698766.5319
4565005.1508 41.21038767 41.370681985 698760.1762 4564920.4664
41.20962706 41.37057871Alan 9963.09 m2EYNER ENERJ RETM VE TC. LTD.
T. TALIKAYA REGLATR VE HES(22,658 MWm/22,052 MWe), KIRMA-ELEMEED
RAPORUVE HAR NTES TESSLERTOPUOLU MADEN. SAN. VE TC.. LTD.
.30/387Krma Eleme Tesisi ve Malzeme Depo Alan1 698683.3299
4565224.9654 41.21238646 41.369761802 698777.1389 4565199.7954
41.21213690 41.370871683 698766.5319 4565005.1508 41.21038767
41.370681984 698655.3406 4565069.3363 41.21099264 41.369377655
698696.7337 4565141.0435 41.21162786 41.36989428Alan 1,6596
hektarReglatr Alan Ulam Yolu1 697442.6440 4569230.636 41.24874184
41.356269362 697454.6872 4569210.111 41.24855417 41.356406343
697385.3946 4569154.886 41.24807405 41.355562154 697367.6316
4569124.456 41.24780451 41.355340485 697347.7391 4569061.269
41.24724067 41.355082836 697310.7501 4569033.476 41.24699956
41.354632757 697223.6450 4569006.175 41.24677509 41.353585218
697206.6696 4568964.769 41.24640657 41.353369409 697206.6696
4568919.872 41.24600249 41.3533549010 697234.8954 4568881.464
41.24564992 41.3536790711 697293.1411 4568829.950 41.24517208
41.3543569812 697307.6093 4568785.816 41.24477134 41.3545152413
697248.6726 4568677.531 41.24381113 41.3537774614 697174.8734
4568615.169 41.24326785 41.3528773115 697147.1251 4568571.913
41.24288530 41.3525324616 697129.6350 4568518.388 41.24240783
41.3523066217 697136.5856 4568485.600 41.24211104 41.3523789218
697157.8254 4568421.078 41.24152515 41.3526113419 697155.3341
4568374.351 41.24110520 41.3525665520 697128.0043 4568346.253
41.24085897 41.3522316021 697025.6284 4568327.123 41.24071174
41.3510047122 697001.5967 4568308.312 41.24054829 41.3507120923
696972.3603 4568247.383 41.24000704 41.3503438324 696963.6092
4568158.185 41.23920637 41.3502107125 696928.0774 4568058.286
41.23831590 41.3497548226 696889.4054 4568005.591 41.23785105
41.3492767327 696863.0280 4567955.950 41.23741069 41.3489462228
696863.0280 4567931.900 41.23719423 41.3489384729 696877.7012
4567892.225 41.23683358 41.3491006330 696914.2144 4567843.730
41.23638822 41.3495203431 696941.6908 4567782.353 41.23582913
41.3498281532 696974.9262 4567696.953 41.23505242 41.3501968733
696998.1677 4567621.085 41.23436393 41.3504495034 697017.0369
4567593.469 41.23411078 41.3506655635 697039.4979 4567545.967
41.23367778 41.3509180336 697053.8633 4567502.467 41.23328277
41.3510752637 697054.6146 4567452.485 41.23283274 41.3510680938
697031.8373 4567307.342 41.23153197 41.3507497139 697027.6627
4567227.908 41.23081806 41.3506743240 696996.4184 4567106.805
41.22973571 41.35026277EYNER ENERJ RETM VE TC. LTD. T. TALIKAYA
REGLATR VE HES(22,658 MWm/22,052 MWe), KIRMA-ELE