Top Banner
WP10 Future Magnets EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453 Task 10.1 Steering Committee #3 Videoconference 18 December 2013 L. Rossi - CERN Ph. Fazilleau - CEA
10

Task 10.1 Steering Committee #3

Jan 29, 2016

Download

Documents

kioko

Task 10.1 Steering Committee #3. Videoconference 18 December 2013 L. Rossi - CERN Ph. Fazilleau - CEA. Collaborations/Meetings. Various meetings Visit to Industry (BEST) Visit to Japan Labs ( Riken , University of Kyoto and KEK). Visit to CERN of a JP Industry ( Fujikura ) - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Task 10.1 Steering Committee #3

WP10 Future Magnets

EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453

Task 10.1Steering Committee #3

Videoconference18 December 2013

L. Rossi - CERNPh. Fazilleau - CEA

Page 2: Task 10.1 Steering Committee #3

WP10 Future MagnetsCollaborations/Meetings

• Various meetings– Visit to Industry (BEST)– Visit to Japan Labs (Riken, University of Kyoto and

KEK).– Visit to CERN of a JP Industry (Fujikura) We need to formalise and secure the collaboration.

• Video conference task 10.2 12/12/2013,• Steering Committee EUCARD2 12/12/2013.

Page 3: Task 10.1 Steering Committee #3

WP10 Future MagnetsMilestones

May 2014

November 2014 cea

cern

Page 4: Task 10.1 Steering Committee #3

WP10 Future MagnetsDeliverables

November 2014cea

Page 5: Task 10.1 Steering Committee #3

WP10 Future MagnetsConductor

BEST is better optimized for low temperature,

SuperPower could be an alternative.

(Université de Genève)

Page 6: Task 10.1 Steering Committee #3

WP10 Future MagnetsConductor

Strain dependance (UniTwente)

Page 7: Task 10.1 Steering Committee #3

WP10 Future MagnetsDesign

• Roebel cable « Feather » design,

• « Stacked tapes » cable, studied at the moment by INPG.

• Other alternative ? Clément Lorin should arrived in January (+ C. Pes + M. Segreti)

(Jeroen van Nugteren)

(John Imbele)

Page 8: Task 10.1 Steering Committee #3

WP10 Future MagnetsAOB

• Cern/cea collaboration,

• « SMC type » prototype– Reference paper ?

Page 9: Task 10.1 Steering Committee #3

WP10 Future MagnetsOverall Planning

Page 10: Task 10.1 Steering Committee #3

WP10 Future MagnetsNext step

• Streamline Magnet work : we ahve a scope, we should examine all but twe need a focus!!!

• Be sure we meet next MSs (and future DLVs)• Next Eucard2 Annual Meeting : 19-22 May in Desy

Hamburg– 19-20 General sessions– 21-22 : Workshop on HTS for Accelerators

• Start MoUs preparation to secure: USA, JP and to give a frame for beyond Eucard2 (and prepare future requests t.o EU or national Agency)