Tarbela Dam Project

Page 2: Tarbela dam project97 2003

Group Members

• Jabran Umer• Muhammad Faisal Ashraf

• Muhammad Adil• Muhammad Abdul Rehman

Page 3: Tarbela dam project97 2003

Contents

• History• Objectives• Project Duration• Project Constrain• Project Cost• Project life cycle• Financing• Tunnels• Spillways• Power Generation• Construction Sequence• Problems after construction• Benefits

Page 4: Tarbela dam project97 2003

History• In February 1960, Tippetts-Abbett-McCarthy-

Stratton of USA commonly known as TAMS, were appointed the project consultants, and were entrusted the task of investigations, preparation of detailed designs and contract documents for Tarbela Dam Project and also the supervision of construction work during its execution.

• The project consists of 9000 feet (2,743 meters) long, 470 feet (143 meters) high main dam. A power house 3478 MW five number tunnels, two spillways, auxiliary and service spillways.

Page 5: Tarbela dam project97 2003

Objectives

• Power Generation

• Irrigation

• Diverting three eastern rivers (Ravi, Sutlej, Beas) by India.

Page 6: Tarbela dam project97 2003

Project Duration

• Started in 1968

• Initial test filling 1974

• Estimated completion 7.25 year’s

• Actual completion time 8.3 years(approximately 1 year later)

Page 7: Tarbela dam project97 2003

Project Constrain

• Cost – 2.63 billion

• Scope– Power generation and irrigation

• Time– 8.3 year’s

Page 8: Tarbela dam project97 2003

Project Cost

• The total cost of project including power units (1-14) amount to US $ 2.63 billion.

Page 9: Tarbela dam project97 2003

Project life cycle

• Defining – Primary objective is storage of water to

overcome the effect of diverting the three eastern rivers (Ravi, Beas and Sutlej) and to increase the agricultural production.

Page 10: Tarbela dam project97 2003

Project life cycle

• Planning & Execution– The project was planned to have following

things essentially • A major earth and rock filled dam.• Two auxiliary earth and rock fill dam.• Two spillways.• Four outlet tunnels with 13.7m diameters.• Power station.

– Cost of project US $ 2.63 billion.

Page 11: Tarbela dam project97 2003

Project life cycle

• Delivery

• Detailed O&M procedures were made in 1975• Started Operating in April 1976.

Page 12: Tarbela dam project97 2003

Financing

• Tarbela Development Fund (TDF) in1968

• loans available from the Indus basin Development Fund and new bilateral loan agreements signed with the several countries including Australia, Canada, France, Italy, New Zealand, the United Kingdom, the United States of America and Germany

• Further extension of power house sponsored by Oil Producing and Exporting Countries (OPEC)

Page 13: Tarbela dam project97 2003

Tunnels

• Total number of Tunnels 4

• Length half mile

• Tunnel 1, 2, 3 for power generation and tunnel 4 for irrigation

Page 14: Tarbela dam project97 2003

Spillway

• Two Spillway on left bank (Service spillway auxiliary spillway)

• Spillway is flood routing structure• Spillways capacity is 1500,000 cusecs • Service spillway has 44% of total capacity• Discharge capacity of service spillway is

650,000 cusecs.• Discharge capacity of auxiliary spillway is

850,000 cusecs.

Page 15: Tarbela dam project97 2003

Power Generation

Four power units of 175 MW installed on each of the tunnels 1, 2, and 3.

The project has thus been enhanced from 2100 MW, as originally planned to 3478 MW.

Page 16: Tarbela dam project97 2003

Construction Sequence

• A contract signed for construction of civil work of Tarbela Dam Project between WAPDA and Tarbela Joint venture (TJV) including three Italian and three French heavy construction contractors.

Page 17: Tarbela dam project97 2003

Problems after construction

• Appearance of sink holes and cracks in the impervious blanket of the bed of river.

• Excessive seepage through the foundation.

• Erosion of the hills.

Page 18: Tarbela dam project97 2003

BenefitsYearRelease

s (MAF)Benefits

(Rs million)

Generation (MKWH)

Benefits (Rs. Million) @ 0.30 per

KWH

Total (Rs. Million)

1234561975-80 41.0208204.0011354.5003406.35011610.350

1980-8549.5009900.0028262.2408478.67218378.672

1985-9257.82011564.0068998.24020699.47832263.478

1992-9629.2808784.0056498.81016949.64325733.643

1996-0795.194160805.405

85674.60048241.622133916.22

Total272.814124126325919.21 97775.749221902.21