52

Taramakau Road Bridge - REAAA · 2019. 7. 12. · •1.5km of new road approaches •250m 7 span river bridge (42no. 34m Super Tee Beams)- Stahlton •250m long 10m high Temporary

Feb 04, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Taramakau Road Bridge

  • • 1.5km of new road approaches• 250m 7 span river bridge (42no. 34m Super Tee Beams)- Stahlton • 250m long 10m high Temporary Bridge Structure• 11m long x 70m wide Rail Overpass Bridge (47no 11m Double Hollowcore beams -Stahlton• Over 5,000m3 of concrete• Over 700 tonnes of reinforcing steel• 120,000m3 of gravel imported• 28,000m2 Sealing• 22,000 Mixed Native Plants- FH Canterbury Landscaping• 4m of rain in the first 12 months

  • Colin MacKay and Matt Loach Part 1 - REAAA Roadshow 2018.pdfColin MacKay and Matt Loach Part 2 - REAAA Roadshow 2018.pdf