Bharat College Of Engineering, Badlapur (W) Department of Mechanical Engineering. BHARAT COLLEGE OF ENGINEERING, KANHOR, BADLAPUR (W)-421504 Dist, Thane DEPATRMENT OF MECHANICAL ENGINEERING TARAPUR ATOMIC POWER STATION, MAHARASHTRA (29 th & 30 th Oct. 2015) Number of Students: 120 BE Mechanical Batch-A 60, Batch-B 60 Faculty members: Asst.Prof. Raviraj Ahire Asst.Prof. Chetan Rane Asst.Prof.Himanshu Raghav
11
Embed
TAPS Industrial Visit Report 2015 BCOE by Raviraj Ahire
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Bharat College Of Engineering, Badlapur (W) Department of Mechanical Engineering.
BHARAT COLLEGE OF ENGINEERING, KANHOR,
BADLAPUR (W)-421504 Dist, Thane
DEPATRMENT OF MECHANICAL ENGINEERING
TARAPUR ATOMIC POWER STATION,
MAHARASHTRA
(29th
& 30th
Oct. 2015)
Number of Students: 120 BE Mechanical
Batch-A 60, Batch-B 60
Faculty members:
Asst.Prof. Raviraj Ahire Asst.Prof. Chetan Rane Asst.Prof.Himanshu Raghav
Bharat College Of Engineering, Badlapur (W) Department of Mechanical Engineering.
Tarapur Atomic Power Station, (MH) TAPS - 3&4
Objectives of Industrial Visit are to enhance the knowledge of students, to make aware
with real industry, to know the persons of industry and what the working role of person in
industry is. The visit was planned for making observations in desired framework of the study
Tarapur Atomic Power Station (TAPS) is located in Tarapur,(MH). It was initially
constructed with two Boiling Water Reactor (BWR) units of 210 MWe each initially
by Bechtel and GE under the 1963 123 Agreement between India, US and International
Atomic Energy Agency (IAEA). The capacity of units 1 and 2 was reduced to 160 MWe
later on due to technical difficulties. Units 1 and 2 were brought online for commercial
operation on 28 October 1969.These were the first of their kind in Asia.
More recently, an additional two Pressurised Heavy Water Reactor (PHWR) units of 540
MWe. Each were constructed by L&T and Gammon India, Unit 3 was brought online for
commercial operation on 18 August 2006, and unit 4 on 12 September 2005.
The Visit was organised for BE Mechanical Student as a part of Industrial visit activity under
the Power Plant Engineering subject, with the prior permission of Hon.Principal
Dr. S.N.Barai , HOD of Mechanical Department Prof. V.Pudale & Visit In charge
Asst.Prof.R.R.Ahire Along with 120 students of Bharat College of Engg. Badlapur(W)
Also Special thanks to Tarapur Atomic Power Station (TAPS 3&4)
Supportive Staff Jaypal Gedam sir (HR Department) help us to getting Visit permission.
Vaibhav Baviskar sir (Control Engineer TAPS) & Dyneshvar Awsare sir (Main control
Engineer). Prashant Patil sir (Visit guide TAPS) for guide us.