A portfolio of degree project work carried out using AutoCAD
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • P O R T F O L I OWelsh School of Architecture

    T A N S Y . D U N C A N

  • 2 Cardiff _ Natural systems / Housing Tenby _ Initial Strategies Tenby _ Final Proposal Swansea _ Technical drawingsSwansea _ Scheme overviewSwansea _ Sections ISwansea _ Sections IISwansea _ ModelsRiverside _ Rennie Street Herb Garden

    4 6 8 10 12 14 16 18 20

  • 3DPM II: Tectonic BoardTansy Duncan

    ConceptionThe lasercut model is an extended

    section taken from the rst and second oors of the masterplan. It cuts through

    the open air green layer, and through part of a unit above.

    It aims to explore the juxtaposition of a rolling landscape and organic forms

    with the orthogonal arrangement of an individual unit, and also the spatial

    qualities of the residential oors from public to private.

    The Next StepThe model was created in 3ds Max, but using measurements from the AutoCAD plans. Once assembled,

    sections were cut through it so that the nished model would be practical to assemble and also so that the subtly changing contours of the lower oor would be clearly delineated.

    The script was set so that a section was cut every two millimetres, the same width as the board used to cut out the model, as this ensures that the physical model would have the correct proportions.

    OutputThe section lines were then exported to AutoCAD where they were arrayed properly

    and cleaned up before being sent to the laser cutter. The physical sections were then assembled one by one, to create a nal model showing

    the changing landscape of the lower oor in contrast to the organisation of the residential oor above.

    The result, of a scale of approximately 1:130, shows clearly the relationship between the two oors and the potential for place-making within both.

    The outlines to be cut:

    3DSMax model:

    Final Images:

  • 4Site Section A:A, 1:200

    Water is channeled down through the units, where each oor has an individual water tank that services the oor below. Excess water falls to the ground system.

    Water from every surface on site is channeled into the water system. Any surface run-o is released slowly into the river to prevent ooding. The rainwater from the roof feeds the individual water tanks on each oor.

    Central water collector: Water is ltered underground, then collected in the central area and used as a grey water resource.

    River Water: the ltered water overows into the river if necessary. Alternatively the central reservoir connects to a soaka-way underground.

    A

    A

  • 5Site section 1:200

    River

    From the initial masterplan idea of bringing the river in, a jetty was created which integrates with the existing ferry network. The level of the site and the open space close to the riverbank creates a feeling of proximity to the local natural water system.

    Stratication

    Another masterplan strat-egy was the idea of stratify-ing the site, in keeping with our research on ero-sion and the natural system. In this vein, the building is integrated into the site using levelling and horizontality to increase the feeling of place.

    Circulation

    The concept of human traf-c as a force of erosion ties into the circulation paths in and around the site. The circulation routes actually create the form of the spiral, and in turn the spiral catches the passing trac and directs it inwards to the retail and public space.

  • 6OLD TOWN AND TOURIST ATTRACTIONS

    SITE

    TRANSPORT POINTSAND MAIN ROADS

    PUBLIC GREEN SPACE

    SITE ANALYSISDIAGRAMS 1:5000

    Tansy DuncanCardiff University

    Jan 19, 2012 17:38Scale 1:100000 100 200 300 400 500 600 700 800 900 1000 m

    Geological Map Data NERC 2011 Crown copyright/database right 2011. An Ordnance Survey/EDINA supplied service

    Tenby geological makeup, 1:10000Map showing the dierent rock types around the Tenby peninsula. The site is predominantly Pembrokeshire Limstone, with blown sand where the site meets the sand dunes. Piles or other deep foundations will be necessary to ensure stability. The cli (limestone) to the east of the site is suitable for building or excavating into.

    Tra

    nsp

    orT

    poin

    Ts

    Ma

    in r

    oa

    ds

    old

    To

    wn /

    To

    uri

    sT a

    TTra

    cTi

    on

    s

    publ

    ic g

    reen

    spa

    ce

    siTe

    PEDESTRIAN ACCESS

    VEHICLE ACCESS

    SITE ANALYSISDIAGRAMS 1:1000

    SITE ANNUAL SUN-PATH DIAGRAM WIND-ROSE DIAGRAMPrevailing winds from SW-NW (Spring)and NW (Autumn)

    VIEWS FROM IN AND AROUND SITE

    OLD TOWN AND TOURIST ATTRACTIONS

    SITE

    TRANSPORT POINTSAND MAIN ROADS

    PUBLIC GREEN SPACE

    SITE ANALYSISDIAGRAMS 1:5000

    Tansy DuncanCardiff University

    Jan 19, 2012 17:38Scale 1:100000 100 200 300 400 500 600 700 800 900 1000 m

    Geological Map Data NERC 2011 Crown copyright/database right 2011. An Ordnance Survey/EDINA supplied service

    Tenby geological makeup, 1:10000Map showing the dierent rock types around the Tenby peninsula. The site is predominantly Pembrokeshire Limstone, with blown sand where the site meets the sand dunes. Piles or other deep foundations will be necessary to ensure stability. The cli (limestone) to the east of the site is suitable for building or excavating into.

  • 7

  • 8FIRST FLOOR PLAN

    GROUND FLOOR PLAN

    LONG SECTIONN1:200

    A

    A

    B

    B

    C

    C

    SECTION A:A 1:100

    SECTION B:B 1:100

    SECTION C:C 1:50

    KEY

    1 MAIN WORKSHOP2 SAILMAKING AND TEXTILES3 SPRAY ROOM4 MACHINE ROOM5 STEAM ROOM6 MARINE ENGINEERING7 PLANT8 STORE9 SURF SHOP10 GRP BAY11 ADMINISTRATION12 LECTURE AND EDUCATION13 RECEPTION14 TOILETS15 EXHIBITION16 GALLERY17 CAFE18 ROOF TERRACE19 SLIPWAY20 PEDESTRIAN ACCESS21 CAR PARK

    1

    2

    3

    4

    5

    6

    78

    910

    11 12

    8 813

    14

    15

    16 16 1617

    18

    19

    20

    21

    MONOLITH / STEELTHE MAIN WORKSHOP IS CONSTRUCTED

    AS A SERIES OF STEEL PORTAL FRAMES WITH A CORRUGATED STEEL ROOF. OVER

    TIME THE STEEL WILL CORRODE AND BLEND WITH THE MANUAL BACKGROUND

    OF TENBY.

    DRIFTWOOD / TIMBERTHE SMALLER WORKSHOPS ACT AS SEPARATE TIMBER BOXES, WITH THEIR OWN CONSTRUCTION METHODS AND FINISHES. THEY COLLIDE WITH THE VOLUME OF THE MAIN WORKSHOP AND INTERRUPT ITS ORDERED RHYTHM.

    BUCKETS AND SPADES / MESH AND TUBING THESE COMPONENTS TRAP AND PLAY WITH THE SAND AS IT GETS SWEPT OVER THE SITE, COLLECTING AND REDISTRIBUTING IT TO MAKE A PATTERN OF HIGH AND LOW WIND LEVELS.

    ROUGH OR SMOOTH? / CONCRETE, PLASTER AND GLASSCONCRETE FORMS THE FOUNDATIONS, WALLS AND FLOOR FOR THE MAIN MONOLITHIC VOLUMES OF THE SCHEME. SAND-BLASTED, POLISHED AND SHUTTERED FINISHES ARE ALL ENTERTAINED ACCORDING TO PROXIMITY TO THE SANDS. CEILINGS ARE PLASTERED, AND SOME FILMED GLASS IS INSERTED IN THE WINDIER CORNERS OF THE BUILDINGS TO EXPERIMENT WITH THE SAND-BLASTING POSSIBILITIES OF WINDSWEPT SAND.

    FUNCTIONAL WORKFLOWTHE WORKSHOP SPACES ARE TREATED AS WASHED-UP CON-

    TAINERS OR DRIFTWOOD, WHICH SLOT INTO THE MAIN WORKSHOP SPACE BUT DO NOT CONFORM TO ITS STRUC-

    TURAL RHYTHM. THEY ARE ORGANISED ACCORDING TO FUNCTION: THE DELIVERED TIMBER CAN BE DELIVERED AT

    ONE END OF THE SHED AND CAN ZIG-ZAG ITS WAY TO BECOMING A FULLY FINISHED TENBY LUGGER.

    FRAMING THE SUNSETTHE WINDOWS THROUGHOUT

    THE SCHEME ARE SET UP TO FRAME THE VIEWS IN CERTAIN

    WAYS: THE ENTIRETY OF THE SCHEME FACES THE HORIZON

    OVER THE SEA. THE VIEWS FROM THE MAIN WORKSHOP ARE DIRECTED TOWARD THE SKY AND THROUGH VARYING

    WIDTHS BETWEEN THE PROJECTING WORKSHOPS. THE

    SMALLER WORKSHOP WINDOWS ARE SIMILARLY TALL

    AND THIN, AND THEY ALTERNATE SO THAT THERE

    ARE NO DIRECT VIEWS ACROSS WORKSHOPS EXCEPT AT AN

    ANGLE.

    THEY ARE MORE SMALL GAPS IN THE WALLS THAN VIEWING

    WINDOWS. FROM THE GALLERY SPACE THE VIEW IS ORIENTED

    DIRECTLY PERPENDICULAR TO THE BUILDINGS. HOWEVER A

    SIMILAR STRATEGY IS EMPLOYED WHEN ONES ATTENTION SHOULD BE

    FOCUSSED ON EXHIBITIONS AND ARTWORK. WHEN THE

    CAFE IS REACHED, AFTER NAVIGATING THE SEQUENCE OF PRECEDING ROOMS, THE

    VIEW IS COMPLETELY OPENED UP WITH A DOUBLE HEIGHT SPACE FACING THE SUNSET.

    1:500 PLANS

    TENBY LUGGER BOATBUILDING CENTRE / TANSY DUNCANSET BETWEEN A CLIFF AND SAND DUNES, THE BOAT BUILDING CENTRE IS A PLACE FOR HANDS-ON ACTIVITY AND RELAXING OBSERVA-TION. THE BUILDING FACES THE SEA AND THE HORIZON, SHELTERING BETWEEN THE TWO HIGHER AREAS AND CREATING A BARRIER FOR THE REAR SPACE OF CARPARKING AND SEATING.

  • 9FIRST FLOOR PLAN

    GROUND FLOOR PLAN

    LONG SECTIONN1:200

    A

    A

    B

    B

    C

    C

    SECTION A:A 1:100

    SECTION B:B 1:100

    SECTION C:C 1:50

    KEY

    1 MAIN WORKSHOP2 SAILMAKING AND TEXTILES3 SPRAY ROOM4 MACHINE ROOM5 STEAM ROOM6 MARINE ENGINEERING7 PLANT8 STORE9 SURF SHOP10 GRP BAY11 ADMINISTRATION12 LECTURE AND EDUCATION13 RECEPTION14 TOILETS15 EXHIBITION16 GALLERY17 CAFE18 ROOF TERRACE19 SLIPWAY20 PEDESTRIAN ACCESS21 CAR PARK

    1

    2

    3

    4

    5

    6

    78

    910

    11 12

    8 813

    14

    15

    16 16 1617

    18

    19

    20

    21

    MONOLITH / STEELTHE MAIN WORKSHOP IS CONSTRUCTED

    AS A SERIES OF STEEL PORTAL FRAMES WITH A CORRUGATED STEEL ROOF. OVER

    TIME THE STEEL WILL CORRODE AND BLEND WITH THE MANUAL BACKGROUND

    OF TENBY.

    DRIFTWOOD / TIMBERTHE SMALLER WORKSHOPS ACT AS SEPARATE TIMBER BOXES, WITH THEIR OWN CONSTRUCTION METHODS AND FINISHES. THEY COLLIDE WITH THE VOLUME OF THE MAIN WORKSHOP AND INTERRUPT ITS ORDERED RHYTHM.

    BUCKETS AND SPADES / MESH AND TUBING THESE COMPONENTS TRAP AND PLAY WITH THE SAND AS IT GETS SWEPT OVER THE SITE, COLLECTING AND REDISTRIBUTING IT TO MAKE A PATTERN OF HIGH AND LOW WIND LEVELS.

    ROUGH OR SMOOTH? / CONCRETE, PLASTER AND GLASSCONCRETE FORMS THE FOUNDATIONS, WALLS AND FLOOR FOR THE MAIN MONOLITHIC VOLUMES OF THE SCHEME. SAND-BLASTED, POLISHED AND SHUTTERED FINISHES ARE ALL ENTERTAINED ACCORDING TO PROXIMITY TO THE SANDS. CEILINGS ARE PLASTERED, AND SOME FILMED GLASS IS INSERTED IN THE WINDIER CORNERS OF THE BUILDINGS TO EXPERIMENT WITH THE SAND-BLASTING POSSIBILITIES OF WINDSWEPT SAND.

    FUNCTIONAL WORKFLOWTHE WORKSHOP SPACES ARE TREATED AS WASHED-UP CON-

    TAINERS OR DRIFTWOOD, WHICH SLOT INTO THE MAIN WORKSHOP SPACE BUT DO NOT CONFORM TO ITS STRUC-

    TURAL RHYTHM. THEY ARE ORGANISED ACCORDING TO FUNCTION: THE DELIVERED TIMBER CAN BE DELIVERED AT

    ONE END OF THE SHED AND CAN ZIG-ZAG ITS WAY TO BECOMING A FULLY FINISHED TENBY LUGGER.

    FRAMING THE SUNSETTHE WINDOWS THROUGHOUT

    THE SCHEME ARE SET UP TO FRAME THE VIEWS IN CERTAIN

    WAYS: THE ENTIRETY OF THE SCHEME FACES THE HORIZON

    OVER THE SEA. THE VIEWS FROM THE MAIN WORKSHOP ARE DIRECTED TOWARD THE SKY AND THROUGH VARYING

    WIDTHS BETWEEN THE PROJECTING WORKSHOPS. THE

    SMALLER WORKSHOP WINDOWS ARE SIMILARLY TALL

    AND THIN, AND THEY ALTERNATE SO THAT THERE

    ARE NO DIRECT VIEWS ACROSS WORKSHOPS EXCEPT AT AN

    ANGLE.

    THEY ARE MORE SMALL GAPS IN THE WALLS THAN VIEWING

    WINDOWS. FROM THE GALLERY SPACE THE VIEW IS ORIENTED

    DIRECTLY PERPENDICULAR TO THE BUILDINGS. HOWEVER A

    SIMILAR STRATEGY IS EMPLOYED WHEN ONES ATTENTION SHOULD BE

    FOCUSSED ON EXHIBITIONS AND ARTWORK. WHEN THE

    CAFE IS REACHED, AFTER NAVIGATING THE SEQUENCE OF PRECEDING ROOMS, THE

    VIEW IS COMPLETELY OPENED UP WITH A DOUBLE HEIGHT SPACE FACING THE SUNSET.

    1:500 PLANS

    TENBY LUGGER BOATBUILDING CENTRE / TANSY DUNCANSET BETWEEN A CLIFF AND SAND DUNES, THE BOAT BUILDING CENTRE IS A PLACE FOR HANDS-ON ACTIVITY AND RELAXING OBSERVA-TION. THE BUILDING FACES THE SEA AND THE HORIZON, SHELTERING BETWEEN THE TWO HIGHER AREAS AND CREATING A BARRIER FOR THE REAR SPACE OF CARPARKING AND SEATING.

    FIRST FLOOR PLAN

    GROUND FLOOR PLAN

    LONG SECTIONN1:200

    A

    A

    B

    B

    C

    C

    SECTION A:A 1:100

    SECTION B:B 1:100

    SECTION C:C 1:50

    KEY

    1 MAIN WORKSHOP2 SAILMAKING AND TEXTILES3 SPRAY ROOM4 MACHINE ROOM5 STEAM ROOM6 MARINE ENGINEERING7 PLANT8 STORE9 SURF SHOP10 GRP BAY11 ADMINISTRATION12 LECTURE AND EDUCATION13 RECEPTION14 TOILETS15 EXHIBITION16 GALLERY17 CAFE18 ROOF TERRACE19 SLIPWAY20 PEDESTRIAN ACCESS21 CAR PARK

    1

    2

    3

    4

    5

    6

    78

    910

    11 12

    8 813

    14

    15

    16 16 1617

    18

    19

    20

    21

    MONOLITH / STEELTHE MAIN WORKSHOP IS CONSTRUCTED

    AS A SERIES OF STEEL PORTAL FRAMES WITH A CORRUGATED STEEL ROOF. OVER

    TIME THE STEEL WILL CORRODE AND BLEND WITH THE MANUAL BACKGROUND

    OF TENBY.

    DRIFTWOOD / TIMBERTHE SMALLER WORKSHOPS ACT AS SEPARATE TIMBER BOXES, WITH THEIR OWN CONSTRUCTION METHODS AND FINISHES. THEY COLLIDE WITH THE VOLUME OF THE MAIN WORKSHOP AND INTERRUPT ITS ORDERED RHYTHM.

    BUCKETS AND SPADES / MESH AND TUBING THESE COMPONENTS TRAP AND PLAY WITH THE SAND AS IT GETS SWEPT OVER THE SITE, COLLECTING AND REDISTRIBUTING IT TO MAKE A PATTERN OF HIGH AND LOW WIND LEVELS.

    ROUGH OR SMOOTH? / CONCRETE, PLASTER AND GLASSCONCRETE FORMS THE FOUNDATIONS, WALLS AND FLOOR FOR THE MAIN MONOLITHIC VOLUMES OF THE SCHEME. SAND-BLASTED, POLISHED AND SHUTTERED FINISHES ARE ALL ENTERTAINED ACCORDING TO PROXIMITY TO THE SANDS. CEILINGS ARE PLASTERED, AND SOME FILMED GLASS IS INSERTED IN THE WINDIER CORNERS OF THE BUILDINGS TO EXPERIMENT WITH THE SAND-BLASTING POSSIBILITIES OF WINDSWEPT SAND.

    FUNCTIONAL WORKFLOWTHE WORKSHOP SPACES ARE TREATED AS WASHED-UP CON-

    TAINERS OR DRIFTWOOD, WHICH SLOT INTO THE MAIN WORKSHOP SPACE BUT DO NOT CONFORM TO ITS STRUC-

    TURAL RHYTHM. THEY ARE ORGANISED ACCORDING TO FUNCTION: THE DELIVERED TIMBER CAN BE DELIVERED AT

    ONE END OF THE SHED AND CAN ZIG-ZAG ITS WAY TO BECOMING A FULLY FINISHED TENBY LUGGER.

    FRAMING THE SUNSETTHE WINDOWS THROUGHOUT

    THE SCHEME ARE SET UP TO FRAME THE VIEWS IN CERTAIN

    WAYS: THE ENTIRETY OF THE SCHEME FACES THE HORIZON

    OVER THE SEA. THE VIEWS FROM THE MAIN WORKSHOP ARE DIRECTED TOWARD THE SKY AND THROUGH VARYING

    WIDTHS BETWEEN THE PROJECTING WORKSHOPS. THE

    SMALLER WORKSHOP WINDOWS ARE SIMILARLY TALL

    AND THIN, AND THEY ALTERNATE SO THAT THERE

    ARE NO DIRECT VIEWS ACROSS WORKSHOPS EXCEPT AT AN

    ANGLE.

    THEY ARE MORE SMALL GAPS IN THE WALLS THAN VIEWING

    WINDOWS. FROM THE GALLERY SPACE THE VIEW IS ORIENTED

    DIRECTLY PERPENDICULAR TO THE BUILDINGS. HOWEVER A

    SIMILAR STRATEGY IS EMPLOYED WHEN ONES ATTENTION SHOULD BE

    FOCUSSED ON EXHIBITIONS AND ARTWORK. WHEN THE

    CAFE IS REACHED, AFTER NAVIGATING THE SEQUENCE OF PRECEDING ROOMS, THE

    VIEW IS COMPLETELY OPENED UP WITH A DOUBLE HEIGHT SPACE FACING THE SUNSET.

    1:500 PLANS

    TENBY LUGGER BOATBUILDING CENTRE / TANSY DUNCANSET BETWEEN A CLIFF AND SAND DUNES, THE BOAT BUILDING CENTRE IS A PLACE FOR HANDS-ON ACTIVITY AND RELAXING OBSERVA-TION. THE BUILDING FACES THE SEA AND THE HORIZON, SHELTERING BETWEEN THE TWO HIGHER AREAS AND CREATING A BARRIER FOR THE REAR SPACE OF CARPARKING AND SEATING.

  • 10

    Drainage chute with vegetation barrier

    Sedum blanketDrainage trimsDrainage mat 30mmRoot resistant SBS cap sheet 4mm12mm WBP plyStructural metal decking

    PPC extruded aluminium perimeter trim, PPC aluminium fascia

    Prefabricated concrete panel system wall

    Existing solid stone structure, concrete padstone with steel bearing 160mm

    Drainage system with metal grating

    Technical Section D:D

    Tunnel, 1:20

    Section D:DArchive 1:200

    Section F:FWhite Rock Cafe 1:200

    Section E:EClassroom 1:200

    WarehousesInformation, shelter, workshopsIndependent of historical mapping boundaries, these structures are made to look temporary, yet provideopen-air workshop space and informations points. They facilitate learning and experience without a prescriptive study atmosphere, and allow access without exception.

    RuinsWalls combining existing and new structure, where the permanent voids have been mapped.Concrete walls with prefabricated panels are offset from the existing retaining wall, creating a tunnel along the route of the old railway lines. The gaps between the panels facilitate the experiential quality of the tunnel, as one is reminded of being on a train as the light flashes in the narrow space.

    ExcitementAround the old industrial centres such as yards and chimneys, new social nodes are created. The amphitheatre provides an entertainment space as well as a place of play for children, and the exposed ruins in the ground become sandpits.

    MazesThe changing heights of the walls create a relaxed yet mysterious feeling, with opportunity for sitting, leaning, hiding, surprising and investigating.

    LearningThe two remaining engine houses are outdoor exhibition spaces housing a variety of artefacts, sculpture and demonstrations. The old engine is restored and can be shown as part of the working exhibition. The founo pulleys from the roof structure are reintroduced.

    TrepidationThe remaining furnaces can be explored from an equal level, as the ground drops away towards the river, leaving parts of the furnaces exposed.

  • 11Facade maps 1:200

    1:100

    AT3 Task 3aTansy Duncan, Jamie Squelch and Joseph Capildeo

    PASSIVE STRATEGIES

    REPEATED PANEL / OVERALL ENVELOPE STRATEGY _ WORKED EXAMPLE

    Concept: _ A repetitive system of optimised panels which offer flexibility in terms of interior layout. _ A low U-value of the wall was set in order to reduce conduction losses._ The system attempts to compromise between potential solar gains and conduction losses through the envelope.

    The calculations undertaken to model the heat gains and losses in this scenario set out to confirm or disprove the efficiency of this building envelope strategy.

    The main problem posed is to maintain a passive scenario in winter, when the only variable gain (solar) is negligible due to the northern latitude of the UK.

    From our initial calculations we have found that using this strategy the building can be run passively from June to August.

    COMPLEX PANEL SYSTEM STRATEGY

    Concept: _ A system of panels which are grouped into five different sets. _ These can be selected according to both facade orientation and interior requirements, allowing maximum adaptability. _ They include aluminium cladding and plasterboard modules with cellulosic insulation along with aluminium-framed windows._ The North facade has a higher ratio of wall to window panels as there is minimal solar gain even in summer._ The South facade has a high amount of glazing in order to maximise solar gain, but there may be some issues for overheating during the warmer months.

    ORIENTATION DEPENDENT STRATEGY

    Concept: _ A panel whose fenestration varies according to orientation but does not reflect the interior program._ This allows for maximum solar gains on the south facade and minimal heat loss on the north. _ The panel consists of a ceramic tile-clad skin and aluminium-framed windows, keeping the construction lightweight and with a higher U-value than the repeated panel proposal, in order to try to avoid overheating in summer.

    1:100

    1:50

    1:50

    1:20

    1:20

    10mm plasterboard

    100mm air gap

    1mm damp proof membrane

    40mm polyisocyanurate board

    30mm pine cladding

    U-VALUE 0.4 W/mK

    double glazing, u-value 2.7 W/mK

    aluminium window frame

    double glazing, u-value 2.7 W/mK

    aluminium window frame

    20mm plasterboard

    100mm air gap

    1mm damp proof membrane

    40mm expanded polystyrene board20mm ceramic tiles

    U-VALUE 0.6 W/mK

    20mm plasterboard

    1mm damp proof membrane

    100mm air gap

    40mm cellulosic insulation

    20mm aluminium cladding

    U-VALUE 0.89 W/mK

    aluminium window frame

    double glazing, u-value 2.7 W/mK

    THERMAL BRIDGING MAP 1:200

    Shows areas of thermal bridging; between panels and at corner joins of the facade

    Thermal bridging has been minimised by enclosing the structure within the envelope.

    N

    !"#$%&'( !)#$%&'( !*#$%&'( !+#$%&'( ,-.-/*0#$%&'(1-/ 2234536 7849: ;:70? 2234536 734

  • 12

    N

    Plan: ruins1:100

    Elevation H:HRiver Route 1:200

    Section A:A Hinged Program 1:100

    Section B:BSheltered exploration 1:100

    Section E:EArchive 1:200

    Section c:cMarket & Housing 1:100

    Plan: Dwelling 1:100

    Section G:GWhite Rock Cafe 1:200

    A:A

    B:B

    C:C

    D:D

    E:E

    F:F

    G:G

    H:H

    I:I

    Section F:FClassroom 1:200

    Plan: Archive and Library1:100

    WarehousesInformation, shelter, workshopsIndependent of historical map-ping boundaries, these struc-tures are made to look tempo-rary, yet provideopen-air work-shop space and informations points. They facilitate learning and experience without a pre-scriptive study atmosphere, and allow access without exception.

    RuinsWalls combining existing and new structure, where the per-manent voids have been mapped.Concrete walls with prefabri-cated panels are offset from the existing retaining wall, cre-ating a tunnel along the route of the old railway lines. The gaps between the panels facilitate the experiential quali-ty of the tunnel, as one is re-minded of being on a train as the light flashes in the narrow space.

    ExcitementAround the old industrial cen-tres such as yards and chim-neys, new social nodes are cre-ated. The amphitheatre provides an entertainment space as well as a place of play for chil-dren, and the exposed ruins in the ground become sandpits.

    MazesThe changing heights of the walls create a relaxed yet mys-terious feeling, with opportuni-ty for sitting, leaning, hiding, surprising and investigating.

    LearningThe two remaining engine houses are outdoor exhibition spaces housing a variety of artefacts, sculpture and demonstrations. The old engine is restored and can be shown as part of the working exhibi-tion. The founo pulleys from the roof structure are reintro-duced.

    TrepidationThe remaining furnaces can be explored from an equal level, as the ground drops away to-wards the river, leaving parts of the furnaces exposed.

    A

    B

    C

    Drainage chute with vegetation barrier

    Sedum blanketDrainage trimsDrainage mat 30mmRoot resistant SBS cap sheet 4mm12mm WBP plyStructural metal decking

    PPC extruded aluminium perimeter trim, PPC aluminium fascia

    Prefabricated concrete panel system wall

    Existing solid stone structure, concrete padstone with steel bearing 160mm

    Drainage system with metal grating

    Technical Section D:DTunnel, 1:20

    D

    E

    F

    G

    H

    I

  • 13

  • 14

  • 15

  • 16

    Drainage chute with vegetation barrier

    Sedum blanketDrainage trimsDrainage mat 30mmRoot resistant SBS cap sheet 4mm12mm WBP plyStructural metal decking

    PPC extruded aluminium perimeter trim, PPC aluminium fascia

    Prefabricated concrete panel system wall

    Existing solid stone structure, concrete padstone with steel bearing 160mm

    Drainage system with metal grating

    Technical Section D:D

    Tunnel, 1:20

    Section D:DArchive 1:200

    Section F:FWhite Rock Cafe 1:200

    Section E:EClassroom 1:200

  • 17

    Section B:BSheltered exploration 1:100

  • 18

  • 19

  • 20

    6)22-)786))8,)6&+%6()2 8%27=(92'%2

    7,)08)6)(

    7,%(=13-78

    7%2(=433673-0792

    6-',73-04%68-%0792

    4EVWPI]1MRX'LMZIW

    ;EXIVGLIWXRYXW'LEQIPISRTPERX &E]

    6SWIQEV]8L]QI&EWMP'SVMERHIV

    4%8,7%2(6398)78,639+,%6)7)'32(%6=8340%286)59-6)1)287

    8,)'31192%0,)6&+%6()28LIVIWMHIRXWSJ6IRRMI7XVIIXERHRIMKLFSYVMRKVSEHW[MPPFIRIJMXJVSQXLIYWISJETYFPMGKVIIRWTEGIGSRRIGXMRKI\MWXMRKHMWYWIHWUYEVIWERHFVIEOMRKHS[RXLIFEVVMIVWFSXLVIEPERHTIVGIMZIHFIX[IIRXLIQERHXLIGSYRGMPIWXEXI8LMWLIVFKEVHIRGSQTVMWIWTPERXIHFIHWSJYWIJYPGYPMREV]ERHEVSQEXMGLIVFW[MXLXLISTTSVXYRMX]XSGSRXVMFYXIXSXLIQEMRXIRERGIERHXSVIETXLIVI[EVHWSJEGSQQYREPTVSNIGX8LIKEVHIRMWHIWMKRIHXSHIGE]SVIRHYVIEWTIVQMXXIH

    '6)%8-2+-28)6)7832%6398)

    'SRGITXTPER240%2

    7)'8-32''

    7)'8-32%% 7)'8-32&&

    40%28-2+(-%+6%1

    8LIHMJJIVIRXEVIEWVIJPIGXXLIRIIHWSJIEGLGLSWIRTPERX8LMWMWHSRIXLVSYKLPIZIPWERHEXXIRXMSRXSTPERXLIMKLXWEW[IPPEWMRMXMEPTPERXMRKQEXIVMEPW)EGLEVIEEPWSLEWEHMJJIVIRXQEMRXIRERGIPIZIP

    *YPPWYRWERH] WSMP 4EVXMEPWLEHI VMGLWSMP 7LIPXIVIHJVSQ [MRH[IPP HVEMRMRK &SKK]WLEH]

    %

    %

    &

    &

    '

    '

    8LIEKKVIWWMZIWIVMIWSJ[EPPWFIX[IIRXLIWXVIIXERHXLILSYWMRKIWXEXIGVIEXIEXEPPFEVVMIVWITEVEXMRKXLIX[SIRZMVSRQIRXW8LITVSTSWEP[MPPFVIEOXLIWIMRXSWSJXIVTIVQIEFPIPE]IVSJJSPMEKIERHWIEXMRK[MXLEHHIHMRXIVIWXERHZEPYI-XWLSYPHEPWSIRGSYVEKIVIWMHIRXWXSXEOIQSVIGEVISJXLIMRXIVQIHMEXIKVSYRHEVIE

    6IRRMI7XVIIXTVSTSWIHEVIESJHIZIPSTQIRX

    6)22-)786))8,)6&+%6()2 8%27=(92'%2

    7,)08)6)(

    7,%(=13-78

    7%2(=433673-0792

    6-',73-04%68-%0792

    4EVWPI]1MRX'LMZIW

    ;EXIVGLIWXRYXW'LEQIPISRTPERX &E]

    6SWIQEV]8L]QI&EWMP'SVMERHIV

    4%8,7%2(6398)78,639+,%6)7)'32(%6=8340%286)59-6)1)287

    8,)'31192%0,)6&+%6()28LIVIWMHIRXWSJ6IRRMI7XVIIXERHRIMKLFSYVMRKVSEHW[MPPFIRIJMXJVSQXLIYWISJETYFPMGKVIIRWTEGIGSRRIGXMRKI\MWXMRKHMWYWIHWUYEVIWERHFVIEOMRKHS[RXLIFEVVMIVWFSXLVIEPERHTIVGIMZIHFIX[IIRXLIQERHXLIGSYRGMPIWXEXI8LMWLIVFKEVHIRGSQTVMWIWTPERXIHFIHWSJYWIJYPGYPMREV]ERHEVSQEXMGLIVFW[MXLXLISTTSVXYRMX]XSGSRXVMFYXIXSXLIQEMRXIRERGIERHXSVIETXLIVI[EVHWSJEGSQQYREPTVSNIGX8LIKEVHIRMWHIWMKRIHXSHIGE]SVIRHYVIEWTIVQMXXIH

    '6)%8-2+-28)6)7832%6398)

    'SRGITXTPER240%2

    7)'8-32''

    7)'8-32%% 7)'8-32&&

    40%28-2+(-%+6%1

    8LIHMJJIVIRXEVIEWVIJPIGXXLIRIIHWSJIEGLGLSWIRTPERX8LMWMWHSRIXLVSYKLPIZIPWERHEXXIRXMSRXSTPERXLIMKLXWEW[IPPEWMRMXMEPTPERXMRKQEXIVMEPW)EGLEVIEEPWSLEWEHMJJIVIRXQEMRXIRERGIPIZIP

    *YPPWYRWERH] WSMP 4EVXMEPWLEHI VMGLWSMP 7LIPXIVIHJVSQ [MRH[IPP HVEMRMRK &SKK]WLEH]

    %

    %

    &

    &

    '

    '

    8LIEKKVIWWMZIWIVMIWSJ[EPPWFIX[IIRXLIWXVIIXERHXLILSYWMRKIWXEXIGVIEXIEXEPPFEVVMIVWITEVEXMRKXLIX[SIRZMVSRQIRXW8LITVSTSWEP[MPPFVIEOXLIWIMRXSWSJXIVTIVQIEFPIPE]IVSJJSPMEKIERHWIEXMRK[MXLEHHIHMRXIVIWXERHZEPYI-XWLSYPHEPWSIRGSYVEKIVIWMHIRXWXSXEOIQSVIGEVISJXLIMRXIVQIHMEXIKVSYRHEVIE

    6IRRMI7XVIIXTVSTSWIHEVIESJHIZIPSTQIRX

    6)22-)786))8,)6&+%6()2 8%27=(92'%2

    7,)08)6)(

    7,%(=13-78

    7%2(=433673-0792

    6-',73-04%68-%0792

    4EVWPI]1MRX'LMZIW

    ;EXIVGLIWXRYXW'LEQIPISRTPERX &E]

    6SWIQEV]8L]QI&EWMP'SVMERHIV

    4%8,7%2(6398)78,639+,%6)7)'32(%6=8340%286)59-6)1)287

    8,)'31192%0,)6&+%6()28LIVIWMHIRXWSJ6IRRMI7XVIIXERHRIMKLFSYVMRKVSEHW[MPPFIRIJMXJVSQXLIYWISJETYFPMGKVIIRWTEGIGSRRIGXMRKI\MWXMRKHMWYWIHWUYEVIWERHFVIEOMRKHS[RXLIFEVVMIVWFSXLVIEPERHTIVGIMZIHFIX[IIRXLIQERHXLIGSYRGMPIWXEXI8LMWLIVFKEVHIRGSQTVMWIWTPERXIHFIHWSJYWIJYPGYPMREV]ERHEVSQEXMGLIVFW[MXLXLISTTSVXYRMX]XSGSRXVMFYXIXSXLIQEMRXIRERGIERHXSVIETXLIVI[EVHWSJEGSQQYREPTVSNIGX8LIKEVHIRMWHIWMKRIHXSHIGE]SVIRHYVIEWTIVQMXXIH

    '6)%8-2+-28)6)7832%6398)

    'SRGITXTPER240%2

    7)'8-32''

    7)'8-32%% 7)'8-32&&

    40%28-2+(-%+6%1

    8LIHMJJIVIRXEVIEWVIJPIGXXLIRIIHWSJIEGLGLSWIRTPERX8LMWMWHSRIXLVSYKLPIZIPWERHEXXIRXMSRXSTPERXLIMKLXWEW[IPPEWMRMXMEPTPERXMRKQEXIVMEPW)EGLEVIEEPWSLEWEHMJJIVIRXQEMRXIRERGIPIZIP

    *YPPWYRWERH] WSMP 4EVXMEPWLEHI VMGLWSMP 7LIPXIVIHJVSQ [MRH[IPP HVEMRMRK &SKK]WLEH]

    %

    %

    &

    &

    '

    '

    8LIEKKVIWWMZIWIVMIWSJ[EPPWFIX[IIRXLIWXVIIXERHXLILSYWMRKIWXEXIGVIEXIEXEPPFEVVMIVWITEVEXMRKXLIX[SIRZMVSRQIRXW8LITVSTSWEP[MPPFVIEOXLIWIMRXSWSJXIVTIVQIEFPIPE]IVSJJSPMEKIERHWIEXMRK[MXLEHHIHMRXIVIWXERHZEPYI-XWLSYPHEPWSIRGSYVEKIVIWMHIRXWXSXEOIQSVIGEVISJXLIMRXIVQIHMEXIKVSYRHEVIE

    6IRRMI7XVIIXTVSTSWIHEVIESJHIZIPSTQIRX

  • 21

    6)22-)786))8,)6&+%6()2 8%27=(92'%2

    7,)08)6)(

    7,%(=13-78

    7%2(=433673-0792

    6-',73-04%68-%0792

    4EVWPI]1MRX'LMZIW

    ;EXIVGLIWXRYXW'LEQIPISRTPERX &E]

    6SWIQEV]8L]QI&EWMP'SVMERHIV

    4%8,7%2(6398)78,639+,%6)7)'32(%6=8340%286)59-6)1)287

    8,)'31192%0,)6&+%6()28LIVIWMHIRXWSJ6IRRMI7XVIIXERHRIMKLFSYVMRKVSEHW[MPPFIRIJMXJVSQXLIYWISJETYFPMGKVIIRWTEGIGSRRIGXMRKI\MWXMRKHMWYWIHWUYEVIWERHFVIEOMRKHS[RXLIFEVVMIVWFSXLVIEPERHTIVGIMZIHFIX[IIRXLIQERHXLIGSYRGMPIWXEXI8LMWLIVFKEVHIRGSQTVMWIWTPERXIHFIHWSJYWIJYPGYPMREV]ERHEVSQEXMGLIVFW[MXLXLISTTSVXYRMX]XSGSRXVMFYXIXSXLIQEMRXIRERGIERHXSVIETXLIVI[EVHWSJEGSQQYREPTVSNIGX8LIKEVHIRMWHIWMKRIHXSHIGE]SVIRHYVIEWTIVQMXXIH

    '6)%8-2+-28)6)7832%6398)

    'SRGITXTPER240%2

    7)'8-32''

    7)'8-32%% 7)'8-32&&

    40%28-2+(-%+6%1

    8LIHMJJIVIRXEVIEWVIJPIGXXLIRIIHWSJIEGLGLSWIRTPERX8LMWMWHSRIXLVSYKLPIZIPWERHEXXIRXMSRXSTPERXLIMKLXWEW[IPPEWMRMXMEPTPERXMRKQEXIVMEPW)EGLEVIEEPWSLEWEHMJJIVIRXQEMRXIRERGIPIZIP

    *YPPWYRWERH] WSMP 4EVXMEPWLEHI VMGLWSMP 7LIPXIVIHJVSQ [MRH[IPP HVEMRMRK &SKK]WLEH]

    %

    %

    &

    &

    '

    '

    8LIEKKVIWWMZIWIVMIWSJ[EPPWFIX[IIRXLIWXVIIXERHXLILSYWMRKIWXEXIGVIEXIEXEPPFEVVMIVWITEVEXMRKXLIX[SIRZMVSRQIRXW8LITVSTSWEP[MPPFVIEOXLIWIMRXSWSJXIVTIVQIEFPIPE]IVSJJSPMEKIERHWIEXMRK[MXLEHHIHMRXIVIWXERHZEPYI-XWLSYPHEPWSIRGSYVEKIVIWMHIRXWXSXEOIQSVIGEVISJXLIMRXIVQIHMEXIKVSYRHEVIE

    6IRRMI7XVIIXTVSTSWIHEVIESJHIZIPSTQIRX

    6)22-)786))8,)6&+%6()2 8%27=(92'%2

    7,)08)6)(

    7,%(=13-78

    7%2(=433673-0792

    6-',73-04%68-%0792

    4EVWPI]1MRX'LMZIW

    ;EXIVGLIWXRYXW'LEQIPISRTPERX &E]

    6SWIQEV]8L]QI&EWMP'SVMERHIV

    4%8,7%2(6398)78,639+,%6)7)'32(%6=8340%286)59-6)1)287

    8,)'31192%0,)6&+%6()28LIVIWMHIRXWSJ6IRRMI7XVIIXERHRIMKLFSYVMRKVSEHW[MPPFIRIJMXJVSQXLIYWISJETYFPMGKVIIRWTEGIGSRRIGXMRKI\MWXMRKHMWYWIHWUYEVIWERHFVIEOMRKHS[RXLIFEVVMIVWFSXLVIEPERHTIVGIMZIHFIX[IIRXLIQERHXLIGSYRGMPIWXEXI8LMWLIVFKEVHIRGSQTVMWIWTPERXIHFIHWSJYWIJYPGYPMREV]ERHEVSQEXMGLIVFW[MXLXLISTTSVXYRMX]XSGSRXVMFYXIXSXLIQEMRXIRERGIERHXSVIETXLIVI[EVHWSJEGSQQYREPTVSNIGX8LIKEVHIRMWHIWMKRIHXSHIGE]SVIRHYVIEWTIVQMXXIH

    '6)%8-2+-28)6)7832%6398)

    'SRGITXTPER240%2

    7)'8-32''

    7)'8-32%% 7)'8-32&&

    40%28-2+(-%+6%1

    8LIHMJJIVIRXEVIEWVIJPIGXXLIRIIHWSJIEGLGLSWIRTPERX8LMWMWHSRIXLVSYKLPIZIPWERHEXXIRXMSRXSTPERXLIMKLXWEW[IPPEWMRMXMEPTPERXMRKQEXIVMEPW)EGLEVIEEPWSLEWEHMJJIVIRXQEMRXIRERGIPIZIP

    *YPPWYRWERH] WSMP 4EVXMEPWLEHI VMGLWSMP 7LIPXIVIHJVSQ [MRH[IPP HVEMRMRK &SKK]WLEH]

    %

    %

    &

    &

    '

    '

    8LIEKKVIWWMZIWIVMIWSJ[EPPWFIX[IIRXLIWXVIIXERHXLILSYWMRKIWXEXIGVIEXIEXEPPFEVVMIVWITEVEXMRKXLIX[SIRZMVSRQIRXW8LITVSTSWEP[MPPFVIEOXLIWIMRXSWSJXIVTIVQIEFPIPE]IVSJJSPMEKIERHWIEXMRK[MXLEHHIHMRXIVIWXERHZEPYI-XWLSYPHEPWSIRGSYVEKIVIWMHIRXWXSXEOIQSVIGEVISJXLIMRXIVQIHMEXIKVSYRHEVIE

    6IRRMI7XVIIXTVSTSWIHEVIESJHIZIPSTQIRX