Top Banner
F.L.Smidth Minerals S.A. Marchant Pereira 367 – Office 901 Providencia – Santiago – Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59 MANUAL DE INSTALACION OPERACION Y MANTENCION TAMBOR ACIDIFICADOR PROYECTO MINERA GABY CLIENTE CODELCO CHILE ORDEN DE COMPRA Nº G4740101PO FLS PR – 26052
462

Tan¿Mbor Acidificador

Dec 28, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    MANUALDEINSTALACIONOPERACIONYMANTENCIONTAMBORACIDIFICADOR

    PROYECTO

    MINERAGABY

    CLIENTECODELCOCHILE

    ORDENDECOMPRANG4740101PO

    FLS PR 26052

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    - Pgina 1 -

    Indice CAPITULO 1: DESCRIPCION DEL DISEO ............................................................. Pg. 4 1.1 Introduccin ........................................................................................................... Pg. 5 1.2 Descripcin del Proceso........................................................................................ Pg. 6

    1.2.1 Condiciones bsicas para el diseo del equipo............................................. Pg. 7 1.2.2 Caractersticas del Tambor Acidificador ........................................................ Pg. 7 1.2.3 Anlisis de la Produccin bajo diferentes condiciones de Operacin............ Pg. 8 1.2.4 Datos de Operacin Caso 1 (7,5 rpm)........................................................... Pg. 9 1.2.5 Datos de Operacin Caso 2 (7,7 rpm)......................................................... Pg. 10 1.2.6 Datos de Operacin Caso 3 (8,0 rpm)......................................................... Pg. 11

    1.3 Teora del Diseo ................................................................................................ Pg. 12

    1.3.1 Del clculo del material en el interior del tambor ......................................... Pg. 12 1.3.2 De las dimensiones del tambor ................................................................... Pg. 13 1.3.3 De la velocidad de giro del tambor .............................................................. Pg. 13 1.3.4 Del ngulo de inclinacin del tambor........................................................... Pg. 14 1.3.5 Del clculo del porcentaje de llenado .......................................................... Pg. 15

    1.4 Descripcin de los componentes principales....................................................... Pg. 15

    1.4.1 Cilindro......................................................................................................... Pg. 15 1.4.2 Revestimiento de Neopreno ........................................................................ Pg. 16 1.4.3 Bandas de rodadura o llantas...................................................................... Pg. 17 1.4.4 Rodillos de apoyo radiales........................................................................... Pg. 17 1.4.5 Rodillos de empuje axial .............................................................................. Pg. 18 1.4.6 Conjunto de Accionamiento Motriz .............................................................. Pg. 18 1.4.7 Corona dentada del Cilindro ........................................................................ Pg. 19 1.4.8 Eje pin autoalineante ............................................................................... Pg. 19 1.4.9 Chute de Alimentacin................................................................................. Pg. 21 1.4.10 Chute y Ducto de descarga hacia el Lavador de gases ............................ Pg. 22 1.4.11 Bases Principal Estructural de Acero ........................................................ Pg. 23 1.4.12 Sistemas de Lubricacin Centralizados..................................................... Pg. 24 1.4.13 Sistema de Rociado de Acido, Agua y Pulpa ............................................ Pg. 25 1.4.14 Sistema de Medicin de Temperatura y Vibraciones ................................ Pg. 26 1.4.15 Protecciones de Seguridad........................................................................ Pg. 27

    CAPITULO 2: DATA SHEETS .................................................................................. Pg. 28 2.1 Data Sheet A ....................................................................................................... Pg. 29 2.2 Data Sheet B ....................................................................................................... Pg. 30 2.3 Data Sheet C ....................................................................................................... Pg. 36

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    - Pgina 2 -

    CAPITULO 3: PLANOS DE REFERENCIA .............................................................. Pg. 38 3.1 Planos de Disposicin General Mecnicos ......................................................... Pg. 39 3.2 Planos de Diseo Mecnico ................................................................................ Pg. 39 3.3 Planos de Montaje Mecnico............................................................................... Pg. 40 3.4 Planos Estructurales............................................................................................ Pg. 41 3.5 Planos Elctricos y de Instrumentacin............................................................... Pg. 41 CAPITULO 4: INSTALACION DEL EQUIPO Y DE SUS COMPONENTES ............ Pg. 44 4.1 Introduccin ......................................................................................................... Pg. 45 4.2 Fundaciones de Hormign................................................................................... Pg. 45 4.3 Instalacin de las bases estructurales de acero.................................................. Pg. 47 4.4 Instalacin de descansos, rodillos radiales y axiales en sus soportes ............... Pg. 49 4.5 Instalacin del cilindro con las bandas de rodadura............................................ Pg. 52 4.6 Instalacin de las protecciones inferiores de la corona ....................................... Pg. 52 4.7 Instalacin de la corona dentada en el cilindro.................................................... Pg. 52

    4.7.1 Actividades previas...................................................................................... Pg. 53 4.7.2 Alineamiento axial de la corona dentada..................................................... Pg. 53 4.7.3 Alineamiento radial de la corona dentada ................................................... Pg. 56 4.7.4 Instalacin de las protecciones inferiores de la corona ............................... Pg. 58 4.7.5 Instalacin del eje pin autoalineante........................................................ Pg. 58 4.7.6 Instalacin del Reductor de Velocidad ........................................................ Pg. 61

    4.8 Instalacin del Motor Elctrico............................................................................. Pg. 62 4.9 Relleno de las bases de hormign ...................................................................... Pg. 64 4.10 Instalacin de chutes, defensas y otros accesorios .......................................... Pg. 64 4.11 Instalacin de los Sistemas de Lubricacin....................................................... Pg. 65 4.12 Ajustes de la posicin angular ........................................................................... Pg. 66 4.13 Procedimiento final de ajuste para rodillos radiales .......................................... Pg. 66 4.14 Ajuste de sellos de alimentacin y descarga..................................................... Pg. 71

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    - Pgina 3 -

    CAPITULO 5: OPERACIN DEL EQUIPO .............................................................. Pg. 73 5.1 Partida y Operacin Normal ................................................................................ Pg. 74

    5.1.1 Condiciones previas a la partida.................................................................. Pg. 74 5.1.2 Partida del tambor acidificador y sus comprobaciones ............................... Pg. 75

    5.2 Determinacin de curvas de operacin reales .................................................... Pg. 76 5.3 Detencin en condiciones normales.................................................................... Pg. 76

    5.3.1 Detenciones de emergencia ........................................................................ Pg. 77 5.4 Cambio del ngulo de inclinacin ........................................................................ Pg. 77 5.5 Resumen Condiciones Lmites de Operacin del Tambor .................................. Pg. 79 CAPITULO 6: MANTENCION DEL EQUIPO Y DE SUS COMPONENTES............. Pg. 80 6.1 Introduccin ......................................................................................................... Pg. 81 6.2 Anlisis de criticidad de componentes................................................................. Pg. 81

    6.2.1 Componentes altamente crticos ................................................................. Pg. 81 6.2.2 Componentes semi crticos ......................................................................... Pg. 82 6.2.3 Componentes no crticos ............................................................................. Pg. 83

    6.3 Inspecciones Rutinarias personal de Operaciones ............................................. Pg. 83 6.4 Estrategias de Mantenimiento ............................................................................. Pg. 85

    6.4.1 Mantenimiento Correctivo............................................................................ Pg. 85 6.4.2 Mantenimiento Preventivo ........................................................................... Pg. 86 6.4.3 Mantenimiento segn Condicin o Sintomtico........................................... Pg. 86 6.4.4 Plan matriz de Mantenimiento ..................................................................... Pg. 88

    6.5 Lubricacin .......................................................................................................... Pg. 93

    6.5.1 Lubricacin de componentes rotatorios....................................................... Pg. 93 6.5.2 Lubricacin del Sistema de llantas .............................................................. Pg. 93 6.5.3 Lubricacin del Pin autoalineante Hofmann ............................................ Pg. 94

    CAPITULO 7: PLANOS DE CONJUNTO Y LISTADO DE PARTES ....................... Pg. 95 CAPITULO 8: CATALOGOS .................................................................................... Pg. 96

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    CAPITULO 1

    DESCRIPCION DEL DISEO

    - Pgina 4 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    1.1 Introduccin El objetivo de este Manual es proporcionar al personal involucrado directamente con el equipo, una gua de las actividades necesarias para instalar, operar y mantener el tambor acidificador en forma eficiente y satisfactoria asegurando altos niveles de disponibilidad y confiabilidad. La operacin satisfactoria depende, en gran medida, de que se efecte permanentemente una inspeccin peridica y detallada y que se efecten oportunamente las reparaciones y ajustes que se requieran a los componentes que han sufrido desgastes. La mayora de los ajustes y reparaciones se harn con el equipo detenido. Sin embargo, es fundamental efectuar una inspeccin acuciosa a cada uno de los componentes del equipo en servicio, con el propsito de detectar cualquier anomala que se presente y poder as solucionarlas oportunamente, antes de que se produzca un dao mayor y se genere una detencin imprevista del equipo. Por lo indicado anteriormente, es muy importante efectuar cada una de las actividades preventivas indicadas en el Capitulo 6 de este Manual. En la Figura 1.1 se puede apreciar el tambor acidificador en forma general.

    Fig. 1.1: Vista general del tambor acidificador

    - Pgina 5 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    1.2 Descripcin del Proceso La funcin que cumple el tambor acidificador del Proyecto Gaby, es producir y asegurar una buena impregnacin del mineral de cobre con el cido sulfrico y el agua que ingresan al tambor. Se agreg tambin una alimentacin de pulpa pero es una carga secundaria que recoge derrames en el rea y los retorna a su interior para permitir su reproceso. La operacin es la siguiente: Una vez que el mineral de cobre ha pasado por las etapas de chancado, es alimentado a cada tambor acidificador a travs de una correa transportadora y un chute de alimentacin. El cabezal de alimentacin del tambor acidificador es cnico para evitar la retroalimentacin del mineral de cobre. La variable ms importante del proceso es el tiempo de residencia dentro del tambor, la cual es controlada por la pendiente y la velocidad de giro. La pendiente del tambor, fijada por diseo entre 8 y 10, y la velocidad variable de giro entre 5,4 y 8,1 rpm, hacen que el material sea transportado a lo largo del cilindro. A medida que el mineral de cobre se desplaza hacia abajo a lo largo del tambor, es mezclado con cido sulfrico y agua por medio de un sistema de rociado diseado para este efecto. Esta mezcla inducida por la rotacin del cilindro se ve mejorada por efecto de las aletas levantadoras recubiertas con revestimiento de neopreno, como todo el interior del tambor acidificador. Al final del cilindro, el material es descargado a travs del chute de descarga hacia otra cinta transportadora para llevar el mineral acidificado y convenientemente tratado para formar las pilas de lixiviacin. El sistema de rociado con cido, agua y pulpa consiste en tres tuberas fabricadas en acero inoxidable AISI 316L, incluyendo su extremo para soporte sobre el chute de alimentacin. El uso de este tipo de material es necesario con el objeto de reducir la corrosin debido a la presencia de vapores y salpicaduras de cido sulfrico. El interior del tambor y el chute de descarga estn recubiertos con neopreno vulcanizado de diferentes espesores, con el objeto de proteger las estructuras que estn fabricadas en acero al carbono contra el ambiente de cido corrosivo. La nica componente hecha con acero inoxidable en el chute de descarga es la placa deflectora y centradora de carga, que adems de estar hecha con acero AISI 316L, tiene revestimiento cermico para evitar tambin la abrasin generada por el paso de la carga.

    - Pgina 6 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    1.2.1 Condiciones bsicas para el diseo del equipo Tipo de material procesado: Mineral de cobre chancado Granulometra del material tratado: 100% bajo 25mm.

    97 % bajo 19 mm. 80 % bajo 13 mm.

    Capacidad de diseo: 2.612 t/h Porcentaje de humedad al ingreso: 2,6 % Densidad material seco: 1,55 t/m3 Densidad material tratado: 1,6 t/m3 Angulo de reposo: 37 Tiempos de residencia nominal: 38 s Servicio: Continuo Altitud: 3.000 m.s.n.m. 1.2.2 Caractersticas del Tambor Acidificador Dimetro x Largo: 3,7 m x 11 m Velocidad de operacin variable: 5,4 a 8,1 rpm Inclinacin variable de operacin: 8 a 10 Velocidad crtica: 22,1 rpm % de llenado nominal del tambor: 15% % de llenado mximo del tambor: 18% El uso de inclinacin y velocidad de rotacin variables permite una flexibilidad para el ajuste del tiempo de residencia que, combinados con cambios en los parmetros externos al tambor como el flujo de alimentacin de mineral chancado, de cido y de pulpa, es posible obtener diferentes calidades del producto final. La

    - Pgina 7 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    mejor calidad del producto final deseado se podr obtener haciendo las pruebas necesarias una vez iniciada la operacin normal de la planta. IMPORTANTE: El tambor acidificador no se recomienda para un llenado superior al 18%. Una sobre carga por sobre este lmite genera tensiones excesivas sobre las llantas y los rodillos del sistema de rodadura que harn disminuir su vida til. La condicin de arranque del tambor acidificador queda cubierta por la potencia del motor y los otros componentes de la transmisin seleccionados. El tambor ser capaz de partir despus de una parada imprevista con carga slida y 18% de llenado. 1.2.3 Anlisis de la Produccin bajo diferentes condiciones de Operacin Como una aproximacin a lo que se debiera dar en la realidad, se hacen estimaciones de capacidad y ngulo de inclinacin requeridos para diferentes tiempos de residencia entre 38 y 60 segundos para tres velocidades de operacin diferentes. Estas curvas son slo aproximaciones, los rendimientos reales deben definirse solamente a travs de pruebas en la planta. Las curvas que se muestran en las Figuras 1.2, 1.3 y 1.4, muestran la variacin de esos valores para llenados entre un 15% a un 18% con los valores definidos anteriormente.

    - Pgina 8 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    1.2.4 Datos de Operacin Caso 1 (7,5 rpm)

    Operacin a 7,5 rpm

    0200400600800

    1.0001.2001.4001.6001.8002.0002.2002.4002.6002.8003.0003.2003.4003.6003.8004.000

    38 45 50 55 60

    Tiempo Residencia, [s]

    Valo

    r

    Flujo a 15 % llenado, T/hora

    Inclinacin Grados*100

    Flujo a 18% llenado, T/h

    Fig. 1.2: Curva de operacin estimada para 7,5 rpm

    - Pgina 9 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    1.2.5 Datos de Operacin Caso 2 (7,7 rpm)

    Operacin a 7,7 rpm

    0200400600800

    1.0001.2001.4001.6001.8002.0002.2002.4002.6002.8003.0003.2003.4003.6003.8004.000

    38 45 50 55 60

    Tiempo Residencia, [s]

    Valo

    r

    Flujo a 15 % llenado, T/hora

    Inclinacin Grados*100

    Flujo a 18% llenado, T/h

    Fig. 1.3: Curva de operacin estimada para 7,7 rpm

    - Pgina 10 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    1.2.6 Datos de Operacin Caso 3 (8,0 rpm)

    Operacin a 8,0 rpm

    0200400600800

    1.0001.2001.4001.6001.8002.0002.2002.4002.6002.8003.0003.2003.4003.6003.8004.000

    38 45 50 55 60

    Tiempo Residencia, [s]

    Valo

    r

    Flujo a 15 % llenado, T/hora

    Inclinacin Grados*100

    Flujo a 18% llenado, T/h

    Fig. 1.4: Curva de operacin estimada para 8,0 rpm

    - Pgina 11 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    Conclusin: El tambor acidificador es capaz de trabajar con tiempos de residencia variables pero cambia su capacidad productiva. Tambin se puede cambiar la posicin angular, as que el mejor punto de operacin se deber determinar en base a los resultados de los productos obtenidos que, como se mencion anteriormente, se podr descubrir slo a travs de experiencias desarrolladas en la planta. 1.3 Teora del Diseo 1.3.1 Del clculo del material en el interior del tambor

    Qm

    Qm

    Fig. 1.5: Modelo del tambor acidificador Segn la Figura 1.5 sean: t = Tiempo de residencia del mineral dentro del tambor (s) L = Largo del tambor (m) A = Area transversal del material procesado (m2) Qm = Flujo volumtrico del mineral (m3/h) Vm = Volumen del mineral dentro del tambor (m3) (1) Qm = v A Siendo v la velocidad de desplazamiento del material dentro del tambor, dada por:

    v =tL (m/s)

    El volumen de material dentro del tambor es:

    - Pgina 12 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    Vm = A L de donde A =LVm

    Reemplazando en la ecuacin (1),

    Qm = tL

    LVm

    Luego,

    Vm (m3) = Qm (m3/h) x t (s) x 3600

    1

    El flujo volumtrico de mineral Qm (m3/h), se obtiene de dividir la capacidad de procesamiento en tons/hora por la densidad aparente en tons/m3. 1.3.2 De las dimensiones del tambor

    Sea r = DL

    Criterio: 2.5

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    1.3.4 Del ngulo de inclinacin del tambor Se usa la expresin

    t = rN77.1 , donde

    = ngulo de reposo del mineral (grados) = 37 (grados), dato de diseo = Inclinacin del tambor acidificador (grados) t = Tiempo residencia (min), (en este caso varios, ver punto 2.0) N = Velocidad de giro (rpm), (en este caso varios, ver punto 2.0) r = relacin L/D

    En este caso este clculo no es fundamental ya que se ha diseado un sistema que permite regular el ngulo de trabajo del tambor acidificador entre 8 y 10 segn solicitud del cliente. El diseo incluye dos cilindros hidrulicos de accionamiento manual con capacidad para levantar y bajar el tambor con su mxima carga. Se adjuntan tambin las curvas de rendimiento con los diferentes grados de inclinacin en el punto 1.2 de este captulo, que pueden servir de orientacin para encontrar el mejor ngulo de trabajo. En la Figura 1.6 se muestra un detalle del Sistema de levante junto con las columnas de fijacin de posicin angular.

    Fig. 1.6: Detalle Sistema de Levante y Columnas de Fijacin

    - Pgina 14 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    - Pgina 15 -

    1.3.5 Del clculo del porcentaje de llenado Se calcula con la relacin

    Porcentaje (%) = Vm (Volumen de material dentro del tambor) / Vt (Volumen Total)

    Vt = Volumen interior del tambor (m3)

    4

    2 LDVt =

    Se produce un desvo a este requerimiento de diseo si se considera que el dimetro interno del tambor por donde se mueve el aglomerado es menor al del acero, ya que hay que restar el espesor del recubrimiento que es de goma.

    1.4 Descripcin de los componentes principales 1.4.1 Cilindro El cilindro mide 3.700 mm. de dimetro interior (acero) por 9.750 mm. de largo en el tramo cilndrico y 1.250 mm. en el tramo cnico del extremo de alimentacin. Est fabricado de acero al carbono con un espesor de 20 mm. y 38 mm. en la zona en que se fijan las llantas y la brida porta corona. Este cambio de espesor se produce en las zonas de carga con el objeto de prevenir flexiones o tensiones que puedan producir fallas en el acero una vez que el equipo se encuentre en operacin. Las uniones soldadas de las virolas del cilindro fueron efectuadas con soldadura continua y de penetracin total de acuerdo a la exigencia de las Normas AWS al respecto. El cono del cabezal de alimentacin est fabricado en acero al carbono de 20 mm. de espesor, y su funcin es mejorar el movimiento del mineral de cobre dentro del cilindro y evitar los derrames o prdidas por retroceso del material. El sistema de pads para la fijacin de las bandas de rodadura es de diseo exclusivo F.L.Smidth Minerals y su funcin es permitir un ajuste suave y seguro entre las bandas de rodadura y el cilindro. Es importante resaltar que en el diseo del cilindro se utiliza la tcnica de Anlisis de Elementos Finitos para asegurar que las deformaciones y tensiones en el cilindro, bajo las condiciones normales de operacin, se encuentren dentro de los lmites aceptables para los materiales y la funcin del equipo.

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    1.4.2 Revestimiento de Neopreno El revestimiento interior es de neopreno y se instala de dos formas diferentes. Inicialmente se sueldan 26 rieles metlicos a lo largo de la pared interior de todo el manto del cilindro y del cono de carga. Luego se reviste completamente y se reviste con una capa de neopreno de un espesor total de 56 mm. mediante un proceso de vulcanizado y curado con vapor. Posteriormente se instalan los levantadores en el interior del tambor acidificador apernndolos a los rieles. Todos los pernos, tuercas y golillas han sido fabricados en Hastelloy 276 para evitar la eventual corrosin por el cido sulfrico. Los principales componentes del tambor se muestran en la Figura 1.7.

    Fig. 1.7: Componentes principales del tambor acidificador

    - Pgina 16 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    1) Cuerpo del tambor 2) Bandas de rodadura 3) Estructura base de apoyo mvil 4) Chute de alimentacin 5) Sistema motriz 6) Sistema antissmico 7) Cmara del sistema de extraccin de gases

    1.4.3 Bandas de rodadura o llantas El tambor acidificador posee dos llantas de rodadura de acero forjado ASTM A 290 Clase A, templado y revenido hasta una dureza superficial de entre 163 y 202 Brinell. Han sido fabricadas por proceso de forja de una sola pieza sin soldaduras ni uniones. Las llantas estn montadas en el tambor sobre placas de apoyo con anillos de fijacin y bloques de fijacin axial, tangencial y anti rotacin de acuerdo a diseo exclusivo de F.L.Smidth Minerals para el montaje de llantas para este tipo de equipos. 1.4.4 Rodillos de apoyo radiales Las bandas de rodadura se apoyan y ruedan sobre cuatro (4) rodillos slidos, fabricados en acero forjado ASTM A 291 Clase 3, templado y revenido hasta una dureza superficial de entre 223 y 262 Brinell. Cada rodillo est montado con ajuste de interferencia en un eje slido de acero de alta resistencia equivalente a ASTM A 668 Grado D templado y normalizado, el cual tiene dos (2) soportes con rodamientos de rodillos a rtula con agujero cilndrico. Cada uno de estos conjuntos de rodillo eje y descansos est provisto con descansos flotantes en ambos extremos para facilitar el alineamiento del tambor durante su operacin. Cada uno de los descansos puede ser ajustado en forma independiente mediante los pernos de ajustes instalados en las bases. En la Figura 1.8 se muestran los principales elementos del Sistema de rodado. Estos son: Llantas, placas de apoyo, bloques y anillos de fijacin, rodillos radiales y rodillos axiales.

    - Pgina 17 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    Fig. 1.8: Sistema de Rodado

    1.4.5 Rodillos de empuje axial Para soportar el empuje axial se han considerado tres soportes con rueda, eje y rodamientos de diseo F.L.Smidth Minerals. Cada uno de ellos est diseado para soportar la carga del tambor con un llenado de hasta 18% y est compuesto por una rueda fabricada en una sola pieza forjada en acero ASTM A 148 Clase 3, templado y revenido hasta una dureza superficial de entre 220 y 260 Brinell. Este eje rueda va montado en una caja de acero fundido, en dos rodamientos de rodillos a rtula de agujero cilndrico 1.4.6 Conjunto de Accionamiento Motriz El accionamiento motriz del tambor acidificador consiste bsicamente en un motor elctrico conectado al eje de entrada de un reductor de velocidad de ejes paralelos mediante un acoplamiento flexible. El eje de salida del reductor est conectado a un eje pin tambin mediante un acoplamiento flexible. Este eje pin engrana con la corona que va apernada al anillo porta corona soldado al cilindro del tambor, lo que permite una unin firme y finalmente que el tambor gire.

    - Pgina 18 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    El motor elctrico es de marca Reliance de 450 HP y 1.500 rpm, Frame G5012, 3 fases, 50 Hertz, 4.000 Volts, servicio continuo, Aislamiento Clase F, enjaulado tipo TEFC XTS, Factor de Servicio 1,15, montado sobre rodamientos con lubricacin por grasa. El motor es controlado mediante un accionamiento de frecuencia variable suministrado por el cliente. El reductor de velocidad es de marca SUMITOMO Modelo PARAMAX PHD 9100 P3 RLF de engranajes helicoidales del tipo ejes paralelos con una reduccin de 25:1, diseado para trabajar con una inclinacin transversal mxima de 9,9 grados. Tiene un factor de servicio mecnico de 2,14 y un factor de servicio trmico de 1,5 basado en la potencia del motor. El acoplamiento flexible en el lado de alta velocidad es Falk Tipo T10 modelo 1110T con una capacidad de torque mximo a transmitir de 9.340 N-m (82.500 lb-in) El acoplamiento del lado de baja velocidad es Falk Tipo T10, modelo 1180T con una capacidad de torque mximo a transmitir de 104.000 N-m (915.000 lb-in). 1.4.7 Corona dentada del Cilindro La corona dentada del cilindro tiene 232 dientes rectos Mdulo 22, ngulo de presin 25, con un ancho del dentado de 400 mm. El diseo es del tipo anillo dentado (girth gear) soldado al alma de la corona. El anillo dentado est fabricado en Hofalloy 1, material forjado segn AGMA Grado 2, templado y revenido hasta una dureza final en los dientes de la corona de 300 Brinell. El mecanizado de los dientes es con grado de calidad 10, de acuerdo a Norma AGMA 2000-A88. La corona dentada es del tipo partida en dos mitades y est montada en un anillo fabricado en partes y soldado en forma continua al cilindro. La corona dentada est montada y asegurada al anillo mediante pernos de alta resistencia M 48, los que han sido torquedos por el mtodo de control de elongacin por ultrasonido. 1.4.8 Eje pin autoalineante El eje pin es de diseo autoalineante exclusivo de Hofmann Australia, el que permite absorber desalineamientos menores en dos planos (X e Y). Con este diseo se logra una mayor superficie de contacto entre los dientes del pin y los de la corona dentada, lo que se traduce en una mayor duracin de la pareja pin corona y mejora la capacidad de transmisin de torque en forma continua de la pareja de engranajes. El diseo es tambin reversible lo que permite utilizar ambos flancos de los dientes, alargando la vida til del pin.

    - Pgina 19 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    El pin tiene 31 dientes rectos Mdulo 22, ngulo de presin 25, con un ancho del dentado de 410 mm. El material de fabricacin es DIN 17CrNiMo6 con dientes cementados y rectificados con una dureza de entre 58 y 62 Rockwell C. El mecanizado de los dientes es con grado de calidad 12 de acuerdo a Norma AGMA. El eje pin tiene una longitud total de 2.054 mm. y est montado en dos descansos SD 3144 BTST con rodamientos de rodillos a rtula con agujero cnico 23144 CCK / W33 y manguitos de fijacin OH 3144H. La vida til L10 de los rodamientos se ha calculado en ms de un milln de horas. Los descansos tienen sello Taconite en ambos extremos. En la Figura 1.9 se muestra el detalle del pin con sus soportes.

    Fig. 1.9: Detalle del pin y sus soportes

    - Pgina 20 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    1.4.9 Chute de Alimentacin El chute de alimentacin est fijo a la estructura principal de manera que se inclina junto con el tambor cuando se cambia la posicin del conjunto. Tal como se aprecia en la Figura 1.10, consiste en un ducto de seccin rectangular fabricado en acero al carbono ASTM A 36 de 6 y 10 mm. de espesor. Revestido en las caras sometidas a mayor desgaste, con planchas de rpida remocin de 5 mm. de espesor que a la vez estn recubiertas con palmetas cermicas de 13 mm. de espesor. Con el propsito de facilitar la cada de material al interior, este chute conecta con una pieza fija al chute del cabezal de la correa que gua hacia el chute, a pesar de tener diferentes posiciones cuando se cambia su posicin angular. Esta pieza adaptadora tambin est cubierta con cermica en las planchas que reciben el impacto directo del material.

    Fig. 1.10: Vista desde el chute de alimentacin y flauta

    - Pgina 21 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    1.4.10 Chute y Ducto de descarga hacia el Lavador de gases El chute de descarga ha sido diseado y fabricado en acero al carbono para uso estructural ASTM A 36 de 8 mm. El diseo es en dos partes apernadas al centro mediante flanges para facilitar el montaje en terreno. En la parte inferior de la recmara se considera una puerta de inspeccin de 988 mm. de alto y 588 mm. de ancho con bisagras, manilla y seguro. Todo el interior est recubierto con neopreno. La mitad superior del chute, incluyendo el ducto de descarga, tienen un recubrimiento interior de neopreno pegado de 8 mm. de espesor para evitar la corrosin por los vapores cidos. La mitad inferior de la recmara tiene un recubrimiento de neopreno con liners apernados de espesor 8 mm., con el objeto de facilitar el cambio de los que se desgasten por la accin abrasiva producida en la descarga del material aglomerado. En su mitad inferior tiene adems una pareja de placas deflectoras ajustables que permiten guiar la cada de la carga para dejarla centrada sobre la correa inferior, estas placas y sus mecanismos estn construidos en acero inoxidable AISI 316L y estn cubiertos con revestimiento removible cermico de 13 mm de espesor. En la Figura 1.11 se aprecia el tambor acidificador visto desde el lado del chute de descarga.

    - Pgina 22 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    Fig. 1.11: Vista desde el chute de descarga

    1.4.11 Bases Principal Estructural de Acero El tambor acidificador est instalado sobre una base principal estructural de vigas de acero soldadas para el apoyo de los descansos de las ruedas radiales y axiales, para el apoyo del soporte del conjunto motor-reductor del sistema de accionamiento, y para el apoyo del soporte de los descansos del eje pin. Estas bases has sido diseadas y fabricadas en estructuras soldadas para servicio severo lo suficientemente rgidas para el trabajo que prestarn. Esta base principal, por el hecho de tener que soportar el peso del tambor y sus componentes de operacin en diferentes ngulos, fue motivo de un riguroso clculo en las diferentes posiciones lo que indujo a poner una serie de refuerzos que se complementan con una estructura externa especialmente diseada y fabricada para anular los efectos de un sismo. Esta nueva estructura (antissmica) est instalada en el extremo del lado de alimentacin. Ambas estructuras, la

    - Pgina 23 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    principal y la antissmica, estn sobre fundaciones de concreto. La principal est anclada y pivoteada a la fundacin de concreto por el lado de descarga del tambor. El lado opuesto es alzado por dos gatos hidrulicos cuando se desea cambiar el ngulo de trabajo; una vez alcanzada la posicin angular de trabajo, se fija la estructura con cuatro columnas regulables, firmemente ancladas a las bases de apoyo. 1.4.12 Sistemas de Lubricacin Centralizados El sistema de lubricacin centralizado atiende dos subsistemas diferentes, un sistema para la lubricacin de los rodamientos de los rodillos axiales y radiales y otro distinto para la lubricacin del sistema pin corona. Ambos subsistemas usan Sistemas de Lubricacin Automtico con Inyectores paralelos de Lubricacin FARVAL FL-11 con bomba Farval Alemite 50:1, la que tiene un consumo de aire de 15 s.c.f.m. a 80 PSI. Este tipo de bomba est diseada para trabajar con aire comprimido con una presin de trabajo de 80 PSI. El subsistema de lubricacin de rodamientos de rodillos usa un tambor de 60 kg mientras que el de lubricacin del pin corona usa un tambor de 200 kg. El sistema de control es Siemens con un rack remoto ET-200 y un Panel de Control HMI TP-270, el que permitir controlar y programar la lubricacin de ambos subsistemas. El panel cumple con las exigencias que un Sistema de Lubricacin requiere, permite programar la lubricacin como as mismo enviar y recibir seales desde un PLC Central, bajo el Modelo de Profibus. Este sistema permite ajustar los ciclos de lubricacin definiendo el tiempo de espera y el tiempo de lubricacin. Si, por cualquier evento, el tiempo de espera sobrepasa el tiempo programado, se asume que ha ocurrido una falla en el sistema que puede ser falta de lubricante, corte de suministro de energa elctrica o fugas en las lneas de alimentacin principal, por lo cual el sistema no levanta presin. En este caso el PLC asume una falla y enva una seal de falla al Panel de control, energizando un elemento de alarma para este efecto. El funcionamiento del subsistema para lubricacin del sistema pin corona tiene una caracterstica adicional en programacin que consiste en el barrido o limpieza de las boquillas rociadoras (el subsistema de los descansos no lo tiene, es solamente una caera) despus de terminado el ciclo de lubricacin. Esto es estrictamente necesario para evitar que el lubricante acumulado en las vlvulas rociadoras se seque. Todos los lubricantes para pin corona necesitan de un solvente para permitir la atomizacin y para que pueda ser adherido al flanco de

    - Pgina 24 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    los dientes, por lo tanto el programa impide que las vlvulas de rociado se tapen producto de la evaporacin y contaminacin con el polvo existente. 1.4.13 Sistema de Rociado de Acido, Agua y Pulpa El sistema de rociado de cido, agua y pulpa consiste en tres caeras con boquillas o descargas laterales para rociar el mineral con agua y cido cuando ste se est procesando. La caera de pulpa permite el ingreso de mineral derramado en el rea producto de derrames, pero esto es solamente una alimentacin eventual que no tiene mayor importancia en el proceso normal. La alimentacin de agua y cido se hace a travs de boquillas removibles, las que se encuentran prcticamente en toda su longitud. Estn separadas en 100 mm. y se entregan perforadas con un dimetro menor al estimado para la operacin final. El usuario podr seleccionar cuales de ellas tapar y cuales perforar al dimetro final para lograr diferentes condiciones de rociado. Esto facilita el ajuste a las condiciones de operacin definidas en la planta y la reparacin en caso de desgaste de las boquillas. Las tres caeras disponen de flanges ANSI 150 en sus dos extremos para facilitar la conexin y la limpieza en caso de acumulacin de suciedad en su interior. La sustentacin de las caeras es a travs de los apoyos en la entrada del tambor que permiten poder tener este conjunto de caeras en voladizo. En la Figura 1.12 se muestra una vista general del Sistema de rociado de cido y agua.

    - Pgina 25 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    Fig. 1.12: Vista del sistema de rociado de cido y agua

    1.4.14 Sistema de Medicin de Temperatura y Vibraciones Con el objeto de lograr la mxima disponibilidad y confiabilidad de cada uno de los componentes rotatorios del tambor, se considera la instalacin de un Sistema de deteccin de temperatura y vibraciones con sensores Copperhead de SKF, uno en cada uno de los siguientes componentes: Uno en el motor elctrico, dos en el reductor de velocidad, dos en el eje del pin (uno en cada descanso) y uno en cada uno de los descansos de los rodillos axiales y radiales de operacin normal (9 en total). No se considera el monitoreo de los rodillos axiales de respaldo (dos en cada tambor, uno para limitar el descenso en caso del falla del principal y el otro para limitar el ascenso del tambor). Las seales analgicas de los puntos de medicin son enviadas a la sala de Control mediante un Sistema de Comunicacin Profibus, lo que permitir detectar

    - Pgina 26 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    oportunamente cualquier falla incipiente que se presente en el funcionamiento de los componentes del sistema motriz y del sistema de rodado del tambor acidificador. 1.4.15 Protecciones de Seguridad El suministro del tambor acidificador considera la instalacin de protecciones de seguridad para cada uno de los componentes que giran, las que han sido diseadas y fabricadas por F.L.Smidth Minerals siguiendo los ms altos estndares recomendados para este tipo de elementos. Las protecciones consideradas son para: El eje pin, la corona dentada, los acoplamientos de alta y de baja velocidad, las ruedas de apoyo radial y las ruedas de empuje axial. Algunas de ellas se aprecian en la Figura 1.13. Barandas en diferentes partes de la estructura de base metlica han sido diseadas e instaladas para limitar el acceso y evitar los puntos de mayor riesgo de accidente.

    Fig. 1.13: Protecciones

    - Pgina 27 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    CAPITULO 2

    DATA SHEETS

    - Pgina 28 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    2.1 Data Sheet A

    DATA SHEET A OPERATING AND DESIGN CONDITIONS DESCRIPTION UNIT SPECIFIED OFFERED 1 IV. EQUIPMENT IDENTIFICATION EQUIPMENT NAME Acidification Drum Acidification Drum NUMBER OF UNITS REQUIRED 2 2 EQUIPMENT NUMBER 150-AD-001 @ 002 150-AD-001 @ 002 2 MATERIAL DESCRIPTION FEED Oxide crushed copper ore Oxide crushed copper ore SPECIFIC GRAVITY 2,55 2,55 BULK DENSITY, DRY t/m3 1,55 1,55

    MOISTURE CONTENT BY WEIGHT, DRY BASIS % 2,55 2,55

    ANGLE OF REPOSE 37 37 ANGLE OF WITHDRAWALL 60 60 FEED SIZE Under 25 mm % 100 100 Under 19 mm % 97 97 Under 13 mm % 80 80

    3.0 OPERATION

    FEED DESCRIPTION Fixed speed belt conveyor wich is fed from variable speed belt feeder.

    Fixed speed belt conveyor wich is fed from variable speed belt feeder.

    DUTY 24 HOURS/DAY, 365 DAYS / YEAR 24 HOURS/DAY, 365 DAYS/YEAR

    ELECTROMACHNICAL AVAILABILITY BY VENDOR ORE FEED RATE, WET Instantaneous t/h 2332 2332 Desgn t/h 2612 2612 ACIDIFCATION TIME, NOMINAL s 38 38 ACIDIFICATION ORE ANGLE OF REPOSE 37 ACIDIFIED ORE BULK DENSITY t/m3 1,6 1,6 SULFURIC ACID ADDITION, DESIGN kg/t 19 19 ACID SUPPLY CONCENTRATION % 96 96 ACID DENSITY t/m3 1,84 1,84 WATER ADDITION, DESIGN kg/t 40 40

    4.0 DRUM CHARACTERISTICS

    Diamater/Lenght m / m 3,7 / 11 3,7 / 11

    Operating Speed rpm 5,5 5,4 to 8,1 Slope 7,6 8,0 to 10,0 Speed / Critical speed % 25 25 Design Drum filling % 18 15 NORMAL, 18 EVENTUAL

    - Pgina 29 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    2.2 Data Sheet B

    DATA SHEET B INFORMATION REQUIRED FROM BIDDER 1.0 GENERAL

    NAME OF BIDDER --- ---- FLSmidth Minerals MANUFACTURER --- ---- FLSmidth Minerals MODEL AND SIZE --- ---- INCLINABLE, 3.7M F x 11M LG EQUIPMENT NUMBER --- ---- 26052ME01 ----

    2.0 OPERATING DATA 2.1 Design data

    Design capacity, dry ore t/h ---- 2612 Ore charge, % of drum colume % ---- 15% Normal, 18% Eventual Power at design capacity kW ---- 331 Motor power kW ---- 350 Acidification time design s ---- 38 Drum range rpm ---- 5,4 a 8,1

    Slope of the drum, range ---- 8 a 10 (0 for maintenance purposes only) Hidraulyc system work pressure bar ---- NA Pumps capacity at design speed % max ---- NA Drum design life expectancy years ---- 20 Design availability % ---- 95 Material hold-up, range %/t ---- 67 % / 19

    3.0 EQUIPMENT DATA 3.1 Drum

    Diameter, inside mm 3700 3700 Lenght, inside mm 11000 11000 Construction Steel plate material ASTM A36 Shell thickness mm 22 20 Feed end cover plate thickness mm 22 20 Thickness under tires thickness mm 50 38 Lining Material Rubber Neoprene rubber Thickness mm 6 base / 69.85 total 6 base

    Thickness in the first 2m of the drum mm 25 56, total

    Thickness minimum on the rest mm 20 56, total Hardness Shore A 60+-5 60+-5 Lifter dimensions / height x width mm 88.9x127 127 x 127 Lifter hardness Shore A 60+-5 60+-5 Liner fixing type, bolt / glue Bonded rubber, bolted molded rubber Bonded rubber, bolted molded rubber

    - Pgina 30 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    3.2 Riding Rings Quantity 2 2 Outside diameter mm 4040 4352 Outside diameter run out mm 0.1, -0.0 0.1, -0.1

    Width mm 250 > 321 F/Riding ring 1 > 291 F/Riding ring 2

    Tichkness mm 128 271 Material ASTM A290 class A A290, Class A Hardness HBN 183-202 183 - 202 Fixation system to the shell Strap w/retainer Strap w/retainer

    3.3 Trunnion Wheels Wheels Type Steel Forged Steel Quantity 4 4 Diameter mm 875 800 Width mm 270 280 Material-Base ASTM A291 class 3 A291, Grade 3 Material Recovery ASTM N/A N/A Hardness BHN 223-262 223 - 262 Load capacity kN 512 Shaft Material ASTM A668 Grade D A668, Class D Diameter mm 175 360/350/292/260 Length mm 840 1160 Tires wheels NA Service Factor NA Tire pressure kPa NA Pillow Blocks Manufacturer SKF o DODGE HENFEL Model SDAF SDAF Size 23252 23252 Bearing size 23252 23252 CAC/C3 W33 Seal type FLSM-USA Taconite Type Taconite Bearing life L10 h 60000 > 1000000

    3.4 Thrust Wheels Type Roller Roller Quantity 2 3 Maximum Load kN 150 over one wheel 152 Wheels Diameter mm 306 1016 Width mm 51 127 Material-Base ASTM A291 class 3 A291, Grade 3 Material Recovery ASTM N/A N/A Hardness BHN 223 - 262 223 - 262

    - Pgina 31 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    Bearings Manufacturer SKF or similar SKF Model CC/W33 Spherical Roller, CC/W33 Size 22220 24044 + 24040 Seal type Packing Packing Bearing life L10 h 60000 > 197.000

    3.5 Drum gear pinion set ---- General ---- Tooth type ---- Spur Gear Ratio ---- 7,484 Drum driven element diameter mm ---- 5.174 Driving element diameter mm ---- 740 Hardness drive/driven element ---- 59 - 62 / 30 Rc Normal module mm ---- 22 Normal pressure angle deg ---- 25 Helix angle deg ---- N/A Transverse pressure angle deg ---- N/A Maximum allowable misalignment ---- 0,12 whole face Axial run out mm ---- < 0,2, TIR Radial run out mm ---- < 0,4, TIR

    Acceptable tooth contact pattern, % of: ----

    Area @ static condition ---- 80 Lenght direction ---- 80 Height direction ---- 80 Ring gear Gear designer ---- Hofmann Gear manufacturer ---- Hofmann Gear casing supplier ---- Hofmann Material ---- Hofalloy / (AGMA Grade 2) Type / Number of teeth ---- Spur Gear / 232 Tooth hardness and units Rc ---- 31 Hardening method ---- Quench and tempered Gear tooth cutting process ---- N/A Design life expectancy years ---- 12 Tooth form ---- Tip relief % ---- N/A Face width mm ---- 400 Outside diameter mm ---- 5.174 Operating pitch diameter mm ---- 5.104 Root diameter mm ---- N/A Speed range rpm ---- 5,4 - 8,1 Durability service factor ---- N/A Strenght service factor ---- N/A Torque rating N-m ---- 370.000 Number of sections ---- 2 Quality levels ---- Overall ---- AGMA 11 Pitch ---- Profile ----

    - Pgina 32 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    Pinion gear Gear designer ---- Hofmann Gear manufacturer ---- Hofmann Forging supplier ---- Hofmann Material ---- DIN17CrNiMo7 Type / Number of teeth ---- Spur Gear / 32 Hardness and units Rc ---- 59 - 62 Rc Hardening method ---- Case Carburized and Ground Gear tooth cutting process ---- N/A Design life expectancy years ---- 12 Tooh form ---- Tip relief % ---- N/A Face width mm ---- 410 Outside diameter mm ---- 740 Operating pitch diameter mm ---- 682 Root diameter mm ---- N/A Speed range rpm ---- 41 - 61 Durability service factor ---- N/A Strenght service factor ---- N/A Torque rating N-m ---- 49.401 Quality levels: ---- Overall ---- AGMA 13 Pitch ---- Profile ---- Run out ---- Gear Guard Type ---- Carbon Steel Fabricator ---- FLSmidth Seals ---- Yes Self Supporting? ---- Yes Pressured system? ---- No

    4.0 RING AND GEAR LUBE SYSTEM

    Manufacturer ---- FARVAL Number of system per drum ---- One Type ---- Parallel inyector Air requeriment, m3/min - kPag ---- Blocked nozzle detection method ---- No ---- 5.0 ELECTRIC DRIVE Quantity ---- 5.1 Electric Motor (1) ----

    Manufacturer ---- Reliance Type / Model ---- P/ Squirrel- Cage Induction Frame ---- G 5012 Z Torque max. / min. N-m ---- 1587 / 1586 Drive ---- Speed max. / min. rpm ---- 1491 / 740 5.2 VFD Drive ----

    Manufacturer ---- N A Type / Model ---- N A

    - Pgina 33 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    Speed Range (max. / min.) ---- N A 5.3 Speed Reducer ----

    Manufacturer ---- Sumitomo Type / Model ---- Parallel Shaft Ratio ---- 26 Max. / min. Speed rpm ---- 1501 / 58 5.4 Couplings ----

    High Speed ---- Manufacturer ---- Falk Torque max. N-m ---- 2111 Type / Model ---- T 10 / 1110T Close Couple Low Speed ---- Manufacturer ---- Falk Torque max. N-m ---- 54238 Type / Model ---- T 10 / 1180T Close Couple ---- 6.0 BEARING LUBE SYSTEM ----

    Manufacturer ---- Farval Systems per drum ---- One Pumps: ---- One Type ---- Alemite Farval 200222 Rating, l/min - kPag - kW ----

    Number per syst. operating / stand by ---- 3 / 0

    ---- 7.0 SPRAY HEADER ASSEMBLY ---- 7.1 Sulfuric Acid ----

    Pipe Diameter mm (in) ---- 103 ( 4" ) Nozzle, type / material ---- Stailess Steel A 316 L Nozzle, number ---- 78 Operating pressure kPag ---- 10 Nozzle rating l/min ea ---- 5,94 Pipe manifold connection, flanged ---- Flange ANSI 150 4" ----

    7,2 Water ---- Pipe Diameter mm (in) ---- 103 ( 4" ) Nozzle, type / material ---- Stailess Steel A 316 L Nozzle, number ---- 78 Operating pressure kPag ---- Nozzle rating l/min ea ---- 22,7 Pipe manifold connection, flanged ---- Flange ANSI 150 4" ----

    8.0 UNIT SHIPPING WEIGHTS AND SIZES ----

    Total shipping weight kg ---- 174000 Total shipping volume m3 ---- 650 Largest piece (identify) ---- DRUM Size of largest piece m x m x m ---- 3,7 x 3,7 x 12 Heaviest piece (identify) ---- DRUM Weight of heaviest piece kg ---- 69000

    Total number of shipping packages ---- 12

    - Pgina 34 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    Components shipping weights kg ---- 174000

    Maximum width of drum w/ tires with m ---- 3,4

    packing for transporting purposes ---- 8.1 Installed Unit Weights ----

    Drum kg ---- 69000 Ring gear kg ---- 4300 Drive components (Describe) kg ---- MOTO-REDUCTOR 8.2 Heaviest Pieces ----

    Erection ---- Component ---- DRUM Weight kg ---- 69000 Maintenance ---- Weight, kg ---- 4000 ---- 9.0 PAINTING AND FINISH ----

    Surface preparation ---- TO REMOVE : OIL, DUST, RUST, ETC. Prime coat ---- NO Material ---- COR COTE HCR Minimum thickness mils ---- 21 Finish coat ---- Material ---- Minimum thickness, mils ----

    10.0 INSTRUMENT AND CONTROL LIST

    Bidder shall include in a separate sheet the list of instrumentation and control devices indicating at least: type, technology, tag number, dimensions, measurement range, outputs, mark and model, accomplished accomplished in the Bidder's technical data sheet, if necessary.

    11.0 WEIGHT & DIMENSIONS (each drum)

    State number of parts, weights in metric tons (both net and shipping) for each drum component to include, but not limited to the following. Component # of pieces Net. WT (t) Shipping WT (t) Drum Shell and piers 1 50000 60000 Shell frame 5 5 5 Discharge chute 1 5,2 5,5 Feed chute 1 2,4 2,8 Electric motor 1 2,5 3,0 Speed reducer 1 3,0 3,2 Motor- Reducer Frame 1 2,7 2,7

    - Pgina 35 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    2.3 Data Sheet C

    MEDIUM & LOW VOLTAGE AC INDUCTION MOTOR

    DESCRIPTION SPECIFIED (1) OFFERED REMARKS Motor Identification By Vendor P.O. Nr. 75919 Equipment Number By Vendor Item: Manufacturer and Model By Vendor Reliance G5012Z Site altitude m 3000 m.a.s.l. 3000 m.a.s.l Rated Power Output kW By Vendor 335,5 Voltage V By Vendor 4000 Full Load Current A By Vendor 86,3 Frequency Hz 50 50 Service Factor (1.00 or 1.15) By Vendor 1,00 Speed Synchronous RPM By Vendor 1490 Full Load RPM By Vendor 1490 Locked-Rotor Current A By Vendor 383,4 Stall time : Hot / Cold s By Vendor LATER Cool time constant running min By Vendor LATER Cool time constant stopped min By Vendor LATER Current unbalance (% of FLC) By Vendor LATER Type (Squirrel Cage Wound Rotor) Squirrel Cage Secondary (WR) Short-circuit Amps Open circuit Volts Starting By Vendor 4,6% Power Factor Full Load By Vendor 90,3% 75% Load By Vendor 89,1% 50% Load By Vendor 84,7% Full Load By Vendor 95,8% Efficiency 75% Load By Vendor 96,2%

    Notes: 1. The specified values are at site conditions and 40C 2. Mech. equipment Vendor to obtain the information from motor manufacturer 3. Applicable to medium voltage motors 4. Applicable to motor connected to Inverter or AFD

    50% Load By Vendor 96,2% Surge protection : Yes / No (Note 3) Inverter Duty (Note 4) Torque NEMA Design (A B C D) By Vendor B Full load Torque Nm By Vendor 2150,3 Starting Torque (% of Full Load) By Vendor LATER Pull-Up Torque (% of Full Load) By Vendor 85 % Breakdown Torque (% of Full load) By Vendor 228 % Load Wk2 Nm By Vendor Time Duty (Continuous or Time Rated) By Vendor Continuous Insulation Class F F Temperature Rise Over 40C Ambient 80C 80C Thermal Protection Required (Yes or No) By Vendor LATER Enclosure TEFC TEFC IP55 Frame Number By Vendor 5012 Horizontal or Vertical By Vendor Horizontal Cable Size kCM By Vendor LATER Space Heaters Watts/Volts By Vendor/220 V 120 V Bearings (sealed, anti-friction, etc) By Vendor AF Grease Rotation (Viewed from Shaft End) By Vendor ACW Drive Connection By Vendor LATER Slide Raids (Yes or No) By Vendor LATER Length By Vendor

    - Pgina 36 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    Shaft Details Diameter By Vendor Keyway By Vendor

    LATER: Waiting for Supplier Certified Information ATTACHED: Performance Data & Performance Curves

    - Pgina 37 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    CAPITULO 3

    PLANOS DE REFERENCIA

    - Pgina 38 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    3.1 Planos de Disposicin General Mecnicos

    Item Descripcin N Documento

    1 Disposicin General. Elevacin y Corte 26052ME01DG01

    2 Disposicin General. Vistas Laterales 26052ME01DG02

    3 Disposicin General. Detalles 26052ME01DG03

    4 Disposicin General. Planta 26052ME01DG04

    5 Disposicin General. Sistema de Lubricacin de Descansos 26052ME01DG05

    6 Disposicin General. Sistema de Lubricacin del Pin - Corona 26052ME01DG06

    7 Disposicin General. Sistema Lavado de gases 26052ME01DG07

    3.2 Planos de Diseo Mecnico

    Item Descripcin N Documento

    1 Diseo de Tambor. Detalles 2.506428

    2 Diseo de Banda de Rodadura N 1 2.506429

    3 Diseo Sistema Fijacin Bandas de Rodadura 26052-ME-01-DI-08

    4 Diseo Base para Motor Reductor 26052-ME-01-DI-09

    5 Diseo Soporte Eje Pin 26052-ME-01-DI-10

    6 Diseo Soporte Rodillos Axial - Radial 26052-ME-01-DI-11

    7 Diseo Flauta de Sistema de Rociado de Acido. Caera. 26052-ME-01-DI-12

    8 Diseo de Chute de Alimentacin 26052-ME-01-DI-14

    9 Diseo de Chute de Descarga 26052-ME-01-DI-15

    10 Diseo Sistema de Evacuacin de Gases 26052-ME-01-DI-16

    11 Diseo Pivote de la Estructura 26052-ME-01-DI-17

    12 Diseo Columna de Fijacin Angular 26052-ME-01-DI-19

    - Pgina 39 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    13 Diseo Protecciones Acoples 26052-ME-01-DI-20

    14 Diseo Proteccin Pin 26052-ME-01-DI-21

    15 Diseo Protecciones Corona 26052-ME-01-DI-22

    16 Diseo Barandas Proteccin Rodillos Radiales 26052-ME-01-DI-23

    17 Diseo Soporte Columnas Ajuste Angular 26052-ME-01-DI-28

    18 Diseo Adaptador Chute de Alimentacin 26052-ME-01-DI-29

    19 Diseo Gua Base 26052-ME-01-DI-30

    3.3 Planos de Montaje Mecnico

    Item Descripcin N Documento

    1 Montaje General del Tambor Acidificador 26052-ME-01-MO-01

    2 Montaje del Sistema Motriz 26052-ME-01-MO-02

    3 Montaje de Protecciones Sistema Pin - Corona 26052-ME-01-MO-03

    4 Montaje de Rodillos Radiales y Axiales. Llanta 1 26052-ME-01-MO-04

    5 Montaje de Pivote de Lado Descarga 26052-ME-01-MO-06

    6 Montaje del Sistema de Levante y Fijacin Angular 26052-ME-01-MO-07

    7 Montaje de Sistema Lavador de Gases 26052-ME-01-MO-08

    8 Montaje de Flauta de Sistema de Rociado 26052-ME-01-MO-09

    9 Montaje de Chute de Alimentacin 26052-ME-01-MO-10

    10 Montaje de Chute de Descarga 26052-ME-01-MO-11

    11 Montaje Sistema Centralizado. Pin-Corona 26052-ME-01-MO-12

    12 Montaje Recubrimiento Interior y Lifters 26052-ME-01-MO-14

    13 Montaje Sistema Centralizado de Lubricacin. Descansos 26052-ME-01-MO-16

    - Pgina 40 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    3.4 Planos Estructurales

    Item Descripcin N Documento

    1 Disposicin General Base Acero Soporte Acidificador 26052-ES-01-DI-01

    2 Diseo Base Acero Soporte Acidificador. Planta y Secciones 26052-ES-01-DI-02

    3 Diseo Base Acero Soporte Acidificador. Secciones y Detalles 26052-ES-01-DI-03

    4 Diseo Base Acero Soporte Acidificador. Detalles 26052-CI-01-DI-04

    5 Plano Anclaje del Tambor y Componentes Principales 26052-CI-01-DI-02

    6 Plano Base Tambor Acidificador. Disposicin de Carga 26052-ES-01-SK-02

    3.5 Planos Elctricos y de Instrumentacin

    Item Descripcin N Documento

    1 Listado de Instrumentos 26052-IN-01-LI-01

    2 Disposicin de Equipos en Planta 26052-EL-01-DG-01

    3 P&D Proceso e Instrumentacin Acidificador N 150-AD-001 26052-IN-01-DG-01

    4 P&D Proceso e Instrumentacin Acidificador N 150-AD-002 26052-IN-01-DG-02

    5 P&D Proceso e Instrumentacin Lavador de Gases 26052-IN-01-DG-03

    6 Diagrama de Bloques Instrumentacin Acidificador N 150-AD-001 26052-IN-01-DG-04

    7 Diagrama de Bloques Instrumentacin Acidificador N 150-AD-002 26052-IN-01-DG-05

    8 Diagrama Unilineal de Control Acidificador N 150-AD-001 26052-IN-01-DG-10

    9 Diagrama Unilineal de Control Acidificador N 150-AD-002 26052-IN-01-DG-11

    10 Diagrama Elemental de Control Sistema Lubricacin (Pin-Corona) N 150-AD-001 26052-IN-01-DG-20

    - Pgina 41 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    11 Diagrama Elemental de Control Sistema Lubricacin (Descansos) N 150-AD-001 26052-IN-01-DG-21

    12 Diagrama Elemental de Control Sistema Lubricacin (Pin-Corona) N 150-AD-002 26052-IN-01-DG-22

    13 Diagrama Elemental de Control Sistema Lubricacin (Descansos) N 150-AD-002 26052-IN-01-DG-23

    14 Diagrama de Interconexin Instrumentos Sistema Lubricacin N 150-AD-001 26052-IN-01-DG-30

    15 Diagrama de Interconexin Instrumentos Sistema Vibracin y Temperatura N 150-AD-001 (1 de 3) 26052-IN-01-DG-31

    16 Diagrama de Interconexin Instrumentos Sistema Vibracin y Temperatura N 150-AD-001 (2 de 3) 26052-IN-01-DG-32

    17 Diagrama de Interconexin Instrumentos Sistema Vibracin y Temperatura N 150-AD-001 (3 de 3) 26052-IN-01-DG-33

    18 Diagrama de Interconexin Instrumentos Sistema Lubricacin N 150-AD-002 26052-IN-01-DG-34

    19 Diagrama de Interconexin Instrumentos Sistema Vibracin y Temperatura N 150-AD-002 (1 de 3) 26052-IN-01-DG-35

    20 Diagrama de Interconexin Instrumentos Sistema Vibracin y Temperatura N 150-AD-002 (2 de 3) 26052-IN-01-DG-36

    21 Diagrama de Interconexin Instrumentos Sistema Vibracin y Temperatura N 150-AD-002 (3 de 3) 26052-IN-01-DG-37

    22 Disposicin de Instrumentos en Planta N 150-AD-001 26052-IN-01-DG-40

    23 Diagrama Interconexiones Sist. Vibracin y Temperatura Acidificador N 150-AD-002 (1 de 3) 26052-IN-01-DG-41

    24 Diagrama Interconexiones Sist. Vibracin y Temperatura Acidificador N 150-AD-002 (2 de 3) 26052-IN-01-DG-42

    25 Diagrama Interconexiones Sist. Vibracin, Temperatura y Velocidad Acidificador N 150-AD-002 (3 de 3)

    26052-IN-01-DG-43

    26 Diagrama Interconexiones Sist. Lubricacin Pin Corona Acidificador N 150-AD-002 26052-IN-01-DG-44

    27 Diagrama Interconexiones Sist. Lubricacin Descansos Acidificador N 150-AD-002 26052-IN-01-DG-45

    - Pgina 42 -

  • F.L.Smidth Minerals S.A. Marchant Pereira 367 Office 901 Providencia Santiago Chile Tel: 56-2-876 32 00 - Fax: 56-2-236 10 59

    28 Diagrama Alambrado Caja de Conexiones 150-JB-011 Acidificador N 150-AD-002 26052-IN-01-DG-46

    29 Diagrama Alambrado Caja de Conexiones 150-JB-012 Acidificador N 150-AD-002 26052-IN-01-DG-47

    30 Detalle de Montaje Instrumentos 26052-IN-01-DG-50

    31 Detalle de Montaje Paneles 7359689

    - Pgina 43 -

  • (

    '

    &

    %

    )

    *

    +

    ,

    -

    $

    -

    ,

    +

    *

    )

    (

    '

    &

    %

    $

    7KHLQIRUPDWLRQWUDQVPLWWHGE\WKLVGRFXPHQWLVWKHSURSULHWDU\DQGFRQILGHQWLDOSURSHUW\RI))(0,1(5$/6DQGPD\QRWEHGXSOLFDWHGGLVFORVHGRUXWLOL]HGZLWKRXWZULWWHQFRQVHQWIURP))(0,1(5$/6

    $

    3&

    5HY

    6FDOH 0DWO

    :HOGV'21276&$/('5$:,1*

    $SSU'DWH'UDZQ $SSU&KNG

    3$5$&20(17$5,2

    NJ

    3DWWHUQQXPEHUHPERVVHGFRXQWHUVXQN

    8QOHVVRWKHUZLVHVSHFLILHGDGKHUH

    WR*HQHUDO:RUNVKRS,QVWUXFWLRQV1R

    'UDZLQJ1XPEHU 5HY

    ,62(

    ))(0,1(5$/6&+,/(6$

    (0('*

    ',0(16,21(6*(1(5$/(6

    7$0%25$&,',),&$'257$*1$'

    352

  • $3&

    5HY

    6FDOH 0DWO

    :HOGV'21276&$/('5$:,1*

    $SSU'DWH'UDZQ $SSU&KNG

    5HYLVLRQLQ]RQH'HVFULSWLRQ

    NJ

    3DWWHUQQXPEHUHPERVVHGFRXQWHUVXQN

    8QOHVVRWKHUZLVHVSHFLILHGDGKHUH

    WR*HQHUDO:RUNVKRS,QVWUXFWLRQV1R

    'UDZLQJ1XPEHU 5HY

    ,62(

    ))(0,1(5$/6&+,/(

    ,62

    &0('*

    7$0%25$&,',),&$'257$*1$'3/$17$

    352

  • )250%2/76

    +2/(

    6

    ,,

    (

    '

    &

    %

    $

    )

    *

    + +

    *

    )

    (

    '

    &

    %

    $

    7KHLQIRUPDWLRQWUDQVPLWWHGE\WKLVGRFXPHQWLVWKHSURSULHWDU\DQGFRQILGHQWLDOSURSHUW\RI))(0,1(5$/6DQGPD\QRWEHGXSOLFDWHGGLVFORVHGRUXWLOL]HGZLWKRXWZULWWHQFRQVHQWIURP))(0,1(5$/6

    ))(0,1(5$/686$,1&

    ,62(

    5HY'UDZLQJ1XPEHU

    WR*HQHUDO:RUNVKRS,QVWUXFWLRQV1R

    8QOHVVRWKHUZLVHVSHFLILHGDGKHUH

    3DWWHUQQXPEHUHPERVVHGFRXQWHUVXQN

    NJ

    5HYLVLRQLQ]RQH'HVFULSWLRQ&KNG $SSU'UDZQ $SSU'DWH

    '21276&$/('5$:,1* :HOGV

    0DWO6FDOH

    5HY

    3&

    ,1',&$7('

    527$5

  • (

    '

    &

    %

    $

    )

    *

    + +

    *

    )

    (

    '

    &

    %

    $

    7KHLQIRUPDWLRQWUDQVPLWWHGE\WKLVGRFXPHQWLVWKHSURSULHWDU\DQGFRQILGHQWLDOSURSHUW\RI))(0,1(5$/6DQGPD\QRWEHGXSOLFDWHGGLVFORVHGRUXWLOL]HGZLWKRXWZULWWHQFRQVHQWIURP))(0,1(5$/6

    3&

    5HY

    6FDOH,QGLFDWHG

    0DWO

    :HOGV,62'21276&$/('5$:,1*

    'UDZQ $SSU&KNG

    NJ

    3DWWHUQQXPEHUHPERVVHGFRXQWHUVXQN

    8QOHVVRWKHUZLVHVSHFLILHGDGKHUH

    WR*HQHUDO:RUNVKRS,QVWUXFWLRQV1R

    'UDZLQJ1XPEHU 5HY

    ,62(

    ))(0,1(5$/686$,1&

    $SU

    6+(//'(7$,/6+(//0',$0;0/21*527$5

  • 140

    140140

    2740

    3384

    4850

    5-4-2

    140

    49013565

    2500

    380 917 965

    144144 134 134

    10

    208

    270

    100

    108

    308

    480

    308

    100

    32

    A A

    PL 25

    PL 25 TIP

    PL 32

    PL 32

    PL 25

    ELEVACION BASE MOTOR - REDUCTORESCALA 1 : 10

    6.3

    6.3

    6.3

    280 280

    760

    1000

    500

    120 120

    1425

    560220 508 508 307

    25002740

    288288

    120

    120

    2020

    508

    680

    920

    970

    735

    735

    310

    240

    2020

    585

    195 93144 144

    B

    B

    C C

    PL 650x195x25

    PL 650x400x25

    PL 650x195x25

    C LRE

    DU

    CTO

    R

    C LM

    OTO

    R

    CL MOTOR

    PERNO GATA M 20

    PERF. ALARGADA 20x20

    PERF'S 48

    PL 32

    CL REDUCTOR

    PLANTAESCALA 1 : 10

    440 440

    760

    1000

    627

    1273

    367

    4 ES

    P. @

    347

    = 1

    388

    2020

    5 ESP. @ 396 = 1980 521120

    880 870 870

    2740

    60

    120

    680

    120

    400

    400

    920

    60870

    473

    627

    60

    60

    SECCIN A-A ESCALA 1 : 10

    12 PERF'S 45

    PL 32

    PL 25 TIP.

    PL 25 TIP.TIP.

    38044

    848

    0613

    -4-2

    600160

    920

    488

    548

    37

    650

    688

    970

    898

    189 164 164

    25

    730

    214

    SECCIN B-B ESCALA 1 : 10

    PL 25 TIP.

    PERNO GARRA CON M 20

    PL 32

    PL 32

    PL 25

    PL 32

    PERF'S PARA M 20

    TIP.

    560

    650760

    268

    140

    448

    480

    505

    -4-2

    6801601000

    D

    SECCIN C-C ESCALA 1 : 10

    PL 25 TIP.

    PL 25 TIP.

    PL 32

    PL 32

    PL 25 TIP.

    6.3

    TIP.

    DETALLE D ESCALA 1 : 5

    1 2 3 4 5 6 141312

    11109

    1 2 3 4 5 6 9 10 11 12 13 147 8

    E

    D

    C

    B

    F

    G

    H

    I

    J

    A

    J

    I

    H

    G

    F

    E

    D

    C

    B

    A

    Revision in zone / Description

    Matl

    Welds

    Pattern number, embossed / countersunk

    Unless otherwise specified, adhere

    to General Workshop Instructions No 520530.

    DO NOT SCALE DRAWING

    Rev 2

    Appr DateDrawnScale ApprChkd

    Drawing Number Rev

    LO INDICADO

    kg

    ISO-A

    The information transmitted by this document is the proprietary andconfidential property of FFE MINERALS, and may not be duplicated,disclosed or utilized without written consent from FFE MINERALS.

    CODELCO CHILE PROYECTO GABYTAMBORES ACIDIFICADORESTAG 150AD001/002BASE PARA MOTOR - REDUCTOR

    P.G.Y. M.V. I.P. JUL.2007

    26052ME01DI09 2

    DISEO

    DESDE0.5

    HASTA3(1)

    DESDE3

    HASTA6

    DESDE6

    HASTA30

    DESDE30

    HASTA120

    DESDE120HASTA400

    DESDE400HASTA1000

    DESDE1000HASTA2000

    DESDE2000HASTA4000

    DESVIACIONES ADMISIBLES PARA DIMENSIONES LINEALES (mm)

    +/- 0,1 +/- 0,1 +/- 0,2 +/- 0,3 +/- 0,5 +/- 0,8 +/- 1,2 +/- 2,0

    DESIGNACIONDESCRIPCION

    m MEDIA

    CLASE DE TOLERANCIA

    +/- 0,2 +/- 0,3 +/- 0,5 +/- 0,8 +/- 1,2 +/- 2,0 +/- 3,0 +/- 4,0c BASTA

    ---- +/- 0,5 +/- 1,0 +/- 1,5 +/- 2,5 +/- 4,0 +/- 6,0 +/- 8,0v MUY BASTA

    DESDE4000HASTA8000

    +/- 3,0

    +/- 5,0

    +/- 8,0

    DESDE8000HASTA12000

    +/- 4,0

    +/- 6,0

    +/- 10,0

    TIPICO

    NOTAS

    1 DIMENSIONES EN MILIMETROS (S.I.C.)

    2 DIMENSIONES PREVALECEN SOBRE EL DIBUJO (S.I.C.)

    3 SOLDADURA SEGUN NORMA AWS

    4 SOLDADURA DEBE SER IGUAL AL MINIMO ESP. A UNIR

    5 ELIMINAR REBABAS Y ARISTAS VIVAS

    6 TERMINACION Y PINTURA SEGUN ESPECIFICACION DEL PROYECTO

    7 SOLDADURA ELECTRODO SERIE E70XX SEGUN AWS 5.1

    8 LAS DESVIACIONES LINEALES EN LA CONSTRUCCION, NO DEBEN ESTAR SOBRE LO INDICADO EN LA TABLA N 1, UTILIZAR DESIGNACION CLASE "m"

    9 ACERO A36 O EQUIVALENTE

  • 1084

    140

    240

    181

    380

    678

    710

    790

    804

    1059

    A A

    ESCALA 1 : 10ELEVACION

    PL25 TIP.

    PL25 TIP.

    PL 32

    PL 32

    ARANDELA PARA M 36

    PL 25 TIP.

    PL 25 TIP.

    -2 -4 -4-2

    -4-2

    -4-2

    6.3

    TIP.

    89 4 ESP. @ 156 = 624

    804

    3116

    032

    016

    0

    542847 847

    1844

    540

    1000

    1200

    80

    35

    120

    60

    240

    542

    B

    B

    CC

    D

    D

    CL

    CL

    PERNO GATA M 36

    PL 25 TIP.

    PL 32

    PLANTA SOPORTE EJE PIONESCALA 1 : 10

    1000

    75 380 934 380

    1844

    253

    3 ES

    P. @

    240

    = 7

    2022

    812

    00

    368 530 530

    100

    SECCIN A-A ESCALA 1 : 10

    CL

    CL

    8 PERF'S 45

    PL 25 TIP.

    PL 32

    TIP.

    360240

    1200

    235 35

    5

    710

    750

    1200

    120

    140

    140

    790

    80

    R25

    SECCIN B-B ESCALA 1 : 10

    PERNO GATA M 36

    ARANDELA M 36

    PL 32

    PL 32

    PL 25 TIP.PL 25 TIP.

    PL 25 TIP.

    6.3

    140

    240

    1084

    80

    710

    1844

    625

    SECCIN C-C ESCALA 1 : 10

    PL 25 TIP.

    PL 32

    PL 25 TIP.

    PL 25 TIP.

    PL 32

    355

    710

    235

    360240

    140

    140

    750790

    1200

    R25

    SECCIN D-D ESCALA 1 : 10

    PL 32

    PL 32PL 25 TIP.

    PL 25 TIP.

    6.3

    1 2 3 4 5 6 14131211109

    1 2 3 4 5 6 9 10 11 12 13 147 8

    E

    D

    C

    B

    F

    G

    H

    I

    J

    A

    J

    I

    H

    G

    F

    E

    D

    C

    B

    A

    Revision in zone / Description

    Matl

    Welds

    Pattern number, embossed / countersunk

    Unless otherwise specified, adhere

    to General Workshop Instructions No 520530.

    DO NOT SCALE DRAWING

    Rev 1

    Appr DateDrawnScale ApprChkd

    Drawing Number Rev

    LO INDICADO

    kg

    ISO-A

    The information transmitted by this document is the proprietary andconfidential property of FFE MINERALS, and may not be duplicated,disclosed or utilized without written consent from FFE MINERALS.

    CODELCO CHILE PROYECTO GABYTAMBORES ACIDIFICADORESTAG 150AD001/002SOPORTE EJE PION

    P.G.Y. M.V. I.P. JUN.2007

    26052ME01DI10 1

    DISEO

    6 TERMINACION Y PINTURA SEGUN ESPECIFICACION DEL PROYECTODESDE0.5

    HASTA3(1)

    DESDE3

    HASTA6

    DESDE6

    HASTA30

    DESDE30

    HASTA120

    DESDE120HASTA400

    DESDE400HASTA1000

    DESDE1000HASTA2000

    DESDE2000HASTA4000

    DESVIACIONES ADMISIBLES PARA DIMENSIONES LINEALES (mm)

    +/- 0,1 +/- 0,1 +/- 0,2 +/- 0,3 +/- 0,5 +/- 0,8 +/- 1,2 +/- 2,0

    DESIGNACIONDESCRIPCION

    m MEDIA

    CLASE DE TOLERANCIA

    +/- 0,2 +/- 0,3 +/- 0,5 +/- 0,8 +/- 1,2 +/- 2,0 +/- 3,0 +/- 4,0c BASTA

    ---- +/- 0,5 +/- 1,0 +/- 1,5 +/- 2,5 +/- 4,0 +/- 6,0 +/- 8,0v MUY BASTA

    DESDE4000HASTA8000

    +/- 3,0

    +/- 5,0

    +/- 8,0

    DESDE8000HASTA12000

    +/- 4,0

    +/- 6,0

    +/- 10,0

    1 DIMENSIONES EN MILIMETROS

    2 DIMENSIONES PREVALECEN SOBRE EL DIBUJO (S.I.C.)

    4 SOLDADURA DEBE SER IGUAL AL MINIMO

    3 SOLDADURA SEGUN NORMA AWS

    5 ELIMINAR REBABAS Y ARISTAS VIVAS

    7 SOLDADURA ELECTRODO SERIE E70XX SEGUN AWS 5.1

    9 ACERO A36 EQUIVALENTE

    8 LAS DESVIACIONES LINEALES EN LA CONSTRUCCION, NO DEBEN ESTARSOBRE LO INDICADO EN LA TABLA N 1, UTILIZAR DESIGNACION CLASE "m"

  • 1 2 3 4 5 6 14131211109

    1 2 3 4 5 6 9 10 11 12 13 147 8

    E

    D

    C

    B

    F

    G

    H

    I

    J

    A

    J

    I

    H

    G

    F

    E

    D

    C

    B

    A

    Revision in zone / Description

    Matl

    Welds

    Pattern number, embossed / countersunk

    Unless otherwise specified, adhere

    to General Workshop Instructions No 520530.

    DO NOT SCALE DRAWING

    Rev 1

    Appr DateDrawnScale ApprChkd

    Drawing Number Rev

    LO INDICADO

    kg

    ISO-A

    The information transmitted by this document is the proprietary andconfidential property of FFE MINERALS, and may not be duplicated,disclosed or utilized without written consent from FFE MINERALS.

    CODELCO CHILE PROYECTO GABYTAMBORES ACIDIFICADORESTAG 150AD001/002SOPORTE RODILLOS AXIAL-RADIAL

    P.G.Y. M.V. I.P. JUN. 2007

    26052ME01DI11 1

    DISEO

    1 DIMENSIONES EN MILIMETROS. (S.I.C.)

    2 DIMENSIONES PREVALECEN SOBRE EL DIBUJO (S.I.C.)

    3 SOLDADURA SEGUN NORMAS AWS

    4 SOLDADURA DEBE SER IGUAL AL MINIMO ESP. A UNIR

    5 ELIMINAR REBABAS Y ARISTAS VIVAS

    6 TERMINACION Y PINTURA SEGUN ESPECIFICACION DEL PROYECTO

    7 SOLDADURA ELECTRODO SERIE E70XX SEGUN AWS 5.1

    8 LAS DESVIACIONES LINEALES EN LA CONSTRUCCION, NO DEBEM ESTAR SOBRE LO INDICADO EN LA TABLA N1, UTILIZAR DESIGNACION CLASE "m".

    9 ACERO A36 O EQUIVALENTE

    NOTAS:

    DESDE0.5

    HASTA3(1)

    DESDE3

    HASTA6

    DESDE6

    HASTA30

    DESDE30

    HASTA120

    DESDE120HASTA400

    DESDE400HASTA1000

    DESDE1000HASTA2000

    DESDE2000HASTA4000

    DESVIACIONES ADMISIBLES PARA DIMENSIONES LINEALES (mm)

    +/- 0,1 +/- 0,1 +/- 0,2 +/- 0,3 +/- 0,5 +/- 0,8 +/- 1,2 +/- 2,0

    DESIGNACIONDESCRIPCION

    m MEDIA

    CLASE DE TOLERANCIA

    +/- 0,2 +/- 0,3 +/- 0,5 +/- 0,8 +/- 1,2 +/- 2,0 +/- 3,0 +/- 4,0c BASTA

    ---- +/- 0,5 +/- 1,0 +/- 1,5 +/- 2,5 +/- 4,0 +/- 6,0 +/- 8,0v MUY BASTA

    DESDE4000HASTA8000

    +/- 3,0

    +/- 5,0

    +/- 8,0

    DESDE8000HASTA12000

    +/- 4,0

    +/- 6,0

    +/- 10,0

    183 1596

    900

    1596275 313313

    4458

    1616 1616

    4093

    440 32580

    140 98 140 570 140 140 570 140 98 140 198

    140

    25 185 25185

    5

    R25 (

    INT.)

    863 863

    BB

    ELEVACION DE SOPORTE RODILLOS AXIAL-RADIAL

    ESCALA 1:15

    CL

    ESCALA 1:15

    PL32

    PL25

    6.3

    6.3

    6.3

    314

    474

    1223

    1274

    1434

    85 216 420 908 1200 908 420 216 85

    900

    40424458

    1574

    250

    200

    674

    200

    200

    200

    562

    1832

    635

    44

    18663286

    342

    342

    532

    532

    3882

    874

    A

    A

    C

    CO

    PLANTA

    PERF`S 45

    PERF`S ALARG.33X80

    4458

    1574

    1223

    1074

    674

    342

    540

    342

    175

    2100

    1574

    183

    243 570 738

    900

    275 738 570 243

    2046 2046

    SECCIN B-B ESCALA 1 : 15

    PL20 TIP.

    PL25PL25PL25PL25PL25

    PL25

    PL25

    PL20PL20

    PL20 TIP.

    TIP.TIP.

    1274

    474

    440

    275

    50

    438 322 560 322 458

    2100

    32

    SECCIN A-A ESCALA 1 : 15

    PL25PL20 PL20

    PL20PL20

    6.3 6.3

    TIP.

    1274

    4405

    80

    324474

    310

    342 342

    560 314 560

    175 175

    70 70

    1574

    1223

    5

    510

    874

    SECCIN C-C ESCALA 1 : 15

    PERNO GATA M36C/ CONTRATUERCA

    PL25

    PL20PL20PL20 PL20

    PL32

    TIP.

    185

    80

    320

    200

    100

    P P

    DETALLE O ESCALA 1 : 5

    M56

    76

    185

    80

    70

    140

    5

    110 f7

    185

    80

    60

    SECCIN P-P ESCALA 1 : 5

    6.3

  • 78 ESP. @ 100 = 7800

    9672

    9200

    55

    225

    125

    24

    1946

    870105

    1252

    600

    B

    BC D

    A

    A

    50

    209

    302

    2134

    57 93

    335

    741

    7180 133 8062

    426

    365

    667

    92 150 150 130

    426

    R800

    28

    40

    10

    FLANGE 4"BLIND

    CA. 4"SCH 40

    FLANGE 4"BLIND

    FLANGE 4"BLIND

    PL 10

    PL 6

    PERF'S 22

    VISTA LATERAL IZQ.ESCALA 1 : 10

    VISTA LATERAL DER.ESCALA 1 : 10

    VISTA PRINCIPALESCALA 1 : 15

    CL

    CL

    NOTAS

    5011

    019

    212

    0

    199

    400

    667

    365

    335

    209

    93

    741

    94 6280 133 80 71

    130 150 150 92

    426

    10

    R800 28

    40

    CA. 4"SCH 40

    PL 10

    CA. 4"SCH 40

    FLANGE 4"SLIP-ON

    CA. 4"SCH 40

    FLANGE 4"SLIP-ONCA. 4"

    SCH 40

    FLANGE 4"SLIP-ON

    PL 6

    PERF'S 22

    CL

    CL

    1 DIMENSIONES EN MILIMETROS (S.I.C.)

    2 DIMENSIONES PREVALECEN SOBRE EL DIBUJO (S.I.C.)

    3 SOLDADURA SEGUN NORMA AWS

    4 SOLDADURA DEBE SER IGUAL AL MINIMO ESPESOR A UNIR

    5 ELIMINAR REBABAS Y ARISTAS VIVAS

    6 TERMINACION Y PINTURA SEGUN ESPECIFICACION DEL PROYECTO

    7 SOLDADURA ELECTRODO AWS E-310-316

    8 LASDESVIACIONES LINEALES EN LA CONSTRUCCION, NO DEBEN ESTAR SOBRE LO INDICADO EN LA TABLA N 1, UTILIZAR DESIGNACION CLASE "M".

    9 MATERIAL ACERO INOXIDABLE A316L

    130 150 150

    103

    467

    120

    365 4

    65

    300

    426

    40

    414 INT.

    SECCIN B-B ESCALA 1 : 15

    FLANGE 4"SLIP - ON

    FLANGE 4"SLIP - ON

    FLANGE 4"SLIP - ON

    CA. 4"SCH 40

    CA. 4"SCH 40

    CA. 4"SCH 40

    CA. 4"SCH 40

    PL 100 x 14

    PL 6 TIP.

    CL

    TIP.

    100 100

    53 10

    16

    E

    E

    DETALLE C ESCALA 1 : 5

    70 240 240 240 80

    25 63

    126870

    105

    50

    93

    192

    1126

    365

    30275

    93 62

    GG

    DETALLE D ESCALA 1 : 10

    CL

    CA. 4"SCH 40

    PL 10

    PL 100 x 14

    71 80 133 80 62

    426

    29

    92 150 150 130

    28

    5020

    9 302

    93213

    335

    120

    457

    741

    365

    R800

    40

    SECCIN A-A ESCALA 1 : 10

    CL

    CA. 4"SCH 40

    CA. 4"SCH 40

    CA. 4"SCH 40

    PL 100 x 14

    PL 10

    PL 6

    PERF'S 22

    CL

    PL 6

    CA. 4"SCH 40TIP.

    TIP.

    300

    414

    64

    35

    166

    230

    10

    114

    124426

    150150

    F

    SECCIN E-E ESCALA 1 : 5

    TIP.

    14

    28

    35

    28

    34

    10

    16

    3056

    64

    DETALLE F ESCALA 1 : 1

    300

    870105

    1126

    1256

    100

    SECCIN G-G ESCALA 1 : 10

    CL

    CL

    CA. 4"SCH 40

    TIP.

    1 2 3 4 5 6 14131211109

    1 2 3 4 5 6 9 10 11 12 13 147 8

    E

    D

    C

    B

    F

    G

    H

    I

    J

    A

    J

    I

    H

    G

    F

    E

    D

    C

    B

    A

    Revision in zone / Description

    Matl

    Welds

    Pattern number, embossed / countersunk

    Unless otherwise specified, adhere

    to General Workshop Instructions No 520530.

    DO NOT SCALE DRAWING

    Rev 1

    Appr DateDrawnScale ApprChkd

    Drawing Number Rev

    LO INDICADO

    kg

    ISO-A

    The information transmitted by this document is the proprietary andconfidential property of FFE MINERALS, and may not be duplicated,disclosed or utilized without written consent from FFE MINERALS.

    CODELCO CHILE PROYECTO GABYTAMBORES ACIDIFICADORESTAG 150AD001/002FLAUTA DE SISTEMA DE ROCIADO

    P.G.Y. M.V. I.P. JUL. 2007

    26052ME01DI12 1

    DISEO

    DESDE0.5

    HASTA3(1)

    DESDE3

    HASTA6

    DESDE6

    HASTA30

    DESDE30

    HASTA120

    DESDE120HASTA400

    DESDE400HASTA1000

    DESDE1000HASTA2000

    DESDE2000HASTA4000

    DESVIACIONES ADMISIBLES PARA DIMENSIONES LINEALES (mm)

    +/- 0,1 +/- 0,1 +/- 0,2 +/- 0,3 +/- 0,5 +/- 0,8 +/- 1,2 +/- 2,0

    DESIGNACIONDESCRIPCION

    m MEDIA

    CLASE DE TOLERANCIA

    +/- 0,2 +/- 0,3 +/- 0,5 +/- 0,8 +/- 1,2 +/- 2,0 +/- 3,0 +/- 4,0c BASTA

    ---- +/- 0,5 +/- 1,0 +/- 1,5 +/- 2,5 +/- 4,0 +/- 6,0 +/- 8,0v MUY BASTA

    DESDE4000HASTA8000

    +/- 3,0

    +/- 5,0

    +/- 8,0

    DESDE8000HASTA12000

    +/- 4,0

    +/- 6,0

    +/- 10,0

  • R:790

    (INT.)

    1600 (EXT.)

    196

    501

    965

    13

    196

    13

    746 84

    6

    22

    1181

    2501

    950 950

    1900

    1027 980

    200785

    62

    22628

    10

    90

    CL

    80 880

    43044010

    846

    965

    1396

    1426

    2011

    2501

    965

    4304401920

    51

    10 CERAMICA DE REVESTIMIENTO 16 mm PARA RECUBRIR SUPERFICIES EN CONTACTO CON MINERAL

    9 ACERO A 36 O EQUIVALENTE PARA EL CUERPO DEL CHUTE

    8 LAS DESVIACIONES LINEALES EN LA CONSTRUCCION, NO DEBEN ESTAR SOBRE LO INDICADO EN LA TABLA N1, UTILIZAR DESIGNACION CLASE "m"

    7 SOLDADURA ELECTRODO SERIE E70XX SEGUN AWS 5.1

    6 TERMINACION Y PINTURA SEGUN ESPECIFICACION DEL PROYECTO

    5 ELIMINAR REBABAS Y ARISTAS VIVAS

    4 SOLDADURA DEBE SER IGUAL AL MINIMO ESPESOR A UNIR

    3 SOLDADURA SEGUN NORMA AWS

    2 DIMENSIONES PREVALECEN SOBRE EL DIBUJO (S.I.C.)

    1 DIMENSIONES EN MILIMETROS (S.I.C.)

    NOTAS

    1600

    1426

    1257 1

    00

    846

    209

    2011

    2501

    3 ESP. @ 240 = 72064 96

    150 430 440

    960

    10

    435 4351840

    1920

    80 51

    22

    A

    A

    C C

    PLANTAESCALA 1 : 15

    1920

    1760

    1737

    182518472007

    B B

    E

    196

    846

    965

    209

    429

    133 808062 74

    84

    50

    950950

    110

    50

    50

    95

    117

    50

    846

    1426

    2011

    2501

    62

    85

    578492

    2007

    80

    SECCIN A-A ESCALA 1 : 15

    436

    501

    846

    1426

    2011

    790 800150

    150

    746 8

    46

    49

    589335

    D

    SECCIN B-B ESCALA 1 : 15

    VISTA LATERALESCALA 1 : 15

    ELEVACION CHUTE DE ALIMENTACIONESCALA 1 : 15

    VISTA LATERALESCALA 1 : 15

    REVESTIMIENTOCERAMICO 16mm 280150 150

    880

    155145

    7517

    50

    1900

    430 440 160

    790

    160

    780

    10

    25

    SECCIN C-C ESCALA 1 : 15

    ATIEZADOR 80 x 10

    50

    80 10

    41

    80

    DETALLE D ESCALA 1 : 5

    REVESTIMIENTOCERAMICO 16 mm

    80

    80

    DETALLE E ESCALA 1 : 5

    REVESTIMIENTO CERAMICO 16 mm

    ATIEZADOR

    1 2 3 4 5 6 14131211109

    1 2 3 4 5 6 9 10 11 12 13 147 8

    E

    D

    C

    B

    F

    G

    H

    I

    J

    A

    J

    I

    H

    G

    F

    E

    D

    C

    B

    A

    Revision in zone / Description

    Matl

    Welds

    Pattern number,embossed /countersunk

    Unless otherwise specified, adhere

    to General Workshop Instructions No 520530.

    DO NOT SCALE DRAWING

    Rev 1

    Appr DateDrawnScale ApprChkd

    Drawing Number Rev

    LO INDICADO

    kg

    ISO-A

    The information transmitted by this document is the proprietary andconfidential property of FFE MINERALS, and may not be duplicated,disclosed or utilized without written consent from FFE MINERALS.

    CODELCO CHILE PROYECTO GABYTAMBORES ACIDIFICADORESTAG 150AD001/002CHUTE DE ALIMENTACION

    P.G.Y. M.V. I.P. JUL.2007

    26052ME01DI14 1

    DISEO

    DESDE0.5

    HASTA3(1)

    DESDE3

    HASTA6

    DESDE6

    HASTA30

    DESDE30

    HASTA120

    DESDE120HASTA400

    DESDE400HASTA1000

    DESDE1000HASTA2000

    DESDE2000HASTA4000

    DESVIACIONES ADMISIBLES PARA DIMENSIONES LINEALES (mm)

    +/- 0,1 +/- 0,1 +/- 0,2 +/- 0,3 +/- 0,5 +/- 0,8 +/- 1,2 +/- 2,0

    DESIGNACIONDESCRIPCION

    m MEDIA

    CLASE DE TOLERANCIA

    +/- 0,2 +/- 0,3 +/- 0,5 +/- 0,8 +/- 1,2 +/- 2,0 +/- 3,0 +/- 4,0c BASTA

    ---- +/- 0,5 +/- 1,0 +/- 1,5 +/- 2,5 +/- 4,0 +/- 6,0 +/- 8,0v MUY BASTA

    DESDE4000HASTA8000

    +/- 3,0

    +/- 5,0

    +/- 8,0

    DESDE8000HASTA12000

    +/- 4,0

    +/- 6,0

    +/- 10,0

  • 700

    1568

    166

    738

    1116

    2684

    424 424

    1216

    840840

    1509

    2107

    392

    2875

    R2083(EXT.)

    530

    350

    13

    22

    4000 (INT.)4166

    8

    490

    2323

    A

    A

    F

    RECUBRIMIENTOCERAMICO 16 mm

    PLANTAESCALA 1 : 20

    CL

    CL

    CL

    PL 8

    PL 25

    L 75x75x 8

    L 75x75x 8

    4950

    190

    170

    180

    170

    190

    123

    55

    804

    36 78 848 478

    2083 2083

    2361

    78

    2361

    2000

    467

    66

    VISTA POSTERIORESCALA 1 : 20

    PERF'S 22

    PERF'S 22

    1500 (INT)

    700

    1568

    2180

    2692

    671821

    75

    2000

    801

    1609

    360 360 396

    4958

    75

    182

    804 111

    C

    E

    VISTA LATERALESCALA 1 : 20

    VISTA PRINCIPALESCALA 1 : 20

    L 75x75x 8L 75x75x 8