Operate PB-1 and PB-2 Seal Water Filter System Type CONTINUOUS Document No. TO-600-210 Rev/Mod L-7 Release Date 04/05/2018 Page 1 of 39 Tank Farm Plant Operating Procedure 242-A Evaporator USQ # EV-18-0526-D, Rev 0 CHANGE HISTORY ( LAST 5 REV-MODS ) Rev-Mod Release Date Justification: Summary of Changes L-7 04/05/2018 Address WRPS-PER-2017- 1808 Deleted requirement to initial and made columns "Check" blocks. Added signature at the end. Added a step just prior to step 5.1.2 that states "Personnel initialing valve line-up on Checklist 1, must record the required information on Signature Sheet 1." L-6 05/23/2017 Process improvement, PCA was a result of a periodic review. Updated a step regarding short term shutdown. Updated a referenced procedure title and pagination in this document. L-5 06/02/2016 Not closing valve 4-50A leaves the system pressurized Added closing valve 4-50A to system shutdown in step 5.10.7 Records section updated to standard. L-4 04/26/2016 Operational flexibility Changes give option to use F-RW-1 and/or F-RW-2 Raw Water Strainers in service. Pages 7 and 34 L-3 04/12/2016 Operational flexibility Correct component ID. Add alternate valving to isolate seal water flow to PB-2 pump. Table of Contents Page 1.0 PURPOSE AND SCOPE ................................................................................................................ 3 1.1 Purpose................................................................................................................................ 3 1.2 Scope ................................................................................................................................... 3 2.0 INFORMATION............................................................................................................................. 4 2.1 General Information ............................................................................................................ 4 3.0 PRECAUTIONS AND LIMITATIONS......................................................................................... 5 3.1 Personnel Safety.................................................................................................................. 5 3.2 Equipment Safety ................................................................................................................ 5 3.3 Radiation and Contamination Control ................................................................................ 5 3.4 Environmental Compliance ................................................................................................ 5 3.5 Limits .................................................................................................................................. 6 4.0 PREREQUISITES .......................................................................................................................... 6 4.1 Special Tools, Equipment, and Supplies............................................................................. 6
39

Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Aug 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

1 of 39

Tank Farm Plant Operating Procedure 242-A Evaporator

USQ # EV-18-0526-D, Rev 0

CHANGE HISTORY ( LAST 5 REV-MODS )

Rev-Mod Release Date Justification: Summary of Changes

L-7 04/05/2018 Address WRPS-PER-2017-

1808

Deleted requirement to initial and made columns "Check"

blocks. Added signature at the end. Added a step just prior to

step 5.1.2 that states "Personnel initialing valve line-up on

Checklist 1, must record the required information on Signature

Sheet 1."

L-6 05/23/2017 Process improvement, PCA was

a result of a periodic review.

Updated a step regarding short term shutdown. Updated a

referenced procedure title and pagination in this document.

L-5 06/02/2016 Not closing valve 4-50A leaves

the system pressurized

Added closing valve 4-50A to system shutdown in step 5.10.7

Records section updated to standard.

L-4 04/26/2016 Operational flexibility Changes give option to use F-RW-1 and/or F-RW-2 Raw Water

Strainers in service. Pages 7 and 34

L-3 04/12/2016 Operational flexibility Correct component ID. Add alternate valving to isolate seal

water flow to PB-2 pump.

Table of Contents Page

1.0 PURPOSE AND SCOPE ................................................................................................................ 3

1.1 Purpose ................................................................................................................................ 3

1.2 Scope ................................................................................................................................... 3

2.0 INFORMATION............................................................................................................................. 4

2.1 General Information ............................................................................................................ 4

3.0 PRECAUTIONS AND LIMITATIONS......................................................................................... 5

3.1 Personnel Safety.................................................................................................................. 5

3.2 Equipment Safety ................................................................................................................ 5

3.3 Radiation and Contamination Control ................................................................................ 5

3.4 Environmental Compliance ................................................................................................ 5

3.5 Limits .................................................................................................................................. 6

4.0 PREREQUISITES .......................................................................................................................... 6

4.1 Special Tools, Equipment, and Supplies............................................................................. 6

Page 2: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

2 of 39

4.2 Performance Documents ..................................................................................................... 6

4.3 Field Preparation ................................................................................................................. 7

5.0 PROCEDURE ................................................................................................................................. 8

5.1 Valve In Filtered Raw Water .............................................................................................. 8

5.2 Start Up Seal Water System on Filtered Raw Water ........................................................ 10

5.3 Operability Testing of P-C-105 and P-C-105A Booster Pumps ....................................... 12

5.4 Start Up and Operate Seal Water Booster Pumps ............................................................. 14

5.5 Shutdown Seal Water Booster Pumps .............................................................................. 16

5.6 Switch from F-CA1-L to F-CA1-R to Perform Maintenance on F-CA1-L ...................... 18

5.7 Switch from F-CA1-R to F-CA1-L to Perform Maintenance on F-CA1-R...................... 21

5.8 Switch Seal Water System from Filtered Raw Water to Process Condensate .................. 24

5.9 Switch Seal Water System from Process Condensate to Filtered Raw Water .................. 28

5.10 Shut Down Seal Water System ......................................................................................... 30

5.11 Short Term Shutdown of PB-1 and/or PB-2 Seal Water Systems .................................... 31

5.12 Return to Service from Short Term Shutdown of PB-1 and/or PB-2 Seal Water Systems

........................................................................................................................................... 32

5.13 Records ............................................................................................................................. 33

Checklist 1 - Seal Water System Valve Lineup ........................................................................................ 34

Signature Sheet 1 ...................................................................................................................................... 37

Figure 1 - PB-1 and PB-2 Seal Water System .......................................................................................... 38

Figure 2 - PB-1 and PB-2 Seal Water Filter Assembly ............................................................................ 39

Page 3: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

3 of 39

1.0 PURPOSE AND SCOPE

1.1 Purpose

This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal

Water System and filters.

1.2 Scope

1.2.1 This procedure applies to the seal water system and filters for the PB-1 and

PB-2 pumps at 242-A Evaporator.

1.2.2 This procedure interfaces with other nuclear facilities, i.e., the interface

between Tank Farm and the 242-A Evaporator.

Page 4: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

4 of 39

2.0 INFORMATION

2.1 General Information

2.1.1 The seal water is filtered through either a 1-3 micron, 5 micron, or a

10 micron sock filter located on the fifth floor of Condenser Room.

2.1.2 The seal water system can use two sources of water for the seals: either

filtered raw water or process condensate. Valve HV-CA1-10 is the

controlling valve which directs either filtered raw water or process

condensate to the pump seals and de-entrainer sprays. The process

condensate is pumped by pump P-C106 through CUNO ™

filters F-C-5 or F-C-4 up to HV-CA1-10.

2.1.3 During startup or normal operation of the 105 and 105A seal water booster

pumps, a pump that is in “MANUAL” can only be started by a command

from the MCS. Either pump may be used as the primary, and is set to

MANUAL and ON status. The other pump (if operable) is set to AUTO and

OFF status so it can start automatically, if necessary, due to a low flow or low

pressure condition. When first started, if the primary pump does not clear an

existing low flow/low pressure alarm, or a low flow/low pressure alarm

activates while a booster pump is in operation, it starts a two minute timer.

After a two minute delay following receiving a low flow or low pressure

alarm sensed by one of the following, FIT-CA1-1, FIT-CA1-2, PT-CA1-9 or

PT-CA1-10, the standby pump (in AUTO) will automatically start. If at the

end of these two minutes the low pressure or low flow condition has not

cleared, the backup pump will start. If the low pressure or low flow

condition still does not clear, then two minutes later (following start of the

backup pump) the (four minute) low pressure/flow timer will stop the first

pump. After an additional two minutes with the low pressure or low flow

condition not clear, the (four minute) low pressure/flow timer for the standby

pump will stop that pump.

Page 5: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

5 of 39

3.0 PRECAUTIONS AND LIMITATIONS

3.1 Personnel Safety

3.1.1 The hazards associated with the performance of this procedure have been

determined to be covered by the GHA.

3.2 Equipment Safety

CAUTION - Allowing process condensate to flow through booster pumps P-C-105 and

P-C-105A for an extended period may damage seals.

3.2.1 A loss of seal water due to misalignment of valving or other means to PB-1

and PB-2 Recirculation and Slurry Pumps may cause permanent damage to

the seals.

3.3 Radiation and Contamination Control

3.3.1 Work in radiological areas will be performed using a Radiological Work

Permit (RWP) following review by Radiological Control per

TFC-ESHQ-RP_RWP-C-03, ALARA Work Planning.

3.3.1 Opening or performing maintenance on sock filters (F-CA-L or F-CA-R)

requires HPT coverage and contamination controls (Pre and Post Surveys at a

minimum).

3.3.2 A Radiological Work Permit may be used to perform this procedure

contingent upon no part of the activity being performed within a High

Contamination Area, High Radiation Area, or Airborne Radioactivity Area.

The opening of any system or component within a Radiological Area requires

the presence of a Health Physics Technician to verify contamination control.

3.4 Environmental Compliance

3.4.1 Report any information concerning spills or releases to the appropriate Shift

Office and Environmental per TF-REC-001. This includes spills or releases

to secondary containment.

3.4.2 Process Condensate is considered a Dangerous Waste under WAC 173-303.

Process Condensate and items that are generated from contact with Process

Condensate upon disposal must be managed as Dangerous or Mixed Waste.

Page 6: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

6 of 39

3.5 Limits

OPERATING SPECIFICATION DOCUMENTS (OSDs)

OSD-T-151-00012, Operating Specifications for the 242-A Evaporator

OSD-T-151-00012, 2.5, P-B-1 Recirculation Pump Characteristics

Minimum Seal Water Pressure 35 psig

Maximum Seal Water Pressure 90 psig

Minimum Seal Water Flowrate 0.25 gpm

Maximum Seal Water Flowrate 3.0 gpm

OSD-T-151-00012, 2.6, P-B-2 Slurry Pump Characteristics

Minimum Seal Water Pressure 60 psig

Maximum Seal Water Pressure 75 psig

Minimum Seal Water Flowrate 0.94 gpm

4.0 PREREQUISITES

4.1 Special Tools, Equipment, and Supplies

The following supplies may be needed to perform this procedure:

Sock filters

Paper (for protecting and covering floor and surrounding equipment from

contamination).

4.2 Performance Documents

The following documents may be needed to perform this procedure:

TO-600-130, Operate 242-A-81 Raw Water Strainer System

TO-600-180, Evaluate and Change Raw Water and Process Condensate Filters

and Clean In Line Strainer

TO-600-220, 242-A Evaporator Adjust PB-1 Seal Water Needle Valve

TF-OR-A-04, Monitor 242-A Evaporator Operation Trends

H-2-99003, P&ID Filtered Raw Water System.

Page 7: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

7 of 39

4.3 Field Preparation

4.3.1 ENSURE Raw Water Strainers F-RW-1 and/or F-RW-2 are in service per

TO-600-130.

4.3.2 ENSURE raw water is supplied to the evaporator facility as indicated by

PI-RW-2 (G11, F17/0) F-RW-1/2 FILTER UPSTREAM PRESSURE,

reading a pressure greater than 100 psig.

4.3.3 ENSURE the following breakers/disconnects have been energized:

Panel Board B breaker 12, SEAL WATER PUMP P-C-105

(1-1/2 HP)

Panel Board B breaker 29, P-C-105A (1-1/2 HP) & FEED SAMP

LEAK DET.

4.3.3.1 IF pump P-C106 is required, ENSURE MCC-1 cubicle G6,

CONDENSATE RECYCLE PUMP P-C106 breaker is energized.

4.3.4 NOTIFY Shift Manager that Seal Water is being started AND

RECORD date and time Shift Manager was notified below:

Shift Manager notified: Date: Time:

/ /

Signature Print (First & Last) Date

Operator

Page 8: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

8 of 39

5.0 PROCEDURE

NOTE - Several different activities are performed in this procedure. After completing Section

4.3 and 5.1, individual sections may be performed out of sequence in any logical

order, or omitted, as directed by Shift Manager.

5.1 Valve In Filtered Raw Water

5.1.1 IF initial valving has already been performed per TO-600-010,

GO TO Section 5.2.

5.1.2 IF personnel are initialing valve line-up on Checklist 1 , RECORD the

required information on Signature Sheet 1.

5.1.3 POSITION valves in Checklist 1 to line up filtered raw water/process

condensate for seal water system operation.

NOTE - The handle on In-Line Strainer F-H-3 Selection valve H-2 points to the strainer

currently in service.

5.1.4 IF Shift Manager directs F-H-3 In-Line Strainer be switched from the current

in service to the standby strainer, PERFORM the following:

5.1.4.1 LOOSEN retainer bar HV-H-1B.

5.1.4.2 POSITION In-Line Strainer F-H-3 Selection valve H-2 to point

towards the strainer to be placed in service.

5.1.4.3 TIGHTEN retainer bar HV-H-1B.

5.1.5 DETERMINE which Raw Water Filter (F-H-1 or F-H-2) is currently in

service.

5.1.6 IF directed to place F-H-1 in service from F-H-2, PERFORM the following

actions in HVAC Room.

5.1.6.1 ENSURE outlet valve H-4 is CLOSED.

5.1.6.2 CRACK OPEN Valve H-3A.

5.1.6.3 OPEN inlet valve H-3.

5.1.6.4 AFTER a steady flow of water is seen coming from Valve H-3A,

CLOSE Valve H-3A.

5.1.6.5 SLOWLY OPEN outlet valve H-4.

5.1.6.6 ENSURE Valves H-6 and H-6A are CLOSED.

Page 9: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

9 of 39

5.1 Valve In Filtered Raw Water (Cont.)

5.1.7 IF directed to place F-H-2 in service from F-H-1, PERFORM the following

actions in HVAC Room.

5.1.7.1 ENSURE outlet valve H-6 is CLOSED.

5.1.7.2 CRACK OPEN Valve H-6A.

5.1.7.3 OPEN inlet valve H-5.

5.1.7.4 AFTER a steady water flow is coming from Valve H-6A,

CLOSE Valve H-6A.

5.1.7.5 SLOWLY OPEN outlet valve H-6.

5.1.7.6 ENSURE Valves H-4 and H-3A are CLOSED.

5.1.8 PLACE "In Service" and "Standby" signs on appropriate Raw Water Filters.

5.1.9 ENSURE the Raw Water Filter in standby is CLEAN.

5.1.9.1 IF requested by Shift Manager, CHANGE OUT raw water

filters per TO-600-180.

Page 10: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

10 of 39

5.2 Start Up Seal Water System on Filtered Raw Water

5.2.1 REQUEST from Shift Manager to have an NCO monitor

AW02D-WT-LD-197 for alarm at a TFMCS HMI for the duration of seal

water addition to AW Farm.

5.2.2 ENSURE HV-CA1-10 (G12/15, F6/14) SEAL WATER VALVE is set to

CF-FRW position.

5.2.3 POSITION the following valves as indicated and in the order given:

Valve Number Supply for Position

4-50A HV-CA1-10 OPEN

5-45A PB-1 seals OPEN

5-43 PB-2 seals OPEN

NOTE - If raw water pressure to the fifth floor of the condenser room is not at least 65

psig, the PB-2 seal water pressure PI-CA1-10 will not read within the normal

range of 65 to 75 psig. One or both of the seal water booster pump(s) will need

to be in operation before PI-CA1-10 can be confirmed within normal range.

Parameters may be monitored from current trend 8, on screen graphics or

locally.

5.2.4 NOTIFY Shift Manager if any of the following readings are not within

normal range: (OSD-T-151-00012)

Pump EPN Normal Range

PB-1 FI-CA1-1 (G12) 0.60 to 2.0 gpm

PI-CA1-9 (G12) 40 to 58 psig

PB-2 FI-CA1-2 (G15) 1.0 to 2.00 gpm

PI-CA1-10 (G15) 65 to 75 psig

Page 11: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

11 of 39

5.2 Start Up Seal Water System on Filtered Raw Water (Cont.)

NOTE - FI-CA1-1 should be greater than 0.60 gpm. This will ensure a pump room

entry to adjust the seal water outlet valve on PB-1 will not be necessary prior to

filling CA1.

5.2.5 IF FI-CA1-1 (G12, F6/14) PB-1 SEAL WATER FLOW reads less than

0.60 gpm, PERFORM the following:

5.2.5.1 IF PDI-CA1-3 is greater than 15 psig, SWITCH to Backup Filter

and clean sock filters per the following:

Seal Water Filter Section

F-CA1-L 5.6

F-CA1-R 5.7

5.2.5.2 IF FI-CA1-1 (G12, F6/14) PB-1 SEAL WATER FLOW still

does not read greater than 0.6 gpm, NOTIFY Shift Manager that

a pump room entry to adjust the seal water needle valve on PB-1

may be necessary per TO-600-220.

Page 12: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

12 of 39

5.3 Operability Testing of P-C-105 and P-C-105A Booster Pumps

NOTE - If both seal water booster pumps are operable, either seal water booster pump

may be placed in MANUAL and used as the PRIMARY, and the

“ALTERNATE” pump placed in AUTO and used as a backup.

- If only one seal water booster pump is operable the “INOPERABLE” pump

will be left in OFF and MANUAL with the isolation valves for that pump

closed.

- If testing of seal water booster pumps and pressure and flow ranges were

previously completed satisfactorily at start of campaign, this section may not

be required to be re-performed.

Start P-C-105A Seal Water Pump to Confirm Pump Operability

5.3.1 IF testing P-C-105A, PERFORM the following:

5.3.1.1 SET P-C-105 (G12/12, F6/1) SEAL WATER PUMP to

MANUAL.

5.3.1.2 SET P-C-105A (G12/13, F6/3) SEAL WATER PUMP to

MANUAL and CF-ON status.

5.3.1.3 IF PI-CA1-10 (G15, F10/9) PB-2 SEAL WATER PRESSURE is

still not within normal range of 65 to 75 psig,

NOTIFY Shift Manager.

5.3.1.4 CONFIRM no abnormal noises from the P-C-105A pump or

leaks are coming from the seal water system AND

NOTIFY Shift Manager of any abnormal conditions.

5.3.1.5 SET P-C-105A (G12/13, F6/3) SEAL WATER PUMP to

MANUAL and CF-OFF status.

Page 13: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

13 of 39

5.3 Operability Testing of P-C-105 and P-C-105A Booster Pumps (Cont.)

Start P-C-105 Seal Water Pump to Confirm Pump Operability

5.3.2 IF testing P-C-105, PERFORM the following:

5.3.2.1 SET P-C-105A (G12/13, F6/3) SEAL WATER PUMP to

MANUAL.

5.3.2.2 SET P-C-105 (G12/12, F6/1) SEAL WATER PUMP to

MANUAL and CF-ON status.

5.3.2.3 IF PI-CA1-10 (G15, F10/9) PB-2 SEAL WATER PRESSURE is

still not within normal range of 65 to 75 psig, NOTIFY Shift

Manager.

5.3.2.4 CONFIRM no abnormal noises from the P-C-105 pump or leaks

are coming from the seal water system AND

NOTIFY Shift Manager of any abnormal conditions.

5.3.2.5 SET P-C-105 (G12/12, F6/1) SEAL WATER PUMP to

MANUAL and CF-OFF status.

5.3.3 IF short term shutdown of the seal water system is desired,

GO TO Section 5.11.

5.3.4 IF it is desired to switch seal water source to process condensate,

GO TO Section 5.8.

5.3.5 IF seal water booster pumps are required to be placed in service to provide

sufficient seal water pressure and flow, GO TO Section 5.4.

5.3.6 IF filtered raw water is to continue supplying seal water, and booster pumps

are not required to be in service, ENSURE seal water is being monitored per

TF-OR-A-04.

Page 14: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

14 of 39

5.4 Start Up and Operate Seal Water Booster Pumps

5.4.1 ENSURE the following valves are in the position shown below:

Valve Number Pumps Position

5-16 P-C-105

OPEN

5-18 OPEN

5-17 P-C-105A

OPEN

5-19 OPEN

5-45A PB-1 OPEN

5-43 PB-2 OPEN

5.4.2 IF P-C-105 is to be used as the primary seal water booster pump,

PERFORM the following:

5.4.2.1 SET P-C-105A (G12/13, F6/3) SEAL WATER PUMP to

MANUAL.

5.4.2.2 SET P-C-105 (G12/12, F6/1) SEAL WATER PUMP to

MANUAL and CF-ON status.

5.4.2.3 SET P-C-105A (G12/13, F6/3) SEAL WATER PUMP to AUTO.

NOTE - Parameters may be monitored from current trend 8, on screen

graphics or locally.

5.4.2.4 NOTIFY Shift Manager if any of the following readings are not

within normal range: (OSD-T-151-00012)

Pump EPN Normal Range

PB-1 FI-CA1-1 (G12) 0.60 to 2.0 gpm

PI-CA1-9 (G12) 40 to 58 psig

PB-2 FI-CA1-2 (G15) 1.0 to 2.00 gpm

PI-CA1-10 (G15) 65 to 75 psig

Page 15: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

15 of 39

5.4 Start Up and Operate Seal Water Booster Pumps (Cont.)

5.4.3 IF P-C-105A is to be used as the primary seal water booster pump,

PERFORM the following:

5.4.3.1 SET P-C-105 (G12/12, F6/1) SEAL WATER PUMP to

MANUAL.

5.4.3.2 SET P-C-105A (G12/13, F6/3) SEAL WATER PUMP to

MANUAL and CF-ON status.

5.4.3.3 SET P-C-105 (G12/12, F6/1) SEAL WATER PUMP to AUTO.

NOTE - Parameters may be monitored from current trend 8, on screen

graphics or locally.

5.4.3.4 NOTIFY Shift Manager if any of the following readings are not

within normal range: (OSD-T-151-00012)

Pump EPN Normal Range

PB-1 FI-CA1-1 (G12) 0.60 to 2.0 gpm

PI-CA1-9 (G12) 40 to 58 psig

PB-2 FI-CA1-2 (G15) 1.0 to 2.00 gpm

PI-CA1-10 (G15) 65 to 75 psig

5.4.4 IF short term shutdown of the seal water system is desired,

GO TO Section 5.11.

5.4.5 IF it is desired to switch seal water source to process condensate,

GO TO Section 5.8.

5.4.6 IF seal water booster pumps are to remain in service,

ENSURE seal water is being monitored per TF-OR-A-04.

Page 16: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

16 of 39

5.5 Shutdown Seal Water Booster Pumps

NOTE - If raw water pressure to the fifth floor of the condenser room is not at least 65

psig, the PB-2 seal water pressure PI-CA1-10 will not read within the normal

range of 65 to 75 psig. One or both of the seal water booster pump(s) will need

to be in operation before PI-CA1-10 can be confirmed within normal range.

Parameters may be monitored from current trend 8, on screen graphics or

locally.

5.5.1 IF Shift Manager determines that there is sufficient pressure in the filtered

raw water system and directs continuing, PERFORM steps 5.5.2 through

5.5.5.

5.5.2 IF P-C-105 (G12/12, F6/1) SEAL WATER PUMP is running as the primary

booster pump, PERFORM the following:

5.5.2.1 SET P-C-105A (G12/13, F6/3) SEAL WATER PUMP to

MANUAL.

5.5.2.2 SET P-C-105 (G12/12, F6/1) SEAL WATER PUMP to

MANUAL and CF-OFF status.

5.5.2.3 ENSURE P-C-105A (G12/13, F6/3) SEAL WATER PUMP is in

CF-OFF status.

5.5.3 IF P-C-105A (G12/13, F6/3) SEAL WATER PUMP is running as the

primary booster pump, PERFORM the following:

5.5.3.1 SET P-C-105 (G12/12, F6/1) SEAL WATER PUMP to

MANUAL.

5.5.3.2 SET P-C-105A (G12/13, F6/3) SEAL WATER PUMP to

MANUAL and CF-OFF status.

5.5.3.3 ENSURE P-C-105 (G12/12, F6/1) SEAL WATER PUMP is in

CF-OFF status.

5.5.4 ENSURE the following Valves are OPEN.

5-18A

5-18B.

Page 17: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

17 of 39

5.5 Shutdown Seal Water Booster Pumps (Cont.)

5.5.5 POSITION the following valves as indicated:

Valve Number Pumps Position

5-16 P-C-105

CLOSED

5-18 CLOSED

5-17 P-C-105A

CLOSED

5-19 CLOSED

Page 18: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

18 of 39

5.6 Switch from F-CA1-L to F-CA1-R to Perform Maintenance on F-CA1-L

5.6.1 ENSURE F-CA1-R Right Seal Water Filter is available for operation.

5.6.2 IF switch is being made for cleaning and maintenance, and process

condensate is currently being used for seal water source,

SWITCH seal water system to filtered raw water per Section 5.9.

5.6.2.1 ENSURE filtered raw water has been used for seal water for at

least 10 minutes before continuing with this task.

5.6.3 POSITION the following valves as indicated in the order given:

Valve Description Position

5-14 FRW to F-CA1-L/R OPEN

5-20 FRW to F-CA1-L/R OPEN

5-21 F-CA1-R Drain valve CLOSED

5-22 F-CA1-L/R Bypass SLOWLY

OPEN

5-21B F-CA1-L/R 3-Way Inlet valve *D position

5-21C F-CA1-L/R 3-Way Outlet valve *D position

* - See Figure 2

5.6.4 CHECK for visual signs of leakage from the F-CA1-R filter.

5.6.5 IF leakage is observed from F-CA1-R filter, SWITCH flow from F-CA1-R

to F-CA1-L.

5.6.5.1 NOTIFY Shift Manager that maintenance is required for

F-CA1-R.

5.6.6 SLOWLY CLOSE Valve 5-22, F-CA1-L/R Bypass.

5.6.7 IF differential pressure across filter F-CA1-R using gages PI-FCA1R-2 and

PI-FCA1R-1 (Right Filter Outlet and Right Filter Inlet Pressures) is greater

than 15 psig, SWITCH flow from F-CA1-R to F-CA1-L.

5.6.7.1 NOTIFY Shift Manager that F-CA1-R sock filter needs to be

replaced.

5.6.8 IF maintenance or replacement of sock filter is required on F-CA1-L,

PERFORM Steps 5.6.9 through 5.6.16.

Page 19: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

19 of 39

5.6 Switch from F-CA1-L to F-CA1-R to Perform Maintenance on F-CA1-

LSwitch from F-CA1-L to F-CA1-R (Cont.)

Perform Maintenance or Replace Sock Filter on F-CA1-L

5.6.9 OPEN 5-21A, F-CA1-L Drain valve.

5.6.10 CHECK PI-FCA1L-1 reads zero.

NOTE - An HPT needs to be present when the sock filters are removed and cleaned.

5.6.11 REQUEST HPT be present during the disassembly, cleaning of filter, and

reassembly of filter housing.

5.6.12 REQUEST Craft Personnel clean or replace sock filter.

5.6.13 AFTER filter cleaning or replacement is complete and the filter is installed,

REQUEST HPT to survey work area for contamination.

5.6.14 WHEN filter cleaning is complete and the filter is installed, PRESSURIZE

AND FILL F-CA1-L, as follows:

5.6.14.1 CLOSE 5-21A, F-CA1-L Drain valve.

5.6.14.2 SLOWLY OPEN Valve 5-22, F-CA1-L/R Bypass.

5.6.14.3 SLOWLY POSITION 5-21B, F-CA1-L/R 3-Way Inlet valve to

the C position (See Figure 2).

5.6.14.4 CHECK for visual signs of leakage from the F-CA1-L filter.

5.6.14.5 IF leakage is observed from F-CA1-L filter, POSITION 5-21B,

F-CA1-L/R 3-Way Inlet valve to the “D” position AND

NOTIFY Shift Manager that maintenance is required for

F-CA1-R.

5.6.14.6 OPEN 5-21A, F-CA1-L Drain valve to bleed any trapped air

from filter.

5.6.14.7 AFTER bleeding air from the filter, CLOSE 5-21A, F-CA1-L

Drain valve.

Page 20: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

20 of 39

5.6 Switch from F-CA1-L to F-CA1-R to Perform Maintenance on F-CA1-

LSwitch from F-CA1-L to F-CA1-R (Cont.)

5.6.14.8 POSITION 5-21B, F-CA1-L/R 3-Way Inlet valve to D position

(See Figure 2).

5.6.14.9 SLOWLY CLOSE Valve 5-22, F-CA1-L/R Bypass.

5.6.15 IF F-CA1-L will be placed in service, ALIGN Flow through F-CA1-L Left

Seal Water Filter per Section 5.7.

5.6.16 IF process condensate is to be used for the seal water source and the process

condensate seal water system is available, PERFORM Section 5.8 to change

the seal water system to process condensate.

Page 21: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

21 of 39

5.7 Switch from F-CA1-R to F-CA1-L to Perform Maintenance on

F-CA1-R

5.7.1 ENSURE F-CA1-L is available for operation.

5.7.2 IF switch is being made for cleaning and maintenance, and process

condensate is currently being used for seal water source,

SWITCH seal water system to filtered raw water per Section 5.9.

5.7.2.1 ENSURE filtered raw water has been used for seal water for at

least 10 minutes before continuing with this task.

5.7.3 POSITION the following valves as indicated in the order given:

Valve Description Position

5-14 FRW to F-CA1-L/R OPEN

5-20 FRW to F-CA1-L/R OPEN

5-21A F-CA1-L Drain valve CLOSED

5-22 F-CA1-L/R Bypass SLOWLY

OPEN

5-21B F-CA1-L/R 3-Way Inlet valve *A position

5-21C F-CA1-L/R 3-Way Outlet valve *A position

* - See Figure 2

5.7.4 CHECK for visual signs of leakage from the F-CA1-L filter.

5.7.5 IF leakage is observed from F-CA1-L filter, SWITCH flow from F-CA1-L

to F-CA1-R.

5.7.5.1 NOTIFY Shift Manager that maintenance is required for

F-CA1-L.

5.7.6 SLOWLY CLOSE Valve 5-22, F-CA1-L/R Bypass.

5.7.7 IF differential pressure across filter F-CA1-L using gages PI-FCA1L-2 and

PI-FCA1L-1 (Left Filter Outlet and Left Filter Inlet Pressures) is greater than

15 psig, SWITCH flow from F-CA1-L to F-CA1-R.

5.7.7.1 NOTIFY Shift Manager that F-CA1-L sock filter needs to be

replaced.

5.7.8 IF maintenance or replacement of sock filter is required on F-CA1-R,

PERFORM Steps 5.7.9 through 5.7.16.

Page 22: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

22 of 39

5.7 Switch from F-CA1-R to F-CA1-L to Perform Maintenance on

F-CA1-R (Cont.)

Perform Maintenance or Replace Sock Filter on F-CA1-R

5.7.9 OPEN 5-21, F-CA1-R Drain valve.

5.7.10 CHECK PI-FCA1R-1 reads zero.

NOTE - An HPT needs to be present when the sock filters are removed and cleaned.

5.7.11 REQUEST HPT be present during the disassembly, cleaning of filter, and

reassembly of filter housing.

5.7.12 REQUEST Craft Personnel clean or replace sock filter.

5.7.13 AFTER filter cleaning or replacement is complete and the filter is installed,

REQUEST HPT to survey work area for contamination.

5.7.14 WHEN filter cleaning is complete and the filter is installed, PRESSURIZE

AND FILL F-CA1-L, as follows:

5.7.14.1 CLOSE 5-21, F-CA1-R Drain valve.

5.7.14.2 SLOWLY OPEN Valve 5-22, F-CA1-L/R Bypass.

5.7.14.3 SLOWLY POSITION 5-21B, F-CA1-L/R 3-Way Inlet valve to

the C position (See Figure 2).

5.7.14.4 CHECK for visual signs of leakage from the F-CA1-R filter.

5.7.14.5 IF leakage is observed from F-CA1-R filter, POSITION 5-21B,

F-CA1-L/R 3-Way Inlet valve to the “A” position AND

NOTIFY Shift Manager that maintenance is required for

F-CA1-R.

5.7.14.6 OPEN 5-21, F-CA1-R Drain valve to bleed any trapped air from

filter.

5.7.14.7 AFTER bleeding air from the filter, CLOSE 5-21, F-CA1-R

Drain valve.

5.7.14.8 POSITION 5-21B, F-CA1-L/R 3-Way Inlet valve to A position

(See Figure 2).

5.7.14.9 SLOWLY CLOSE Valve 5-22, F-CA1-L/R Bypass.

Page 23: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

23 of 39

5.7 Switch from F-CA1-R to F-CA1-L to Perform Maintenance on

F-CA1-R (Cont.)

5.7.15 IF F-CA1-R will be placed in service, ALIGN flow through F-CA1-R Right

Seal Water Filter per Section 5.6.

5.7.16 IF process condensate is to be used for the seal water source and the process

condensate seal water system is available, PERFORM Section 5.8 to change

seal water system to process condensate.

Page 24: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

24 of 39

5.8 Switch Seal Water System from Filtered Raw Water to Process

Condensate

NOTE - To operate the process condensate seal water system, a minimum level of

30 percent (shutdown interlock set at 27% with a 2% dead band) must be in

tank TK-C-100.

5.8.1 ENSURE WFIC-C100 (G18/6, F23/1) TK-C-100 WT FACTOR reads

greater than 30%.

5.8.2 IF Process Condensate Seal Water System has previously been started,

GO TO Step 5.8.11.

Process Condensate Seal Water Initial Fill

5.8.3 CLOSE PDT-FC4/5 inlet valve 1-80A.

5.8.4 SET P-C106 (G18/10, F27/5) CONDSATE RECYCLE PUMP to CF-ON.

5.8.5 IF process condensate filter F-C-5 is to be placed in service,

PERFORM the following actions in the Condenser Room.

5.8.5.1 ENSURE outlet valve 1-85 is CLOSED.

5.8.5.2 CRACK OPEN Valve 1-83.

5.8.5.3 OPEN inlet valve 1-82.

5.8.5.4 AFTER a steady flow of water is seen coming from Valve 1-83,

CLOSE Valve 1-83.

5.8.5.5 SLOWLY OPEN outlet valve 1-85.

5.8.5.6 ENSURE the following Valves are CLOSED:

1-89

1-88.

5.8.5.7 CHECK for visible signs of leakage from F-C-5 AND

NOTIFY Shift Manager if leaks are observed.

Page 25: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

25 of 39

5.8 Switch Seal Water System from Filtered Raw Water to Process

Condensate (Cont.)

5.8.6 IF process condensate filter F-C-4 is to be placed in service,

PERFORM the following actions in Condenser Room:

5.8.6.1 ENSURE outlet valve 1-89 is CLOSED.

5.8.6.2 CRACK OPEN Valve 1-88.

5.8.6.3 OPEN inlet valve 1-86.

5.8.6.4 AFTER a steady flow of water is seen coming from Valve 1-88,

CLOSE Valve 1-88.

5.8.6.5 SLOWLY OPEN outlet Valve 1-89.

5.8.6.6 ENSURE the following Valves are CLOSED:

1-85

1-83.

5.8.6.7 CHECK for visible signs of leakage from F-C-4 AND

NOTIFY Shift Manager if leaks are observed.

5.8.7 PLACE the "In Service" and "Standby" signs on appropriate Process

Condensate filters.

5.8.8 OPEN Valve 4-51 for approximately 2 minutes to fill piping with process

condensate.

5.8.9 AFTER approximately 2 minutes, CLOSE Valve 4-51.

5.8.10 OPEN PDT-FC4/5 inlet Valve 1-80A.

Page 26: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

26 of 39

5.8 Switch Seal Water System from Filtered Raw Water to Process

Condensate (Cont.)

NOTE - If the Process Condensate Seal Water System has been previously started per

this section, then the F-C-5/F-C-4 filters do not need to be valved in.

5.8.11 IF Process Condensate Seal Water System has previously been started,

PERFORM the following:

5.8.11.1 IF switching back to Process Condensate after a filter change and

F-C-4 and F-C-5 valving has not changed, GO TO Step 5.8.11.4.

5.8.11.2 IF F-C-5 is in service, ENSURE Valve 1-85 is open.

5.8.11.3 IF F-C-4 is in service, ENSURE Valve 1-89 is open.

5.8.11.4 SET P-C106 (G18/10, F27/5) CONDSATE RECYCLE PUMP to

CF-ON.

Switch PB-1 and PB-2 seal water source to process condensate

CAUTION

Allowing process condensate to flow through booster pumps P-C-105

and P-C-105A for an extended period may damage seals.

NOTE - P-C-105 and P-C-105A must only be used with filtered raw water except when

switching between filtered raw water and process condensate.

5.8.12 ENSURE the following Valves are OPEN:

5-18A

5-18B.

5.8.13 SET HV-CA1-10 (G12/15, F6/14) SEAL WATER VALVE to CF-PC

position by clicking SPLY PC.

Page 27: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

27 of 39

5.8 Switch Seal Water System from Filtered Raw Water to Process

Condensate (Cont.)

5.8.14 IF seal water booster pumps are in operation, PERFORM the following:

5.8.14.1 SET P-C-105A (G12/13, F6) SEAL WATER PUMP to

MANUAL and CF-OFF status.

5.8.14.2 SET P-C-105 (G12/12, F6) SEAL WATER PUMP to MANUAL

and CF-OFF status.

5.8.14.3 POSITION the following valves as indicated:

Valve Number Pumps Position

5-16 P-C-105

CLOSED

5-18 CLOSED

5-17 P-C-105A

CLOSED

5-19 CLOSED

NOTE - Parameters may be monitored from current trend 8, on screen graphics or

locally.

5.8.15 NOTIFY Shift Manager if any of the following readings are not within

normal range: (OSD-T-151-00012)

Pump EPN Normal Range

PB-1 FI-CA1-1 (G12) 0.60 to 2.0 gpm

PI-CA1-9 (G12) 40 to 58 psig

PB-2 FI-CA1-2 (G15) 1.0 to 2.00 gpm

PI-CA1-10 (G15) 65 to 75 psig

Page 28: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

28 of 39

5.9 Switch Seal Water System from Process Condensate to Filtered Raw

Water

Start Filtered Raw Water Booster Pumps

CAUTION

Allowing process condensate to flow through booster pumps P-C-105

and P-C-105A for an extended period may damage seals.

NOTE - P-C-105 and P-C-105A must only be used with filtered raw water except when

switching between filtered raw water and process condensate, or unless

otherwise directed by Shift Manager.

- If both seal water booster pumps are operable, either seal water booster pump

may be placed in MANUAL and used as the primary, and the “ALTERNATE”

pump placed in AUTO and used as a backup.

- If only one seal water booster pump is operable the “INOPERABLE” pump

will be left in OFF and MANUAL with the isolation valves for that pump

closed.

5.9.1 POSITION the following valves as indicated.

Valve Number Pumps Position

5-16 P-C-105

OPEN

5-18 OPEN

5-17 P-C-105A

OPEN

5-19 OPEN

Start P-C-105 Seal Water Pump

5.9.2 IF P-C-105 (G12/12, F6/1) SEAL WATER PUMP is to be used as the

primary seal water booster pump with P-C-105A (G12/13, F6/3) SEAL

WATER PUMP as backup, PERFORM the following:

5.9.2.1 SET P-C-105A to MANUAL.

5.9.2.2 SET P-C-105 to MANUAL and CF-ON status.

5.9.2.3 SET P-C-105A to AUTO.

Page 29: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

29 of 39

5.9 Switch Seal Water System from Process Condensate to Filtered Raw

Water (Cont.)

Start P-C-105A Seal Water Pump

5.9.3 IF P-C-105A (G12/13, F6/3) SEAL WATER PUMP is to be used as the

primary seal water booster pump with P-C-105 (G12/12, F6/1) SEAL

WATER PUMP as backup, PERFORM the following:

5.9.3.1 SET P-C-105 to MANUAL.

5.9.3.2 SET P-C-105A to MANUAL and CF-ON status.

5.9.3.3 SET P-C-105 to AUTO.

Switch PB-1 and PB-2 Water Source to Filtered Raw Water

5.9.4 SET HV-CA1-10 (G12/15, F6/14) SEAL WATER VALVE to CF-FRW

status.

NOTE - Parameters may be monitored from current trend 8, on screen graphics or

locally.

5.9.5 NOTIFY Shift Manager if any of the following readings are not within

normal range: (OSD-T-151-00012)

Pump EPN Normal Range

PB-1 FI-CA1-1 (G12) 0.60 to 2.0 gpm

PI-CA1-9 (G12) 40 to 58 psig

PB-2 FI-CA1-2 (G15) 1.0 to 2.00 gpm

PI-CA1-10 (G15) 65 to 75 psig

5.9.6 SET P-C106 (G18/10, F27/5) CONDSATE RECYCLE PUMP to CF-OFF

status.

Page 30: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

30 of 39

5.10 Shut Down Seal Water System

5.10.1 ENSURE P-C-105A (G12/13, F6/3) SEAL WATER PUMP is set to

MANUAL and CF-OFF status.

5.10.2 ENSURE P-C-105 (G12/12, F6/1) SEAL WATER PUMP is set to

MANUAL and CF-OFF status.

5.10.3 SET HV-CA1-10 (G12/15, F6/14) SEAL WATER VALVE to CF-FRW.

5.10.4 ENSURE P-C106 (G18/10, F27/5) CONDSATE RECYCLE PUMP is set to

MANUAL and CF-OFF status.

5.10.5 POSITION the following valves as indicated.

Valve Number Pumps Position

5-16 P-C-105

OPEN

5-18 OPEN

5-17 P-C-105A

OPEN

5-19 OPEN

5.10.6 ENSURE seal water system has run at least 10 minutes on Filtered Raw

Water to flush the seal water system before proceeding.

5.10.7 REQUEST Backside Operator to position the following valves as indicated.

Valve

Number Description Position

4-50A FRW isolation valve CLOSED

5-45A PB-1 isolation valve CLOSED

1-89 Outlet valve F-C-4 filter CLOSED

5-43 PB-2 isolation valve CLOSED

1-85 Outlet valve F-C-5 filter CLOSED

Page 31: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

31 of 39

5.11 Short Term Shutdown of PB-1 and/or PB-2 Seal Water Systems

NOTE - With concurrence of 242-A Shift Manager either or both PB-1 and PB-2 seal

water systems may be put into short term shutdown by isolating seal water

flow to the respective pump(s).

- Seal water flow to PB-1 must not be isolated if the CA1 vessel has a volume of

greater than 96 inches as read on LI-CA1-3.

5.11.1 IF CA1 vessels volume is greater than 96 inches as read on LI-CA1-3,

ENSURE seal water flow to PB-1 is not isolated.

5.11.2 IF isolating both PB-1 and PB-2 seal water systems, SHUTDOWN seal

water booster pumps per Section 5.5.

5.11.3 IF isolating seal water flow to PB-1 pump, CLOSE valve 5-45A.

NOTE - Seal water flow to PB-2 must not be isolated if slurry out activities are in

progress whether by gravity slurry out, PB-2 pumping operation, or FARM

FLUSH.

5.11.4 IF isolating seal water flow to PB-2 pump, CLOSE valve 5-43 or valve 5-29

as specified by Shift Manager.

5.11.5 IF directed by Shift Manager, SET P-C106 (G18/10, F27/5) CONDSATE

RECYCLE PUMP to CF-OFF status.

Page 32: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

32 of 39

5.12 Return to Service from Short Term Shutdown of PB-1 and/or PB-2 Seal

Water Systems

NOTE - With concurrence of 242-A Shift Manager either or both PB-1 and PB-2 seal

water systems may be returned to service from short term shutdown by

restoring seal water flow to the respective pump(s).

- Seal water flow to PB-1 must be returned to service before the CA1 vessel is

filled to greater than 96 inches as read on LI-CA1-3.

5.12.1 IF returning seal water flow to PB-1 pump from short term shutdown and

before the CA1 vessel is filled to greater than 96 inches as read on LI-CA1-3,

OPEN valve 5-45A.

NOTE - Seal water flow to PB-2 must be returned to service before slurry flow is

initiated, whether by gravity slurry out, PB-2 pumping operation, or FARM

FLUSH.

5.12.2 IF returning seal water flow to PB-2 pump from short term shutdown,

OPEN valve 5-43 or valve 5-29 as specified by the Shift Manager.

5.12.3 IF seal water booster pumps are required due to operating conditions,

START seal water booster pumps per Section 5.4.

5.12.4 IF directed by Shift Manager, SET P-C106 (G18/10, F27/5) CONDSATE

RECYCLE PUMP to CF-ON status.

5.12.4.1 SET HV-CA1-10 (G12/15, F6/14) SEAL WATER VALVE to

CF-PC position.

Page 33: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

33 of 39

5.13 Records

5.13.1 PERFORM the following for records identified within this procedure.

5.13.1.1 RECORD the number of times the record was generated in

applicable column

OR

PLACE a check mark () in the N/A column.

5.13.1.2 SUBMIT the package to the central shift office.

Records Submittal Checklist

Number

of times

completed

N/A

()

4.3 Field Preparation Step 4.3.4

Checklists

Checklist 1

Signature Sheets

Signature Sheet 1

FWS/OE/Shift Manager SEND the completed records to the Central Shift Office for

records retention

/ /

Signature Print (First and Last) Date

FWS/OE/Shift Manager

Page 34: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

34 of 39

Checklist 1 - Seal Water System Valve Lineup

Seal Water System Valve Lineup Date Started Time Started

Valve Location Position Description P&ID Location Operator Initial Date

HVAC Room

*H-1 H OPEN RW to F-H-3 98991/2/D7

H-1A H OPEN PDT-FH3-1 Isolation 99003/1/B8

H-2A H CLOSE F-H-3 Drain 99003/1/B8

H-2B H CLOSE F-H-3 Drain 99003/1/B8

HV-H-1C H OPEN PDT-FH3-1 Isolation 99003/1/B8

HV-H-3C H OPEN PDT-FH1-1 Isolation 99003/1/B7

H-3A H CLOSE F-H-1 Vent 99003/1/B7

H-4 H **OPEN/CLOSE F-H-1 Outlet Isolation 99003/1/B7

H-7 H OPEN PI-FH1-2 Isolation 99003/1/B7

HV-H-4A H OPEN PDT-FH1-1 Isolation 99003/1/B7

H-3 H **OPEN/CLOSE F-H-1 Inlet Isolation 99003/1/B7

H-3B H CLOSE F-H-1 Drain 99003/1/B7

H-6B H CLOSE F-H-2 Drain 99003/1/B6

H-5A H OPEN PI-FH1-1 99003/1/B7

H-5 H **OPEN/CLOSE F-H-2 Inlet Isolation 99003/1/B7

HV-H-5B H OPEN PDT-FH2-1 Isolation 99003/1/B6

H-6A H CLOSE F-H-2 Vent 99003/1/B6

HV-H-6C H OPEN PDT-FH2-1 Isolation 99003/1/B6

H-6 H **OPEN/CLOSE F-H-2 Outlet Isolation 99003/1/B6

Condenser Room

***1-82 1 OPEN/CLOSE F-C-5 Inlet 99003/1/F2

1-83 1 CLOSE F-C-5 Vent 99003/1/F2

1-84 1 CLOSE F-C-5 Drain 99003/1/F2

***1-85 1 OPEN/CLOSE F-C-5 Outlet 99003/1/F2

***1-86 1 OPEN/CLOSE F-C-4 Inlet 99003/1/F2

1-87 1 CLOSE F-C-4 Drain 99003/1/F2

1-88 1 CLOSE F-C-4 Vent 99003/1/F2

***1-89 1 OPEN/CLOSE F-C-4 Outlet 99003/1/F2

* Indicates Component Status Seal has been installed on the valve. Red indicates open, green indicates closed.

** If F-H-1 is to be valved in, open H-3 and H-4 and close H-5 and H-6

OR

If F-H-2 is to be valved in, open H-5 and H-6 and close H-3 and H-4.

*** If either F-C-5 or F-C-4 is to be valved in, open 1-82 and 1-85 and close 1-86 and 1-89

OR

Open 1-86 and 1-89 and close 1-82 and 1-85.

Page 35: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

35 of 39

Checklist 1 - Seal Water System Valve Lineup (Cont.)

Valve Location Position Description P&ID Location Operator Initial Date

Condenser Room (Cont.)

1-77 1 OPEN P-C106 Isolation 99003/1/F2

1-78 1 OPEN PI-C106-1 Isolation 99003/1/F2

1-79 1 OPEN PI-C106-1 Isolation 99003/1/F2

1-90 1 CLOSE Auxiliary Conn. 99003/1/F2

1-91 1 OPEN P-C106 Isolation 99003/1/F2

1-92 1 OPEN P-C106 Isolation 99003/1/F2

*HV-PA-

HY-CA1-

10

4 OPEN Process Air to HV-CA1-10 99001/1/F2

4-CA1-20 4 OPEN PT-CA1-20 Isolation 99003/1/C5

4-51 4 CLOSE Process Condensate Recycle

Prime Valve 99003/1/C5

4-52 4 CLOSE BFP-CA1-1 Test Ports 99003/1/D6

4-53 4 CLOSE BFP-CA1-1 Test Ports 99003/1/D6

4-54 4 CLOSE BFP-CA1-1 Test Ports 99003/1/D6

4-55 4 CLOSE BFP-CA1-1 Test Ports 99003/1/D6

*4-50B 4 OPEN BFP-CA1-1 Isolation 99003/1/C5

5-11 5 CLOSE Decon to P-C-105 & P-C-

105A 99003/1/C5

5-12 5 CLOSE Decon to P-C-105 & P-C-

105A 99003/1/C5

5-13 5 CLOSE Auxiliary Decon Connection 98996/1/C7

5-14 5 OPEN FRW to F-CA1-L/R 99003/1/C5

5-15 5 OPEN FRW to P-C-105 & P-C-105A 99003/1/B4

5-16 5 OPEN P-C-105 Isolation 99003/1/B4

5-17 5 OPEN P-C-105A Isolation 99003/1/B4

5-18 5 OPEN P-C-105 Isolation 99003/1/B4

5-18A 5 OPEN P-C-105/P-C-105A Bypass 99003/1/B4

5-18B 5 OPEN P-C-105/P-C-105A Bypass 99003/1/B4

5-19 5 OPEN P-C-105A Isolation 99003/1/B4

5-19A 5 OPEN PI-CA1-1/2 Isolation 99003/1/C4

*5-20 5 OPEN FRW to F-CA1-L/R 99003/1/D5

5-117 5 OPEN Sock Filters to PDT-CA1-3 99003/1/3C

5-118 5 OPEN Sock Filters to PDT-CA1-3 99003/1/3C

5-21 5 CLOSE F-CA1-R Drain 99003/1/C4

* Indicates Component Status Seal has been installed on the valve. Red indicates open, green indicates closed

Page 36: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

36 of 39

Checklist 1 - Seal Water System Valve Lineup (Cont.)

Valve Location Position Description P&ID Location Operator Initial Date

Condenser Room (Cont.)

5-21A 5 CLOSE F-CA1-L Drain 99003/1/C5

5-21B 5 **F-CA1-L or F-

CA1-R F-CA1-L/R 3-way Inlet 99003/1/C5

5-21C 5 **F-CA1-L or F-

CA1-R F-CA1-L/R 3-way Outlet 99003/1/C5

5-22 5 CLOSE F-CA1-L/R Bypass 99003/1/C5

5-23 5 OPEN FIT-CA1-1 Isolation 99003/1/C4

5-26 5 CLOSE FIT-CA1-1 Bypass 99003/1/C4

5-27A 5 OPEN FIT-CA1-1 Isolation 99003/1/C4

5-29A 5 OPEN FIT-CA1-2 Isolation 99003/1/C4

5-29 5 OPEN FIT-CA1-2 Isolation 99003/1/C4

5-30 5 CLOSE FIT-CA1-2 Bypass 99003/1/C4

5-34 5 OPEN PI-CA1-2 Isolation 99003/1/C3

5-34A 5 OPEN PT-CA1-10 Line 99003/1/C3

5-35 5 OPEN PT-CA1-1 Isolation 99003/1/C3

5-35A 5 OPEN PT-CA1-9 Line 99003/1/C3

5-SW-1 5 CLOSE Tygon Tubing to Clean Sock

Filters 829563/2/D2

5-43 5 CLOSE FRW to PB-2 SEAL 98989/1/D4

*5-45 5 CLOSE Cooling Water to PB-1 (up

high) 98988/2/D5

5-45A 5 CLOSE Cooling Water to PB-1 98988/2/D5

5-69C 5 CLOSED C-A-1 Spray Down 99003/1/E7

5-71 5 CLOSE FRW to Lower De-

entrainment Pad Sprays 99003/1/E8

5-76 5 CLOSE FRW to Lower De-

entrainment Pad Sprays 99003/1/E8

5-97 5 CLOSE FRW to Upper De-

entrainment Pad Sprays 99003/1/E5

5-175 5 OPEN PT-CA1-10 Isolation 99003/1/D3

5-174 5 OPEN PT-CA1-9 Isolation 99003/1/D3

* Indicates Component Status Seal has been installed on the valve. Red indicates open, green indicates closed. ** Ensure 5-21B and 5-21C are on the same sock filter

Page 37: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

37 of 39

Signature Sheet 1

Participating personnel enter their signature, printed name (first & last), and initials below.

Signature Printed Name (First & Last) Initials

Page 38: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

38 of 39

Figure 1 - PB-1 and PB-2 Seal Water System

FIT-CA1-1 To PT-CA1-9

PI-CA1-15-35A

5-35

5-455-26

5-23 5-27A

¾ in. FRW-652-M9 to PB-1 seals

PCV-CA1-1

FIT-CA1-2 To PT-CA1-10

PI-CA1-25-34A

5-34

5-435-30

5-29A 5-29

¾ in. FRW-651-M9 to PB-2 seals

PCV-CA1-2

To TK-C1005-18A

5-18B

PCV-CA1-1/2

P-C-105A

RemovableSpool

5-19A

PI-CA1-1/2

5-175-195-185-16

P-C-105

CATCH PAN

5-21

5-21A

ToDrain

5-21B

5-21C

HV-CA1-10

5-20

5-135-11

5-22

5-14

5-15

From PC

From FRW

Ronnigen Peter Micropore Filters

Model D-1118-SS Fabric Filter

1-3 to 10 micron retention

1-½ in. FRW-650-M5

2 in. DECON-801-M9

ACME

METER

CO.

ACME

METER

CO.

ACME

METER

CO.

ACME

METER

CO.

Page 39: Tank Farm Plant Operating Procedure 242-A Evaporator USQ ... · This procedure provides instructions for operating and cleaning the PB-1 and PB-2 Seal Water System and filters. 1.2

Operate PB-1 and PB-2 Seal Water Filter System

Type

CONTINUOUS Document No.

TO-600-210 Rev/Mod

L-7 Release Date

04/05/2018 Page

39 of 39

Figure 2 - PB-1 and PB-2 Seal Water Filter Assembly

A B (outlet only) C (inlet only) D

5-21A

DRAIN

5-21

F-CA1-LF-CA1-R

INLET5-21B

PI-FCA1L-1PI-FCA1R-1

PI-FCA1R-2

PI-FCA1L-2

OUTLET5-21C

ACME METER CO.

ACME METER CO.