Top Banner
Tank Closure Cesium Removal (TCCR) Technology Demonstration Update Jeffrey Bentley Waste Disposition Programs Division, Savannah River Operations Office Status Update November 14, 2017 Pen Mayson Senior Project Manager, TCCR, Savannah River Remediation, Inc
10

Tank Closure Cesium Removal (TCCR) Technology Demonstration Update - SRS … · 2018-06-18 · Tank Closure Cesium Removal (TCCR) Technology Demonstration Update. Jeffrey Bentley.

Mar 10, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tank Closure Cesium Removal (TCCR) Technology Demonstration Update - SRS … · 2018-06-18 · Tank Closure Cesium Removal (TCCR) Technology Demonstration Update. Jeffrey Bentley.

Tank Closure Cesium Removal (TCCR) Technology Demonstration Update

Jeffrey BentleyWaste Disposition Programs Division, Savannah River Operations Office

Status UpdateNovember 14, 2017

Pen MaysonSenior Project Manager, TCCR, Savannah River Remediation, Inc

Page 2: Tank Closure Cesium Removal (TCCR) Technology Demonstration Update - SRS … · 2018-06-18 · Tank Closure Cesium Removal (TCCR) Technology Demonstration Update. Jeffrey Bentley.

Objectives• Design a modular, at-tank, ion exchange (IX) technology

demonstration designed that can:― Treat salt waste by removing cesium― Increase salt processing capability― Enhance bulk waste removal efforts― Be operated by Site staff once complete

• Leverage commercial supplier expertise and contemporary Fukushima experience

• Improve flexibility by exploring alternatives for off-site disposition of used resin

• Address the Dispute Resolution Agreement with the State of South Carolina, dated October 31, 2016

• Achieve completion of Tank 10 Bulk Waste Removal Efforts under the Federal Facility Agreement

Tank Closure Cesium Removal

2

Shielded Ion Exchange Column(Dimensions 12’x5.5’ Shielded)

Page 3: Tank Closure Cesium Removal (TCCR) Technology Demonstration Update - SRS … · 2018-06-18 · Tank Closure Cesium Removal (TCCR) Technology Demonstration Update. Jeffrey Bentley.

Technology Demonstration

• Demonstration planned for May – Aug 2018.• Will treat approx 750 kgal (~0.16 Ci/gal) from Tank 10.• Each IX Column will be loaded with approx 25k Curies.• Will demonstrate a decontamination factor ≥ 1000.• Gather actual processing data during treatment:

– Effectiveness of pre-filtration– Variations in processing rate– Measurement of real rad rates– Optimize feed control strategy

• Evaluate technical feasibility and economic efficiency report by September 30, 2019 for continued operations and additional TCCR.– Decontamination Factor– Worker and public safety, Compliance with applicable regulations– Ability to result in beneficial (accelerated) liquid waste disposition

3

TCCR Module Enclosure Assembly(Enclosure Dimensions 40’x10’)

Page 4: Tank Closure Cesium Removal (TCCR) Technology Demonstration Update - SRS … · 2018-06-18 · Tank Closure Cesium Removal (TCCR) Technology Demonstration Update. Jeffrey Bentley.

TCCR Unit 1: Conceptual Process Diagram

4

Tran

sfer

pum

p an

d lin

e to

fla

nge

conn

ectio

n (b

y SR

R)

Efflu

ent l

ine

to Ta

nk 11

H fro

m

flang

e co

nnec

tion

(by

SRR)

Interim Safe StorageSystem

Tank Closure Cesium Removal

(TCCR) Unit

Utilities (by SRR) (i.e, electricity,

water)

containment

Salt Dissolution Unit (by SRR)

Systems, structures, and components inside the dashed line (including containment) by Supplier

Tank 10H Tank 11H Tank 50H

dissolved salt

Cs-rich media & vessels

Interim Safe Storage(at SRS)

Transportto ISS

Pre-

filter

flus

h re

turn

TCCR Concept – Tank 10 Demonstration Operations Diagram

DissolvedSalt

DecontaminatedSalt Solution

SaltstoneProduction

Facility

Page 5: Tank Closure Cesium Removal (TCCR) Technology Demonstration Update - SRS … · 2018-06-18 · Tank Closure Cesium Removal (TCCR) Technology Demonstration Update. Jeffrey Bentley.

SRS - H-Area Tank Farm Layout

CTS – Concentrate Transfer System

Page 6: Tank Closure Cesium Removal (TCCR) Technology Demonstration Update - SRS … · 2018-06-18 · Tank Closure Cesium Removal (TCCR) Technology Demonstration Update. Jeffrey Bentley.

H-Area Tank Farm TCCR Unit 1 Layout

6

Page 7: Tank Closure Cesium Removal (TCCR) Technology Demonstration Update - SRS … · 2018-06-18 · Tank Closure Cesium Removal (TCCR) Technology Demonstration Update. Jeffrey Bentley.

Tank Closure Cesium Removal Status

• Project Status– A design/build contract to Westinghouse Electric

Company was awarded in July 2016– TCCR unit fabrication is complete

• Process Skid• Ventilation Skid• Control Skid

– System assembly is complete– System testing is in progress– Delivery of TCCR Unit to SRS is expected in late November– SRR Balance of Plant (BOP)/utility activities are ongoing– Safety Basis development is in progress– Regulatory approvals progressing

• Received DOE-HQ concurrence for post-SWPF operations on August 10, 2017• Transmitted letter to SCDHEC to add TCCR stream to Saltstone disposal permit• Construction permit approved by SCDHEC on October 31, 2017• Feasibility study to follow demonstration (due September 30, 2019)

7

TCCR Equipment Fabrication Photos(Above)

SRR TCCR Preparation Photos(Above)SWPF – Salt Waste Processing Facility SCDHEC – South Carolina Dept. of Health & Environmental Control

Page 8: Tank Closure Cesium Removal (TCCR) Technology Demonstration Update - SRS … · 2018-06-18 · Tank Closure Cesium Removal (TCCR) Technology Demonstration Update. Jeffrey Bentley.

TCCR Equipment Modular Units

8

Process Enclosure

Ventilation Skid

Process Enclosure Internals Control Skid

Page 9: Tank Closure Cesium Removal (TCCR) Technology Demonstration Update - SRS … · 2018-06-18 · Tank Closure Cesium Removal (TCCR) Technology Demonstration Update. Jeffrey Bentley.

IX Columns and Shield Assemblies

9

IX Columns and Shield Assemblies

Page 10: Tank Closure Cesium Removal (TCCR) Technology Demonstration Update - SRS … · 2018-06-18 · Tank Closure Cesium Removal (TCCR) Technology Demonstration Update. Jeffrey Bentley.

TCCR Benefits/Opportunities

10

• Increase salt throughput and accelerate waste removal from old style tanks.• Enable salt waste treatment when SWPF is down.• Demonstrates deployment of modularized, targeted treatment capability.• Large-scale radioactive test bed to demonstrate related technologies (e.g., elutable

resins).• Capability to treat unfavorable waste streams anticipated at the end of the program, in

lieu of SWPF.– Could eliminate DWPF recycle returns to the Tank Farm.

• Applicability to other DOE complex sites.– Interest from Low Activity Waste- Pre-treatment at Hanford