TALOJA CETP CO-OP. SOCIETY LTD th 19 ANNUAL REPORT FINANCIAL YEAR 2012 - 13 “LET US DETERMINE TO PROTECT GREEN EARTH & CONSERVE IT’S PROSPERITY” Salil Raikar Hon. Treasurer Satish Anand Shetty Hon. Chairman Sandeep Dongre Hon. Director Rajkumar Aurora Hon. Director Nilesh Gore Hon. Director Anil Ishi Hon. Director Jagdish Gaikwad Managing Director Vidya S. Karkun Hon. Director Preeti Satish Shetty Hon. Director S. N. Karkun Hon. Director Dilip Parulekar Hon. Director Prakash Chavan MIDC Nominee (Reg. No. RGD/PWL/GNL/(O)/509) TCETP TALOJA CETP CO-OP. SOCIETY LTD
24

TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

May 29, 2018

Download

Documents

vonguyet
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TALOJA CETP CO-OP. SOCIETY LTDth19 ANNUAL REPORT

FINANCIAL YEAR 2012 - 13

“LET US DETERMINE TO PROTECT GREEN EARTH & CONSERVE IT’S PROSPERITY”

Salil Raikar Hon. Treasurer

Satish Anand Shetty Hon. Chairman

Sandeep Dongre Hon. Director

Rajkumar Aurora Hon. Director

Nilesh Gore Hon. Director

Anil Ishi Hon. Director

Jagdish GaikwadManaging Director

Vidya S. Karkun Hon. Director

Preeti Satish Shetty Hon. Director

S. N. Karkun Hon. Director

Dilip Parulekar Hon. Director

Prakash Chavan MIDC Nominee

(Reg. No. RGD/PWL/GNL/(O)/509)

TCETP

TALOJA CETP CO-OP. SOCIETY LTD

Page 2: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

Taloja CETP Co-op. Society Ltd.TCETP

TCETP

FINANCIAL YEAR 2012 - 13

THE BOARD OF DIRECTORS OF TALOJA CETP CO-OP. SOCIETY LTD.

(Period 2011-12 to 2015-16)

Sandeep Dongre Hon. Director

Rajkumar Aurora Hon. Director

Nilesh Gore Hon. Director

Anil Ishi Hon. Director

Vidya S. Karkun Hon. Director

Preeti Satish Shetty Hon. Director

S. N. Karkun Hon. Director

Dilip Parulekar Hon. Director

G. L. RomanGeneral Manager

Prakash ChavanNominee Director

Salil Raikar Hon. Treasurer

Jagdish GaikwadManaging Director

Satish Anand Shetty (Anna) Hon. Chairman

Page 3: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

TCETP

Taloja CETP Co-op. Society Ltd.(Reg. No. RGD/PWL/GNL/(O)/509)

Taloja CETP Co-op. Society Ltd.

19th Annual Report

2012 - 2013

Page 4: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

Explaining the Safety Rules on Celebration of Safety Week on 9th March 2013 at CETP Conference

Welcome of RO on World Environment Day on 7th June 2013, at CETP Taloja

Hall Briefing the members on World Environment Day on 7th June 2013 at CETP Taloja

Hall Briefing the members on World Environment Day on 7th June 2013 at CETP Taloja

Meeting of the Federation of CETPs in Maharashtra on 7th January 2013, at CETP Conference Hall

Celebration of World Environment Day, on 7th June 2013, at CETP Taloja

Secondary Clarifier at Plant Explaining the Safety rules on the Safety Week, 9th March 2013, at CETP Conference Hall

Page 5: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

Board of Directors

1 Shri. Satish Anand Shetty (Anna) Hon. Chairman Jayashree Galva Pvt. Ltd.

2 Shri. Ashok G. Kamale till

31.10.2012 Hon. Secretary United Breweries Ltd.

3 Shri. Salil G. Raikar Hon. Treasurer Ravi Dyeware Co. Ltd.

4 Shri. Jagdish M. Gaikwad Hon. Mg. Director A. A. Chemicals

5 Shri. Anil P. Ishi Hon. Director Naik Frozen Foods P Ltd.

6 Shri. Nilesh N. Gore Hon. Director Rexam HTW Bev. Can (I) L.

7 Shri. Sandeep A. Dongre Hon. Director Sanchita Marine Prod. P Ltd

8 Shri. Rajkumar C. Aurora Hon. Director Highrise Chem. Ind. P. Ltd.

9 Shri. Dilip B. Parulekar Hon. Director V. S. Industries

10 Shri. S. N. Karkun Hon. Director Sinmak Chemicals

11 Smt. Vidya S. Karkun Hon. Director Maco Pharma Pvt.Ltd.

12 Smt. Preeti S. Shetty Hon. Director Jayashree Galva Pvt Ltd.

13 Shri. Prakash Chavan MIDC Nominee Ex. Engineer, MIDC Div, Alibag

Period of five years from 2011-12 to 2015-16

Sr.No.

Name Designation Company

ANNUAL REPORT 2012-2013

Taloja CETP Co-op. Society Ltd.TCETP

1

Secretariat:Shri. G. L. Roman General Manager Mrs. Manju D. Singh Office Assistant

Laboratory:Mrs. Naaz R. Hafiz Laboratory In Charge

Plant:Mr. J. E. Kadam Environment EngineerMs. A. A. Tamboli -“-

Accounts:Shri. Ajit M. Gaikwad Sr. Accountant

Auditors:M/s. R.R. Jakhotia & Co. Chartered Accountants

Reuse, Reduce, Recycle and make the world a better place.

Page 6: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

Note by Chairman

Dear Members,

After the struggle on the financial and technical fronts in last 3 years, we with your

strong support have been able to overcome the financial issues completely.

On the technical front also we have taken efforts to improve the situation and have been

successful to some extent.

To improve the plant performance we have completed following things:

1. Reconstruction of old Sludge Drying Bed of 1000m2 area.

2. Installed new Decanter Centrifuge of 25 m3/ hr capacity

3. Completed New Office Administrative Building work.

4. The work of renewation of Old Office Building and Chemical House is in progress.

The diffusers in aeration tank are old and affecting the performance. To replace the diffusers

is necessary.

Also considering inadequate treatment facility available to treat 22.5 MLD effluent,

upgradation of CETP has been proposed but yet to be taken up. We will get the Detailed

Project Report (DPR) approved and will implement the upgradation programme at the

earliest.

Thank you once again for your support and expecting your cooperation in the future too.

Satish Anand Shetty (Anna)

Hon. Chairman

Annual Report 2012 - 2013

ANNUAL REPORT 2012-2013

Taloja CETP Co-op. Society Ltd.TCETP

2Nature Protects if it is protected

Page 7: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

To,

The Members, TALOJA CETP CO-OP. SOCIETY LTD, MIDC TALOJA.

Notice is hereby given that the “19th ANNUAL GENERAL BODY MEETING OF THE MEMBERS OF TALOJA CETP CO-OP. SOCIETY LIMITED”, will be held on Saturday, 28th September, 2013 at 11.30 a.m. at “Hotel Pallavi”, Roadpali, Navi Mumbai - 410208 to transact the following business.

The meeting will be followed by lunch.

1. Welcome address by Hon. Chairman.2. To read and confirm the minutes of AGM held on 26/10/2012 and EOGM held on 27.4.2013.3. Hon. Managing Director to read the Progress Report, in respect of state of affairs of the Society

for the year ended on 31/03/2013.4. To read and adopt the internally Audited Statement of Accounts together with the Balance

Sheet of Taloja-CETP Co-op. Society Ltd. for the year ended on 31/03/2013 and the reports of Board and Auditors thereon.

5. To appoint the Internal Auditors for the Audit of the financial year 2013-2014 and to decide remuneration for the same.

6. To appoint the Statutory Auditors for the Audit of the financial year 2013-2014.7. To discuss and approve the status of up-gradations proposed in TCETP. 8. To ratify the newly appointed Board of Directors by the society.9. To consider any other business with permission of the chair.10.Vote of thanks.

G. L. RomanGeneral Manager.

Date: 31/08/2013 Place: MIDC Taloja

N. B.

1. If due to lack of quorum, the meeting has to be adjourned, the adjourned meeting will be held at the same venue, after half an hour. If at the said adjourned meeting, still there is no quorum the members present shall constitute the quorum and the meeting shall proceed, with the business as set in the Agenda.

2. Members desirous of bringing any issue on above subject or before the A.G.M. or seek any clarification or suggestions, are requested to submit the same in writing latest by 23.09.2013 at the Society Office.

3. Copies of the Annual Report and Statement of Accounts for 2012-13 are enclosed herewith and members are requested to bring the same at the meeting.

ANNUAL REPORT 2012-2013

NOTICE

Taloja CETP Co-op. Society Ltd.TCETP

3Save Water and Secure Future

Page 8: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

Dear Members,

The Managing Director has pleasure in presenting his report on the working of the Society during the last

financial year ending on 31st March 2013 & also the audited financial statement for the year ended on

31st March 2013.

• MEMBERSHIP : The total contribution towards project cost received as on 31st March, 2013 is Rs.5,06,98,963/-.

The number of member industries as on the same date is 941 comprising Large, Medium and

Small Scale Industries.

• BOARD OF DIRECTORS:The Board of Directors met on 13 occasions during the year. Many important decisions regarding

the Society affairs and operation of the CETP were taken.

• STATUS OF THE CETP:

PLANT STATUS :

The CETP of 22.5 MLD Design Capacity is operational. On an average 19 MLD effluents was received and treated in CETP.

2192 MT of solid waste was generated during the year from effluent treatment process and sent

to M/s. Mumbai Waste Management Ltd. for disposal by secured landfill.

To improve the sludge handling facility damaged sludge drying beds of 1000m2 area were reconstructed.

The Regional Officer, Maharashtra Pollution Control Board vide letter dtd. 4.12.2012 has constituted a coordination committee of CETP, MPCB, MIDC, TMA and TIA representatives by the orders of Mumbai High Court in the PIL No.17/2011.

• ACKNOWLEDGEMENT:

The Taloja CETP wishes to put on record thanks to the following Corporations / Dept. and their staff, for their valuable guidance and co-operation from time to time.

1. Maharashtra Industrial Development Corporation (MIDC).

2. Maharashtra Pollution Control Board (MPCB),

3. Taloja Manufacturers’ Association (TMA).

4. Taloja Industries Association (TIA).

5. Industrial Development Bank of India, (IDBI), Mumbai

DIRECTORS REPORT

ANNUAL REPORT 2012-2013

TCETP

4

Taloja CETP Co-op. Society Ltd.

Waste Water today, Live in a Desert Tomorrow.

Page 9: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

ANNUAL REPORT 2012-2013

Taloja CETP Co-op. Society Ltd.TCETP

5

6. IDBI Bank, Taloja Branch.

7. RDCC Bank, Panvel Branch.

8. Ministry of Environment and Forests (MOEF), New Delhi.

9. Ministry of Environment and Forests (MOEF), Mumbai.

10. District Dy. Registrar, Alibag, Raigad.

11. The Asst. Registrar of Co-op. Societies, Panvel.

12. M/s R.R. Jakhotia & Co., Chartered Accountants, Panvel.

13. Asst. Commissioner of Labour, Panvel.

14. Factory Inspector, DISH, Belapur, Navi Mumbai.

15. Taloja & Kalamboli Police Stations.

16. Maharashtra State Electricity Distribution Company Limited (MSEDCL).

17. All Contractors working with CETP.

18. The Society also thanks the Office Staff, who has whole-heartedly co-operated in its functioning.

Jagdish M. GaikwadHon. Managing Director

Put a stop to the drops to Save Water till it will Save you later

Page 10: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

REPORT OF THE AUDITOR

I, the undersigned R.R. JAKHOTIA have examined the attached Balance Sheet as on 31/03/2013 and

the Income and expenditure account for the co-operative year 2012-2013 of TALOJA CETP CO-OPERATIVE

SOCIETY LTD. and report that

1. I have obtained all the information and explanations which to the best of my knowledge and

belief were necessary for the purpose of my audit.

2. In my opinion and to the best of my information and explanations given to me:

a) The Balance sheet and Income & Expenditure A/c are in the agreement with the books of

accounts and Balance Sheet gives True and Fair view of the State of Affairs of the society as on

31/03/2013 and the Income & Expenditure A/c gives true and clear view of surplus of the year

01/04/2012 to 31/03/2013.

b) Accounts give information required by Co-operative Act and present true and fair view of

financial transactions of the society. No personal expenses are included or no loan is shown as

deposit.

c) In my opinion proper books of accounts as required by Maharashtra State Co-operative Rules and

Byelaws have been kept by the society.

d) Society has been awarded Audit classifications for this co-op. Year ___ B ___ Class.

SCHEDULES OF RULE 69 OF M.C.S RULES

SCHEDULE 1: Transactions involving infringements of the provisions of M.S.C. Act and Rules and Bye-laws.

SCHEDULE 2: Particulars of sums which ought to have been brought into account.

SCHEDULE 3: Improper and irregular payments.

SCHEDULE 3A : Irregularities in the realization of money

SCHEDULE 4 : List of doubtful debts

SCHEDULE 4A: Particulars of movable and immovable properties and other assets considers as doubtful for realization.

Refer Report

Nil

Nil

Nil

Nil

Nil

For R. R. JAKHOTIA & CO.Chartered Accountants

R. R. JAKHOTIAPartnerM. No. 40681

Date: 24/09/2013Place: Panvel

ANNUAL REPORT 2012-2013

Taloja CETP Co-op. Society Ltd.TCETP

6Water is Life, Save Water Save Life.

Page 11: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

ANNUAL REPORT 2012-2013

Taloja CETP Co-op. Society Ltd.TCETP

7

SIGNIFICANT ACCOUNTING POLICIES

BASIS OF PREPARATION OF FINANCIAL STATEMENTS:

The financial statements have been prepared in accordance with the accounting standards specified

by the institute of Chartered Accountants of India.

ACCOUNTING CONVENTION & REVENUE RECOGNITION:

The financial statements have been prepared in accordance with historical cost convention.

Revenues and expenses are accounted for on an accrual basis.

FIXED ASSETS:

Fixed assets are stated at the cost of construction / acquisition, improvement and installations.

Pre-operating and pre-opening expenses are capitalized. Also interest during construction period to

finance fixed assets is capitalized. During the year purchased following fixed assets:

1. Office Equipment Rs.5,02,181.00

2. Computer Rs.38,000.00

3. Building & Civil work Rs.1,04,60,995.00

4. Electrical Equipment Rs.1,03,843.00

5. Mechanical Equipment Rs.40,26,091.00

6. Laboratory Equipment Rs.3,52,954.00

7. Plant & Machinery Rs.14,20,543.00

8. PAC Storage Tank Rs.11,50,000.00

DEPRECIATION:

Depreciation is provided during the year as per the rates prescribed under the income tax act.

CONTINGENT LIABILITIES:

There are no claims of contingent nature against the society.

INVESTMENTS:

Investments held by the society are stated at cost along with accrued interest on it, except deposit

with MTNL, MIDC, MSEB and Mumbai Waste Management Ltd.

RETIREMENT BENEFITS:

Ex-gratia Rs. 2, 29,018/- is provided during the year 2012 – 2013.

TDS:

TDS deducted and paid to the Government Authorities. For R. R. JAKHOTIA & CO.Chartered Accountants

R. R. JAKHOTIAPartnerM. No. 40681

Date:

Place: Panvel

24.08.2013

Deteriorating Nature Needs Our Attention, Plant more Trees and Stop Pollution

Page 12: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETPFor R. R. JAKHOTIA & CO.Chartered Accountants

R. R. JAKHOTIAPartnerM. No. 40681

Date: 24/08/2013

Place: Panvel

NOTES ON ACCOUNTS

1. Admission Fee and Contribution towards capital cost:

Admission fee and contribution received from members towards capital cost are credited to

reserve fund. Also unclaimed dividend is credited to reserve funds.

1. Land is acquired on lease from MIDC for a period 99 years at a concessional rate of Re. 1/-

per sq. meter.

2. Internal Auditors remuneration (including service tax @12.36%)

Internal Tax works fees Rs. 19663/-

Tax audit & other work fees Rs. 19663/-

Total Rs. 39326/-

3. No provisions for income tax is made as the profits are exempted under mutuality concept of

the Income Tax Act, water treatment system, sanitation and sewerage system or solid waste

management system are infrastructure development activity.

4. Previous Years figures are regrouped wherever necessary.

ANNUAL REPORT 2012-2013

Taloja CETP Co-op. Society Ltd.TCETP

8Increasing Pollution adds to our Worry, Don't cut trees as this is early Glory.

Page 13: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

ANNUAL REPORT 2012-2013

Taloja CETP Co-op. Society Ltd.TCETP

9

SA

TIS

H S

HE

TT

Y

CH

AIR

MA

N

JAG

DIS

H M

. G

AIK

WA

D

MA

NA

GIN

G D

IRE

CT

OR

AS

HO

K K

AM

AL

E

SE

CR

ETA

RY

SA

LIL

RA

IKA

R

TR

EA

SU

RE

R

G.L

. R

OM

AN

GE

NE

RA

L M

AN

AG

ER

One Goal,One Mission, Clean Environment is our Mission.

Page 14: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

ANNUAL REPORT 2012-2013

Taloja CETP Co-op. Society Ltd.TCETP

10Production is a must, Environment Protection is a must.

TCETP

Page 15: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

11ANNUAL REPORT 2012-2013Insure Environment Protection, Secure Future Generation.

Taloja CETP Co-op. Society Ltd.

Page 16: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

12ANNUAL REPORT 2012-2013

SATISH SHETTY

CHAIRMAN

JAGDISH M. GAIKWAD

MANAGING DIRECTOR

ASHOK KAMALE

SECRETARY

SALIL RAIKAR

TREASURER

G.L. ROMAN

GENERAL MANAGER

Taloja CETP Co-op. Society Ltd.

(R.R. JAKHOTIA)

Environment is a Gift of Nature...... Let us Preserve it.

Page 17: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

13ANNUAL REPORT 2012-2013One Goal,One Mission, Clean Environment is our Mission.

Taloja CETP Co-op. Society Ltd.

Page 18: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

14ANNUAL REPORT 2012-2013A Drop of Water is Worth more than a Sack of Gold to a Thirsty Man.

Taloja CETP Co-op. Society Ltd.

Page 19: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

15ANNUAL REPORT 2012-2013Nature Protects if it is protected

Taloja CETP Co-op. Society Ltd.

Page 20: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

16ANNUAL REPORT 2012-2013Put a stop to the drops to Save Water till it will Save you later

Page 21: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

Secondary Clarifier at Plant 2

Secondary Clarifier at Plant 1

CETP Plant - 2 ( 10 MLD)

Page 22: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

Tree Plantation on World Environment Day on 7th June 2013, at CETP Taloja

Tree Plantation by TCETP Staff on World Environment Day on 7th June 2013, at CETP Taloja

Tree Plantation by TCETP Staff on World Environment Day on 7th June 2013, at CETP Taloja

Tree Plantation on World Environment Day on 7th June 2013, at CETP Taloja

Tree Plantation on World Environment Day on 7th June 2013, at CETP TalojaTree Plantation on World Environment Day

on 7th June 2013, at CETP Taloja

Welcome of Guest on Celebration of Safety Week, on 9th March 2013 at CETP

Laboratory

Page 23: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETPBriefing the member Industries in the meeting taken for IDS on 30th April, 2013 at CETP Conference Hall

Overview of the CETP Plant from Google Earth

Celebrating Independence Day 15th August 2013, at CETP Taloja

Celebrating Independence Day 15th August 2013, at CETP Taloja

Celebrating Independence Day 15th August 2013, at CETP Taloja

Celebration of Republic Day, 26th Janurary 2013 at CETP Taloja

Celebration of Republic Day, 26th Janurary 2013 at CETP Taloja

Secondary Clarifier at Plant

Page 24: TALOJA CETP CO-OP. SOCIETY LTD BALANCE SHEET 2012-13.pdf · TALOJA CETP CO-OP. SOCIETY LTD 19th ANNUAL REPORT ... The total contribution towards project cost received as on 31st March,

TCETP

TCETP

Briefing the Member Industries in 18th AGM on 26th October 2012, at Hotel pallavi a’vida

Briefing the member Industries in 18th AGM on 26th October, 2012 at Hotel Pallavi a ‘vida

Briefing the member Industries in EOGM on 27th April,2013 at CETP Conference Hall

Briefing the member Industries in 18th AGM on 26th October, 2012 at Hotel Pallavi a ‘vida

Briefing the member Industries in EOGM on 27th April,2013 at CETP Conference Hall

Visit of Shri Sonttake, RO MPCB on 2nd May 2013, at CETP Taloja

Visit of Shri Sonttake, RO MPCB on 2nd May 2013, at CETP Taloja

Visit of Shri Sonttake, RO MPCB on 2nd May 2013, at CETP Taloja

P-24 & G 8, MIDC Taloja, Navi Mumbai - 410 208. Tel.: 022-27402658/27402659Telefax : 022-27410706 Email : [email protected], Website : www.talojacetp.com

(Reg. No. RGD/PWL/GNL/(O)/509)