Top Banner

of 15

Taiwan Semiconductor Manufacturing Company (1)

Feb 22, 2018

Download

Documents

Jie Jessie Zhao
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    1/15

    Taiwan Semiconducto

    ManufacturingCompany

    Team B

    Megan OBrien, Lin Yue, Yijiang Xu, Jie Zao, !"aBandi#ade$ar

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    2/15

    %" te emergency order and increa"production #o&ume good for tecompany or 'ad()eiteremergency order nor increa"ing production #o&ume i" 'ad for te comincrea"e uti&i+ation and dige"t te ece"" capacity-

    %n ti" part, it mean" reduce co"t-

    But "ome too& tat in#oed in )./ node proce"", referred a" Cu0C1, a" a&re

    wit 2334 5ti&i+ation

    %f adding emergency order and increa"ing production "imu&taneou"&y, te com"urpa"" te capacity of certain too&- Tu", oter production p&an wi&& 'e a6ec

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    3/15

    The original tool utilization of N65 and N90 within 30 days

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    4/15

    Adding Emergency

    Number of repeats of N65 changed from 6

    The utilization of equipment function u!" reache

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    5/15

    Increasing P

    #emand loading of N65 changed from 33$000 to

    The utilization of equipment function u!" reache

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    6/15

    Adding Emergency Order and Increasing

    The utilization of equipment function u!" reache

    The utilization of equipment function u'" reach

    The utilization of equipment function oating reach

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    7/15

    7at are te $ey "cedu&ing a""umption" tat a#e 'een made&oo$ at te jo' "op organi+ation of 8a' 29, can you out&ine "om"imp&ifying a""umption" or euri"tic" tat are u"ed to manage comp&eity( 7at do te manager" of 8a' 29 optimi+e(

    :ey !""umption" )o oter cu"tomer" wi&& re;uire additiona& product

    %n order to ca&cu&ate too& uti&i+ation a few a""umptionmade

    0ac too& operate" at "&ac$ for ecange"?

    Too&" a#ai&a'&e too& maintenance?

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    8/15

    Loo$ at te B0OL 'o in 0i'it A for te )./ and )

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    9/15

    Loo$ at te B0OL 'o in 0i'it A for te )./ andproce"" ow", and te corre"ponding proce"" tim"own in 0i'it /- 7at are te imp&ication" of adi6erent num'er of repeat" for te ia LayerD %nteLayer(

    Te demand for one unit wi&& direct&y a6ect capaand&e producing te oter unit-

    )./ demand wi&& a#e a greater inuence "ince up te "ared e;uipment for a greater amount o

    Proces

    singTimebyLayer

    N65 N90

    Via 5.8minutes/ 4.2minutes

    5.9minutes/3.8minutes

    Inter-eta!

    "8.9minutes/ "5.9

    "#.$minutes/"5.5

    Tota& timeD one;uipment

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    10/15

    !re tere ad#antage" a" we&& a" adimp&ication" of te two proce"" ow"aring a majority of teir e;uipme

    !d#antage" Le"" e;uipment neededE &e"" capita& re;uired for prod

    e;uipment-

    Fi"ad#antage" Sp&itting order" into "ma&&er 'atce" to G&& ";uare cap

    e;uipment wi&& &ead to increa"ed o#eread-

    More u"e of te e;uipment wi&& &ead to fa"ter depreciTe )./ proce"" re;uire" more time on te "ared e; 293-. minute" >)./? #" )

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    11/15

    0i'it . "ow" te too& uti&i+ation 'a"ed on demand &oading, u"ing ttime" from 0i'it /- %f you wanted to add capacity to eiter )green and magenta ig&igted 'o re"pecti#e&y?-

    Canging te demand &oading 7en canging te demand 'y 2333 unit" for )./

    Cu 0C1 unit uti&i+ation dropped 2334 H

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    12/15

    Foe" ti" "ugge"t tat certain type" of emergencare ea"ier to accommodate tan oter"( Fo you t"ome type" of emergency order" wi&& 'e more co"fu&G&&(

    !dju"ting te num'er of repeat" Ia#ing 2 &e"" repeat for )./ Cu 0C1 uti&i+ation dropped 2334 H @

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    13/15

    7at "ou&d LC try to optimi+e e accommodate" te emergenorder(

    Femand &oading adju"tment" adSM!LL0ST impact on uti&i+ationrate-

    8ocu" on Capacity 1u&&*forward

    06ect of 'ringing in 2 new Cu 0C1 unitand 2 new 1oto*9A@ drop" uti&i+ation

    from 2334H

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    14/15

    06ect of capacity ecange Foe" not cange i""ue" wit Cu 0C1 and 1oto*9A@ 'eing at macapacityK

  • 7/24/2019 Taiwan Semiconductor Manufacturing Company (1)

    15/15

    !re tere recommendation" you mma$e to "enior management(

    Becau"e te e;uipment purca"e" were a&readp&anned, to u" it ma$e" te mo"t "en"e to pu&& to"e e;uipment purca"e" to accommodate torder-