**3* RIGGING ANALYSIS for STEAM DRUM LIFTING by WINCH Refer to ASME B30.26-2004 Rigging Hardware and Hoisting and Rigging Safety Manual (Book) 11/12/2011 Jakarta HaGun
9

TaiLing by Duo Crane

Oct 27, 2014

Download

Documents

HaGun Gunawan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TaiLing by Duo Crane

**3*

RIGGING ANALYSIS for STEAM DRUM LIFTING by WINCH Refer to ASME B30.26-2004 Rigging Hardware and Hoisting and Rigging Safety Manual (Book)

11/12/2011

Jakarta

HaGun

Page 2: TaiLing by Duo Crane

BAB I. RIGGING ANALYSIS

A. Connecting Steam drum to sling by using Double Wrap Basket Hitch

Page 3: TaiLing by Duo Crane

2

E-mail:[email protected]

Page 4: TaiLing by Duo Crane

3

E-mail:[email protected]

Lead Line Load Example A = 25 ton

1 line= 25 ton

Lead Line Load Example B = 25 ton

6 line= 4,167 ton ~ 5 ton

Load on structure A = 25 ton + 25 ton = 50 ton

Load on structure B = 25 ton + 5 ton = 30 ton

B. Angle effect to BLock Load

Analysis:

Load = 25 ton

Lead Line Load = 25 ton

6 line= 4,167 ton ~ 5 ton

Load Block C = Load x Factor α deg angle

Load Block C = 25 ton x 2 = 50 ton

Load on structure = Load + Lead Line Load

Lead Line Load = Load

Parts of Line at Load

Page 5: TaiLing by Duo Crane

4

E-mail:[email protected]

.

Load Block D = Lead Line Load x Factor α deg angle

Load Block D = 5 ton x 1.87 = 9.35 ton

.

Load Block E = Lead Line Load x Factor α deg angle

Load Block E = 5 ton x 0.84 = 4.2 ton

.

Load Block F = Lead Line Load x Factor α deg angle

Load Block F = 5 ton x 1.41 = 7.05 ton

Page 6: TaiLing by Duo Crane

5

E-mail:[email protected]

Page 7: TaiLing by Duo Crane

6

E-mail:[email protected]

Page 8: TaiLing by Duo Crane

7

E-mail:[email protected]

Page 9: TaiLing by Duo Crane

8

E-mail:[email protected]