Top Banner
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Illinois Center for Accelerator and Detector Devel Northern Illinois University and Deutsches Elektronen-Synchrotron (DESY)
10

Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.

Dec 22, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.

Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities

Northern Illinois Center for Accelerator and Detector DevelopmentNorthern Illinois University

andDeutsches Elektronen-Synchrotron (DESY)

Page 2: Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.

CALICE TCMT (Tail Catcher/Muon Tracker)

• Provide a reasonable snapshot of the tail-end of the shower for simulation validation

• Prototype detector with high-fidelity to what is imagined for a generic LCD

correcting for leakage

understanding the impact of coil muon reconstruction + PFA fake rate

• Designed to test new detector technology (Silicon photomultipliers) for the ILC

Page 3: Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.

CALICE TCMT (Tail Catcher/Muon Tracker)

Silicon Photomultiplier

Extruded Scintillator

Diagram of Full Detector

Stack designed and assembled at Fermi

Page 4: Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.

Beam Test at DESY(not to scale)

Collimator

Fingercounters(trigger)

TCMT(blue)

AHCAL(black)

Oct.-Nov. 2005

Page 5: Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.

TCMT Strips

AHCAL Tiles

3 GeV/c Events in TCMT and AHCAL

Page 6: Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.

Transverse scan

Page 7: Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.

Beam Test at Fermilab in February 2006

Fingercounters(trigger) TCMT

cassette

Page 8: Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.

CALICE TCMT

Calibration data showing single Photoelectron separation

• Moved into the facility 3rd week of Feb.

• Took beam in the last week ~ 5 days• Took 120 GeV/c protons, 16 GeV/c

(mostly pions) and some beam dump muon runs

• Calice DAQ Electronics chain reproduced and tested

Raw ADC count from120 GeV proton beam

On Avg. 10-12 p.e./mip

Page 9: Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.

Pedestal subtracted

noise

signal

Page 10: Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.

Plans

• Participation in the combined test beam at CERN.

• Approximately 1 month (August-October) of beam time

• Followed by longer tests at Fermilab in 2007