9 9 8 8 7 7 6 6 5 5 4 4 3 3 2 2 1 1 A A C C E E G G H H J J K K L L M M N N O O 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 15'-2 1/8" [(4625 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6098 mm)] 3.11 Water Jet Facility 3.10 Researcher Machine Shop 3.12 Welding+Powder Coating/Paint Booth 5.1.1 ECE Stores 3.14 Woodwork Shop 3.1 Maker Space 3.4 Coordination Manager 3.3 Project Storage Lockers 3.2 Storage Parts / Consumables 3.7 3D Printer Hub 148.04 m² 1.3 3rd Yr. Electronics Lab (72) 1.11 Copy, Shared, Student Access 3.9 Precision Machinest Workshop 3.6 Laser Cutting Station 2.3 Study/ILS Electrical Room Elevator Machine Room District Energy Comm. Room 3.13 Metal Storage Sub-Elec. Room 1.8 Equip. Support Area:Small Motor Labs 1.1 Small Motor Lab 3.5 Electronics Assembly Area 1.8.3 Research Equipment Storage KAISER BUILDING STAIR 1 STAIR 2 STAIR 3 2.10 Student Advisors (Student Services) 2.3 Study/ILS Existing Chemical Storage Room Mens Womens Pipe Shaft Above MAIN ENTRY LOBBY Dean Smith and Grace Lathe MAHO Milling Machine Arbor Press Nugier Co. Vertical Bandsaw Wickman Lathe Batman Press Brake Horizontal Bandsaw ECCO Machinery Metal Shear XLO Milling Machine Hardinge Lathe IMA Drill Press l 30 Bench and Tool Cabinet 1 2 3 4 5 Handtools and Workspace Neals Bench Handtools Bench Handtools Mark's Desk Vice and Workspace Bench and Tool Cabinet 6 Tool Cabinet Samona International Oscillating Machine Powermatic Belt Sander Delta Sander Planer-Jointer Chop Saw 2.3 Study/ILS 2.3 Study/ILS 300 450 Main Custodial Rm. 0 2 1 5 Scale 1: 100 B B D D F F Lab/Gen Shaft Elevator H/C W/C H/C W/C 1700 1700 1110 W/C 32'-9" [(9982 mm)] 25'-3" [(7696 mm)] 1'-0" [(305 mm)] 20'-0" [(6094 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 40'-0" [(12192 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 14'-2" [(4318 mm)] 32'-9" [(9982 mm)] 25'-3" [(7696 mm)] 1'-0" [(305 mm)] 14'-0" [(4267 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 21'-4 1/8" [(6505 mm)] 13'-8 1/2" [(4178 mm)] PROJECT SCOPE BOUNDARY 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6098 mm)] 1'-0" [(305 mm)] 6'-3" [(1905 mm)] 1'-0" [(306 mm)] 20'-0" [(6096 mm)] 20'-0" [(6094 mm)] LOADING / RECYCLING AREA EXISTING GARBAGE COMPACTORS 93550 93550 93550 93550 93550 93550 96446 93550 EXISTING PROPOSED FIRE ACCESS POINT ON L1 93550 PROPOSED 2778 2782 2781 2780 2779 2777 2776 2775 2772 2773 2774 2768 2769 2770 2771 2756 2757 2758 2759 2760 2761 2765 2764 2763 2762 2767 2766 MV1 MV2 MV3 MV4 2759 2760 2761 2765 2767 2762 2763 2758 2757 2768 2756 NOTE: "COURTYARD" SERIES TREES HAVE BEEN LOCATED BASED ON AERIAL PHOTOGRAPHY. LOCATIONS ARE APPROXIMATE.. 2769 2770 2771 2772 2773 2774 2778 2780 2781 2782 2779 2777 2776 2775 MV1 MV2 MV3 MV4 COURTYARD-1 COURTYARD-2 COURTYARD-3 COURTYARD-4 COURTYARD-5 COURTYARD-6 COURTYARD-7 COURTYARD-8 COURTYARD-9 NOTE: "MV" SERIES TREES ARE APPROXIMATE ONLY. MACLEOD BUILDING ICICS/CS BUILDING ENGINEERING STUDENT CENTRE BUILDING KAISER BULDING MAIN MALL ENGINEERING ROAD EXISTING OVERHEAD WALK EXISTING OVERHEAD WALK 2778 2782 2781 2780 2779 2777 2776 2775 2772 2773 2774 2768 2769 2770 2771 2756 2757 2758 2759 2760 2761 2765 2764 2763 2762 2767 2766 MV1 MV2 MV3 MV4 3.7m 12.1m 3.3m 9.6m 10.2m 8.8m 7.4m 6.7m 8.8m 12.0m 7.2m 3.3m 3.0m 2.0m 2.0m 2.7m 9.7m No construction access via this path. Tree protection fencing can be field-fitted around existing infrastructure. Minimum protection distance specified as "Critical Root Zone" must be maintained . New concrete/hardscape within the critical root zones of trees #2757 and #2758 must be installed above the existing grade, using low impact specification to be reviewed and approved by the project arborist. Arborist supervision is required for the trenching running parallel to the building and limit of work. Vertical shoring of the trench wall is required and low impact excavation (such as hydro-vac and airspade) should be implemented to limit impacts to tree roots. Existing concrete walkway may remain in use during construction, if the concrete is left in place. Any changes to the walkway layout, including the removal of the existing walkway, must be supervised by the project arborist. If walkway is to be replaced, a low impact specification must be implemented. Courtyard-3 Courtyard-1 Courtyard-2 Courtyard-4 Courtyard-5 Courtyard-6 Courtyard-7 Courtyard-8 Courtyard-9 2767 2766 2765 2764 2762 2761 2763 2760 2759 2758 2757 2768 2769 2770 2771 2772 2773 2774 2775 2776 2777 2779 2778 2780 2781 2782 MV1 MV2 MV3 MV4 2756 LEGEND NOTES 1. The location of un-surveyed trees on this plan is approximate. Their location and ownership cannot be confirmed without being surveyed by a Registered BC Land Surveyor. 2. All tree protection fencing must be built to the relevant municipal bylaw specifications.The dimensions shown are from the outer edge of the stem of the tree. 3. The tree protection zone shown is a graphical representation of the critical root zone, measured from the outer edge of the stem of the tree. ( 1 2 the trees diameter was added to the graphical tree protection circles to accommodate the survey point being in the center of the tree) 4. Any construction activities or grade changes within the Root Protection Zone must be approved by the project arborist. 5. This plan is based on a topographic and tree location survey provided by the owners’ Registered British Columbia Land Surveyor (BCLS) and layout drawings provide by the owners’ Engineer (P Eng). 6. This plan is provided for context only, and is not certified as to the accuracy of the location of features or dimensions that are shown on this plan. Please refer to the original survey plan and engineering plans. REFERENCE DRAWINGS 1. Base Survey by: CRITICAL ROOT ZONE TREE PROTECTION ZONE AND FENCING SURVEYED TREE TO BE RETAINED UN-SURVEYED TREE TO BE RETAINED Drawing title: Tree Management Plan Client: UBC Infrastructure Development - Project Services Project address: MacLeod Building, 2356 Main Mall, UBC Point Grey Campus, Musqueam Traditional Territory 3559 COMMERCIAL STREET VANCOUVER BC | V5N 4E8 T 604.733.4886 | F 604.733.4879 Page # 1 of 1 Date: 2020/04/23 Drawn by: DBR Page Size: TABLOID 11"x17" Drawing No: 1 TREE TO BE REMOVED (MUST BE SURVEYED)
1
Embed
TABLOID - 11 x 17...9 9 8 8 7 7 6 6 5 5 4 4 3 3 2 2 1 1 A A C C E E G G H H J J K K L L M M N N O O 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0" [(6096 mm)] 20'-0"
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
specified as "Critical Root Zone"must be maintained .
New concrete/hardscape withinthe critical root zones of trees
#2757 and #2758 must beinstalled above the existing
grade, using low impactspecification to be reviewed and
approved by the project arborist.
Arborist supervision is required for thetrenching running parallel
to the building and limit of work. Verticalshoring of the trench wall is required andlow impact excavation (such as hydro-vacand airspade) should be implemented to
limit impacts to tree roots.
Existing concrete walkway may remain in useduring construction, if the concrete is left inplace. Any changes to the walkway layout,including the removal of the existingwalkway, must be supervised by the projectarborist. If walkway is to be replaced, a lowimpact specification must be implemented.
Courtyard-3Courtyard-1
Courtyard-2
Courtyard-4
Courtyard-5
Courtyard-6Courtyard-7
Courtyard-8Courtyard-9
27672766
27652764
2762
2761
2763
2760
2759
2758
27572768
276927702771 2772
27732774
27752776
2777
27792778
2780
27812782
MV1MV2MV3
MV4
2756
LEGEND
NOTES
1. The location of un-surveyed treeson this plan is approximate. Theirlocation and ownership cannot beconfirmed without being surveyed bya Registered BC Land Surveyor.
2. All tree protection fencing must bebuilt to the relevant municipal bylawspecifications.The dimensions shownare from the outer edge of the stemof the tree.
3. The tree protection zone shown is agraphical representation of thecritical root zone, measured from theouter edge of the stem of the tree. (12the trees diameter was added to thegraphical tree protection circles toaccommodate the survey point beingin the center of the tree)
4. Any construction activities or gradechanges within the Root ProtectionZone must be approved by theproject arborist.
5. This plan is based on a topographicand tree location survey provided bythe owners’ Registered BritishColumbia Land Surveyor (BCLS) andlayout drawings provide by theowners’ Engineer (P Eng).
6. This plan is provided for context only,and is not certified as to the accuracyof the location of features ordimensions that are shown on thisplan. Please refer to the originalsurvey plan and engineering plans.
REFERENCE DRAWINGS
1. Base Survey by:
CRITICAL ROOT ZONE
TREE PROTECTION ZONE AND FENCING
SURVEYED TREE TO BE RETAINED
UN-SURVEYED TREE TO BE RETAINED
Drawing title: Tree Management Plan
Client: UBC Infrastructure Development - Project ServicesProject address: MacLeod Building, 2356 Main Mall, UBC Point Grey Campus, Musqueam Traditional Territory