31 st st st st Var. 99.12% 85.03% -14.08% -15.5% Y-Day Today Plan Act Var. OVER ALL STATUS 31 st st st st Var. 100.0% 100.0% 0.0% 0.0% Plan Act Var. * PRE TA -15.1% -13.5% 99.5% 86.0% * TA CRITICAL SYSTEM TODAY'S WEATHER Humidity-Day Max Humidity-Night Min Day Max.Temp. Night Min.Temp. Wind -Day Wind -Night SAFETY STATISTICS SAFETY SUMMARY MAJOR JOBS TA RIR: Hrs since last Recordable: Total Hrs ISBL Total Incidents Reported : CGC OVERHAUL Total Near Miss Reported: DRYER 301 A/B VIOLATION STATISTICS QUENCH TOWER EXCH E-805 OSBL TK-1244 RTRP SYSTEM READINESS ISBL OSBL CRITICAL SYSTEM VARIANCE ISBL CGC DRYERS QUENCH TOWER OSBL COOLING WATER STEAM SYSTEM NEWLY ADDED AWR JOBS PLANT ISBL OSBL DISCIPLINE PROGRESS MECHANICAL INSTRUMENT ELECTRICAL PROJECT IWR STATUS UNIT ACHEVIMENTS CONCERNS DESCON PROGRESS 520 313 204 3 71 55 13 Comp. 12 -0.2% 13 10 9 -14.81% -10.20% -18.23% OPEN -14.22% -0.98% 331 PLAN 357 RECD THERE IS ALWAYS TIME TO DO IT RIGHT 1 43 DESCON INECO TOTAL 483 26 126 % ACT 81 COMP 402 -12.44% 49 15 Jobs 28 15 PLAN ACT VAR 100.0% 99.8% Readiness In prog. 1.3% -94.8% 96.1% 10 Plan Unit Total -20.53% -2.46% -4.62% 23 14 ACT VAR Km/Hr Km/Hr 13 Act 13 31 76 26 58 17 % % O C O C CGC -18.6% -15.6% 98.9% 73.5% 100.0% 92.9% -7.1% 99.3% 80.7% 100.0% 84.4% -25.4% Tuesday, March 03, 2015 41 0 HK, Others 84.4% 23.3% 41 38 UNSAFE CONDITION -15.1% 2 10 SAFETY AWARENESS SAVE LIVES 0.14 VIOLATIONS Last 24 hrs 96696 PTW 0 28 0 LIFTTING PPE 0 0 3 COOLING WATER -2.46% -14.81% 0 11 SCAFFOLDI NG LT&T Total to Date ISBL 98.22% 99.42% UNSAFE ACT -61.02% -55.5% -13.5% 0 DRYERS -10.20% QUENCH TOWER -20.53% STEAM SYSTEM -4.62% 99.5% 86.0% * POST TA 1108560 0 29 * TA 0 UNIT PROGRESS % VAR -13.12% -16.90% OSBL 86.30% 81.32% Total % PLAN MAJOR CONTRACTOR Comp In-Prog Not.Started NEVER LET A JOB CONTINUE WHEN YOU OBSERVE AN UNSAFE CONDITION RLOC DESCON TRAGS INECO ELIOTT ABB ORYX SIEMENS E-807 channel head gasket replacement OSBL 1 Systems yet to be handed over. Quench tower - distributor installation 6/70 section. De-blinding Thermal Oxidizer refractory repairs completion. Good progress Quench tower bottom cleaning 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% OSBL ISBL 98.22% 99.42% 81.32% 86.30% % Plan % Act 100% 99.9% 99.3% 98.1% 100% 100% 93.4% 88.7% 84.4% 80.4% 94.4% 99.8% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% CAPE EAST CONTRACT DESCON INECO ORYX TRAGS % Act % Plan STEAM SYSTEM 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb 20-Feb 21-Feb 22-Feb 23-Feb 24-Feb 25-Feb 26-Feb 27-Feb 28-Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar 7-Mar 8-Mar 9-Mar 10-Mar %Plan % Actual INCIDENT ----------------NIL------------------ NEARMISS ----------------NIL------------------ SAFETY TOOL BOX Certified crane, crane operator and rigging staff. Always use certified and inspected rigging equipment (slings, belt shackle etc.) Never lift the load beyond Safe Working Load. Always lift the load as per crane load chart. Proper communication (Verbal, visual, radio) 0% 20% 40% 60% 80% 100% 1-Feb 3-Feb 5-Feb 7-Feb 9-Feb 11-Feb 13-Feb 15-Feb 17-Feb 19-Feb 21-Feb 23-Feb 25-Feb 27-Feb 1-Mar 3-Mar %Plan %Actual CGC SYSTEM STATUS HP BARREL END COVER FIXING QUENCH TOWER
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
31stststst Var.
99.12% 85.03% -14.08% -15.5%
Y-DayToday
Plan Act Var.
OVER ALL STATUS
31stststst Var.
100.0% 100.0% 0.0% 0.0%
Plan Act Var.
* PRE TA
-15.1%-13.5%99.5% 86.0%* TA
CRITICAL SYSTEM
TODAY'S WEATHER
Humidity-Day Max
Humidity-Night Min
Day Max.Temp.
Night Min.Temp.
Wind -Day
Wind -Night
SAFETY STATISTICS SAFETY SUMMARY
MAJOR JOBS TA RIR: Hrs since last Recordable: Total Hrs
ISBL Total Incidents Reported :
CGC OVERHAUL Total Near Miss Reported:
DRYER 301 A/B VIOLATION STATISTICS
QUENCH TOWER
EXCH E-805
OSBL
TK-1244
RTRP
SYSTEM READINESS
ISBL
OSBL
CRITICAL SYSTEM VARIANCE
ISBL
CGC
DRYERS
QUENCH TOWER
OSBLCOOLING WATER
STEAM SYSTEM
NEWLY ADDED AWR JOBS
PLANT
ISBL
OSBL
DISCIPLINE PROGRESSMECHANICAL
INSTRUMENT
ELECTRICAL
PROJECT
IWR STATUS
UNIT
ACHEVIMENTSCONCERNS
DESCON PROGRESS
520 313 204 3
71 55
13
Comp.
12
-0.2%
13
10 9
-14.81%
-10.20%
-18.23%
OPEN
-14.22%
-0.98%
331
PLAN
357
RECD
THERE IS ALWAYS TIME
TO DO IT RIGHT
1
43
DESCON
INECO
TOTAL 483
26
126
% ACT
81
COMP
402
-12.44%
49
15
Jobs
28
15
PLAN ACT VAR
100.0% 99.8%
Readiness In prog.
1.3% -94.8%96.1%
10
PlanUnit Total
-20.53%
-2.46%
-4.62%
23
14
ACT VAR
Km/Hr
Km/Hr
13
Act
13
31
76
26
58
17
%
%OCOC
CGC
-18.6%
-15.6%
98.9% 73.5%
100.0% 92.9% -7.1%
99.3% 80.7%
100.0% 84.4%
-25.4%
Tuesday, March 03, 2015
41
0
HK, Others
84.4% 23.3%
41 38
UNSAFE
CONDITION
-15.1%
2 10
SAFETY AWARENESS
SAVE LIVES
0.14
VIOLATIONS
Last 24 hrs
96696
PTW
0
28
0
LIFTTINGPPE
0
0 3
COOLING WATER -2.46%-14.81%
0
11
SCAFFOLDI
NGLT&T
Total to Date
ISBL98.22%99.42%
UNSAFE
ACT
-61.02% -55.5%
-13.5%
0
DRYERS -10.20% QUENCH TOWER -20.53% STEAM SYSTEM -4.62%